ML12320A314
Letter Sequence Acceptance Review | |
---|---|
Initiation Administration Results
Other: | |
MONTHYEARML1229109552012-10-16016 October 2012
[Table View]License Amendment Request Enhancements to Diesel Generator Surveillance Requirements Project stage: Request ML12320A3142012-11-14014 November 2012 Acceptance Review Results Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Request (ME9832 and ME9833) Project stage: Acceptance Review ML13155A4122013-06-12012 June 2013 Request for Additional Information Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Project stage: RAI ML14087A0602014-04-15015 April 2014 Units 1 and 2, Request for Additional Information Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Project stage: RAI ML14153A5622014-05-30030 May 2014 Response to Request for Additional Information Regarding Enhancements to Diesel Generator License Amendment Request Project stage: Response to RAI ML14251A2282014-09-0303 September 2014 Supplemental Information Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Request Project stage: Supplement ML14280A5222014-10-21021 October 2014 Amendment Enhancements to Diesel Generator Surveillance Requirements (Tac Nos. ME9832 and ME9833) Project stage: Acceptance Review 2014-10-21 |
ML12320A314 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 11/14/2012 |
From: | Nadiyah Morgan Plant Licensing Branch 1 |
To: | Furio P Calvert Cliffs |
Morgan N | |
References | |
TAC ME9832, TAC ME9833 | |
Download: ML12320A314 (1) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024
[Table view]NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24108A1352024-05-20020 May 2024 Email to Christian Williams Re Decision on the Exemption Request for Calvert Cliffs ML24108A1312024-05-15015 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Calvert Cliffs Exemption ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) NRC-2024-0085, Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request2024-05-0909 May 2024 Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24131A1212024-04-29029 April 2024 Email to State of MD Requesting Review of the EA for Calvert Cliffs Exemption Request ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23181A0732023-06-30030 June 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs TSTF-59A ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML23080A0672023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program ML23080A1002023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Repair Replacement of Saltwater System Buried Piping ML23026A1332023-01-26026 January 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Deletion of License Condition for Decommissioning Trust LAR ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2402022-03-23023 March 2022 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 03/22/2022 ML22075A1912022-03-16016 March 2022 NRR E-mail Capture - Acceptance for Review of Proposed Alternative Repair Method for Buried Class 3 Saltwater System Piping ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22059B0602022-02-28028 February 2022 Change to Review Schedule Regarding Proposed Alternative for Various Pressurizer Welds ML22060A0172022-02-23023 February 2022 NRR E-mail Capture - Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Withdraw of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21281A1402022-01-14014 January 2022 Acceptance for Review of Proposed Alternative ISI-05-018 for Examinations of Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A5712021-10-22022 October 2021 NRR E-mail Capture - Acceptance for Review of Proposed Alternative ISI-05-019 for Pressure Testing of Certain Portions of ASME Section XI Class 2 Auxiliary Feedwater Piping ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21286A5902021-10-0505 October 2021 Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21214A0202021-08-0909 August 2021 License Amendment Request to Change Spent Fuel Pool Cooling Design Basis ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21201A0482021-07-19019 July 2021 Acceptance of Requested Licensing Action to Change Spent Fuel Pool Cooling Design Basis ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21152A1232021-06-0101 June 2021 Acceptance for Review of Proposed Alternative ISI-05-016 Involving Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (EPID L-2021-LLR-0037) (Email) ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting 2024-09-06 Category:Acceptance Review Letter MONTHYEARML21281A1402022-01-14014 January 2022
[Table view]Acceptance for Review of Proposed Alternative ISI-05-018 for Examinations of Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles ML21152A1232021-06-0101 June 2021 Acceptance for Review of Proposed Alternative ISI-05-016 Involving Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (EPID L-2021-LLR-0037) (Email) ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML20015A4992020-01-15015 January 2020 Acceptance of Requested Licensing Action Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML18304A1392018-10-30030 October 2018 Acceptance of Requested Licensing Action Risk-Informed Approach to Closure for Generic Safety Issue-191 (EPID L-2018-LLA-0222 and EPID L-2018-LLE-0013) ML18271A1372018-09-28028 September 2018 Acceptance of Requested Licensing Action Re Amendment to Relocate Emergency Operations Facility and Joint Information Center ML18124A3162018-05-0404 May 2018 Acceptance of Requested Licensing Action Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17192A1752017-07-11011 July 2017 Plants, Units 1 and 2; Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station, Units 1 and 2; R. E. Ginna - Acceptance of License Amendment Request to Revise Emergency Action Level Schemes ML16326A2682016-11-21021 November 2016 2016/11/21 E-mail from R.Guzman to E.Villar - Acceptance Review Determination - Control Room Emergency Ventilation System LAR ML16306A4712016-11-0202 November 2016 Acceptance Review License Amendment Request - Control Room Emergency Ventilation System ML16091A4842016-03-30030 March 2016 2016/03/30 E-mail from R.Guzman to E.Villar - Acceptance Review Determination LAR to Revise TSs to Adopt Risk-Informed Completion Times TSTF-505, Rev 1 (MF7415, MF7416) ML14300A2202014-10-23023 October 2014 NRR E-mail Capture - Acceptance Review Results Regarding the Calvert Cliffs Containment Leakage Rate Testing Program License Amendment Request (MF4898-99) ML13101A1702013-04-0808 April 2013 MF0617 & MF0618 - Acceptance Review E-mail to Licensee - After Supplemental Information ML13031A3162013-01-31031 January 2013 E-mail - Acceptance Review Results Re Relief Request RR-ISI-04-08 Saltwater Piping Repair ML12320A3142012-11-14014 November 2012 Acceptance Review Results Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Request (ME9832 and ME9833) ML1204500382012-02-14014 February 2012 Acceptance Review for Calvert Cliffs RR-ISI-04-06 and RR-ISI-04-07 ML1201100172012-01-10010 January 2012 Acceptance Review for Calvert Cliffs TAC Nos. ME7672 & ME7673 ML1124404592011-09-0101 September 2011 Acceptance Review of Calvert Cliffs Amendment Application (TAC Nos. ME6831-ME6832) ML1122800522011-08-16016 August 2011 Acceptance Review for Proposed Exemption (TAC Nos. ME6738/9) ML1114508612011-05-25025 May 2011 Acceptance Review for Calvert Cliffs TACs ME6250/ME6251 ML1105500872011-02-24024 February 2011 Acceptance Review for Calvert Cliffs TAC Nos. ME5424/ME5425 ML1105500792011-02-24024 February 2011 Acceptance Review for Calvert Cliffs TAC No. ME5423 ML1030900292010-11-0505 November 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME4892 and ME4893 ML1029404192010-10-21021 October 2010 E-mail Acceptance Review for Calvert Cliffs Cilrt Extension Request ML1020900502010-07-28028 July 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME4220 Through ME4223 ML1011604482010-04-26026 April 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME3696/ME3697 ML1008100792010-03-22022 March 2010 Acceptance Review for Calvert Cliffs, License Amendment Request, Modify the Existing Note within Technical Specification 3.4.10, Pressurizer Safety Valves, TAC Nos. ME3348 & ME3349 ML1003409612010-02-23023 February 2010 Acceptance Review of Licensing Action Transition from Westinghouse to Areva Nuclear Fuel - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 ML1003509372010-02-0404 February 2010 Acceptance Review for Calvert Cliffs TAC Nos. ME2967 and ME2968 ML1000800212010-01-11011 January 2010 Acceptance Review for License Amendment Request to Transition to Areva Fuel-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2-(TAC Nos. ME2831 and ME2832) ML0915302092009-06-0202 June 2009 Acceptance Review for Calvert Cliffs Amendment Request (TAC Nos. ME1336/ME1337) ML0914706282009-05-27027 May 2009 Acceptance Review for Calvert Cliffs TSTF-479 and TSTF-497 Application ML0907100252009-03-11011 March 2009 Acceptance Review for Calvert Cliffs ISI-022 and ISI-023 (TAC Nos. ME0668 & ME0669) ML0905703152009-02-26026 February 2009 Acceptance Review Constellation and Edf Development - Application for Approval of License Transfers and Conforming License Amendment Request-Calvert Cliffs Nuclear Power Plant 1 and 2, Nine Mile Point Nuclear Station 1 and 2, and R.E. Ginna ML0829500742008-10-21021 October 2008 Acceptance Review for 10 CFR 50.61a Reporting Requirements ML0824608562008-09-0202 September 2008 Acceptance Review for TSTF-491 License Amendment Application 2022-01-14 |
Text
From: Morgan, Nadiyah To: Furio, Patricia S
Subject:
Acceptance Review Results Regarding Enhancements to Diesel Generator Surveillance Requirements License Amendment Request (ME9832 and ME9833)
Date: Wednesday, November 14, 2012 3:07:00 PM
- Pat, By letter dated October 16, 2012, Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and
- 2. The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
- Thanks, Nadiyah S. Morgan Calvert Cliffs Project Manager, NRR Nuclear Regulatory Commission (301) 415-1016 Nadiyah.Morgan@NRC.GOV