ML17056B302: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUSOPERATING DATAREPORTDOCKETNO.:50-220DATE:1/31/91COMPLETED BY:K.A.DahlbergTELEPHONE:
{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
(315)349-24431.UnitName:NineMilePointUnit¹12.Reporting Period:5/1/90through5/31/903.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6405.DesignElectrical Rating(NetMWe):6206.MaximumDependable Capacity(GrossMWe):6307.MaximumDependable Capacity(NetMWe):6108.IfChangesOccurinCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative ll.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(Type,Refueloutaestartedonanua221988.744.00.00.00.00.00.00.00.00.00.00.00.0100.0DateandDurationofEach):3,623.00.00.00.00.00.00.00.00.00.00.00.0100.0181,512.2 115,234.3 1,204.2lg,lI7.220.4188,473,132.0 62,473,070.0 60,524,382.0 61.861.854.753.825.426.UnitisTestStatus(PriortoCommercial Operation):
(315)349-2443 1.Unit Name: Nine Mile Point Unit¹1 2.Reporting Period: 5/1/90 through 5/31/90 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative ll.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Refuel outa e started on anua 22 1988.744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Date and Duration of Each): 3,623.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 181,512.2 115,234.3 1,204.2 lg,lI7.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 61.8 61.8 54.7 53.8 25.4 26.Unit is Test Status (Prior to Commercial Operation):
ForecastAchievedIN1TIALCRlTICALITY IN1TIALELECTRIC1TY COMMERCIAL OPERATION
Forecast Achieved IN1TIAL CRlTICALITY IN1TIAL ELECTRIC1TY COMMERCIAL OPERATION ('9i02200104 910207 PDR ADOCK 05000220 R PDR l'}}
('9i02200104 910207PDRADOCK05000220RPDR l'}}

Revision as of 00:32, 8 July 2018

Revised Monthly Operating Rept for May 1990 for Nine Mile Point Nuclear Station Unit 1
ML17056B302
Person / Time
Site: Nine Mile Point 
Issue date: 05/31/1990
From: DAHLBERG K A
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200104
Download: ML17056B302 (2)


Text

OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:

(315)349-2443 1.Unit Name: Nine Mile Point Unit¹1 2.Reporting Period: 5/1/90 through 5/31/90 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative ll.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Refuel outa e started on anua 22 1988.744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Date and Duration of Each): 3,623.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 181,512.2 115,234.3 1,204.2 lg,lI7.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 61.8 61.8 54.7 53.8 25.4 26.Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved IN1TIAL CRlTICALITY IN1TIAL ELECTRIC1TY COMMERCIAL OPERATION ('9i02200104 910207 PDR ADOCK 05000220 R PDR l'