IR 05000261/2014007, October 20-24, 2014 and November 3-7, 2014 H.B. Robinson, Unit 2, Triennial Fire Protection
ML14356A329
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/17/2014
From: Shaeffer S M
NRC/RGN-II/DRS/EB2
To: Glover R M
Duke Energy Carolinas
References
IR 2014007
Download: ML14356A329 (27)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 17, 2014

Richard Michael Glover Site Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road

Hartsville, SC 29550

SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000261/2014007 Dear Mr. Glover

On November 7, 2014, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at the H. B. Robinson Steam Electric Plant, Unit 2. The purpose of the inspection was to evaluate the design, operational status, and material condition of the facility's fire protection program. The purpose was to also verify that B.5.b mitigating strategies were feasible in light of operator training, maintenance of necessary equipment, and any plant modifications.

On November 7, 2014, the NRC inspectors discu ssed the results of the inspection with you and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report. The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of R. Glover 2 NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov./reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket No. 50-261 License Nos. DPR-23

Enclosure: Inspection Report 05000261/2014007 w/Attachment: Supplemental Information

cc: Distribution via Listserv

_ML14356A329__________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE GRW PJB4 JLD2 WRM1 MXT2 GTH1 SMS NAME WISEMAN BRAATEN DYMEK MONK THOMAS HOPPER SHAEFFER DATE 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/12/2014 12/16/2014 12/17/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos: 50-261

License No: DPR-23

Report No: 05000261/2014007

Licensee: Duke Energy Progress, Inc.

Facility: H. B. Robinson Steam Electric Plant, Unit 2 Location: 3581 West Entrance Road Hartsville, SC 29550

Dates: October 20 - 24, 2014 (Week 1)

November 3 - 7, 2014 (Week 2)

Inspectors: P. Braaten, Reactor Inspector J. Dymek, Reactor Inspector W. Monk, Reactor Inspector M. Thomas, Senior Reactor Inspector G. Wiseman, Senior Reactor Inspector (Lead Inspector)

Approved by: Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

SUMMARY

Inspection Report 05000261/2014007; 10/20/2014 - 11/7/2014; H.B. Robinson Steam Electric Plant, Unit 2; Fire Protection (Triennial) and Other Activities.

This report covers an announced two-week period of inspection by a triennial fire protection team composed of five Regional inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5, dated February 2014.

No findings were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

1R05 Fire Protection

This report documents the results of a triennial fire protection inspection of the H.B. Robinson Steam Electric Plant, Unit 2 (RNP). The inspection was conducted in accordance with the guidance provided in NRC Inspection Procedure 71111.05T, "Fire Protection (Triennial)," dated January 31, 2013. The objective of the inspection was to review a minimum sample of three risk-significant fire areas to evaluate implementation of the Robinson Fire Protection Program (FPP). An additional objective was to review site specific implementation of one mitigating strategy from Section B.5.b of NRC Order EA-02-026, "Order for Interim Safeguards and Security Compensatory Measures" (commonly referred to as B.5.b), as well as the storage, maintenance, and testing of B.5.b mitigating equipment. The sampled three fire areas (FAs) and associated fire zones (FZs) were chosen based on a review of available risk information as analyzed by a senior reactor analyst from Region II, a review of previous inspection results, plant walk-downs of FAs/FZs, consideration of relational characteristics of combustible material to targets, and location of equipment needed to achieve and maintain safe shutdown (SSD) of the reactor. In selecting a B.5.b mitigating strategy sample, the team reviewed licensee submittal letters, safety evaluation reports (SERs), licensee commitments, B.5.b implementing procedures, and previous NRC inspection reports. Section 71111.05-05 of the IP specifies a minimum sample size of three fire areas and one B.5.b implementing strategy for addressing large fires and explosions. This inspection fulfilled the requirements of the procedure.

The specific FAs/FZs chosen for review were:

1. Fire Area G1, Fire Zone 25E, Station Service Transformers SST-2F and 2G and associated bus ducts, (inspection focused on area located at Columns c-f and 3-8) 2. Fire Area E, Fire Zone 10, South Cable Vault

3. Fire Area C, Fire Zone 5, Component Cooling Pump Room

The B.5.b Mitigation Strategy chosen for review was refueling water storage tank (RWST) makeup using the emergency diesel makeup pump.

The inspectors evaluated the licensee's FPP against applicable requirements, including RNP Renewed Operating License Condition 3.E, "Fire Protection"; Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix R, "Fire Protection Program For Nuclear Power Facilities Operating Prior To January 1, 1979"; 10 CFR 50.48; commitments to Appendix A of Branch Technical Position (BTP) Auxiliary and Power Conversion Systems Branch (APCSB) 9.5-1; RNP Updated Final Safety Analysis Report (UFSAR); related NRC safety evaluation reports (SERs); and plant Technical Specifications. The review of the B.5.b mitigating strategies was based on the RNP B.5.b submittal letters, related NRC SERs, licensee commitments, B.5.b implementing procedures, and previous NRC inspection reports. The team evaluated all areas of this inspection, as documented below, against these requirements. Specific licensing basis documents reviewed are listed in the Attachment to this report.

.01 Protection of Safe Shutdown Capabilities

a. Inspection Scope

The inspectors reviewed applicable sections of the RNP fire hazards analysis (FHA), post-fire safe shutdown analysis (SSA) Calculation RNP-E/ELEC-1216, "The Fire Safe Shutdown Analysis for H.B. Robinson Nuclear Plant," abnormal operating procedures (AOPs), dedicated shutdown procedures (DSPs), emergency operating procedures (EOPs), piping and instrumentation drawings (P&IDs), component cable routing information, the RNP UFSAR, and other supporting documents to verify that post-fire SSD could be achieved and maintained from the main control room (MCR) for a postulated fire in Fire Area G1/Fire Zone 25E, Fire Area E/Fire Zone 10, or Fire Area C/Fire Zone 5. The inspection activities focused on ensuring the adequacy of systems selected for reactivity control, reactor coolant makeup, reactor heat removal, process monitoring instrumentation, and support system functions. The inspectors reviewed the systems and components credited for SSD from the MCR to verify that one train would remain free of fire damage.

Section III.G.2 of 10 CFR Part 50, Appendix R, specified the separation and design requirements for protecting one train of cables and equipment necessary to achieve and maintain SSD conditions from fire damage when redundant trains are located within the same fire area. For instances where the separation requirements of Section III.G.2 were not met and local operator manual actions (OMAs) were utilized by the licensee in lieu of cable protection, the inspectors verified that the unapproved OMAs for the selected FAs/FZs were entered in the licensee's correction action program (CAP) for resolution. For OMAs not previously approved by the NRC, the licensee committed to adopt National Fire Protection Association (NFPA) Standard NFPA 805 and resolve the OMA issue during transition of the RNP fire protection licensing basis to the performance based standard of 10 CFR 50.48 (c). The specific procedures and references reviewed are listed in the Attachment.

b. Findings

No findings were identified.

.02 Passive Fire Protection

a. Inspection Scope

The inspectors walked down the selected FAs/FZs to evaluate the adequacy of the credited fire resistance of the reinforced concrete floor, wall, and ceiling fire barriers. This evaluation also included mechanical and electrical penetrations, fire doors, fire damper assemblies, and electrical raceway fire barrier systems (ERFBS) to ensure that at least one train of SSD equipment would be maintained free of fire damage. The inspectors walked down accessible portions of the selected FAs/FZs to observe the installed barrier assemblies and compared the as-built configurations to the approved construction details, supporting fire endurance test data, licensing basis commitments, and standard industry practices to assure that the respective fire barriers met their intended design function. The inspectors reviewed completed fire door, fire damper, ERFBS, and penetration seal inspection procedures for the selected FAs/FZs to confirm licensing basis commitments were met. The passive barriers reviewed are listed in the

.

b. Findings

No findings were identified.

.03 Active Fire Protection

a. Inspection Scope

The inspectors reviewed the redundancy of fire protection water sources and fire pumps to confirm that they were installed in accordance with the NFPA codes-of-record to satisfy the applicable separation, design requirements, and licensing basis requirements of the RNP FPP.

Current fire protection system health reports were reviewed and discussed with personnel knowledgeable in the operation and maintenance of these systems. The inspectors performed in-plant observations of the material condition and operational lineup for the operation of the fire water pumps and fire protection water supply distribution piping which included manual fire hose and standpipe systems for the selected FAs/FZs. Using operating and valve cycle/alignment procedures as well as engineering drawings, the inspectors examined the fire pumps and accessible portions of the fire main piping system to verify the operational status and the

alignment of system valves; and to verify the consistency of as-built configurations with engineering drawings. The inspectors also ex amined portions of the licensee's SSA and select electrical circuit routing drawings outlining the fire water pumps' power and pressure start capability to verify that the fire water system would be available to support fire brigade response activities during power block fire events.

The inspectors compared the fire detection and fire suppression systems for the selected FAs/FZs to the applicable NFPA Standard(s) by reviewing design documents and observing their as-installed configurations during in-plant walk-downs. The inspectors reviewed selected fire protection vendor equipment specifications, drawings, and engineering calculations to determine whether the fire detection and suppression methods were appropriate for the types of fire hazards that existed in the selected FAs/FZs. During plant walk-downs, the inspectors observed the placement of the fire hose stations, fire hose nozzle types, and fire hose lengths, as designated in the firefighting pre-plan strategies, to verify that they were accessible and that adequate reach and coverage was provided. Additionally, the inspectors reviewed completed periodic surveillance testing and maintenance program procedures for manual hose stations and automatic fire detection and suppression systems and compared them to required operability, testing, and compensatory measures. This review was to assess whether the test program was sufficient to validate proper operation of the fire detection and suppression systems in accordance with their design requirements. Inspectors verified the adequacy of the plant's fire extinguishers via material inspection walk-downs and procedural reviews. The inspection activities verified the 12-yr hydro and 6-yr service test dates of a sample of fire extinguishers. The inspectors conducted walk-downs in the selected FAs/FZs to inspect the spacing and material condition of the associated fire extinguishers in those areas. These walk-downs also confirmed that extinguisher access was properly maintained.

Aspects of fire brigade readiness were reviewed, including but not limited to, the fire brigade's personal protective equipment, self-contained breathing apparatuses, portable communications equipment, and other fire brigade equipment located in the fire brigade equipment staging and storage areas to determine accessibility, material condition, and operational readiness of equipment. During plant walk-downs, the inspectors compared firefighting pre-plan drawings to existing plant layout and equipment configurations and to fire response procedures for the selected FAs/FZs. This was done to verify that firefighting pre-fire plan drawings were consistent with the fire protection features and potential fire conditions within the area. The inspectors also verified that appropriate information was provided to fire brigade members to facilitate suppression of an exposure fire that could impact the SSD strategy. An operating shift of the fire brigade was randomly selected to conf irm that all members were currently qualified with regard to their medical and fire brigade training records. The inspectors reviewed fire brigade drill planning and evaluation report records for announced, unannounced, and off-site fire department drills performed in 2013 and 2014. Current mutual aid agreements with local outside

fire departments were also reviewed. Specific documents reviewed by the inspectors are listed in the Attachment.

b. Findings

No findings were identified.

04. Protection From Damage From Fire Suppression Activities

a. Inspection Scope

The inspectors evaluated whether water-based manual firefighting activities could adversely affect equipment credited for SSD, inhibit access to alternate shutdown equipment, or adversely affect local OMAs required for SSD in the selected FAs/FZs. The inspectors reviewed available documentation related to flooding analysis from fire protection activities as well as potential flooding through unsealed concrete floor cracks. The inspectors also observed the material condition of floor penetration seals and concrete floor slabs to assess the potential for damage to equipment below. Firefighting pre-plan strategies; fire brigade training procedures; fire damper locations; heating, ventilation and air conditioning (HVAC) drawings; and, fire response procedures were reviewed to verify that ventilation of heat and smoke through HVAC systems from a fire and drainage/runoff from installed fixed fire suppression systems and manual hose streams were addressed. The inspectors also verified access to safe shutdown equipment and OMAs would not be inhibited by smoke migration from one area to adjacent plant areas used to accomplish SSD.

Specific documents reviewed by the inspectors are listed in the Attachment.

b. Findings

No findings were identified.

.05 Alternative Shutdown Capability

a. Inspection Scope

The inspectors reviewed AOP-004, "Control R oom Inaccessibility," and DSP-002, "Hot Shutdown Using the Dedicated/Alternate Shutdown System," to verify that the procedures were consistent with the SSD methodology specified in the SSA for post-fire SSD in fire areas that credited alternative shutdown outside the MCR. The inspectors reviewed training lesson plans for licensed and non-licensed operators to verify that the training reinforced the alternative

shutdown methodology in the SSA and the procedures. The inspectors also reviewed shift turnover logs and shift manning to verify that personnel required for SSD using the alternative shutdown systems and procedures were available onsite, exclusive of those assigned as fire brigade members. None of the fire areas selected for review during this inspection credited alternative shutdown capability for a postulated fire.

b. Findings

No findings were identified.

.06 Circuit Analyses

a. Inspection Scope

The inspectors reviewed the FHA, Safe Shutdown Compliance Assessment Report, Fire Safe Shutdown Program Manager Database (FSSPMD), and the licensee circuit analysis documents to verify that the licensee properly identified required and associated circuits that could impact post-fire SSD for the selected FAs/FZs. For the sample of components selected, the inspectors reviewed piping and instrumentation drawings, electrical schematics, and wiring diagrams to identify power, control, and instrumentation cables necessary to support safe shutdown equipment operation. The review also focused on ensuring that the required functions for post-fire safe shutdown and the corresponding equipment specified as necessary to perform those functions were included in the procedures. The inspectors conducted walk-downs of the selected FAs/FZs to help determine if the credited components relied upon for SSD would still be available given a fire in the chosen FAs/FZs.

The inspectors reviewed the licensee's evaluations for spurious circuit failure scenarios specified in the circuit analysis to determine if the sample list of components challenged the assumptions made in the SSD analysis. The in spectors reviewed the licensee's electrical coordination study calculations to determine if power supplies were susceptible to fire damage, which would potentially affect the credited components for the FAs/FZs chosen for review. The specific components and references reviewed are listed in the Attachment.

b. Findings

No findings were identified.

.07 Communications

a. Inspection Scope

The inspectors reviewed plant communication capabilities to evaluate the availability of the portable radio system to support plant personnel in the performance of OMAs to achieve and maintain SSD, as credited in the RNP UFSAR, Section 9.5.2, "Communications Systems" and the NRC approved FPP. The inspectors perform ed plant walk-downs with the licensee's operations staff to assess the credited methods of communication used to complete SSD actions as specified in post-fire SSD procedures for the selected FAs/FZs. The inspectors also reviewed the communication systems available at different locations within the plant that would be relied upon to support fire event notification and fire brigade firefighting activities to verify their availability at those locations. Additionally, the inspectors assessed the operator's ability to communicate based upon observation of a licensee-conducted communications test with the SSD and fire brigade portable radios.

Inspector walk-downs of the fire brigade and SSD storage locations were conducted to verify the material condition of the fire brigade and SSD communication system equipment. Radio vendor documentation was reviewed to verify the radios' battery endurance supported full 12-hour shift operations. Additionally, the inspectors reviewed preventive maintenance and surveillance test records to verify that the communication equipment was being properly maintained and tested. Specific documents reviewed by the team are listed in the Attachment.

b. Findings

No findings were identified.

.08 Emergency Lighting

a. Inspection Scope

The inspectors verified the adequacy of the plant

's emergency lighting systems through review of design and maintenance aspects and inspection walk-downs of the fixed 8-hour battery pack emergency lighting units (ELUs), as required by 10 CFR 50 Appendix R, Section III.J and the RNP approved FPP. The inspectors performed plant walk-downs of the post-fire SSD procedures for the selected FAs/FZs to observe the placement and coverage area of the ELUs

required to illuminate operator access and egr ess pathways, and any equipment requiring local operation and/or instrumentation monitoring for post-fire SSD. In some instances, operations personnel performed onsite tests of the ELUs to verify operation. This review also included examination of whether ELUs were provided for the primary and secondary fire emergency equipment storage locations and dress-out areas in support of fire brigade operations should power fail during an emergency. In areas with less than adequate lighting, it was verified that the licensee incorporated appropriate compensatory measures (operators are required to carry flashlights and spares stored in SSD and fire brigade equipment lockers) in order to complete

SSD actions.

The inspectors also reviewed completed test records of ELU battery 8-hr post-service capacity tests, completed surveillances, system health reports, and maintenance tests to ensure that they were sized, tested, rated for at least an 8-hr capacity and maintained consistent with vendor guidance, license requirements, and licensee commitments. The inspectors reviewed the ELU vendor manual to ensure that the ELUs were being maintained consistent with the manufacturer's recommendations and verified the battery storage conditions and maintenance practices were also being followed in accordance with the vendor guidance. Specific documents reviewed by the team are listed in the Attachment.

b. Findings

No findings were identified.

.09 Cold Shutdown Repairs

a. Inspection Scope

The inspectors reviewed DSP-007, "Cold Shutdown Using the Dedicated/Alternate Shutdown System" to determine if any repairs were necessary to achieve cold shutdown. For the selected FAs/FZs, SSD procedure DSP-007 described equipment necessary to repair and operate structures, systems, and components needed to bring the unit from hot standby to cold shutdown. The inspectors reviewed procedure DSP-011, "RHR System Temperature Indication Repair Procedure," which listed storage locations of this equipment. The inspectors reviewed surveillances and verified through observation that the repair materials were available on the site. Specific documents reviewed are listed in the Attachment.

b. Findings

No findings were identified.

.10 Compensatory Measures

a. Inspection Scope

(1) Compensatory Measures for Degraded Fire Protection Components The inspectors reviewed the administrative controls for out-of-service, degraded and/or inoperable fire protection features (e.g. detection and suppression systems, and passive fire barriers) to verify that short-term compensatory measures were adequate for the degraded function or feature until appropriate corrective actions could be taken. The inspectors reviewed impairment and compensatory measures forms for fire watch tours to confirm they were being performed within the allowable time frames. Field interviews with fire watch personnel were conducted to assess their familiarity with job duties and responsibilities; and to verify that they were qualified to perform the task.
(2) Operator Manual Actions as Compensatory Measures for Safe Shutdown

The inspectors reviewed applicable sections of RNP Unit 2 Calculation RNP-E/ELEC-1216, AOPs, EOPs, and DSPs, to identify OMAs credited for SSD in the selected FAs/FZs. In cases where local OMAs were credited in lieu of cable protection or separation of SSD equipment, the

inspectors reviewed NCR 205333, "RIS 2006-010 Manual Action Evaluation," and calculation RNP-E-8.050, "Appendix R Transient Analysis and Timeline Evaluation for H.B. Robinson," to verify that the unapproved OMAs for the selected FAs/FZs had been identified by the licensee, entered in the CAP, and demonstrated to be feasible compensatory measures during the transition to NFPA 805. Additionally, the inspectors performed in-plant walk-downs of a sample of the OMAs to verify that they were feasible, utilizing the guidance of NRC IP 71111.05T, paragraph 02.02.j.2.

b. Findings

No findings were identified.

.11 Review and Documentation of Fire Protection Program Changes

a. Inspection Scope

The inspectors reviewed a sample of fire protection system modifications and changes made between January 2010 and October 2014 to assess the licensee's effectiveness to determine if the changes to the FPP were in accordance with the fire protection license condition and had no

adverse effect on the ability to achieve SSD. Design change documents reviewed by the inspectors are listed in the Attachment.

b. Findings

No findings were identified.

.12 Control of Combustibles and Ignition Sources

a. Inspection Scope

The inspectors conducted tours of numerous plant areas that were important to reactor safety, including the selected FAs/FZs, to verify the licensee's implementation of FPP requirements as described in the RNP FPP. For the selected FAs/FZs, the inspectors evaluated generic fire protection training; fire event history; the potential for fires or explosions; the combustible fire load characteristics; and the potential exposure fire severity to determine if adequate controls were in place to maintain general housekeeping consistent with the UFSAR, administrative procedures, and other FPP procedures. There were no hot work activities ongoing within the selected FAs/FZs during the inspection and observation of this activity could not be performed.

b. Findings

No findings were identified.

.13 B.5.b Inspection Activities

a. Inspection Scope

The inspectors reviewed, on a sample basis, the licensee's mitigation measures to provide makeup to the RWST in accordance with the extreme damage mitigation guidelines (EDMG),

utilizing the emergency diesel makeup pump for large fires and explosions. To verify that the licensee continued to meet the requirements of their B.5.b license condition and 10 CFR 50.54 (hh)(2), the inspectors reviewed applicable procedures to ensure that they were adequate and were being maintained; equipment was properly staged and was being maintained and properly tested; and plant personnel received training on implementation of the strategy. The inspectors conducted an independent audit and inventory of required equipment and a visual inspection of the dedicated credited power and water sources. The inspectors performed a walk-down of the procedure with licensee personnel to verify that the procedural actions were feasible. Specific documents reviewed are listed in the Attachment.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA2 Problem Identification and Resolution

a. Inspection Scope

A review of condition report CR 664223 (see NCV 05000261/2014002-04, ADAMS No.

ML14119A278) was performed regarding previously identified concerns associated with the properties of diesel fuel oil used at RNP in extremely cold weather, with specific focus on potential adverse effects on the starting capability of the outdoor diesel-driven fire pump. The licensee initiated CR 715032 to address precautionary measures to be taken during in extremely cold weather for the diesel driven fire pump and other important diesels onsite. The inspectors also reviewed CRs 567517 and 567632 (see NCV 05000261/2012008-02, ADAMS No. ML12363A149) associated with the licensee's ELU System 10 CFR 50.65 a

(1) Maintenance Rule (MR) Corrective Action plan. The licensee placed the ELU system in MR a
(1) status, set ELU System maintenance performance goals, implemented actions to examine their MR performance criteria definition, and has maintained corrective actions in place.

Additionally, the ELU System Corrective Acti on Plan has become a Duke Corporate level initiative to ensure the nuclear fleet is maintaining an adequate emergency lighting system and maintenance program. A timeframe of at least two more years remained to complete the Maintenance Rule Corrective Action plan.

The inspectors reviewed a sample of licensee independent audits, self- assessments, and system/program health report for thoroughness, completeness and conformance to FPP requirements described in Appendix 9.5.1A of the RNP UFSAR. The inspectors reviewed CAP documents, including completed corrective actions and operating experience program documents, to ascertain whether industry identified fire protection issues (actual or potential)affecting RNP were appropriately entered into the corrective action program for resolution.

Items included in the operating experience program effectiveness review were NRC Information Notices, Regulatory Issue Summaries, industry or vendor generated reports of defects and non-compliances submitted pursuant to 10 CFR Part 21, and vendor information letters. The documents reviewed are listed in the Attachment.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On November 7, 2014, the lead inspector presented the preliminary inspection results to Mr. M. Glover and other members of the licensee's staff, who acknowledged the results. The licensee acknowledged the results. Proprietary information was not included in this inspection report.

ATTACHMENT:

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

J. Brady, General Office Regulatory Affairs
S. Connelly, Regulatory Affairs
M. Conrad, Safe Shutdown Analysis
H. Curry, Manager, Training
J. Ertman, Manager, Fleet Fire Protection
P. Fagan, Manager, Engineering Support
M. Glover, Site Vice President
T. Groch, Fire Protection Program
R. Hightower, Manager, R

egulatory Affairs

J. Kammer, General Manager, Engineering
K. Lavin, Fleet Fire Protection
J. Little, Manager, Shift Operations
K. McGee, Site Fire Marshall
F. Modlin, Safe Shutdown Analysis
S. Peavyhouse, Director, Organizational Effectiveness
D. Schroeder, Manager, Engineering Programs
S. Williams, Manager, Chemistry

NRC Personnel

K. Ellis, Senior Resident Inspector,
H.B. Robinson Steam Electric Plant C. Scott, Resident Inspector,
H.B. Robinson Steam Electric Plant S. Shaeffer, Chief, Engineering Branch 2, Division of Reactor Safety, Region II

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed

None

Discussed

None

LIST OF DOCUMENTS REVIEWED

LIST OF FIRE BARRIER FEATURES INSPECTED (Refer Report Section 1R05.02 and 1R05.03)

Fire Barriers Floors/Walls/Ceiling Identification
Description Walls, Floor and Ceilings
FZ 5
FZ 10
FZ 25E
Fire Damper Identification
Description
FD-18, 19, 20, 21 and 216
FZ 5 to FZ 7
FD-24 and 25
FZ 5 to
FZ 21
Fire Door Identification
Description
FDR-3
FZ 5 to FZ 7
FDR-6 and 7
FZ 10 to
FZ 25C
FDR- 8A and 8B
FZ 10 to FZ 9
Fire Barrier Penetration Seal Identification
Description Penetration 2522
FZ 5 to FZ 7 Penetration 4001 & 4057
FZ10 to
FZ 21
Electrical Raceway Fire Barrier System Identification
Description Interam E54A ERFBS
FZ 5
LIST OF COMPONENTS REVIEWED

(Refer to Report Sections 1RO5.05- and 1RO5-.06)

Components Sampled
FC254-0527, Station Service Transformer,
SST-2F FC254-0520, Station Service Transformer,
SST-2G
Unit 2 Electric Driven Fire Water Pump
CC-716A, RCP Cooling Water Inlet Isolation MOV
CC-716B, RCP Cooling Water Inlet Isolation MOV
Service Water Pump D Transfer Switch
MCC-5 Transfer Switch
2/17B, EDG A to Bus E1 BKR
2/27B, EDG B to Bus E2 BKR
RCS 10 KVA Voltage Regulator Transformer
LIST OF DOCUMENTS REVIEWED

Procedures

AD-OP-ALL-1000, Conduct of Operations, Rev. 2
AOP-004, Control Room Inaccessibility, Rev. 24
AOP-034, Security Events, Rev. 26
AOP-041, Response to Fire Event, Rev. 7
CM 621, Structural, Mechanical and Electrical Penetration Fire Barriers, Rev. 36
CP-001, Chemistry Monitoring Program, Rev. 122
CP-DSL-402, Diesel Fuel Oil Storage Tank Sampling, Rev. 4
DSP-001, Alternate Shutdown Diagnostic, Rev. 14
DSP-002, Hot Shutdown Using the Dedicated/Alternate Shutdown System, Rev. 52
DSP-004, Hot Shutdown from the Control Room with a Fire in the CCW Room, Rev. 28
DSP-005, Hot Shutdown from the Control Room with a Fire in the N Cable Vault, Rev. 29
DSP-006, Hot Shutdown from the Control Room with a Fire in the South Cable Vault, Rev. 21
DSP-007, Cold Shutdown Using the Dedicated/Alternate Shutdown System, Rev. 32
DSP-011, RHR System Temperature Indication Repair Procedure, Rev. 2
DSP-015, Hot Shutdown from the Control Room with a Fire in the Turbine Building, Rev. 12
EDMG-000, Extreme Damage Initial Actions, Rev. 18
EDMG-001, Extreme Damage Event Early Actions and Response Determination Criteria, Rev. 4
EDMG-002, Refueling Water Storage Tank (RWST), Rev. 8
EDMG-010, Emergency Diesel Make-up Pump (EDMP) Setup and Operation, Rev. 6
EGR-NGGC-0102, Safe Shutdown / Fire Protection Review, Rev. 36
EOP-E-0, Reactor Trip or Safety Injection, Rev. 6
EOP-ECA-0.0, Loss of All AC Power, Rev. 0
EOP-ES-0.1, Reactor Trip Response, Rev. 7
EPL0004R, EDMG Practical Exercise, Rev. 4
EPP-1, Loss of All AC Power, Rev. 45
EPP-21, Energizing Pressurizer Heaters from Emergency Busses, Rev. 21
EPPRO-02, Maintenance and Testing, Rev. 42
FIR-NGGC-0001, Fire Detection Systems, Rev. 2
FIR-NGGC-0003, Hot Work Permit, Rev. 7
FIR-NGGC-0004, Determination of Combustible Loading and Equivalent Fire Severity, Rev. 4
FIR-NGGC-0101, Fire Protection Nuclear Safety Capability Assessment, Rev. 4
FP-001, Fire Emergency, Rev. 64
FP-003, Control of Transient Combustibles, Rev. 30
FP-004, Duties of a Fire Watch, Rev. 15
FP-006, Handling of Flammable Liquids and Gases, Rev. 4
FP-010, Housekeeping Controls, Rev. 31
FP-012, Fire Protection System Minimum Equipment and Component Actions, Rev. 18
FP-013, Fire Protection Systems Surveillance Requirements, Rev. 10
FP-014, Control of Fire Barrier Penetrations, Rev. 10
OMM-001-12, Minimum Equipment List and Shift Relief, Rev. 82
OMM-002, Fire Protection Manual, Rev. 49
OMM-009, Locked Valve List, Rev. 97
OP-602, Dedicated Shutdown, Rev. 71
OP-801, Fire Water System, Rev. 62
OP-802, Low Voltage Fire Detection and Actuation Systems, Rev. 16
OP-805, Carbon Dioxide Suppression Systems, Rev. 18
OST-013, Weekly Checks and Operations, Attachment 2, Page 8, Rev. 117
OST-600-1, B.5.b Designated Hose Service Test for Trailer 1, Rev. 1
OST-600-2, B.5.b Designated Hose Service Test for Trailer 2, Rev. 1
OST-602, Unit 2 Fire Water System Flow-path Verification (Monthly) and Valve Cycling (Annual), Rev. 51
OST-603, Motor Driven Fire Water Pump and Engine Driven Fire Water Pump Test (Weekly), Rev. 36
OST-608, Unit 1 Fire Water System Flow-path Valves, Rev. 20
OST-609, Inspection and Flushing of the Interior Fire Hose Stations (Annually), Rev. 29
OST-610, Unit 2 Portable Fire Extinguishers, Fire Hose Stations and Houses (Monthly), Rev. 57
OST-611-2, Low Voltage Fire Detection and Actu ation System Zones 3, 4 and 5 (Semi-annual),
Rev. 3
OST-611-5, Low Voltage Fire Detection and Actuation System Zones 9 and 10 (Semi-annual), Rev. 9
OST-622, Fire Suppression Water System Motor Driven Fire Pump Test, Rev. 28
OST-623, Fire Barrier Penetration Seal Inspection (18-month), Rev. 25
OST-624, Fire Damper Inspection (18-month), Rev. 24
OST-625, Fire Door Inspection (Semi-annual), Rev. 32
OST-639, Fire Equipment Inventory (Monthly), Rev. 34
OST-633, Interior Fire Hose Hydrostatic Test, Rev. 25
OST-646, Fire Suppression Water System Engine Driven Fire Pump Test, Rev. 20
OST-648, CCW Room One-hour Rated Fire Barrier Wrap Inspection (18-month), Rev. 5
OST-656, CCW Pump Room Sprinkler System Drain and Alarm Test (Semi-annual), Rev. 7
OST 690, Unit 1 Fire Suppression Water System Motor Driven Fire Pump Test and Fire Hydrant
Flush, Rev. 11
OST-692, Unit 1 Fire Suppression Water System Flow Test (Three-year), Rev. 10
OST-936, Emergency Equipment Inventory (Quarterly), Rev. 23
PLP-076, Portable Transceiver Usage, Rev. 11
PM-E-ELS-ELIGHT-001, Self-Contained Exide DC Emergency Lighting System, Rev. 0
PM-047, Emergency Lighting System Unit Load Test, Rev. 6
PM-418, Smoke Detector Sensitivity Checks, Rev. 1
TPP-219, Fire Protection Training Program, Rev. 23

Drawings

G-190304,
HVAC-Turbine, Fuel, Aux., Reactor & Waste Building, Sheet 2 of 5, Rev. 39
G-190304,
HVAC-Turbine, Fuel, Aux., Reactor & Waste Building, Sheet 3 of 5, Rev. 26
G-190305, HVAC Auxiliary Bldg. & Turbine Bldg. Ground Floor Plan, Sheet 2 of 3, Rev. 1
G-190495, Reactor Auxiliary Building Ground & Mezzanine Floor Plans Plumbing & Drainage,
Rev. 9 G-190496, Reactor Auxiliary Building Miscellaneous Floor Plans-Roof Riser Diagrams & Details Plumbing & Drainage, Rev. 10
G-190304, HVAC - Turbine, Fuel, Aux, Reactor and Radwaste Building, Rev. 39
G-190626, 480 & 120/208 Volt One Line Diagram, Rev. 25
G-190626, Main & 4160 Volt One Line Diagram, Rev. 10 B-190627, Aux. Electrical Distr. System - MMC No. 5, Rev. 6 B-190628,
HVE-17 Control Wiring Diagram, Rev. 19
B-190628,
HVE-18 Control Wiring Diagram, Rev. 16
B-190628, Service Water Pump "D" Control Wiring Diagram, Rev. 16
B-190628, Fire Water Pump Control Wiring Diagram, Rev. 18 B-190628, Rod Position Indication Control Wiring Diagram, Rev. 17
B-190628,
CC-716A RCP Cooling Water Inlet Isolation, Rev. 17 B-190628,
CC-716B RCP Cooling Water Inlet Isolation, Rev. 20
B-190628, 480V Breaker 52/18B Control Wiring Diagram, Rev. 25 B-190628,
RHR-744A Control Wiring Diagram, Rev. 19 B-190628,
HVH-1 Control Wiring Diagram, Rev. 35
HBR-8751, Fire Protection Modification CO2 Suppression System North and South Cable Vault, Sheet 1 of 3, Rev. 2
HBR-8751, Fire Protection Modification CO2 Suppression System North and South Cable Vault, Sheet 2 of 3, Rev. 2
HBR-8751, Fire Protection Modification CO2 Suppression System North and South Cable Vault,
Sheet 3 of 3, Rev. 0
HBR2-8255, Fire Protection System Intake Structure Flow Diagram Sheet 1, Rev. 18
HBR2-9716, Fire Barrier Penetrations, Sheet 69, Rev. 2
HBR2-9716, Fire Barrier Penetrations, Sheet 176, Rev. 4
HBR2-9717, Fire Area/Zone Locations, Sheet 1, Rev. 4
HBR2-9717, Fire Area / Fire Zone Locations, Sheet 2, Rev. 12
HBR2-9717, Fire Area / Fire Zone Locations, Sheet 3, Rev. 4
HBR2-9717, Fire Area/Fire Zone Locations, Sheet 4, Rev. 6
HBR2-9717, Fire Area/Fire Zone Locations, Sheet 5, Rev. 1
HBR2-9717, Fire Area / Fire Zone Locations, Sheet 7, Rev. 1
HBR2-9800, Plot Plan, Rev. 35
HBR2-9868, Unit 1 & Unit 2 Fire Water Yard Piping, Sheet 1, Rev. 17
HBR2-10773, Zone 9 and 10 CO2 System (North / South Cable Vault), Rev. 1
HBR2-11937, Fire Pre-plan, Auxiliary Building, First Level General Layout, Sheet 1, Rev. 1
HBR2-11937, Fire Pre-plan, Auxiliary Building, Hallway Central, Sheet 2, Rev. 1
HBR2-11937, Fire Pre-plan, Auxiliary Building, Hallway North and Adjoining Rooms, Sheet 3,
Rev. 1
HBR2-11937, Fire Pre-plan, Auxiliary Building, South Cable Vault, Sheet 6, Rev. 0
HBR2-11937, Fire Pre-plan, Turbine Building Mezzanine Level, Sheet 58, Rev. 2
HBR2-11937, Fire Pre-plan, Turbine Building 4160 V Switchgear Room, Sheet 59, Rev. 0
HBR2-190181, General Arrangement, Turbine Building, Ground Floor Plans, Rev. 24
HBR2-190182, General Arrangement, Turbine Building, Mezzanine Plans, Rev. 19
HBR2-190186, General Arrangement, Reactor Building, Mezzanine Sheet, Rev. 14
HBR2-G190190, General Arrangement, Reactor Auxiliary Building-Plans, Rev. 31
OST- 611-2, Page 10 of 14, Detector and Pull Station Locations, CCW Pump Room, Rev. 3
OST- 611-5, Page 19 of 22, Detector and Pull Station Locations, South Cable Vault, Rev. 3 5359-C, Pump and Tank Foundations at Intake Structure, Rev. 1 23442, Cummins Fire Diesel harness, Dual Fan, 24V Enclosure Sheet 1 & 2, Initial Issue AD42A521, Cummins Fire Diesel, Schematic Electric FP Drive Electric Fans Incorporated Sheet

& 2, Initial Issue

Calculations, Evaluations & Specifications
CPL025.0200.0001, Combustible Loading Calculation, Rev. 34
GID/R87038/0014, Design Basis Document-Fire Barrier Systems, Rev. 3
NUS Corporation Specification 5137-M-200, Smoke/Seal Smoke Dampers, Rev. 2
RNP-E/ELEC-1216, Fire Safe Shutdown Analysis for H.B. Robinson Nuclear Plant, Rev. 0
RNP-E/ELEC-1216, Fire Safe Shutdown Analysis, SSD Compliance Report FA C, Rev. 0
RNP-E/ELEC-1216, Fire Safe Shutdown Analysis, SSD Compliance Report FA E, Rev. 0
RNP-E/ELEC-1216, Fire Safe Shutdown Analysis, SSD Compliance Report FA G1, Rev. 0
RNP-C/SPPT-1482, Electrical Cable Supports Calculation, Rev. 3
RNP-E-2.009, Overcurrent Protection Emergency Bus E1 & E2 Emergency Supply, Rev. 3
RNP-E-8.016, EDG Static and Dynamic Analysis for HBR Unit 2, Rev. 9
RNP-E-6.018, DC Control Circuit Loop Analysis, Rev. 3
RNP-E-6.018. A001.17B, Panel A, Circuit 1, Compt. 17B, Rev. 0
RNP-E-8.050, Appendix R Transient Analysis and Timeline Evaluation for H.B. Robinson - Unit No. 2, Rev. 1
RNP-E-9.005, Fuse Analysis for Emergency Buses E1 and E2, Rev. 2
RNP-E-9.008, Control Circuit Fuse Analysis for 4.16KV Switchgear Busses 1, 2, 3 and 4, Rev. 2
RNP-F/PSA-0009, Assessment of Internally Initiated Flood Events, Rev. 2
RNP-M/BRMK-1001, Code Compliance Evaluation, NFPA 10 Portable Fire Extinguisher, Rev. 0
RNP-M/BRMK-1002, Code Compliance Evaluation, NFPA 30, Flammable and Combustible
Liquids Code, Unit 2 Diesel Fuel Storage Tanks, Rev. 3
RNP-M/BRMK-1003, Code Compliance Evaluation, NFPA 80, Standard for Fire Doors and Windows, Power Block, Rev. 2
RNP-M/BRMK-1005, Code Compliance Evaluation, NFPA 12, NFPA 72D, Standard for the
Installation, Maintenance and Use of Proprietary Protection Signaling Systems, Rev. 1
RNP-M/BRMK-1006, Code Compliance Evaluation, NFPA 72E, Standard on Automatic Fire Detectors, Rev. 4
RNP-M/BRMK-1007, Code Compliance Evaluation, NFPA 12, Carbon Dioxide Extinguishing
Systems, Rev. 3
RNP-M/BRMK-1009, Code Compliance Evaluation, NFPA 13, Standard for the Installation of
Sprinkler Systems, Rev. 7
RNP-M/BRMK-1010, Code Compliance Evaluation, NFPA 14, Standpipe and Hose Systems, Rev. 7
RNP-M/BRMK-1012, Code Compliance Evaluation, NFPA 20, Centrifugal Fire Pumps, Rev. 2
RNP-M/BRMK-1013, Code Compliance Evaluation, NFPA 24, Standard for Outside Protection,
Rev. 2
RNP-M/BRMK-1015, Code Compliance Evaluation, NFPA 50A, Standard for Gaseous Hydrogen Systems at Customer Sites Centrifugal Fire Pumps, Rev. 0
RNP-M/MECH-1676, Evaluation of Non-Standard Fire Barrier Penetration Seals in Fire Zone 5, Rev. 4
RNP-M/MECH-1681, Evaluation of Non-Standard Fire Barrier Penetration Seals in Fire Zone
10, Rev. 2
RNP-M/MECH-1729, Hydraulic Analysis of the Component Cooling Water Pump Area Automatic Sprinkler System, Rev. 0
RNP-M/MECH-1785, Alternate Spent Fuel Pool and RCS Makeup Water, Rev. 2
RNP-M/MECH-1797, Robinson Nuclear Plant Thermal Hydraulic Response to Appendix R
Cooldown Scenarios, Rev. 2
SP-771, Verification of Dedicated Shutdown Emergency Lighting Adequacy, dated 5/13/1987
Completed Surveillance Procedures, Test Records
FP-003, Control of Transient Combustibles, Combustible Item Walk-down (Signoff Sheets),
QTR 3-2013,
QTR4-2013,
QTR1-2014 and QTR 2- 2014.
FP-003, Control of Transient Combustibles, Combustible Tracking Logs for Fire Areas 5, 10 and
25E, dated 1/1/2012 through 10/7/2014
OST-609, Inspection and Flushing of the Interior Fire Hose Stations (Annually), dated 4/30/14
OST-610, Unit 2 Portable Fire Extinguishers, Fire Hose Stations and Houses (Monthly), dated
6/17/14
OST-611-2, Low Voltage Fire Detection and Actuation System Zones 3, 4,& 5, dated 9/10/11,
4/23/12, 3/9/13, 8/30/13 and 8/30/14
OST-611-5, Low Voltage Fire Detection and Actuation System Zones 9 & 10, dated 10/20/12,
4/16/13 and 11/18/13
OST-624, "Fire Damper Inspection (18-Month), dated 9/3/2014
OST-648, CCW Room One-hour Rated Fire Barrier Wrap Inspection (18-month), dated
2/7/2013
OST-639, Fire Equipment Inventory, 9/13/2014
OST-656, CCW Pump Room Sprinkler System Drain and Alarm Test (Semi-annual), dated
9/8/2014
OST-922, Dedicated Shutdown Equipment Identification Audit, completed 9/30/2014,
Fire Fighting Preplans
OMM-003, Fire Protection Pre-plans / Unit No. 2, Rev. 64
Applicable Codes & Standards
NFPA 10, Portable Fire Extinguishers, 1965 Edition
NFPA 12, Carbon Dioxide Extinguishing Systems, 1968 Edition
NFPA 12A, Halogenated Extinguishing Agent Systems, 1977 Edition NFPA 13, Standard for the Installation of Sprinkler Systems, 1983 Edition NFPA 14, Standard for the Installation of Standpipe and Hose Systems, 1974 Edition
NFPA 20, Standard for the Installation of Centrifugal Fire Pumps, 1968 Edition
NFPA 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances,
1966 Edition
NFPA 30, Flammable Combustible Liquids Code, 1977 Edition NFPA 50A, Standard for Gaseous Hydrogen Systems at Customer Sites, 1999 Edition
NFPA 72D, Standard for the Installation, Maintenance, and Use of Proprietary Protection Signaling Systems, 1975 Edition
NFPA 72E, Standard on Automatic Fire Detectors, 1974 Edition
NFPA 80, Standard on Fire Doors and Windows, 1968 Edition NFPA 251, Fire Tests, Building Construction and Materials, 1979 Edition

Licensing Basis Documents

Appendix A to Branch Technical Position (BTP) APCSB 9.5-1 Guidelines for Fire Protection for Nuclear Power Plants, dated 8/23/1976 H. B. Robinson Steam Electric Plant, Unit 2 Renewed Facility Operating License No.
DPR-23,
Amendment No. 236, dated 8/11/2013 H. B. Robinson Steam Electric Plant, Unit 2 Renewed Operating License Condition 3.E, "Fire
Protection"
Notice of Granting an Exemption from the Requirements of 10
CFR 50.48 and Appendix R for Fire Protection, dated 11/13/1981 Exemption from Certain Requirements of 10 CFR Part 50, Appendix R, Sections
III.G.2 and
III.G.3 - H.B. Robinson Steam Electric Plant, Unit No. 2, dated 9/17/1986
Exemptions from Certain Requirements of 10 CFR Part 50, Appendix R, Section
III.J -
H.B Robinson Steam Electric Plant, Unit No. 2, dated 7/30/1987
Exemptions from Requirements of Section
III.G.2 of Appendix R of 10 CFR Part 50 -
H.B. Robinson Steam Electric Plant Unit No. 2, dated 10/17/1990
Exemptions from the Requirements of 10 CFR Part 50, Appendix R, for H.B. Robinson Steam
Electric Plant, Unit No. 2, dated 10/08/1992
Exemption from Certain Requirements of 10 CFR Part 50, Appendix R, Section
III.J -
H.B. Robinson Steam Electric Plant, Unit No. 2, dated 07/03/1995 H.B. Robinson Electric Plant, Unit 2 Re: 10 CFR Part 50 Appendix R Separation Analysis and Fire Protection Exemptions, dated 9/05/2001
H. B. Robinson Steam Electric Plant, Unit 2 UFSAR, Section 9.5.1, Fire Protection System,
Rev. 15 H. B. Robinson Steam Electric Plant, Unit 2 UFSAR, Appendix 9.5.1A, Fire Hazards Analysis,
Rev. 19 H. B. Robinson Steam Electric Plant, Unit 2 UFSAR, Appendix 9.5.1B, Fire Protection
Description and Review, Rev. 14 H. B. Robinson Steam Electric Plant, Unit 2 UFSAR, Appendix 9.5.1C, Post-Fire Safe-Shutdown
Analysis Report, Rev. 18
H. B. Robinson Steam Electric Plant, Unit 2 UFSAR, Section 9.5.2, Communication Systems,
Rev. 25 H. B. Robinson Steam Electric Plant, Unit 2 UFSAR, Section 9.5.3, Lighting Systems, Rev. 22
NC-77-704 Fire Protection Program Evaluation, dated 6/23/1977
NLU-78-71, Appendix A to BTP APCSB 9.5-1 SER, dated 2/281978
NLU-81-245, Amendment 57 to OL, Revising Technical Specifications, dated 5/15/1981
NLS-85-026, H. B. Robinson Steam Electric Plant, Unit 2 Appendix R Exemption Request, dated 2/13/1985
NLU-86-570, Exemption for Fire Detection and Suppression, dated 9/17/1986
NLU-92-024, Fire Protection Condition of License and Technical Specifications, dated
2/21/1992
NO-80-430, Replacement of Propane Fueled Fire Pump, dated 3/18/1980
NO-81-448, Petition for Exemption from Requirements of 10CFR50.48 and Appendix R to
10CFR Part 50, dated 10/7/1981
NRC-90-622, Exemption from Requirements of Section
III.G.2 of Appendix R to 10CFR50, dated 10/17/1990
NRC-92-0702, Issuance of Amendment No. 142 Regarding Fire Protection, dated 12/7/1992

Other Documents

EDMG-013, Airborne Release Scrubbing, Rev. 9 HBR2 Maintenance Rule - Emergency Lighting Units Hot Work Permit 14-9-30 (Work Order 1975695)
Ignition Source Walk-Down Sheet for Fire Zone 25E, Rev. 1
Ignition Source Walk-Down Sheet for Fire Zone 10, Rev. 1
GID/R87038/0002, 10CFR50, APPENDIX R, Rev. 2 Transient Storage Temporary Storage Permit 2014-25E-015, dated 8/18/2014
Transient Storage Temporary Storage Permit 2014-25B-038, dated 9/19/2014
Fire Drill 14-1Q-01U, (Unannounced) Critique of Independent Auditor (SWGR Room), dated
2/5/2014
Fire Drill 13-4Q-03U, Off-Site Fire Department (Turbine Building), dated 12/8/2013
Fire Drill 11-1Q-03U, (Announced) CCW Pump Room, dated 3/15/2011 Fire Drill 10-1Q-01A, (Announced) South Cable Vault, dated 2/22/10 Fire Drill 10-1Q-03A, (Announced) South Cable Vault, dated 2/9/10
Fire Drill 10-1Q-04A, (Announced) South Cable Vault, dated 3/23/10
Fire Drill 10-1Q-05A, (Announced) South Cable Vault, dated 2/15/10 Fire Drill, 4160 Switchgear Room Turbine Building, dated 11/22/13
Fire Drill, Hydrogen Dryer Turbine Building, dated 1/27/14 RNP Fire Brigade Member Personal Qualification File Data, dated 10/1/2014 Watch Station Matrix by Persons by Duty Area \ Qualification Group, dated 10/22/14
Mutual Aid Agreement, Duke Energy Progress, Inc. and Darlington County Fire Department, dated 6/17/ 2014
Plant Modifications and Engineering Changes Plant Modification
EC 63687, Replacement of Hemyc Fire Wrap with Interam E54A in CCW
Pump Room, Rev. 6
Plant Modification EC84207, Replacement-Tur bine Lube-Oil Fire Protection and Detection System, dated 8/24/2011
Plant Modification EC91633, Replacement-Engine-Driven Fire Pump, dated 11/15/2013
Technical Manuals, Vendor Information and Fire Tests Cummins CFP9E Engine Data Sheet, dated 11/2013
Hancock Data Sheet 361 Globe Valves 1/2" through 2", Class 800 LTD Class, Rev. 2003
Jerguson Magnicator Magnetic Level Gauge Bulletin M100.01, dated 1/21/1999 Eagle / Justrite Safety Specifications for Flammable Liquids Storage Containers, Dispensing Cans for Flammable Cleaners and Flammable Waste Containers, Rev. 2014
Northern Battery Manufacturing Company Data Sheet, EPM Part No. 908D, dated 12/8/2011
Sherwood Valve Company High Pressure Master Shut-Off Valves: 430 Series for Manifold
Piping, Rev. 2014
Specification Sheet -Motorola Impress HT750 Battery Audits & Self-Assessments Emergency Lighting System Health Report, Q3-2014
Fire Protection System Health Report, Q1-2014 and Q2-2014
Fire Protection Program Health Report, Q1-2014 and Q2-2014
RNP Fire Protection / Safe Shutdown Shut-down Program Effectiveness Assessment
508608-03, Completed 4/19/2012 Fire Protection Program Audit R-FP-14-01, dated 3/20/2014
Fire Protection Program Audit R-FP-12-01, dated 3/7/2012
Readiness Review Triennial Fire Protection Inspection, dated 9/11/2014

Work Orders

WO 710916-10, Quarterly B.5.b Emergency Response Equipment, Tool Box, and Key
Inventories, completed 10/16/2014
WO 01123926, Breach and Foam Seal Penetration
EP-2522.06-FL-05/07 After Cable
Installation
WO 13317791-01,
EDMG-004 O&M Building Tool Room Inventory, completed 04/30/2014
WO 13337391-01, Quarterly B.5.b Inventory of Supplies per
EPPRO-02, Maintenance and Testing, completed 06-17-2014
WO 13348831-01, EDMP Pump Response Box Inventory, completed 05/01/2014
WO 13397181-01, Monthly B.5.b Key Box Surveillance in Accordance with
EPPRO-02,
Maintenance and Testing, completed 07/02/2014
WO 13398940-01, Monthly B.5.b Radio Surveillances in Accordance with
EPPRO-02,
Maintenance and Testing, completed 07/01/2014

Condition Reports

(CRs) Reviewed During Inspection

CR No.
Description
205333
RIS 2006-010, Manual Action Evaluation
553147
Review of
IN 2012-11, Age Related Capacitor Degradation
567517
Maintenance Rule Criteria for Emergency Lights
567632
Lack of CR Initiation for Failure Rate of Emergency Lights
596852 Review of
IN 2013-02, Issues Potentially Affecting Nuclear Facility Fire Safety
664223
EDG Diesel Fuel Oil Storage Tank Cloud-Point Limit Basis
679259 Review of
IN 2014-04, Potential for Teflon Material Degradation in Containment Penetrations, Mechanical Seals and Other Components List of Condition Reports (CRs) Generated as a Result of This Inspection
CR No.
Description
714407
Control and Monitoring of Oily Rag Safety Cans
714456
PI-1617A Frayed Wire
714465
Engine Driven Fire Pump Ventilation Fans Not Wired for Enclosure
714473
SST-2G Temp
EC 714498
ELS-99 Blocked By
SST-2G Tarp
714502 Temporary Step Platform to Security House Blocks Door to Hose House
714554 Duct Tape Identified as a Non-Controlled Combustible in South Cable Vault
714587 FSSPMD Database Not Correct for
HVH-1 Cables
714606 Poor Record Keeping of
FP-003 Transient Combustible Quarterly Walk-down Records for Second Quarter of 2014
714614 Unable to Locate
OST-013 Inspection Record Package for Second Quarter of 2014
714643 CCW Pump "B" Oil Adsorbent Pad Does Not Meet Station Practice for Capturing Oil Leakage
714827 Shift Turnover Package for the Day Shift 10/20/14 Did Not Have Required Review Signature
714879 Documentation for the MMV of Fire Damper
FD-216 Could Not be Located
715032
OP-925 Does Not Address Precautionary Measures to be Taken During Cold Weather for the Diesel Driven Fire Pump and Other Important Diesels Onsite
715050
RAI 45, Proposed UFSAR Update
715052 Emergency Lighting Maintenance Rule Action Plan
715077
Unsecured Screwdrivers Found in Battery Room
715082
Control and Monitoring of Flammable/Combustible Liquid
Safety Cans
715086 Control and Monitoring of Trash Receptacles Credited for Preventing Fire Spread
715102
Outage Power Drop Causes ELS Actuation
715104
Develop Battery Testing & Warehousing Requirements
716026
Potential for Inadvertent Actuation of CO
Systems in Cable Vaults
716757
10 KVA Transformer Labeling Issue
716842
Minimum Length of Fire Hose for B.5.b Trailers 1 and 2
716844 Length of Hose on B.5.b Trailers Not Listed in the Quarterly Surveillance Inventory List
716880
PM-E-ELS-Elight-001 Conflicts With
EDP-011
716882
Identified Lamp Failure on
ELS-98
716883
Identified Lamp Failure on
ELS-54
716899
Open Bucket of Waste Oil Found
716915
Current Status Of Emergency Lighting A1 Action Plan
716919
Wire Snips Found With Supplemental Extinguisher
716921
Chemistry Sample Staging Container Collecting

LIST OF ACRONYMS

AND [[]]
ABBREV IATIONS
AOP Abnormal Operating Procedure
APCSB Auxiliary and Power Conversion Systems Branch
BTP Branch Technical Position
CAP Corrective Action Program
CR Condition Report
DSP Dedicated Shutdown Procedure
ELU Emergency Lighting Unit
EOP Emergency Operating Procedure
ERFBS Electrical Raceway Fire Barrier System
FA Fire Area
FHA Fire Hazard Analysis
FPP Fire Protection Program
FSSPMD Fire Safe Shutdown Program Manager Database
FZ Fire Zone
HVAC Heating, Ventilation and Air Conditioning
IR Inspection Report
MCR Main Control Room
MR Maintenance Rule
NFPA National Fire Protection Association
OMA Operator Manual Action
PI&D Piping and Instrumentation Drawings
RNP Robinson Nuclear Plant
RWST Refueling Water Storage Tank
SER Safety Evaluation Report
SSA Safe Shutdown Analysis

SSD Safe Shutdown

UFSAR Updated Final Safety Analysis Report