IR 05000312/1988025
| ML20205S862 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 11/01/1988 |
| From: | Yuhas G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Firlit J SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| References | |
| NUDOCS 8811140009 | |
| Download: ML20205S862 (1) | |
Text
. _ _
. _ _ _ _
___ --___ _ _.
_ _ _ _
___ _ _
______ _ ___ _ _
_ _ _ _ _ _ _ _ _ _
_ - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _
_
!
s.
,
j.
a
.
,
!
!
NOV - 1 1988
!
I j
Docket No. 50-312 f
Rancho Seco Nuclear Generating Station
!
Sacramento Municipal Utility District i
14440 Twin Cities Road
.
Herald.. California 95638-9799 l
Attention:
Mr. Joseph F. Firlit Chief Executive Of ficer, Nuclear
>
Thaak you for your letter dated September 29, 1988, in response'to our Notice
of Violation and Inspection Report No. 50-312/88-25, dated September 1, 1988,
!
i informing us of the steps you have taken to correct the items which we brought l
to your attention.
Your corrective actions will be verified during a future i
e inspection.
!
- l
{
Your cooperation with us is appreciated.
i i-
Sincerely
.
s (
(
r
'
GregoryP.hahas, Chief i
i Emergency Preparedness and i
Radiological Protection Branch
!
l l
bec w/ copy of letter 9/29/88:
}
docket file r
!
State of California
!
A. Johnson
!
.
G. Cook
[
]
B. Faulkenberry l
J. Martin
!
'
Resident Inspector
{
Project Inspector J. Zollicoffer i
a M. Smith j
t
REC V
6D
!
RF5h g
[
'
Kh rgast GPYuha 114 11/\\/88 orlrfts i
t
<
Ri STCOPY1 I
(YEyEST COPY ]Jtf.1Nf)/
S / NO
](YES NO
]
/h
{
!
S 10 PDR ]
f 6ES / NO
]
.
l
~
k\\
'
iM"Maima 96(
LA
-
e#,
,
-
t
!
.
.. _
_
- -. - - -
_
.-- - -.
- - _____,____
._.
.
'
.
'.
,
~L.*.
-
-
--
.
_
'
-
-
s
-
.-
.
__
o-q
~
A bEfllCQ
.
.,.
.
--
-
.
'
QG
.
,
'
'
-
,
ame=amo asuencerAL utiuty oesTsuCT O P. C. Som 15SkN/Mnto CA 95852 18'36.(916) 452 3251
'
.
AN ELECTRIC SYSTEM SERVING THE HEART OF CAUFORNIA I3 AID ' 0 7 CEO 88-244 September 29, 1988
-
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Hashington, DC 20555 Docket No. 50-312 Rancho Seco 'luclear Generating Station License No. DPR-54 RESPONSE TO NOTICE OF VIOLATION 88-25 Attention: George Knighton On September 1,1988, the Sacramento Municipal Stility District received a Notice of Violation concerning activities at the Rancho Seco Nuclear Generating Station.
In accordance with 10 CFR 2.201, the District provides the attached response to this violation.
This letter acknowledges the violation cited and describes the Ulstrict's corrective actions.
Members of your staff with questions requiring additional information or clarification may contact Ms. Rita Bowser at (916) 452-3211, extension 4522.
Sincerely, f<
.osep) F. Fir 11t Chief Executive Officer Nuclear Attachment cc w/atch:
A. D'Angelo NRC, Rancho Seco J. B. Martin, NRC, Halnut Creek
.
INPO 90)n%. - n o- -
-3
-vW(w#Os-D4?O,
/d RANCHO RECO NUCLEAR GENERATING STATION C 1444o T*e Cities Road, Herald. CA 95638 9793;(203) 333-2935
_ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -
..
-
_
- -.. - - -. - - - - -
_ _ _ _ _
_
(
--
q
_
,
7
-
~
-
-
.
,,
I
. ' "
DISTRICT RESPONSE TO NOTICE OF VIOLATION 88-25
~
~
'
~
.'
.
.
-
.
NRC STATEMENT OF VIOLATION
- .
Ouring an NRC inspection conducted on July 19-21, 1988, a violation of HRC
,
i requirements was identified.
In accordance with the "General Statement of J
Policy and Procedure for NRC Enforcement Actions " 10 CFR Part 2, Appendix C (1988), the violation is listed below:
Paragraph 50.54(q) of 10 CFR Part 50 requires that emergency plans be followed and maintained. Paragraph 8.5.2 of the Rancho Seco Emergency Plan requires that emergency "instruments and equipment shall be calibrated at intervals
,
established by the Radiation Protection Department." Section 3 of Procedure
'
AP.311. "Portable Health Physics Instrumentation" states in part, "dose rate instruments are calibrated quarterly."
Contrary to the above, on July 20, 1988, two portable dose rate survey instruments, Serial Nos. 1410 and 1632, located in the Auxiliary Building were observed to have exceeded their calibration frequency. The instruments were last calibrated on November 23, 1987 and were due for recalibration on
!
February 23, 1988.
i This is a Severity Lev / V Violation (Supplement VIII).
j DISTRICT RESPONSE
,
,
i 1.
Admission or dental of alleged violation:
]
The Olstrict acknowledges e.d admits that the above occurred as stated.
i 2.
Reason for the violation:
l Emergency Plan Implementing Procedure EPIP-5660. Revision 0, "Emergency
'
]
Preparedness Surveillance Program." had the following deficiencies which led to the violation:
)
!
Responsibility for completion of Attachment 7.12 was igned to the
)
Supersisor, Emergency Preparedness Division in step s.a.2, and to the Rad Ops Supervisor in step 5.2.1.
Clear delineation of responsibility l
was not provided.
Responsibility for correcting discrepancies was assigned to the
Supervisor. Emergency Preparedness Division.
Radiation Protection's
'
!
functional responsibility for dose-rata instruments was not addressed i
in this procedure.
Attache nts in the procedure did not include "As found," "As left "
"Cal Oue Date " "Performed By," "Reviewed By " or other sections to
-
record data and reviews associated with performance of this procedure.
This limited both th9 performer's and reviewer's ability to identify l
and correct discrepancies.
!
The Rad Ops Supervisor used an obsolete form (from AP.587 which was
superseded by EPIP-5660) to record data since the attachments of
{
EPIP-5660 did not have provision for data recording. This was done to
,
supplement the requirements of EPIP-5660. Since the obsolete forms
,
were not official, no completed forms wtre forwarded to Emergency
,
l Preparedness. As a result, discrepancies with the forms and the
{
{
equipment were not corrected.
b
.
.
_ _ _ _ _.
- - _ _ _ _ _ - _ _
)
_. -
.
.-
. _ _ _ _ _ _ _ _ _ _ _ _ _ _
__
__
_
e.
- .
.
,
.
DISTRICT RESPONSE T0 h9? ICE OF VIOLATION 88-25
.
. '
- **
3.
Corrective actions taken and results achieved:
Dose rate survey instruments, Serial Nos. 1410 and 1632, were removed a.
from the Offsite Assembly Point Kits and replaced with calibrated instruments.
b.
Dose rate survey instruments, Serial Nos.1410 and 1632, were recalibrated.
The recalibrations were acceptable,'although the
"As Found" readings had drifted from the previous "As left" readings.
i Radiatinn Protection performed inventories on Onsite Emergency Lockers c.
and on the O "tite Assembly Point Kits.
The results of the inventories forwarded to Emergency Preptvedness.
4.
Corrective L
.aken to avoid further violations:
EPIP-5660, Revision 1, was issued effective July 26, 1983. This a.
revision includes correction of responsibility assignments and the addition of a form to improve Surveillance Record keeping.
By October 31, 1988, the performance of the third quarter surveillance b.
of EPIP-5660, Revision 1 will be reviewed and analyz9d by Emergency Preparedness Supervision to ensure the effectiveress of the revisions.
By October 31, 1988, the performance of the third quarter surveillance c.
of EPIP-5660, Revision 1 will be reviewed and analyzed by Radiation Protection Supervision to ensure the effectiveness of the revisions.
Me 5.
Date when full compliance will be achieved:
'
Full compliance will be achieved October 31, 1988, upon review of the
effectiveness of EPIP-5660, Revision 1.
-
I P