Pages that link to "PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress"
Jump to navigation
Jump to search
The following pages link to PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress:
Displayed 50 items.
- PNO-IV-88-048, on 880516,EBASCO Employee Working in Refueling Area Received Approx 22 Rem Dose to Skin of Whole Body. Caused by Lodging of Hot Particale (Fuel Flea) on Employee Thigh After Passing Through Protective Clothing (← links)
- PNO-V-86-011, on 860314,during Main Turbine Testing,Safety Injection & Reactor Trip Occurred from High Steam Flow Signal.Plant Stabilized.Licensee Will Resume Operations Once Event Evaluated & Excess Boron Removed (← links)
- PNO-V-86-008, on 860219,unusual Event Declared & Hot Shutdown Initiated After Boron Sample Exceeded 2,200 Ppm.Unusual Event Terminated When Primary Std for Boron Analysis Determined to Be Faulty (← links)
- PNO-IV-88-044, on 880518,two Employees Received Radiological Overexposure Due to Hot Particle & Sliver of Metal on Respirator,Respectively.Licensee Upgraded One Area to Hot Particle Control Area & Tightened Hot Particle Controls (← links)
- PNO-IV-88-041, on 880512,operators Noted Disagreement Between Tygon Tube Rv Level Indicator & New Indicator Just Installed.Cause Unknown at Present.Water Removed,Bringing Rv Level Indicator Into Relative Agreement (← links)
- PNO-IV-88-037, on 880505,catalytic Cracking Unit at Shell Oil Co Refinery in Norco,La Exploded Into Flames.No Damage Found in Walkdown of Primary Coolant Boundaries.Second Refueling Outage Underway (← links)
- PNO-V-86-009, on 860227,unusual Event Declared When Small Leak from Pressurizer Instrument Top Weld Discovered. Borating Began to Achieve Necessary Shutdown Margin.Cooldown & Leak Repair Planned (← links)
- PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site (← links)
- PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 (← links)
- PNO-IV-98-041, on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades (← links)
- ML20151X835 (← links)
- ML20151X694 (← links)
- ML20151X586 (← links)
- PNO-IV-88-032, on 880423,control Element Assembly (CEA) Inadvertently Withdrawn W/Upper Guide Structure During Refueling Outage.Cause Still Under Investigation.Replacement of CEA Gripper & Extension Under Consideration (← links)
- ML20151U146 (← links)
- PNO-V-88-048, on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault (← links)
- PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley (← links)
- PNO-V-88-012, on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at Site (← links)
- PNO-V-88-002, on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed (← links)
- PNO-V-88-014, on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored (← links)
- PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area (← links)
- PNO-IV-88-085, on 881022,plant Shutdown to Determine Source of Noise in Steam Generator 2.Source Believed to Be in Feed Flow Nozzle Area of Check Valve.Licensee Continuing Investigation of Problem (← links)
- PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities (← links)
- PNO-V-86-032, on 860612,facility Resumed Operation After Second Refueling Outage.Outage Included Replacement of Reactor Coolant Pump Seal Packages & Testing motor-operated Valves Per IE Bulletin 86-003 (← links)
- PNO-V-81-025, on 810426,onsite Seismic Trigger Tripped Alarm. Some Licensee Personnel Stated That Slight Earthquake Was Felt During Time of Alarm Trip.Upon Insp of Facility,No Damage Was Found (← links)
- PNO-V-84-017, on 840331-0401,licensee Discussed Main Steam Safety Valve Failure,Inoperable Radwaste Valve & Loss of Control Room Annunciation (← links)
- PNO-V-84-023, on 840422,seal Water Leak Developed Past Mechanical Seal in Reactor Coolant Pump 14.Cause Unknown.Rcs Cooled.Problem Will Be Corrected Prior to Proceeding Further Toward Initial Criticality (← links)
- PNO-V-83-061, on 831216,Region V Office Received Telephone Inquiries from Knxt Television in Los Angeles & Office of Senator a Cranston in Washington Re 1982 Incident Re Contaminated Sewage from San Onofre Nuclear Station (← links)
- PNO-V-83-028, on 830718,licensee Representative Called Region V Office to Report That PG&E Determined That Less than Min Wall Thickness Existed in RCS at Location of Gouges Previously Identified on 830419 (← links)
- PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed (← links)
- PNO-V-87-028, on 870403,reactor Tripped from 12% Power During Shut Down for First Refueling Outage.Caused by Flicker of High Steam Flow Bistables Coincident w/lo-lo T Average.Investigation Continuing (← links)
- PNO-V-87-025, on 870321,facility Experienced Safety Injection,Reactor Trip & Unit Trip.Caused by Coincidence of High Steam Flow & Low Steam Generator Pressure Signals Due to Closure of MSIV FCV 41.Piping & Valve Switches Inspected (← links)
- PNO-V-86-052, on 860805,reactor Trip Initiated by Turbine Load Rejection When Control Valves Closed,Causing Insurge of Water Into Pressurizer.Cause Under Investigation (← links)
- PNO-V-83-018, on 830421,util Received Ltr from C-E Informing of Error in Equivalent Voltages Corresponding to Setpoints Associated W/Steam Generator High Delta Pressure Trip Function.Corrective Action Being Developed (← links)
- PNO-V-86-049, on 860729 & 30,pressure Transmitter 459 Failed Low Resulting in Steam Flow/Feed Flow Mismatch Trip Circuits Becoming Inoperable.Caused by Failed Electric Card in Pressure Transmitter Amplifier.Amplifier Replaced (← links)
- PNO-V-82-046, on 821117,steam Generator Water Chemistry Analyses Identified Chloride Levels Near 250 Ppm.Caused by One or More Tubes Rupturing in Main Condenser.Power Level Ramped Down.Ruptured Tubes Plugged within 4 H (← links)
- PNO-V-86-027, on 860505,diesel Generator Unexpectedly Started & Loaded on Vital Bus G Undervoltage Condition.Auxiliary Feeder Breaker Tripped on Overcurrent & Startup Power Feeder Breaker Did Not Close In.Investigation Underway (← links)
- PNO-V-86-067, on 861001,fuel Assembly in Vessel Found W/ 10-degree Tilt & Resting Askew Against Core Baffle Plate. Cause Under Investigation.Program & Special Tools Prepared to Return Assembly to Vertical Position (← links)
- PNO-V-86-065, on 860918,reactor Tripped Due to Loss of Main Feedwater Pump 2-2 During Maint on Lovejoy Speed Controller Sys.Caused by Steam Flow/Feed Flow Mismatch Coincident W/Low Level on Steam Generators 2 & 4.Cause Under Investigation (← links)
- PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield (← links)
- PNO-V-86-043, on 860715,criticality Achieved Following Eighth Refueling Outage.Unit Shutdown for 236 Days Following 851121 Loss of Power & Water Hammer Event.Unit Scheduled to Go on-line After Completion of Low Power Physics Testing (← links)
- PNO-V-86-019, on 860418,unusual Event Declared on Initiation of Shutdown.On 860417,problems W/Computer Info from in-core Instrumentation for Quadrant Power Tilt Ratio Measurement Occurred (← links)
- PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter (← links)
- PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core (← links)
- PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg (← links)
- PNO-V-86-040, on 860709,reactor Tripped Due to Low Level in Steam Generator Coincident W/Steam Flow Feed Flow Mismatch. Caused by Loss of Main Feed Pump.Pump Repaired & post-trip Review Conducted (← links)
- PNO-III-86-034, on 860407,util Announced Plans to Convert Facility to Be Fueled by Natural Gas.Const on Facility Halted on 840716 Because of Financial & Rate Uncertainties. Conversion Phase to Be Completed in 1990 (← links)
- PNO-V-86-038, on 860703,facility Experienced Reactor Trip & Safety Injection Due to Momentary High Steam Flow Coincident w/lo-lo Tavg Signal from solid-state Protection Sys.On 860706,second Turbine & Reactor Trip Experienced (← links)
- PNO-IV-86-022, on 860708,plant Shut Down for More than 48 H Due to Continued Temp Rise in Leak Off Temp from Reactor Coolant Pump Seal 2B.Caused by Seal Deterioration.Seal Will Be Replaced During Outage (← links)
- PNO-V-87-002, on 870105,reactor Trip/Turbine Trip Occurred. Caused by Loss of Turbine Governor/Stop Valve electro- Hydraulic Sys Pressure,Attributed to Leak in Compression Fitting Connection to Steam Lead Stop Valve FCV-145 (← links)