U. S. NUCLEAR REGULATORY COMMISSION
' REGION V Report No.
50-312/86-01
Docket No.
50-312 License No.
DPR-54 Licensee:
Sacramento Municipal Utility District P. O. Box 15830 Sacramento, California 95813 Facility Name:
Rancho Seco Unit'l Inspection at:
Herald, California (Rancho Seco Site)
,
Inspection conducted:
January 6-10, 1986 s
-
Inspector:
'
-
C.Af4 Clark,ReactorInspector:-
Date Signed
,
b
~
Approved By:
e
.
T. Young, Jr., Chie Engine ng ction Date Signed Summary:
Inspection during the period of January 6-10, 1986 (Report No. 50-312/86-01)
Areas Inspected: This routine unannounced inspection consisted of a review of open items, and the program plan,' procedures, records pertaining to the Rancho Seco inservice testing program for pumps and valves. The inspection involved a total' of 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> onsite by one NRC inspector. During this inspection, inspection procedures 92701.and 92702 were covered.
Results:
In the areas inspected, no violations of NRC requirements were identified.
'
.
8602280538 860212 PDR ADOCM 05000312 G
.
.
_,
,,
-.. _.
-
_ _
_ _ _
__
.-
_
- - _ -
-_
.
.
DETAILS'
l.
Persons Contacted
- S. Redeker, Plant Superintendent
- J. McColligan, Nuclear Plant Assistant Manager
- R. Colombo, Regulatory Compliance Supervisor
-
- J. Jewett,-QA Supervisor
- H.
Canter, QA Ope ations Surveillance Supervisor
- S.
Crunk, Incident Analysis Supervisor
- W. Koepke, QC Supervisor
- W. Speight, Regulatory Compliance
- J.
Bobbitt, Mechanical Associate Engineer
- R. Lawrence, Mechanical Maintenance Superintendent
- J. Uhl, Plant Mechanical Engineer
- E. Banaghan, I&C Assistant Engineer
- M. Hardin, Engineer Specialist
- R. Mannheimer, Licensing J. Irvin, I&C Senior Engineer J. Willfong, I6C Engineer Specialist D. Wiles, I&C Supervisor G. Paptzum, Mechanical Engineer M. Sheridan, I&C Associate Engineer R. Wichert, Senior Mechanical Engineer
- Denotes those personnel in attendance at the exit meeting on January 10, 1986.
The inspector also interviewed other licensee employees involved with open items and inservice testing activities.
2.
Licensee Action on Previously Inspector Id'entified Items
~
a.
(0 pen) Unresolved Item No. 50-312/85-23-01: Non-current Inservice Testing (IST) Program Plant and Delay in Implementing SER Requirements and SMUD Commitments
"
The Rancho Seco IST program is outlined.in a document entitled "ASME Code Section XI Inservice Inspection'and Testing Program." The licensee had not issued any changes or. revisions to the subject
'
document.
-
A licensee representative stated that additional personnel had been assigned to work on the above item. {This item will remain open until the required action is completed.,
b.
(0 pen) Notice of Violation No. 50-312/85-23-02: Inadequate Calibration, Lack of Proper Calibration Records and Improper Closure of Audit Findings Quality Assurance Procedure (QAP) '4, " Calibration of Measurement
and Test Equipment", and QAP 26, " Test Control", require test of
'
.
.
~
,,
-
- - _. _.
.
__.
. _
_
_
.
.
..
,
_l
.
',e f
'
+-
<
,
,
_
y
.2
,
,
'
,
,
.
.
,
,
g4
.
,, ~
-.
..
..
.
.
.
s
,
. Class )1 equipment to be made with' instruments calibratied.in a
~
F
,
,
controlled, periodic' calibration, program.. Contrary-to;the'above
requirements,'at the. time'of NRC Inspection Report,No'.;50-312/85-23, two plant gauges [PI-26103 and,PI-26143] for the-low; pressure
,
injection pumps were not in the sit'excalibration program.
In --
-
_
-
.
' addition,twogauges[PI-2380'4!andPI-23848]ynjhesitecalibration
.
,
.
,~
,
.
-
program had no calibration'recordsP
~
7-
'
-
,
.
, w. -
_ ;
f. -
.
,
.,
The licensee response byiletter of: September.3 01985;ito the'above
'
item was in part,'"As3 a,resultilofTtheset findings, alll surveillance
'
procedures have been" reviewed an'd all ins'truments used to obtain l
data have been. included in the preventive siaintenance calibration program,' instruments ~ add'ed,to the) program,and' instruments'due for
'
"
r
' calibration are presently being calibrated. This work will be completed prior ~to January-1,[1986!"'
- " >
"'
,
,
,
y i
The inspector examined a sample of'.thellicensee surveillance procedure review documentation, latest surveillance procedures,. site j
calibration records, plant gauges and found the"following:
j
^
'
i -,
..
-(1) The two plant gauges [PI-26103"andiPI-26143] for the low:
.
r pressure injection pumps, previously. identified not in 'the site
-
.
j calibration program were now in the program and were last
~
s
!
calibrated August 22,.1985.-
(This" item is closed).'-
,
.
(2) The two plant gauges [PI-23804 and PI-2384'8] in the site
j calibration program, previously identified a's having'no i
calibration records, now each have a sheet in the site:
l calibration record books / file showing no recorded calibratio"n
_
i information for PI-23804 and that PI-23848 was last calibrated j
April 15 -1983. A licensee representative stated that the'
-
t two gauges had been calibrated-but the.information had not-returned to record books / file at-the time of the inspection.-
'
(This item remains open).-
_
,
(3) Since the instrument and control (I'&C) group?of the licensee-.
l staff completed the' review-of'all surveillance procedures prior-to September 3, 1985, and included'all-additional' instruments
used to obtain data in the Preventive Maintenance! Calibration
Program, the following has occurred:
~^
Another group of the licensee staff has~ issued changes to
,
surveillance procedures (SP):203.05A, " Quarterly Decay-
l
- Heat Removal System' LoopA'Esurveillance'P-261A",
-l SP 204.03A, " Quarterly Reactor Building Spray / decay Heat
,
System 'A'. Loop Surveillance and Inservice Test"~and SP 204.03B, " Quarterly Reactor Building / Decay Heat System'
'B' Loop Surveillance and Inservice Test", adding new-...
,
,
requirements to' record temperature readings from existin's
!l
. instruments TI-48703, TI-29123 and TI-29124.
,
}-
The subject instruments [TI-48703, TI-29123'and TI-29124]
j-have not been included in the site preventive maintenance
- ,
calibration program, nor are.there any calibratica ~ record J
i,
.
.
-
-
>
.
sheets in the site calibration record books / file for the subject instruments.
- The subject instruments have been used to record official surveillance data [ bearing oil cooler discharge temperatures], in order to monitor and evaluate bearing cooler performance, without any check of calibration since 1971 [per calibration stickers]. While these temperatures are not being recorded for verification against pump or cooler acceptance criteria, it has been determined that the data recording is required in official surveillance procedures to aide in the detection of biofouling in.the
,
- applicable coolers.
The accuracy of the subject instruments should have been verified and documented upon initial use in surveillance procedures, at least more recent than 1971.
It was noted that there was no documented evidence that data takers questioned the accuracy of the subject instruments.
Based on the above findings, the licensee representatives stated a review of the calibration requirements for the subject added instruments would be performed, along with a look at finding a better method of notifying procedure writers of new licensee commitments.
This item will remain open until the licensee has performed the above identified actions.
c.
(Open) Unresolved Item No. 50-312/85-23-03: Adequacy of IST Implementing Procedures The licensee response by letter of September 3, 1985, stated in
.
part, "All surveillance ~ procedures will be revised to require the documenting of calibration data for all instrumentation,.other than control room instrumentation.... prior-to January 1, 1987".
At the time of this inspection, the licensee was preparing a guide for procedure writers to ensure the issuing of adequate changes aud revisions to IST implementing procedures.
This guide would ensure that the latest calibration requirements, licensee's commitments and positions were incluced in curveillancetprocedures.
This item will remain open until the' licensee has. performed the above identified actions.
.
d.
(Closed) Notice of Violation No. 50-312/85-23-04: Failure to Test Additional Valves After Failure of Valves and Failure to Retest Valves After Repair The licensee response by letter.of September 3, 1985, stated in part, "As a result of these findings, the pest. records for the valves listed above were reviewed.
It is apparent that a lack of proper review and corrective action was responsible for these and other violations. The Safety and Relief Valve Setpoint Verification
-
,
'
.
,
.
.
%
~4'
.
Test _ Procedure will be. revised to' require additional Technical Support review. This review will include a provision to specify-additional valves to be tested when required. _This procedure will
.
also be revised to specifically state the requirement to obtain
"as-found" setpoint data. These changes will ensure that additional valves will be tested when required due to inservice testing failures.- These changes will be completed and full compliance achieved by September 15, 1985."
,
The inspector reviewed-the latest Safety and Relief. Valve Setpoint Verification Test Procedure " Maintenance Testing (MT) 006",
revision 2 issued on September 20, 1985, and found it appeared.to provide the additional instructions necessary to resolve the
'
concerns addressed in this notice of violation.
This item is closed.
'
3.
Licensee Action on IE Information Notice
,
(Open) IE Information Notice No. 85-71: Containment Integrated Leak.
Rate Tests The licensee is tracking this item and has assigned its review to one of-their staff. The licensee representative has performed an initial review of the subject notice, and believe that changes to testing procedures will be required prior tc the next containment testing, which should be performed in early.198'
4.
Exit Meeting The inspector met with the licensee representatives identified.in
paragraph 1 on January 10, 1986. The inspector summarized the scope of j
the inspection and findings as described in this report.
.