ML20154L717
| ML20154L717 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 05/23/1988 |
| From: | Elin J, Johnston G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML20154L706 | List: |
| References | |
| 50-312-OL-88-01, 50-312-OL-88-1, NUDOCS 8806010046 | |
| Download: ML20154L717 (2) | |
Text
-__ _ _ _ _ _ _ _ _ _ _ _
4.
Examination Report No. 50-312/0L-88-01 Facility Docket No.
50-312 Facility:
Rancho Seco Nuclear Generating Station, Clay Station, CA Examination Date:
May 11, 1988
, l/' clf2 Ga
/ Jo ston, Operator Licensing Examiner.g Chief Examiner:
.t Udteygned Approved by:
5' d
D. Elin, Ch'ief, Operations 7ction Djrte Signed Summary:
Examination on May 11, 1988 An operating examination was administered to one candidate. The candidate passed the examination.
P g601oo46880525 7
y ADOCK 05o00312 DCD
. - < G.h% k
..o.. ;
REPORT DETAILS 1.
Persons Examined:
There was one candidate for-an operating examination.
2.
Examiner:
- G. Johnston, RV
- Chief Examiner 3.
Persons Attending the Exit Meeting:
NRC G. Johnston, Operator licensing Examiner
~
SMUD M. Harrell, Ope.rator. Training Supervisor 4.
Operating Examination:
The examiner conducted one operating examination. Due to the nature of this examination no generic concerris were identified.
5.
Exit' Meeting:
The examiner met with the facility representative denoted in Paragraph 3 on May 11, 1988. The examiner discussed the examination process and the results to that point.
=4 4
- F