| | {{#Wiki_filter:Kevin Hacker, Dominion Generation NDE Integration Committee Vice Chairman September 11, 2012 Update of NIFG Action Evaluation of North Anna Probes and Mockups |
| | |
| | 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | |
| | ===Background=== |
| | *Eight-action plan initiated to address NRC concerns raised by PNNL report and North Anna experience |
| | -Collaborative effort between NIFG and NRC Research |
| | -Agreed upon workplan |
| | -All scans will be encoded |
| | -Data collected by both organizations will be made available for review |
| | -Data to be gathered in a manner that allows NIFG and PNNL data sets to be directly compared |
| | -The analysis of data sets will be performed separately |
| | |
| | 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | Objectives |
| | *Determine if the North Anna mockups are adequate for assessing the flaw detection capabilities of the North Anna tandem probes for this specific component configuration |
| | *Determine if the North Anna tandem probes are adequate for flaw detection for this specific component configuration |
| | *Assess the information and data gathered on the probes and mockups with respect to the requirements/intent of Appendix VIII and PDI to determine if changes to the Code, procedures, or Owner |
| | -controlled processes are necessary |
| | |
| | 4 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | Actions *Characterize North Anna Tandem Probes |
| | -Determine exit point |
| | -Measure the refracted and skew angles |
| | *North Anna Mockups (two flawed North Anna mockups and one non-flawed FlawTech mockup) -Scan mockups with zero degree probes to assess the quality of welding |
| | -Scan mockups with North Anna tandem probes |
| | -Utilize a receiver mounted on the inside surface of a mockup to assist in probe characterization |
| | |
| | 5 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | Actions *Collect data with a conventional, dual side |
| | -by-side RL probe from EPRI inventory to demonstrate effectiveness of standard demonstrated probes |
| | *Collect phased array data recreating field application of phased array procedure (electronic skewing) |
| | -Demonstrate field procedure flaw detection capabilities on mockups |
| | -Compare phased array data from field flaws (non |
| | -encoded) to the data collected from the mockups to assess demonstration flaw characteristics |
| | -Compare field phased array data to data collected from the mockups to assess how well the mockup responses in 'clean' areas correlate with the responses of the weld in the field |
| | |
| | 6 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | Actions *Collect phased array data scanning with mechanically corrected wedges to compare with electronic skewing data |
| | *Polish, etch, and photograph a cross section of one of the mockups to provide weld microstructure information |
| | -For input into modeling calculations |
| | *Perform Beam Simulations |
| | -Obtain tandem probe waveforms for each transducer (RR and LR) |
| | -Perform ultrasonic beam simulations utilizing new input waveforms with CIVA -To the extent possible, use the microstructure information to simulate ultrasonic wave prorogation through the weld |
| | |
| | 7 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | Actions *Perform Flaw Response Modeling |
| | -Using the actual tandem probe waveforms, simulate the expected axial flaw responses with CIVA. To the extent possible, the weld microstructure information will also be utilized during flaw response modeling |
| | -Perform comparisons of the CIVA simulated ultrasonic data with the experimental data |
| | |
| | 8 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | Status *Tandem probe characterization data has been collected and is being evaluated |
| | *UT Data from the three mockups has been collected with the selected probes (zero degree, tandem, conventional dual side |
| | -by-side RL, phased array) |
| | *Data currently being organized in preparation for analysis |
| | *One mockup has been polished, etched, and photographed |
| | *Tandem probe waveforms and microstructure photographs provided to the computer modeling team to begin beam simulations and flaw response modeling |
| | *Mockups and tandem probes to be shipped to PNNL 9/10/12 |
| | *Data analysis of collected data to begin 9/10/12 |
| | |
| | 9 © 2012 Electric Power Research Institute, Inc. All rights reserved. |
| | Together-Shaping the Future of Electricity}} |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16104A3822016-04-26026 April 2016 New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference ML16104A3872016-04-13013 April 2016 Criticality Analysis Checklist for North Anna ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML1124205512011-08-30030 August 2011 Seismic Event ML1110304942011-04-13013 April 2011 Public Meeting Attendees ML1110304982011-04-13013 April 2011 Public Meeting Handouts ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0911000392009-04-17017 April 2009 Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power Station 2024-09-03
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18141A3072018-05-21021 May 2018 18 - SLR Status ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML12040A2742011-08-31031 August 2011 E-Mail from G. Wilson, NRR to D. Merzke, EDO; Subject: Seismic Instruments at North Anna ML12044A2912011-08-30030 August 2011 E-mail from G. Bowman, EDO to T. Hipschman, Comm, Et Al; Subject: FYI-Revised Slides on North Anna/Gl-199 ML1124205512011-08-30030 August 2011 Seismic Event ML12044A2792011-08-30030 August 2011 Email from M. Khanna, NRR to R. Auluck, NRR FW: North Anna Earthquake Issue Commissioner Briefing Final with Talking Points ML12044A2572011-08-26026 August 2011 Email from A. Istar, NRR to A. Hiser, NRR on North Anna Nuclear Power Plant. Pptx ML1110304822011-04-13013 April 2011 Public Annual Assessment Meeting/Open House Slides ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation 2024-09-03
[Table view] |
Text
Kevin Hacker, Dominion Generation NDE Integration Committee Vice Chairman September 11, 2012 Update of NIFG Action Evaluation of North Anna Probes and Mockups
2 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Background
- Eight-action plan initiated to address NRC concerns raised by PNNL report and North Anna experience
-Collaborative effort between NIFG and NRC Research
-Agreed upon workplan
-All scans will be encoded
-Data collected by both organizations will be made available for review
-Data to be gathered in a manner that allows NIFG and PNNL data sets to be directly compared
-The analysis of data sets will be performed separately
3 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Objectives
- Determine if the North Anna mockups are adequate for assessing the flaw detection capabilities of the North Anna tandem probes for this specific component configuration
- Determine if the North Anna tandem probes are adequate for flaw detection for this specific component configuration
- Assess the information and data gathered on the probes and mockups with respect to the requirements/intent of Appendix VIII and PDI to determine if changes to the Code, procedures, or Owner
-controlled processes are necessary
4 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Actions *Characterize North Anna Tandem Probes
-Determine exit point
-Measure the refracted and skew angles
- North Anna Mockups (two flawed North Anna mockups and one non-flawed FlawTech mockup) -Scan mockups with zero degree probes to assess the quality of welding
-Scan mockups with North Anna tandem probes
-Utilize a receiver mounted on the inside surface of a mockup to assist in probe characterization
5 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Actions *Collect data with a conventional, dual side
-by-side RL probe from EPRI inventory to demonstrate effectiveness of standard demonstrated probes
- Collect phased array data recreating field application of phased array procedure (electronic skewing)
-Demonstrate field procedure flaw detection capabilities on mockups
-Compare phased array data from field flaws (non
-encoded) to the data collected from the mockups to assess demonstration flaw characteristics
-Compare field phased array data to data collected from the mockups to assess how well the mockup responses in 'clean' areas correlate with the responses of the weld in the field
6 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Actions *Collect phased array data scanning with mechanically corrected wedges to compare with electronic skewing data
- Polish, etch, and photograph a cross section of one of the mockups to provide weld microstructure information
-For input into modeling calculations
-Obtain tandem probe waveforms for each transducer (RR and LR)
-Perform ultrasonic beam simulations utilizing new input waveforms with CIVA -To the extent possible, use the microstructure information to simulate ultrasonic wave prorogation through the weld
7 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Actions *Perform Flaw Response Modeling
-Using the actual tandem probe waveforms, simulate the expected axial flaw responses with CIVA. To the extent possible, the weld microstructure information will also be utilized during flaw response modeling
-Perform comparisons of the CIVA simulated ultrasonic data with the experimental data
8 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Status *Tandem probe characterization data has been collected and is being evaluated
- UT Data from the three mockups has been collected with the selected probes (zero degree, tandem, conventional dual side
-by-side RL, phased array)
- Data currently being organized in preparation for analysis
- One mockup has been polished, etched, and photographed
- Tandem probe waveforms and microstructure photographs provided to the computer modeling team to begin beam simulations and flaw response modeling
- Mockups and tandem probes to be shipped to PNNL 9/10/12
- Data analysis of collected data to begin 9/10/12
9 © 2012 Electric Power Research Institute, Inc. All rights reserved.