ML17265A557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:V
{{#Wiki_filter:V  


==SUBJECT:==
==SUBJECT:==
Revito"Technical Requirements Manual(TRM).",DISTRIBUTION CODE:A001DCOPIESRECEIVED:LTR ENCLTITLE:ORSubmittal:
Revi to"Technical Requirements Manual (TRM)." ,DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL TITLE: OR Submittal:
GeneralDistribution CSIZE:CATEGORY1,REGULAYINFORMATION DISTRIBUTION SYSTEM(RIDS)r.<ACCESSION NBR:9903050332 DOC.DATE:
General Distribution C SIZE: CATEGORY 1, REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)r.<ACCESSION NBR:9903050332 DOC.DATE: 99/02/25 NOTARIZED:.
99/02/25NOTARIZED:.
NO DOCKET&#xb9;FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 050 0244 AUTH..NEGATE AUTHOR AFFILIATION
NODOCKET&#xb9;FACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G0500244AUTH..NEGATE AUTHORAFFILIATION
*Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION rzr~y/NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)
*Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION rzr~y/NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72)
.05000244 E INTERNAL: RECIPIENT ID CODE/NAME PD1-1 LA VISSING,G.
.05000244EINTERNAL:
NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNG,1 OGC/HDS3 COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-1'D NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIES LTTR ENCL G EXTERNAL: NOAC NRC PDR D 0 N NOTE TO ALL"RIDS" RECIPIENTS:
RECIPIENT IDCODE/NAME PD1-1LAVISSING,G.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 13 1 S~
NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSBJUNG,1OGC/HDS3COPIESLTTRENCLRECIPIENT IDCODE/NAME PD1-1'DNRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIESLTTRENCLGEXTERNAL:
DISR061 CHESTER GAS Ec'ELECTRIC C ORATION DOCUMENT CONTROL Document Transmittal To: DOCUMENT CONTROL DESK US NRC ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 Transmittal:
NOACNRCPDRD0NNOTETOALL"RIDS"RECIPIENTS:
9902082N 055.Date: 02/24/1999 Holder: 1217 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE)~
LTTRENCL13 1S~
AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.Doc Id TRM Doc Title TECHNICAL REQUIREMENTS MANUAL FOR GINNA STATION Rev Rev Date Qty 008 02/25/1999 1 9903050332 9'70225 PDR ADQCK 05000244 PDR Receipt Acknowledgement and Action Taken: Signature Date Return to: Rochester Gas&.Electric Corporation Ginna Station-Records Management 1503 Lake Road Ontario, New York 14519 Rochester Gas and Electric Corporation Inter-Office Correspondence February 24, 1999  
DISR061CHESTERGASEc'ELECTRIC CORATIONDOCUMENTCONTROLDocumentTransmittal To:DOCUMENTCONTROLDESKUSNRCATT:ALLENJOHNSONPROJECTDOCTORATE 1-1WASHINGTON DC20555Transmittal:
9902082N055.Date:02/24/1999 Holder:1217LISTEDBELOWARENEWORREVISEDCONTROLLED DOCUMENTS.
REVIEWTHEATTACHEDINSTRUCTION LETTER(IFAPPLICABLE)~
ANDUPDATEYOURCONTROLLED DOCUMENTINACCORDANCE WITHRM-RDM-1.
DocIdTRMDocTitleTECHNICAL REQUIREMENTS MANUALFORGINNASTATIONRevRevDateQty00802/25/1999 19903050332 9'70225PDRADQCK05000244PDRReceiptAcknowledgement andActionTaken:Signature DateReturnto:Rochester Gas&.ElectricCorporation GinnaStation-RecordsManagement 1503LakeRoadOntario,NewYork14519 Rochester GasandElectricCorporation Inter-Office Correspondence February24,1999


==Subject:==
==Subject:==
Technical Requirements Manual(TRM)Revision8TQIDistribution Attachedaretheassociated revisedpagesfortheGinnaStationTechnical Requirements Manual(TRM).ThechangesincludedwithinRevision8aresummarized asfollows:1.NewTRsandsurveillances wereaddedtoprovidetherequirements forspentfuelpoolcoolingduringnormalconditions andduringafullcoreofHoad.Revision8oftheTRMisconsidered effective February25,1999.Instructions forthenecessary changestoyourcontrolled copyoftheITSareasfollows:VolumeSectionRemoveInsertIIIIIImIIIIIIIIIIIIIIIIIIIIITRMTRMTRMTOCTRMChapter3.7TRMChapter3.7TRMChapter3.9TRMChapter3.9TRMChapter3.9TRMChapter3.9TRMChapter3.9CoverPageLEP-iTRM3.9-2TRM3.9-3CoverPageLEP-iiTRM3.7-25TRM3.7-26TRM3.9-2TRM3.9-3TRM3.9-5TRM3,9-6TRM3.9-7PleasecontactTomHarding(extension 3384)ifyouhaeanyquestions.
Technical Requirements Manual (TRM)Revision 8 TQI Distribution Attached are the associated revised pages for the Ginna Station Technical Requirements Manual (TRM).The changes included within Revision 8 are summarized as follows: 1.New TRs and surveillances were added to provide the requirements for spent fuel pool cooling during normal conditions and during a full core ofHoad.Revision 8 of the TRM is considered effective February 25, 1999.Instructions for the necessary changes to your controlled copy of the ITS are as follows: Volume Section Remove Insert III III m III III III III III III III TRM TRM TRM TOC TRM Chapter 3.7 TRM Chapter 3.7 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 Cover Page LEP-i TRM 3.9-2 TRM 3.9-3 Cover Page LEP-i i TRM 3.7-25 TRM 3.7-26 TRM 3.9-2 TRM 3.9-3 TRM 3.9-5 TRM 3,9-6 TRM 3.9-7 Please contact Tom Harding (extension 3384)if you ha e any questions.
ThomasL.Harding 0~1 GINNASTATIONTRReision7TECHNICAL FIEQUIMENTSMANUAL{TM}7.Responsible HanagetEffective DateContiolledyNo./~l ListofEffective Pages(TRH)PageRev.TOCPageRev.Section3.3(con'd)PageRev.Section3.7(con'd)PageRev.Section1.0TRM1.0-10Section.2.0='RH2.0-1'6Section3.0TRH3.0;11fSection3.1"-TRN3.3-13TRH3.3-14TRH3.3-15'RN3.3-16Section,TRH:3:4-.'.1~TRH3.4-2TRH3.4-3TRN3.4-4TRN3.4-5.TRN,3.4-6'JRH3.4-7TRH3.4-.8-TRN3.4-93.41-100000TRN3.7-10TRN3.7-11TRH3.7-12TRH3.7-13,TRH3.7-14TRM3.7-15TRH3.7-16TRM3.7-17TRM3.7-18TRN3.7-19TRN3.7-20TRM3.7-21TRN3.7-22TRM3.7-23TRM3.7-2461114161166611TRH3.1-1TRH3..1-2TRM3.1-3"TRH3.1-4TRM3.1-5TRH3.1-6,TRH3.1-7012,051'2TRN3.4-10,--3TRN3.4-1'1.;."--'
Thomas L.Harding 0~1 GINNA STATION TR Re ision 7 TECHNICAL FIEQUI MENTS MANUAL{T M}7.Responsible Hanaget Effective Date Conti ol l ed y No./~l List of Effective Pages (TRH)Page Rev.TOC Page Rev.Section 3.3 (con'd)Page Rev.Section 3.7 (con'd)Page Rev.Section 1.0 TRM 1.0-1 0 Section.2.0='RH 2.0-1'6 Section 3.0 TRH 3.0;1 1f Section 3.1"-TRN 3.3-13 TRH 3.3-14 TRH 3.3-15'RN 3.3-16 Section , TRH:3: 4-.'.1~TRH 3.4-2 TRH 3.4-3 TRN 3.4-4 TRN 3.4-5.TRN,3.4-6'JRH 3.4-7 TRH 3.4-.8-TRN 3.4-9 3.4 1-1 0 0 0 0 0 TRN 3.7-10 TRN 3.7-11 TRH 3.7-12 TRH 3.7-13 , TRH 3.7-14 TRM 3.7-15 TRH 3.7-16 TRM 3.7-17 TRM 3.7-18 TRN 3.7-19 TRN 3.7-20 TRM 3.7-21 TRN 3.7-22 TRM 3.7-23 TRM 3.7-24 6 1 1 1 4 1 6 1 1 6 6 6 1 1 TRH 3.1-1 TRH 3..1-2 TRM 3.1-3" TRH 3.1-4 TRM 3.1-5 TRH 3.1-6, TRH 3.1-7 0 1 2 , 0 5 1'2 TRN 3.4-10,--3 TRN 3.4-1'1.;."--'
3TRH3.4-12-.3TRN'3.4-13" 3TRN3.4-14Section3.5Section3.8TRH3.8-1TRH3.8-2TRH3.8-'3Section3.9036TRN3.2-1Section3.6Section,3.2
3 TRH 3.4-12-.3 TRN'3.4-13" 3 TRN 3.4-14 Section 3.5 Section 3.8 TRH 3.8-1 TRH 3.8-2 TRH 3.8-'3 Section 3.9 0 3 6 TRN 3.2-1 Section 3.6 Section,3.2
'RM3;5-10TRH3.9-1TRM3.9-2TRH3.9-3TRN3.9-4Section3.3TRH3.6-10Section4.0TRH3.3-1TRH3.3-2TRN3.3-3TRH3.3-4TRH3.3-5TRN3.3-6TRN3.3-7TRN3.3-8TRN3.3-9TRM3.3-10TRH3.3-11TRN3.3-12101000~116444Section3.7TRN3.7-1TRH3.7-2TRH3.7-3.TRH3.7-4'TRH3;7-5'RH3.7-6TRH"3.7-7.
'RM 3;5-1 0 TRH 3.9-1 TRM 3.9-2 TRH 3.9-3 TRN 3.9-4 Section 3.3 TRH 3.6-1 0 Section 4.0 TRH 3.3-1 TRH 3.3-2 TRN 3.3-3 TRH 3.3-4 TRH 3.3-5 TRN 3.3-6 TRN 3.3-7 TRN 3.3-8 TRN 3.3-9 TRM 3.3-10 TRH 3.3-11 TRN 3.3-12 1 0 1 0 0 0~1 1 6 4 4 4 Section 3.7 TRN 3.7-1 TRH 3.7-2 TRH 3.7-3.TRH 3.7-4'TRH 3;7-5'RH 3.7-6 TRH"3.7-7.
TRH3.7-8'.TRH3,7-'9116,41131TRN4.0-1Section5.0TRH5.0-1TRM5.0-2GinnaStationTRHLEP-iRevision7
TRH 3.7-8'.TRH 3, 7-'9 1 1 6 ,4 1 1 3 1 TRN 4.0-1 Section 5.0 TRH 5.0-1 TRM 5.0-2 Ginna Station TRH LEP-i Revision 7
~~TABLEOFCONTENTS1.0USEANDAPPLICATION
~~TABLE OF CONTENTS 1.0 USE AND APPLICATION
....................
....................
1.0-12.03.03.03.13.1.13.1.2SAFETY,LIMITS(SLs)LIHITINGCONDITION FOROPERATION (LCO)APPLICABILITY SURVEILLANCE REQUIREMENT (SR)APPLICABILITY REACTIVITY CONTROLSYSTEMS.BoronInjection System-MODES 1,2,3,and4....BoronInjection System-MODE 5.2.0-13.0-13.0-13.1-13.1-13.1-63.2POWERDISTRIBUTION LIMITS.....:.........3.2-13.33.3.13.3.23.3.33.3.43.3.53.43.4.13.4.23.4.33.53.6INSTRUMENTATION ControlRoomEmergency AirTreatment System(GREATS)Instrumentation Circulating WaterFloodProtection Instrumentation
1.0-1 2.0 3.0 3.0 3.1 3.1.1 3.1.2 SAFETY, LIMITS (SLs)LIHITING CONDITION FOR OPERATION (LCO)APPLICABILITY SURVEILLANCE REQUIREMENT (SR)APPLICABILITY REACTIVITY CONTROL SYSTEMS.Boron Injection System-MODES 1, 2, 3, and 4....Boron Injection System-MODE 5.2.0-1 3.0-1 3.0-1 3.1-1 3.1-1 3.1-6 3.2 POWER DISTRIBUTION LIMITS.....:.........3.2-1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.4 3.4.1 3.4.2 3.4.3 3.5 3.6 INSTRUMENTATION Control Room Emergency Air Treatment System (GREATS)Instrumentation Circulating Water Flood Protection Instrumentation
.MovableIn-CoreInstrumentation FireDetection Instrumentation
.Movable In-Core Instrumentation Fire Detection Instrumentation
.LowTemperature Overpressure Protection (LTOP)ArmingLogicREACTORCOOLANTSYSTEM(RCS)ReactorVesselHeadVentsRCSChemistry Anticipated Transients WithoutScram(ATWS)Mitigation EMERGENCY CORECOOLINGSYSTEHS(ECCS)CONTAINMENT SYSTEMS3.3-13.3-13~333.3-63~373.3-143.4-13.4-13.4-33.4-83.5-13.6-13.73.7.13.7.23.7.33.7.43.7.53.7.63.83.8.13.8.2PLANTSYSTEMSFireSuppression WaterSources.FireSuppression SprayandSprinkler HalonSystemsFireHoseStations.FireBarrierPenetration Seals.FireYardLoop.ELECTRICAL POWERSYSTEMS.Offsit'ePowerSourcesInstrument BusD.~~t~Systems3.7-13.7-13.7-63.7-113.7-143.7-18307233.8-13.8-13.8-23.93.9.13.9.23.9.3REFUELING OPERATIONS
.Low Temperature Overpressure Protection (LTOP)Arming Logic REACTOR COOLANT SYSTEM (RCS)Reactor Vessel Head Vents RCS Chemistry Anticipated Transients Without Scram (ATWS)Mitigation EMERGENCY CORE COOLING SYSTEHS (ECCS)CONTAINMENT SYSTEMS 3.3-1 3.3-1 3~3 3 3.3-6 3~3 7 3.3-14 3.4-1 3.4-1 3.4-3 3.4-8 3.5-1 3.6-1 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.8 3.8.1 3.8.2 PLANT SYSTEMS Fire Suppression Water Sources.Fire Suppression Spray and Sprinkler Halon Systems Fire Hose Stations.Fire Barrier Penetration Seals.Fire Yard Loop.ELECTRICAL POWER SYSTEMS.Offsit'e Power Sources Instrument Bus D.~~t~Systems 3.7-1 3.7-1 3.7-6 3.7-11 3.7-14 3.7-18 30723 3.8-1 3.8-1 3.8-2 3.9 3.9.1 3.9.2 3.9.3 REFUELING OPERATIONS
.FuelStorageinSpentFuelPool(SFP)RegionFuelAssemblyMovementinAuxiliary BuildingRefueling Manipulator CraneInterlocks
.Fuel Storage in Spent Fuel Pool (SFP)Region Fuel Assembly Movement in Auxiliary Building Refueling Manipulator Crane Interlocks
.23.9-13.9-13.9-23.9-4GinnaStationTRHRevision
.2 3.9-1 3.9-1 3.9-2 3.9-4 Ginna Station TRH Revision
~+lIFuelAssemblyMovementinAuxiliaryBuildingTR3.9.?3.9REFUELING OPERATIONS 3.9.2FuelAssemblyMovementinAuxiliary BuildingTR3.9.2Duringmovementofirradiated fuelassemblies, thefollowing sha'bemet:a.Radiation levelsinthespentfuelpool(SFP)areashallbemonitored c'ohtinuously; b.Aloadinexcessofonefuelassemblyandit.",handlingtoolshallnotbestationed nrtransferred oveithestoragerackscontaining spentfuel;andc.TheSFPtemperature shallbez150'F.-NOTE-Theloadrestriction isnotapplicable formovementofconsolidated fuelrodcanisters ifthespentfuelracksbeneaththetransported canisteronlycontainfuelwhichhasdecayedz60dayssincebeingirradiated.
~+l I Fuel Assembly Movement in Auxil iary Building TR 3.9.?3.9 REFUELING OPERATIONS 3.9.2 Fuel Assembly Movement in Auxiliary Building TR 3.9.2 During movement of irradiated fuel assemblies, the following sha'be met: a.Radiation levels in the spent fuel pool (SFP)area shall be monitored c'ohtinuously; b.A load in excess of one fuel assembly and it.", handling tool shall not be stationed nr transferred ovei the storage racks containing spent fuel;and c.The SFP temperature shall be z 150'F.-NOTE-The load restriction is not applicable for movement of consolidated fuel rod canisters if the spent fuel racks beneath the transported canister only contain fuel which has decayed z 60 days since being irradiated.
APPLICABILITY:
APPLICABILITY:
Duringmovementofirradiated fuelassemblies intheoperating floorareaoftheAuxiliary Building.
During movement of irradiated fuel assemblies in the operating floor area of the Auxiliary Building.ACTIONS CONDITION REQUIRED ACTION COMPLETION T IHE A.Radiation levels not continuously monitored.
ACTIONSCONDITION REQUIREDACTIONCOMPLETION TIHEA.Radiation levelsnotcontinuously monitored.
A.I Suspend movement of irradiated fuel assemblies.
A.ISuspendmovementofirradiated fuelassemblies.
Immediately OR Load restriction not met.OR SFP temperature not within limit.Ginna Station TRH TRH 3.9-2 Revision 0
Immediately ORLoadrestriction notmet.ORSFPtemperature notwithinlimit.GinnaStationTRHTRH3.9-2Revision0
~~J Fuel Assembly Movement in Auxiliary Building TH 3.9.?SURVEILLANCE RE(UIPEMENTS SURVEILLANCE FREQUENCY'lSR 3.9.2.1 Verify no load in excess of one fuel assembly and its handling tool is stationed or transferred over the storage racks.Once prior to moving loads over the storage rac).'ontaining spent iuel TSR 3.9.2,2 Verify radiation monitors in SFP area are OPERABLE.24 hours TSR 3.9.2.3 Verify SFP temperature is within limit.24 hours Ginna Station TRM TRM 3.9~3 Revision 0}}
~~J FuelAssemblyMovementinAuxiliary BuildingTH3.9.?SURVEILLANCE RE(UIPEMENTS SURVEILLANCE FREQUENCY
'lSR3.9.2.1Verifynoloadinexcessofonefuelassemblyanditshandlingtoolisstationed ortransferred overthestorageracks.Oncepriortomovingloadsoverthestoragerac).'ontaining spentiuelTSR3.9.2,2Verifyradiation monitorsinSFPareaareOPERABLE.
24hoursTSR3.9.2.3VerifySFPtemperature iswithinlimit.24hoursGinnaStationTRMTRM3.9~3Revision0}}

Revision as of 13:35, 7 July 2018

Rev 4 to Technical Requirements Manual (Trm).
ML17265A557
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/25/1999
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-990225, NUDOCS 9903050332
Download: ML17265A557 (11)


Text

V

SUBJECT:

Revi to"Technical Requirements Manual (TRM)." ,DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL TITLE: OR Submittal:

General Distribution C SIZE: CATEGORY 1, REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)r.<ACCESSION NBR:9903050332 DOC.DATE: 99/02/25 NOTARIZED:.

NO DOCKET¹FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 050 0244 AUTH..NEGATE AUTHOR AFFILIATION

  • Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION rzr~y/NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)

.05000244 E INTERNAL: RECIPIENT ID CODE/NAME PD1-1 LA VISSING,G.

NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNG,1 OGC/HDS3 COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-1'D NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIES LTTR ENCL G EXTERNAL: NOAC NRC PDR D 0 N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 13 1 S~

DISR061 CHESTER GAS Ec'ELECTRIC C ORATION DOCUMENT CONTROL Document Transmittal To: DOCUMENT CONTROL DESK US NRC ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 Transmittal:

9902082N 055.Date: 02/24/1999 Holder: 1217 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.

REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE)~

AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.Doc Id TRM Doc Title TECHNICAL REQUIREMENTS MANUAL FOR GINNA STATION Rev Rev Date Qty 008 02/25/1999 1 9903050332 9'70225 PDR ADQCK 05000244 PDR Receipt Acknowledgement and Action Taken: Signature Date Return to: Rochester Gas&.Electric Corporation Ginna Station-Records Management 1503 Lake Road Ontario, New York 14519 Rochester Gas and Electric Corporation Inter-Office Correspondence February 24, 1999

Subject:

Technical Requirements Manual (TRM)Revision 8 TQI Distribution Attached are the associated revised pages for the Ginna Station Technical Requirements Manual (TRM).The changes included within Revision 8 are summarized as follows: 1.New TRs and surveillances were added to provide the requirements for spent fuel pool cooling during normal conditions and during a full core ofHoad.Revision 8 of the TRM is considered effective February 25, 1999.Instructions for the necessary changes to your controlled copy of the ITS are as follows: Volume Section Remove Insert III III m III III III III III III III TRM TRM TRM TOC TRM Chapter 3.7 TRM Chapter 3.7 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 Cover Page LEP-i TRM 3.9-2 TRM 3.9-3 Cover Page LEP-i i TRM 3.7-25 TRM 3.7-26 TRM 3.9-2 TRM 3.9-3 TRM 3.9-5 TRM 3,9-6 TRM 3.9-7 Please contact Tom Harding (extension 3384)if you ha e any questions.

Thomas L.Harding 0~1 GINNA STATION TR Re ision 7 TECHNICAL FIEQUI MENTS MANUAL{T M}7.Responsible Hanaget Effective Date Conti ol l ed y No./~l List of Effective Pages (TRH)Page Rev.TOC Page Rev.Section 3.3 (con'd)Page Rev.Section 3.7 (con'd)Page Rev.Section 1.0 TRM 1.0-1 0 Section.2.0='RH 2.0-1'6 Section 3.0 TRH 3.0;1 1f Section 3.1"-TRN 3.3-13 TRH 3.3-14 TRH 3.3-15'RN 3.3-16 Section , TRH:3: 4-.'.1~TRH 3.4-2 TRH 3.4-3 TRN 3.4-4 TRN 3.4-5.TRN,3.4-6'JRH 3.4-7 TRH 3.4-.8-TRN 3.4-9 3.4 1-1 0 0 0 0 0 TRN 3.7-10 TRN 3.7-11 TRH 3.7-12 TRH 3.7-13 , TRH 3.7-14 TRM 3.7-15 TRH 3.7-16 TRM 3.7-17 TRM 3.7-18 TRN 3.7-19 TRN 3.7-20 TRM 3.7-21 TRN 3.7-22 TRM 3.7-23 TRM 3.7-24 6 1 1 1 4 1 6 1 1 6 6 6 1 1 TRH 3.1-1 TRH 3..1-2 TRM 3.1-3" TRH 3.1-4 TRM 3.1-5 TRH 3.1-6, TRH 3.1-7 0 1 2 , 0 5 1'2 TRN 3.4-10,--3 TRN 3.4-1'1.;."--'

3 TRH 3.4-12-.3 TRN'3.4-13" 3 TRN 3.4-14 Section 3.5 Section 3.8 TRH 3.8-1 TRH 3.8-2 TRH 3.8-'3 Section 3.9 0 3 6 TRN 3.2-1 Section 3.6 Section,3.2

'RM 3;5-1 0 TRH 3.9-1 TRM 3.9-2 TRH 3.9-3 TRN 3.9-4 Section 3.3 TRH 3.6-1 0 Section 4.0 TRH 3.3-1 TRH 3.3-2 TRN 3.3-3 TRH 3.3-4 TRH 3.3-5 TRN 3.3-6 TRN 3.3-7 TRN 3.3-8 TRN 3.3-9 TRM 3.3-10 TRH 3.3-11 TRN 3.3-12 1 0 1 0 0 0~1 1 6 4 4 4 Section 3.7 TRN 3.7-1 TRH 3.7-2 TRH 3.7-3.TRH 3.7-4'TRH 3;7-5'RH 3.7-6 TRH"3.7-7.

TRH 3.7-8'.TRH 3, 7-'9 1 1 6 ,4 1 1 3 1 TRN 4.0-1 Section 5.0 TRH 5.0-1 TRM 5.0-2 Ginna Station TRH LEP-i Revision 7

~~TABLE OF CONTENTS 1.0 USE AND APPLICATION

....................

1.0-1 2.0 3.0 3.0 3.1 3.1.1 3.1.2 SAFETY, LIMITS (SLs)LIHITING CONDITION FOR OPERATION (LCO)APPLICABILITY SURVEILLANCE REQUIREMENT (SR)APPLICABILITY REACTIVITY CONTROL SYSTEMS.Boron Injection System-MODES 1, 2, 3, and 4....Boron Injection System-MODE 5.2.0-1 3.0-1 3.0-1 3.1-1 3.1-1 3.1-6 3.2 POWER DISTRIBUTION LIMITS.....:.........3.2-1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.4 3.4.1 3.4.2 3.4.3 3.5 3.6 INSTRUMENTATION Control Room Emergency Air Treatment System (GREATS)Instrumentation Circulating Water Flood Protection Instrumentation

.Movable In-Core Instrumentation Fire Detection Instrumentation

.Low Temperature Overpressure Protection (LTOP)Arming Logic REACTOR COOLANT SYSTEM (RCS)Reactor Vessel Head Vents RCS Chemistry Anticipated Transients Without Scram (ATWS)Mitigation EMERGENCY CORE COOLING SYSTEHS (ECCS)CONTAINMENT SYSTEMS 3.3-1 3.3-1 3~3 3 3.3-6 3~3 7 3.3-14 3.4-1 3.4-1 3.4-3 3.4-8 3.5-1 3.6-1 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.8 3.8.1 3.8.2 PLANT SYSTEMS Fire Suppression Water Sources.Fire Suppression Spray and Sprinkler Halon Systems Fire Hose Stations.Fire Barrier Penetration Seals.Fire Yard Loop.ELECTRICAL POWER SYSTEMS.Offsit'e Power Sources Instrument Bus D.~~t~Systems 3.7-1 3.7-1 3.7-6 3.7-11 3.7-14 3.7-18 30723 3.8-1 3.8-1 3.8-2 3.9 3.9.1 3.9.2 3.9.3 REFUELING OPERATIONS

.Fuel Storage in Spent Fuel Pool (SFP)Region Fuel Assembly Movement in Auxiliary Building Refueling Manipulator Crane Interlocks

.2 3.9-1 3.9-1 3.9-2 3.9-4 Ginna Station TRH Revision

~+l I Fuel Assembly Movement in Auxil iary Building TR 3.9.?3.9 REFUELING OPERATIONS 3.9.2 Fuel Assembly Movement in Auxiliary Building TR 3.9.2 During movement of irradiated fuel assemblies, the following sha'be met: a.Radiation levels in the spent fuel pool (SFP)area shall be monitored c'ohtinuously; b.A load in excess of one fuel assembly and it.", handling tool shall not be stationed nr transferred ovei the storage racks containing spent fuel;and c.The SFP temperature shall be z 150'F.-NOTE-The load restriction is not applicable for movement of consolidated fuel rod canisters if the spent fuel racks beneath the transported canister only contain fuel which has decayed z 60 days since being irradiated.

APPLICABILITY:

During movement of irradiated fuel assemblies in the operating floor area of the Auxiliary Building.ACTIONS CONDITION REQUIRED ACTION COMPLETION T IHE A.Radiation levels not continuously monitored.

A.I Suspend movement of irradiated fuel assemblies.

Immediately OR Load restriction not met.OR SFP temperature not within limit.Ginna Station TRH TRH 3.9-2 Revision 0

~~J Fuel Assembly Movement in Auxiliary Building TH 3.9.?SURVEILLANCE RE(UIPEMENTS SURVEILLANCE FREQUENCY'lSR 3.9.2.1 Verify no load in excess of one fuel assembly and its handling tool is stationed or transferred over the storage racks.Once prior to moving loads over the storage rac).'ontaining spent iuel TSR 3.9.2,2 Verify radiation monitors in SFP area are OPERABLE.24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TSR 3.9.2.3 Verify SFP temperature is within limit.24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Ginna Station TRM TRM 3.9~3 Revision 0