Pages that link to "IR 05000312/1988032"
Jump to navigation
Jump to search
The following pages link to IR 05000312/1988032:
Displayed 50 items.
- PNO-V-85-071, on 851007,one of Two Auxiliary Feedwater Pumps Declared Inoperable Due to Failure of Pump Thrust Bearing. Caused by Disintegrated Thrust Bearing Due to Inadequate Lubrication.Bearing Replaced (← links)
- IR 05000312/1985017 (← links)
- ML20133E264 (← links)
- ML20133D185 (← links)
- PNO-V-85-064, on 850928,reactor Achieved Criticality.Plant in Cold Shutdown Since 850623 Due to 1-inch Diameter Hot Leg Vent Piping Failure.Exams of Other Piping Sys & Supports Completed.Plant at 40% Power (← links)
- IR 05000312/1985015 (← links)
- ML20132G147 (← links)
- IR 05000312/1996003 (← links)
- ML20129D519 (← links)
- PNO-V-85-031, on 850521,during Chemical Cleaning of Boiler, Sight Glass Fitting on Large Auxiliary Boiler Failed While Boiler at Approx 130 Psi Steam Pressure.Cause Not Stated. Plant Shut Down Since 850315 for Refueling Outage (← links)
- IR 05000312/1985009 (← links)
- IR 05000312/1985011 (← links)
- IR 05000312/1985012 (← links)
- PNO-V-85-036, on 850618,facility Manually Shut Down from 15% Power Due to Flow Blockage in Main Turbine Lubricating Oil Sys.Turbine Must Be Secured,Vacuum Broken in Condenser & Primary Plant Cooled to 230 F.Shutdown Will Last 4 Days (← links)
- IR 05000312/1992007 (← links)
- PNO-V-80-016, on 800305,Region 5 Mgt Met W/Licensee at Site to Discuss Valve & Electrical Noncompliance That Has Rendered Portions of HPI Sys Inoperable.Escalated Enforcement Will Be Requested 800314 (← links)
- PNO-V-80-001, on 800109,members of Ibew Voted 522 to 27 to Authorize Strike on 800114.Approx 51% of Site Employees Are Members.Resident Inspector Has Completed Prestrike Insp Requirements (← links)
- IR 05000126/2003013 (← links)
- IR 05000312/1988012 (← links)
- ML20155A672 (← links)
- IR 05000312/1986010 (← links)
- IR 05000312/1988026 (← links)
- IR 05000312/1988024 (← links)
- ML20154L717 (← links)
- IR 05000312/1988013 (← links)
- ML20154J398 (← links)
- IR 05000312/1988005 (← links)
- ML20154J344 (← links)
- IR 05000312/1988025 (← links)
- ML20154H817 (← links)
- ML20154H809 (← links)
- IR 05000312/1988017 (← links)
- IR 05000312/1986001 (← links)
- ML20153E508 (← links)
- ML20153E466 (← links)
- IR 05000312/1986003 (← links)
- PNO-V-88-030, on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak (← links)
- IR 05000312/1988008 (← links)
- IR 05000312/1988011 (← links)
- ML20151X524 (← links)
- PNO-V-88-029, on 880429,SMUD Released Info Re Potential Agreement W/Duke Power Co (DPC) Under Which DPC Employee Would Become Chief Executive Officer,Nuclear,Reporting to New Rancho Seco Mgt Committee.Meeting Planned on 880509 (← links)
- IR 05000312/1988002 (← links)
- ML20151W087 (← links)
- IR 05000312/1987040 (← links)
- IR 05000312/1988021 (← links)
- ML20151R802 (← links)
- IR 05000312/1987037 (← links)
- IR 05000312/1988007 (← links)
- IR 05000312/1988019 (← links)
- IR 05000312/1988022 (← links)