ML17056B296: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:I/31/91COMPLETED BY:K.A.DahlbergTELEPHONE:
{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
(315)349-24431.UnitName:NineMilePointUnit//I2.Reporting Period:11/I/90through11/30/903.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6455.DesignElectrical Rating(NetMWe):6256.MaximumDependable Capacity(GrossMWe):6357.MaximumDependable Capacity(NetMWe):6158.IfChangesOccurinCapacityRatings(ItemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6MonthsMidccleutneforsurveillance tcstln8,016.02,676.50.02,358.40.02,848,082.0 909,568.0 874,127.0 29.429.417.817.570.2720.062890.0607.00.01,047,531.0 358,210.0 347,062.0 84984978.477.115.7(Type,DateandDurationofEach):MarchIthrouh13Aril1.185,9052117,910.8 1,204.2114,475.6 20.4191,321,214.0 63,382,638.0 61,398,509.0 61.661.654.153.325.925.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:26.UnitisTestStatus(PriortoCommercial Operation):
(315)349-2443 1.Unit Name: Nine Mile Point Unit//I 2.Reporting Period: 11/I/90 through 11/30/90 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 645 5.Design Electrical Rating (Net MWe): 625 6.Maximum Dependable Capacity (Gross MWe): 635 7.Maximum Dependable Capacity (Net MWe): 615 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Midc cle utn e for surveillance tcstln 8,016.0 2,676.5 0.0 2,358.4 0.0 2,848,082.0 909,568.0 874,127.0 29.4 29.4 17.8 17.5 70.2 720.0 6289 0.0 607.0 0.0 1,047,531.0 358,210.0 347,062.0 849 849 78.4 77.1 15.7 (Type, Date and Duration of Each): March I throu h 13 A ril 1.185,9052 117,910.8 1,204.2 114,475.6 20.4 191,321,214.0 63,382,638.0 61,398,509.0 61.6 61.6 54.1 53.3 25.9 25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Unit is Test Status (Prior to Commercial Operation):
ForecastAchievedINITIALCRITICALITY INlTIALELECTRICITY COMMERCIAL OPERATION
Forecast Achieved INITIAL CRITICALITY INlTIAL ELECTRICITY COMMERCIAL OPERATION---PI,0220008 05000220 910207 pQOCK pDP.R  
---PI,0220008 05000220910207pQOCKpDP.R  
~I~PIP 4 J'll l)}}
~I~PIP4J'lll)}}

Revision as of 23:33, 7 July 2018

Revised Monthly Operating Rept for Nov 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B296
Person / Time
Site: Nine Mile Point 
Issue date: 11/30/1990
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200086
Download: ML17056B296 (2)


Text

OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:

(315)349-2443 1.Unit Name: Nine Mile Point Unit//I 2.Reporting Period: 11/I/90 through 11/30/90 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 645 5.Design Electrical Rating (Net MWe): 625 6.Maximum Dependable Capacity (Gross MWe): 635 7.Maximum Dependable Capacity (Net MWe): 615 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Midc cle utn e for surveillance tcstln 8,016.0 2,676.5 0.0 2,358.4 0.0 2,848,082.0 909,568.0 874,127.0 29.4 29.4 17.8 17.5 70.2 720.0 6289 0.0 607.0 0.0 1,047,531.0 358,210.0 347,062.0 849 849 78.4 77.1 15.7 (Type, Date and Duration of Each): March I throu h 13 A ril 1.185,9052 117,910.8 1,204.2 114,475.6 20.4 191,321,214.0 63,382,638.0 61,398,509.0 61.6 61.6 54.1 53.3 25.9 25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INlTIAL ELECTRICITY COMMERCIAL OPERATION---PI,0220008 05000220 910207 pQOCK pDP.R

~I~PIP 4 J'll l)