ML17328A746: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Attachment toAEP:NRC:0659S ProposedTechnical Specification PagesA90iiOiOi47,
{{#Wiki_filter:Attachment to AEP:NRC:0659S Proposed Technical Specification Pages A 90iiOiOi47,~060003i5 PDR ADOCK o PDC P ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant Manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.6.1.2 The Shift Supervisor (or during his absence from the control room complex, a designated individual) shall be responsible for the control room command function.A management directive to this effect signed by the Vice President-Nuclear Operations shall be reissued to all station personnel on an annual basis, 6.2 ORGANIZATION ONSITE AND OFFSITE ORGANIZATIONS 6.2.1 Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.
~060003i5 PDRADOCKoPDCP ADMINISTRATIVE CONTROLS6.1RESPONSIBILITY 6.1.1ThePlantManagershallberesponsible foroverallfacilityoperation andshalldelegateinwritingthesuccession tothisresponsibility duringhisabsence.6.1.2TheShiftSupervisor (orduringhisabsencefromthecontrolroomcomplex,adesignated individual) shallberesponsible forthecontrolroomcommandfunction.
The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.Lines of authority, responsibility, and communication shall be established and defined for the highest management level through intermediate levels to and including all operating organization positions.
Amanagement directive tothiseffectsignedbytheVicePresident
These relationships shall be documented and updated, as appropriate, in the form of organizational charts.These organizational charts will be documented in the FSAR and updated in accordance with 10 CFR 50.71(e).b.The Plant Manager shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.C.The Vice President-Nuclear Operations shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.d.The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager;however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
-NuclearOperations shallbereissuedtoallstationpersonnel onanannualbasis,6.2ORGANIZATION ONSITEANDOFFSITEORGANIZATIONS 6.2.1Onsiteandoffsiteorganizations shallbeestablished forunitoperation andcorporate management, respectively.
FACILITY STAFF 6.2.2 The Facility organization shall be subject to the following:
Theonsiteandoffsiteorganizations shallincludethepositions foractivities affecting thesafetyofthenuclearpowerplant.Linesofauthority, responsibility, andcommunication shallbeestablished anddefinedforthehighestmanagement levelthroughintermediate levelstoandincluding alloperating organization positions.
a.Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6'-1.COOK NUCLEAR PLANT-UNIT 1 6-1 AMENDMENT NO.
Theserelationships shallbedocumented andupdated,asappropriate, intheformoforganizational charts.Theseorganizational chartswillbedocumented intheFSARandupdatedinaccordance with10CFR50.71(e).
ADMINISTRATIVE CONTROLS b.At least one licensed Operator shall be in the control room when fuel is in the reactor.In addition, while the unit is in Mode 1, 2, 3, or 4, at least one licensed Senior Operator shall be in the control room.*c.An individual qualified in radiation protection procedures shall I be on site when fuel is in the reactor.d.All CORE ALTERATIONS shall be directly supervised by a licensed Senior Operator trained or qualified in refueling and CORE ALTERATIONS (SO-CA)who has no other concurrent responsibilities during this operation.
b.ThePlantManagershallberesponsible foroverallunitsafeoperation andshallhavecontroloverthoseonsiteactivities necessary forsafeoperation andmaintenance oftheplant.C.TheVicePresident
e.A site fire brigade of at onsite at all times.The of the minimum shift crew or any personnel required fire emergency.
-NuclearOperations shallhavecorporate responsibility foroverallplantnuclearsafetyandshalltakeanymeasuresneededtoensureacceptable performance ofthestaffinoperating, maintaining, andproviding technical supporttotheplanttoensurenuclearsafety.d.Theindividuals whotraintheoperating staffandthosewhocarryouthealthphysicsandqualityassurance functions mayreporttotheappropriate onsitemanager;however,theyshallhavesufficient organizational freedomtoensuretheirindependence fromoperating pressures.
least 5 members*shall be maintained fire brigade shall not include 3 members necessary for safe shutdown of the unit for other essential functions during a f.The amount of overtime worked by plant staff members performing safety-related functions must be limited in accordance with NRC Policy Statement on working hours (Generic Letter 82-12).g.The Shift Supervisor, Assistant Shift Supervisor, and Unit Supervisor shall hold a Senior Operator License.h.The Operations Superintendent must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor and one mid-level Operations Production Supervisor shall hold a current Senior Operator Licensees*The individual qualified in radiation protection procedures and the composition of the fire brigade may be less than the minimum requirements for a period of time not to exceed 2 hours, in order to accommodate unexpected absence provided immediate action is taken to fill the required positions.
FACILITYSTAFF6.2.2TheFacilityorganization shallbesubjecttothefollowing:
COOK NUCLEAR PLANT-UNIT 1 6-2 AMENDMENT NO.
a.Eachondutyshiftshallbecomposedofatleasttheminimumshiftcrewcomposition showninTable6'-1.COOKNUCLEARPLANT-UNIT16-1AMENDMENT NO.
ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1)the Plant Radiation Protection Manager, who shall meet or exceed qualifications of f Regulatory Guide 1.8, September 1975, (2)the Shift Technical Advisor, who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents and, (3)the Operations Superintendent must hold or have held a Senior Operator License as specified in Section 6.2.2.h.6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COMMITTEE PNSRC FUNCTION 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to nuclear safety.COMPOSITION 6.5.1.2 The PNSRC shall be composed of Assistant Plant Managers, Department Superintendents, or supervisory personnel reporting directly to the Plant Manager, Assistant Plant Managers or Department Superintendents from the functional areas listed below: Licensing Activities Safety&Assessment Operations Technical Support Radiation Protection Maintenance The Chairman, his alternate and other members and their alternates of the PNSRC shall be designated by the Plant Manager.In addition to the Chairman, the PNSRC membership shall consist of one individual from each of the areas designated above.PNSRC members and alternates shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.
ADMINISTRATIVE CONTROLSb.AtleastonelicensedOperatorshallbeinthecontrolroomwhenfuelisinthereactor.Inaddition, whiletheunitisinMode1,2,3,or4,atleastonelicensedSeniorOperatorshallbeinthecontrolroom.*c.Anindividual qualified inradiation protection procedures shallIbeonsitewhenfuelisinthereactor.d.AllCOREALTERATIONS shallbedirectlysupervised byalicensedSeniorOperatortrainedorqualified inrefueling andCOREALTERATIONS (SO-CA)whohasnootherconcurrent responsibilities duringthisoperation.
The nuclear power plant operations individual shall meet the qualifications of Section 4.2.2 of ANSI N18.1-1971 except for the requirement to hold a current Senior Operator License.The operations individual must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor.The maintenance individual shall meet the qualifications of Section 4.2.3 of ANSI N18.1-1971.
e.Asitefirebrigadeofatonsiteatalltimes.Theoftheminimumshiftcreworanypersonnel requiredfireemergency.
COOK NUCLEAR PLANT-UNIT 1 6-4 AMENDMENT NO.
least5members*shallbemaintained firebrigadeshallnotinclude3membersnecessary forsafeshutdownoftheunitforotheressential functions duringaf.Theamountofovertimeworkedbyplantstaffmembersperforming safety-related functions mustbelimitedinaccordance withNRCPolicyStatement onworkinghours(GenericLetter82-12).g.TheShiftSupervisor, Assistant ShiftSupervisor, andUnitSupervisor shallholdaSeniorOperatorLicense.h.TheOperations Superintendent mustholdorhaveheldaSeniorOperatorLicenseatCookNuclearPlantorasimilarreactorandonemid-level Operations Production Supervisor shallholdacurrentSeniorOperatorLicensees
ADMINISTRATIVE CONTROLS'I h.Performance of special reviews, investigations of analyses and reports thereon as requested by the Chairman of the NSDRC.i.Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.j.Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.k.Review of any accidental, unplanned, or uncontrolled radioactive release including the preparation of reports covering evaluations, recommendations, and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Vice President-Nuclear Operations and to the NSDRC.1.Review of changes to the PROCESS CONTROL PROGRAM, OFFSITE DOSE CALCULATION MANUAL, and radwaste treatment system.AUTHORITY 6.5.1.7 The PNSRC shall: a.Recommend to the Plant Manager written approval or disapproval of items considered under 6.5.1.6 (a)through (d)above.b.Render determinations in writing with regard to whether or not each item considered under 6.5.1.6 (a)through (c)and (e)above constitutes an unreviewed safety question.Provide written notification within 24 hours to the Vice President-Nuclear Operations and the NSDRC of disagreement between the PNSRC and the Plant Manager;however, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.RECORDS 6.5.1.8 The PNSRC shall maintain written minutes of each meeting and copies shall be provided to the Chairman of the NSDRC.6.5.2 NUCLEAR SAFETY AND DESIGN REVIEW COMMITTEE NSDRC FUNCTION 6.5.2.1 The NSDRC shall function to provide independent review and audit of designated activities in the areas of: a.nuclear power plant operations b.nuclear engineering COOK NUCLEAR PLANT-UNIT 1 6-6 AMENDMENT NO.
*Theindividual qualified inradiation protection procedures andthecomposition ofthefirebrigademaybelessthantheminimumrequirements foraperiodoftimenottoexceed2hours,inordertoaccommodate unexpected absenceprovidedimmediate actionistakentofilltherequiredpositions.
ADMINISTRATIVE CONTROLS CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NSDRC Chairman to provide expert advice to the NSDRC.MEETING FRE UENCY 6.5.2.5 The NSDRC shall meet at least once per six months.gUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting shall be eight members, of whom no more than two shall be designated or temporary alternates.
COOKNUCLEARPLANT-UNIT16-2AMENDMENT NO.
The Chairman or acting Chairman+shall be present for all NSDRC meetings.If the number of members present*is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operations of the facility.For the purpose of a quorum, only the Plant Manager is considered to have line responsibility.
ADMINISTRATIVE CONTROLS6.3FACILITYSTAFFUALIFICATIONS 6.3.1Eachmemberofthefacilitystaffshallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 forcomparable positions, exceptfor(1)thePlantRadiation Protection Manager,whoshallmeetorexceedqualifications offRegulatory Guide1.8,September 1975,(2)theShiftTechnical Advisor,whoshallhaveabachelor's degreeorequivalent inascientific orengineering discipline withspecifictraininginplantdesign,andresponseandanalysisoftheplantfortransients andaccidents and,(3)theOperations Superintendent mustholdorhaveheldaSeniorOperatorLicenseasspecified inSection6.2.2.h.6.4TRAINING6.4.1Aretraining andreplacement trainingprogramforthefacilitystaffshallbemaintained underthedirection oftheTrainingManagerandshallmeetorexceedtherequirements andrecommendations ofSection5.5ofANSIN18.1-1971 andof10CFRPart55.6.5REVIEWANDAUDIT6.5.1PLANTNUCLEARSAFETYREVIEWCOMMITTEE PNSRCFUNCTION6.5.1.1ThePNSRCshallfunctiontoadvisethePlantManageronallmattersrelatedtonuclearsafety.COMPOSITION 6.5.1.2ThePNSRCshallbecomposedofAssistant PlantManagers, Department Superintendents, orsupervisory personnel reporting directlytothePlantManager,Assistant PlantManagersorDepartment Superintendents fromthefunctional areaslistedbelow:Licensing Activities Safety&Assessment Operations Technical SupportRadiation Protection Maintenance TheChairman, hisalternate andothermembersandtheiralternates ofthePNSRCshallbedesignated bythePlantManager.InadditiontotheChairman, thePNSRCmembership shallconsistofoneindividual fromeachoftheareasdesignated above.PNSRCmembersandalternates shallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 Section4.4forcomparable positions.
REVIEW 6.5.2.7.The NSDRC is responsible for assuring that independent**
Thenuclearpowerplantoperations individual shallmeetthequalifications ofSection4.2.2ofANSIN18.1-1971 exceptfortherequirement toholdacurrentSeniorOperatorLicense.Theoperations individual mustholdorhaveheldaSeniorOperatorLicenseatCookNuclearPlantorasimilarreactor.Themaintenance individual shallmeetthequalifications ofSection4.2.3ofANSIN18.1-1971.
reviews of the following are performed:
COOKNUCLEARPLANT-UNIT16-4AMENDMENT NO.
a.The safety evaluations for 1)changes to procedures, equipment or systems and 2)tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.b.Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.c.Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.d.Proposed changes in Technical Specifications or this operating license.e.Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
ADMINISTRATIVE CONTROLS'Ih.Performance ofspecialreviews,investigations ofanalysesandreportsthereonasrequested bytheChairmanoftheNSDRC.i.ReviewofthePlantSecurityPlanandimplementing procedures andshallsubmitrecommended changestotheChairmanoftheNSDRC.j.ReviewoftheEmergency Planandimplementing procedures andshallsubmitrecommended changestotheChairmanoftheNSDRC.k.Reviewofanyaccidental, unplanned, oruncontrolled radioactive releaseincluding thepreparation ofreportscoveringevaluations, recommendations, anddisposition ofthecorrective actiontopreventrecurrence andtheforwarding ofthesereportstotheVicePresident
*Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis.If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.**Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.
-NuclearOperations andtotheNSDRC.1.ReviewofchangestothePROCESSCONTROLPROGRAM,OFFSITEDOSECALCULATION MANUAL,andradwastetreatment system.AUTHORITY 6.5.1.7ThePNSRCshall:a.Recommend tothePlantManagerwrittenapprovalordisapproval ofitemsconsidered under6.5.1.6(a)through(d)above.b.Renderdeterminations inwritingwithregardtowhetherornoteachitemconsidered under6.5.1.6(a)through(c)and(e)aboveconstitutes anunreviewed safetyquestion.
COOK NUCLEAR PLANT-UNIT 1 6-8 AMENDMENT NO.
Providewrittennotification within24hourstotheVicePresident
ADM'ENISTRATIVE CONTROLS shall be approved by the appropriate department head as previously designated in writing by the Plant Manager.The Plant Manager shall approve Security Plan implementing procedures, Emergency Plan implementing procedures and Plant Manager Procedures'emporary changes to procedures which do not change the intent of the approved procedures shall be approved for implementation by two members of the plant staff, at least one of whom holds a Senior Operator license, and documented.
-NuclearOperations andtheNSDRCofdisagreement betweenthePNSRCandthePlantManager;however,thePlantManagershallhaveresponsibility forresolution ofsuchdisagreements pursuantto6.1.1above.RECORDS6.5.1.8ThePNSRCshallmaintainwrittenminutesofeachmeetingandcopiesshallbeprovidedtotheChairmanoftheNSDRC.6.5.2NUCLEARSAFETYANDDESIGNREVIEWCOMMITTEE NSDRCFUNCTION6.5.2.1TheNSDRCshallfunctiontoprovideindependent reviewandauditofdesignated activities intheareasof:a.nuclearpowerplantoperations b.nuclearengineering COOKNUCLEARPLANT-UNIT16-6AMENDMENT NO.
The temporary changes shall be approved by the original approval authority within 14 days of implementation.
ADMINISTRATIVE CONTROLSCONSULTANTS 6.5.2.4Consultants shallbeutilizedasdetermined bytheNSDRCChairmantoprovideexpertadvicetotheNSDRC.MEETINGFREUENCY6.5.2.5TheNSDRCshallmeetatleastoncepersixmonths.gUORUM6.5.2.6Aquorum,theminimumnumberofregularmembersandalternates requiredtoholdaNSDRCmeetingshallbeeightmembers,ofwhomnomorethantwoshallbedesignated ortemporary alternates.
For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change prior to implementation.
TheChairmanoractingChairman+shall bepresentforallNSDRCmeetings.
Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the Plant Manager.Each such modification shall be reviewed (reference T/S 6.5.3.1.e) by a qualified (reference T/S 6.5.3.1.d) individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modifications'roposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the Plant Manager.Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report or Technical Specifications shall be prepared, reviewed, and approved.Each such test or experiment shall be reviewed by qualified individuals/groups other than the individual/group which prepared the proposed test or experiment to assure cross-disciplinary review as appropriate for the proposed test or experiment.
Ifthenumberofmemberspresent*isgreaterthanaquorum,thenthemajorityparticipating andvotingatthemeetingshallnothavelineresponsibility foroperations ofthefacility.
Proposed tests and experiments shall be approved before implementation by the Plant Manager.Individuals who conducted the reviews performed in the accordance with Specification 6.5.3.1a, 6.5.3.lb, and 6.5.3.lc, shall be members of the plant management staff previously designated by the Plant Manager and shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.
Forthepurposeofaquorum,onlythePlantManagerisconsidered tohavelineresponsibility.
Each such review shall include a determination of whether or not additional, cross-disciplinary review is necessary.
REVIEW6.5.2.7.TheNSDRCisresponsible forassuringthatindependent**
If deemed necessary, such review shall be performed by qualified personnel of the appropriate discipline.
reviewsofthefollowing areperformed:
Each review shall include a determination of whether or not an unreviewed safety question is involved.Pursuant to 10 CFR 50.59, NRC approval of items involving unreviewed safety questions shall be obtained prior to the Plant Manager approval for implementation.
a.Thesafetyevaluations for1)changestoprocedures, equipment orsystemsand2)testsorexperiments completed undertheprovision of10CFR50.59toverifythatsuchactionsdidnotconstitute anunreviewed safetyquestion.
f.The Emergency Plan and implementing procedures shall be reviewed at least once per 12 months.Recommended changes to the COOK NUCLEAR PLANT-UNIT 1 6-11 AMENDMENT NO.
b.Proposedchangestoprocedures, equipment orsystemswhichinvolveanunreviewed safetyquestionasdefinedin10CFR50.59.c.Proposedtestsorexperiments whichinvolveanunreviewed safetyquestionasdefinedin10CFR50.59.d.ProposedchangesinTechnical Specifications orthisoperating license.e.Violations ofcodes,regulations, orders,Technical Specifications, licenserequirements, orofinternalprocedures orinstructions havingnuclearsafetysignificance.
ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant Manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.6.1.2 The Shift Supervisor (or during his absence from the control room complex, a designated individual) shall be responsible for the control room command function.A management directive to this effect signed by the Vice President-Nuclear Operations shall be reissued to all station personnel on an annual basis.6.2 ORGANIZATION ONSITE AND OFFSITE ORGANIZATIONS 6.2.1 ,Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.
*RegularNSDRCmembersareexpectedtoattendthemeetingwheneverpossible, andalternates mayattendasvotingmembersonlyonanirregular basis.Ifbotharegularmemberandhisalternate attendameeting,onlytheregularmembermayparticipate asavotingmember,andthealternate isconsidered aguest.**Independent reviewsmaybeperformed bygroupswhichreportdirectlytotheNSDRCandwhichmusthaveNSDRCmembership participation.
The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.Lines of authority, responsibility, and communication shall be established and defined for the highest management level through intermediate levels to and including all operating organization positions.
COOKNUCLEARPLANT-UNIT16-8AMENDMENT NO.
These relationships shall be documented and updated, as appropriate, in the form of organizational charts.These organizational charts will be documented in the FSAR and updated in accordance with 10 CFR 50.71(e).b.The Plant Manager shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.The Vice President-Nuclear Operations shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.d.The individuals who train the operating staff and those who carry ou't health physics and quality assurance functions may report to the appropriate onsite manager;however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.
ADM'ENISTRATIVE CONTROLSshallbeapprovedbytheappropriate department headaspreviously designated inwritingbythePlantManager.ThePlantManagershallapproveSecurityPlanimplementing procedures, Emergency Planimplementing procedures andPlantManagerProcedures'emporary changestoprocedures whichdonotchangetheintentoftheapprovedprocedures shallbeapprovedforimplementation bytwomembersoftheplantstaff,atleastoneofwhomholdsaSeniorOperatorlicense,anddocumented.
FACILITY STAFF 6.2.2 The Facility organization shall be subject to the following:
Thetemporary changesshallbeapprovedbytheoriginalapprovalauthority within14daysofimplementation.
a.Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.COOK NUCLEAR PLANT-UNIT 2 6-1 AMENDMENT NO.
Forchangestoprocedures whichmayinvolveachangeinintentoftheapprovedprocedures, thepersonauthorized abovetoapprovetheprocedure shallapprovethechangepriortoimplementation.
ADMINISTRATIVE CONTROLS b.At least one licensed Operator shall be in the control room when fuel is in the reactor.In addition, while the unit is in Mode 1, 2, 3, or 4, at least one licensed Senior Operator shall be in the control room.c.An individual*
Proposedchangesormodifications toplantnuclearsafety-related structures, systemsandcomponents shallbereviewedasdesignated bythePlantManager.Eachsuchmodification shallbereviewed(reference T/S6.5.3.1.e) byaqualified (reference T/S6.5.3.1.d) individual/group otherthantheindividual/group whichdesignedthemodification, butwhomaybefromthesameorganization astheindividual/group whichdesignedthemodifications'roposed modifications toplantnuclearsafety-related structures, systemsandcomponents shallbeapprovedpriortoimplementation bythePlantManager.Proposedtestsandexperiments whichaffectplantnuclearsafetyandarenotaddressed intheFinalSafetyAnalysisReportorTechnical Specifications shallbeprepared,
qualified in radiation protection procedures shall be on site when fuel is in the reactor.d.All CORE ALTERATIONS shall be directly supervised by a licensed Senior Operator trained or qualified in refueling and CORE ALTERATIONS (SO-CA)who has no other concurrent responsibilities during this operation.
: reviewed, andapproved.
e.A site fire brigade of at onsite at all times.The of the minimum shift crew or any personnel required fire emergency.
Eachsuchtestorexperiment shallbereviewedbyqualified individuals/groups otherthantheindividual/group whichpreparedtheproposedtestorexperiment toassurecross-disciplinary reviewasappropriate fortheproposedtestorexperiment.
least 5 members*shall be maintained fire brigade shall not include 3 members necessary for safe shutdown of the unit for other essential functions during a f.The amount of overtime worked by plant staff members performing safety-related functions must be limited in accordance with NRC Policy Statement on working hours (Generic Letter 82-12).g The Shift Supervisor, Assistant Shift Supervisor, and Unit Supervisor shall hold a Senior Operator License.The Operations Superintendent must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor and one mid-level Operations Production Supervisor shall hold a current Senior Operator License.*The individual qualified in radiation protection procedures and the composition of the fire brigade may be less than the minimum requirements for a period of time not to exceed 2 hours, in order to accommodate unexpected absence provided immediate action is taken to fill the required positions.
Proposedtestsandexperiments shallbeapprovedbeforeimplementation bythePlantManager.Individuals whoconducted thereviewsperformed intheaccordance withSpecification 6.5.3.1a, 6.5.3.lb, and6.5.3.lc, shallbemembersoftheplantmanagement staffpreviously designated bythePlantManagerandshallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 Section4.4forcomparable positions.
COOK NUCLEAR PLANT-UNIT 2 6-2 AMENDMENT NO.
Eachsuchreviewshallincludeadetermination ofwhetherornotadditional, cross-disciplinary reviewisnecessary.
ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1)the Plant Radiation Protection Manager, who shall meet or exceed qualifications of Regulatory Guide 1.8, September 1975, (2)the Shift Technical Advisor, who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents and, (3)the Operations Superintendent must hold or have held a Senior Operator License as specified in Section 6.2'.h.6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager and shall meet or I exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COMMITTEE PNSRC FUNCTION 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to'uclear safety.COMPOSITION 6.5.1.2 The PNSRC shall be composed of Assistant Plant Managers, Department Superintendents, or supervisory personnel reporting directly to the Plant Manager, Assistant Plant Managers or Department Superintendents from the functional areas listed below: Licensing Activities Safety&Assessment Operations Technical Support Radiation Protection Maintenance The Chairman, his alternate and other members and their alternates of the PNSRC-shall be designated by the Plant Manager.In addition to the Chairman, the PNSRC membership shall consist of one individual from each of the areas designated above.PNSRC members and alternates shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.
Ifdeemednecessary, suchreviewshallbeperformed byqualified personnel oftheappropriate discipline.
The nuclear power plant operations individual shall meet the qualifications of Section 4.2.2 of ANSI N18.1-1971 except for the requirement to hold a current Senior Operator License.The operations individual must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor.The maintenance individual shall meet the qualifications of Section 4.2.3 of ANSI N18.1-1971.
Eachreviewshallincludeadetermination ofwhetherornotanunreviewed safetyquestionisinvolved.
COOK NUCLEAR PLANT-UNIT 2 6-4 AMENDMENT NO.  
Pursuantto10CFR50.59,NRCapprovalofitemsinvolving unreviewed safetyquestions shallbeobtainedpriortothePlantManagerapprovalforimplementation.
f.TheEmergency Planandimplementing procedures shallbereviewedatleastonceper12months.Recommended changestotheCOOKNUCLEARPLANT-UNIT16-11AMENDMENT NO.
ADMINISTRATIVE CONTROLS6.1RESPONSIBILITY 6.1.1ThePlantManagershallberesponsible foroverallfacilityoperation andshalldelegateinwritingthesuccession tothisresponsibility duringhisabsence.6.1.2TheShiftSupervisor (orduringhisabsencefromthecontrolroomcomplex,adesignated individual) shallberesponsible forthecontrolroomcommandfunction.
Amanagement directive tothiseffectsignedbytheVicePresident
-NuclearOperations shallbereissuedtoallstationpersonnel onanannualbasis.6.2ORGANIZATION ONSITEANDOFFSITEORGANIZATIONS 6.2.1,Onsiteandoffsiteorganizations shallbeestablished forunitoperation andcorporate management, respectively.
Theonsiteandoffsiteorganizations shallincludethepositions foractivities affecting thesafetyofthenuclearpowerplant.Linesofauthority, responsibility, andcommunication shallbeestablished anddefinedforthehighestmanagement levelthroughintermediate levelstoandincluding alloperating organization positions.
Theserelationships shallbedocumented andupdated,asappropriate, intheformoforganizational charts.Theseorganizational chartswillbedocumented intheFSARandupdatedinaccordance with10CFR50.71(e).
b.ThePlantManagershallberesponsible foroverallunitsafeoperation andshallhavecontroloverthoseonsiteactivities necessary forsafeoperation andmaintenance oftheplant.TheVicePresident
-NuclearOperations shallhavecorporate responsibility foroverallplantnuclearsafetyandshalltakeanymeasuresneededtoensureacceptable performance ofthestaffinoperating, maintaining, andproviding technical supporttotheplanttoensurenuclearsafety.d.Theindividuals whotraintheoperating staffandthosewhocarryou'thealthphysicsandqualityassurance functions mayreporttotheappropriate onsitemanager;however,theyshallhavesufficient organizational freedomtoensuretheirindependence fromoperating pressures.
FACILITYSTAFF6.2.2TheFacilityorganization shallbesubjecttothefollowing:
a.Eachondutyshiftshallbecomposedofatleasttheminimumshiftcrewcomposition showninTable6.2-1.COOKNUCLEARPLANT-UNIT26-1AMENDMENT NO.
ADMINISTRATIVE CONTROLSb.AtleastonelicensedOperatorshallbeinthecontrolroomwhenfuelisinthereactor.Inaddition, whiletheunitisinMode1,2,3,or4,atleastonelicensedSeniorOperatorshallbeinthecontrolroom.c.Anindividual*
qualified inradiation protection procedures shallbeonsitewhenfuelisinthereactor.d.AllCOREALTERATIONS shallbedirectlysupervised byalicensedSeniorOperatortrainedorqualified inrefueling andCOREALTERATIONS (SO-CA)whohasnootherconcurrent responsibilities duringthisoperation.
e.Asitefirebrigadeofatonsiteatalltimes.Theoftheminimumshiftcreworanypersonnel requiredfireemergency.
least5members*shallbemaintained firebrigadeshallnotinclude3membersnecessary forsafeshutdownoftheunitforotheressential functions duringaf.Theamountofovertimeworkedbyplantstaffmembersperforming safety-related functions mustbelimitedinaccordance withNRCPolicyStatement onworkinghours(GenericLetter82-12).gTheShiftSupervisor, Assistant ShiftSupervisor, andUnitSupervisor shallholdaSeniorOperatorLicense.TheOperations Superintendent mustholdorhaveheldaSeniorOperatorLicenseatCookNuclearPlantorasimilarreactorandonemid-level Operations Production Supervisor shallholdacurrentSeniorOperatorLicense.*Theindividual qualified inradiation protection procedures andthecomposition ofthefirebrigademaybelessthantheminimumrequirements foraperiodoftimenottoexceed2hours,inordertoaccommodate unexpected absenceprovidedimmediate actionistakentofilltherequiredpositions.
COOKNUCLEARPLANT-UNIT26-2AMENDMENT NO.
ADMINISTRATIVE CONTROLS6.3FACILITYSTAFFUALIFICATIONS 6.3.1Eachmemberofthefacilitystaffshallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 forcomparable positions, exceptfor(1)thePlantRadiation Protection Manager,whoshallmeetorexceedqualifications ofRegulatory Guide1.8,September 1975,(2)theShiftTechnical Advisor,whoshallhaveabachelor's degreeorequivalent inascientific orengineering discipline withspecifictraininginplantdesign,andresponseandanalysisoftheplantfortransients andaccidents and,(3)theOperations Superintendent mustholdorhaveheldaSeniorOperatorLicenseasspecified inSection6.2'.h.6.4TRAINING6.4.1Aretraining andreplacement trainingprogramforthefacilitystaffshallbemaintained underthedirection oftheTrainingManagerandshallmeetorIexceedtherequirements andrecommendations ofSection5.5ofANSIN18.1-1971 andof10CFRPart55.6.5REVIEWANDAUDIT6.5.1PLANTNUCLEARSAFETYREVIEWCOMMITTEE PNSRCFUNCTION6.5.1.1ThePNSRCshallfunctiontoadvisethePlantManageronallmattersrelatedto'uclear safety.COMPOSITION 6.5.1.2ThePNSRCshallbecomposedofAssistant PlantManagers, Department Superintendents, orsupervisory personnel reporting directlytothePlantManager,Assistant PlantManagersorDepartment Superintendents fromthefunctional areaslistedbelow:Licensing Activities Safety&Assessment Operations Technical SupportRadiation Protection Maintenance TheChairman, hisalternate andothermembersandtheiralternates ofthePNSRC-shallbedesignated bythePlantManager.InadditiontotheChairman, thePNSRCmembership shallconsistofoneindividual fromeachoftheareasdesignated above.PNSRCmembersandalternates shallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 Section4.4forcomparable positions.
Thenuclearpowerplantoperations individual shallmeetthequalifications ofSection4.2.2ofANSIN18.1-1971 exceptfortherequirement toholdacurrentSeniorOperatorLicense.Theoperations individual mustholdorhaveheldaSeniorOperatorLicenseatCookNuclearPlantorasimilarreactor.Themaintenance individual shallmeetthequalifications ofSection4.2.3ofANSIN18.1-1971.
COOKNUCLEARPLANT-UNIT26-4AMENDMENT NO.  


ADMINISTRATIVE CONTROLSh.Performance ofspecialreviews,investigations ofanalysesandreportsthereonasrequested bytheChairmanoftheNSDRC.i.ReviewofthePlantSecurityPlanandimplementing procedures andshallsubmitrecommended changestotheChairmanoftheNSDRC.j.ReviewoftheEmergency Planandimplementing procedures andshallsubmitrecommended changestotheChairmanoftheNSDRC.k.Reviewofanyaccidental, unplanned, oruncontrolled radioactive releaseincluding thepreparation ofreportscoveringevaluations, recommendations, anddisposition ofthecorrective actiontopreventrecurrence andtheforwarding ofthesereportstotheVicePresident
ADMINISTRATIVE CONTROLS h.Performance of special reviews, investigations of analyses and reports thereon as requested by the Chairman of the NSDRC.i.Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.j.Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.k.Review of any accidental, unplanned, or uncontrolled radioactive release including the preparation of reports covering evaluations, recommendations, and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Vice President-Nuclear Operations and to the NSDRC.1.Review of changes to the PROCESS CONTROL PROGRAM, OFFSITE DOSE CALCULATION MANUAL, and radwaste treatment system.AUTHORITY 6.5.1.7 The PNSRC shall: a.Recommend to the Plant Manager written approval or disapproval of items considered under 6.5.1.6 (a)through (d)above.b.Render determinations in writing with regard to whether or not each item considered under 6.5.1.6 (a)through (c)and (e)above constitutes an unreviewed safety question.Provide written notification within 24 hours to the Vice President-Nuclear Operations and the NSDRC of disagreement between the PNSRC and the Plant Manager;however, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to 6.1~1 above.RECORDS 6.5.1.8 The PNSRC shall maintain written minutes of each meeting and copies shall be provided to the Chairman of the NSDRC.6.5.2 NUCLEAR SAFETY AND DESIGN REVIEW COMMITTEE NSDRC FUNCTION 6.5.2.1 The NSDRC shall function to provide independent review and audit of designated activities in the areas of: a.nuclear power plant operations b.nuclear engineering COOK NUCLEAR PLANT-UNIT 2 6-6 AMENDMENT NO.
-NuclearOperations andtotheNSDRC.1.ReviewofchangestothePROCESSCONTROLPROGRAM,OFFSITEDOSECALCULATION MANUAL,andradwastetreatment system.AUTHORITY 6.5.1.7ThePNSRCshall:a.Recommend tothePlantManagerwrittenapprovalordisapproval ofitemsconsidered under6.5.1.6(a)through(d)above.b.Renderdeterminations inwritingwithregardtowhetherornoteachitemconsidered under6.5.1.6(a)through(c)and(e)aboveconstitutes anunreviewed safetyquestion.
ADMINISTRATIVE CONTROLS CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NSDRC Chairman to provide expert advice to the NSDRC.MEETING FRE UENCY 6.5.2.5 The NSDRC shall meet at least once per six months.QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting shall be eight members, of whom no more than two shall be designated or temporary alternates.
Providewrittennotification within24hourstotheVicePresident
The Chairman or acting Chairman shall be present for all NSDRC meetings.If the number of members present*is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operations of the facility.For the purpose of a quorum, only the Plant Manager is considered to have line responsibility.
-NuclearOperations andtheNSDRCofdisagreement betweenthePNSRCandthePlantManager;however,thePlantManagershallhaveresponsibility forresolution ofsuchdisagreements pursuantto6.1~1above.RECORDS6.5.1.8ThePNSRCshallmaintainwrittenminutesofeachmeetingandcopiesshallbeprovidedtotheChairmanoftheNSDRC.6.5.2NUCLEARSAFETYANDDESIGNREVIEWCOMMITTEE NSDRCFUNCTION6.5.2.1TheNSDRCshallfunctiontoprovideindependent reviewandauditofdesignated activities intheareasof:a.nuclearpowerplantoperations b.nuclearengineering COOKNUCLEARPLANT-UNIT26-6AMENDMENT NO.
REVIEW 6.5.2.7.The NSDRC is responsible for assuring that independent**
ADMINISTRATIVE CONTROLSCONSULTANTS 6.5.2.4Consultants shallbeutilizedasdetermined bytheNSDRCChairmantoprovideexpertadvicetotheNSDRC.MEETINGFREUENCY6.5.2.5TheNSDRCshallmeetatleastoncepersixmonths.QUORUM6.5.2.6Aquorum,theminimumnumberofregularmembersandalternates requiredtoholdaNSDRCmeetingshallbeeightmembers,ofwhomnomorethantwoshallbedesignated ortemporary alternates.
reviews of the following are performed:
TheChairmanoractingChairmanshallbepresentforallNSDRCmeetings.
a.The safety evaluations for 1)changes to procedures, equipment or systems and 2)tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.b.Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.c.Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.d.Proposed changes in Technical Specifications or this operating license.e.Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
Ifthenumberofmemberspresent*isgreaterthanaquorum,thenthemajorityparticipating andvotingatthemeetingshallnothavelineresponsibility foroperations ofthefacility.
Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis.If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.**Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.
Forthepurposeofaquorum,onlythePlantManagerisconsidered tohavelineresponsibility.
COOK NUCLEAR PLANT-UNIT 2 6-8 AMENDMENT NO.
REVIEW6.5.2.7.TheNSDRCisresponsible forassuringthatindependent**
E V~'DMINISTRATIVE CONTROLS shall be approved by the appropriate department head as previously designated in writing by the Plant Manager.The Plant Manager shall approve Security Plan implementing procedures, Emergency Plan implementing procedures and Plant Manager Procedures.
reviewsofthefollowing areperformed:
Temporary changes to procedures which do not change the intent of the approved procedures shall be approved for implementation by two members of the plant staff, at least one of whom holds a Senior Operator license, and documented.
a.Thesafetyevaluations for1)changestoprocedures, equipment orsystemsand2)testsorexperiments completed undertheprovision of10CFR50.59toverifythatsuchactionsdidnotconstitute anunreviewed safetyquestion.
The temporary changes shall be approved by the original approval authority within 14 days of implementation.
b.Proposedchangestoprocedures, equipment orsystemswhichinvolveanunreviewed safetyquestionasdefinedin10CFR50.59.c.Proposedtestsorexperiments whichinvolveanunreviewed safetyquestionasdefinedin10CFR50.59.d.ProposedchangesinTechnical Specifications orthisoperating license.e.Violations ofcodes,regulations, orders,Technical Specifications, licenserequirements, orofinternalprocedures orinstructions havingnuclearsafetysignificance.
For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change prior to implementation.
RegularNSDRCmembersareexpectedtoattendthemeetingwheneverpossible, andalternates mayattendasvotingmembersonlyonanirregular basis.Ifbotharegularmemberandhisalternate attendameeting,onlytheregularmembermayparticipate asavotingmember,andthealternate isconsidered aguest.**Independent reviewsmaybeperformed bygroupswhichreportdirectlytotheNSDRCandwhichmusthaveNSDRCmembership participation.
Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the Plant Manager.Each such modification shall be reviewed (reference T/S 6.5.3.1.e) by a qualified (reference T/S 6.5.3.l.d) individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modifications.
COOKNUCLEARPLANT-UNIT26-8AMENDMENT NO.
Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the Plant Manager.Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report or Technical Specifications shall be prepared, reviewed, and approved.Each such test or experiment shall be reviewed by qualified individuals/groups other than the individual/group which prepared the proposed test or experiment to assure cross-disciplinary review as appropriate for the proposed test or experiment.
EV~'DMINISTRATIVE CONTROLSshallbeapprovedbytheappropriate department headaspreviously designated inwritingbythePlantManager.ThePlantManagershallapproveSecurityPlanimplementing procedures, Emergency Planimplementing procedures andPlantManagerProcedures.
Proposed tests and experiments shall be approved before implementation by the Plant Manager.Individuals who conducted the reviews performed in the accordance with Specification 6.5.3.1a, 6.5.3.1b, and 6'.3.1c, shall be members of the plant management staff previously designated by the Plant Manager and shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.
Temporary changestoprocedures whichdonotchangetheintentoftheapprovedprocedures shallbeapprovedforimplementation bytwomembersoftheplantstaff,atleastoneofwhomholdsaSeniorOperatorlicense,anddocumented.
Each such review shall include a determination of whether or not additional, cross-disciplinary review is necessary.
Thetemporary changesshallbeapprovedbytheoriginalapprovalauthority within14daysofimplementation.
If deemed necessary, such review shall be performed by qualified personnel of the appropriate discipline.
Forchangestoprocedures whichmayinvolveachangeinintentoftheapprovedprocedures, thepersonauthorized abovetoapprovetheprocedure shallapprovethechangepriortoimplementation.
e.Each review shall include a determination of whether or not an unreviewed safety question is involved.Pursuant to 10 CFR 50.59, NRC approval of items involving unreviewed safety questions shall be obtained prior to the Plant Manager approval for implementation.
Proposedchangesormodifications toplantnuclearsafety-related structures, systemsandcomponents shallbereviewedasdesignated bythePlantManager.Eachsuchmodification shallbereviewed(reference T/S6.5.3.1.e) byaqualified (reference T/S6.5.3.l.d) individual/group otherthantheindividual/group whichdesignedthemodification, butwhomaybefromthesameorganization astheindividual/group whichdesignedthemodifications.
The Emergency Plan and implementing procedures shall be reviewed at least once per 12 months.Recommended changes to the COOK NUCLEAR PLANT-UNIT 2.6-11 AMENDMENT NO.}}
Proposedmodifications toplantnuclearsafety-related structures, systemsandcomponents shallbeapprovedpriortoimplementation bythePlantManager.Proposedtestsandexperiments whichaffectplantnuclearsafetyandarenotaddressed intheFinalSafetyAnalysisReportorTechnical Specifications shallbeprepared,
: reviewed, andapproved.
Eachsuchtestorexperiment shallbereviewedbyqualified individuals/groups otherthantheindividual/group whichpreparedtheproposedtestorexperiment toassurecross-disciplinary reviewasappropriate fortheproposedtestorexperiment.
Proposedtestsandexperiments shallbeapprovedbeforeimplementation bythePlantManager.Individuals whoconducted thereviewsperformed intheaccordance withSpecification 6.5.3.1a, 6.5.3.1b, and6'.3.1c,shallbemembersoftheplantmanagement staffpreviously designated bythePlantManagerandshallmeetorexceedtheminimumqualifications ofANSIN18.1-1971 Section4.4forcomparable positions.
Eachsuchreviewshallincludeadetermination ofwhetherornotadditional, cross-disciplinary reviewisnecessary.
Ifdeemednecessary, suchreviewshallbeperformed byqualified personnel oftheappropriate discipline.
e.Eachreviewshallincludeadetermination ofwhetherornotanunreviewed safetyquestionisinvolved.
Pursuantto10CFR50.59,NRCapprovalofitemsinvolving unreviewed safetyquestions shallbeobtainedpriortothePlantManagerapprovalforimplementation.
TheEmergency Planandimplementing procedures shallbereviewedatleastonceper12months.Recommended changestotheCOOKNUCLEARPLANT-UNIT2.6-11AMENDMENT NO.}}

Revision as of 08:52, 6 July 2018

Proposed Tech Specs Re Section 6 on Administrative Controls,Including Onsite & Offsite Organizations & Plant Nuclear Safety Review Committee
ML17328A746
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/26/1990
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17328A745 List:
References
NUDOCS 9011010147
Download: ML17328A746 (14)


Text

Attachment to AEP:NRC:0659S Proposed Technical Specification Pages A 90iiOiOi47,~060003i5 PDR ADOCK o PDC P ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant Manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.6.1.2 The Shift Supervisor (or during his absence from the control room complex, a designated individual) shall be responsible for the control room command function.A management directive to this effect signed by the Vice President-Nuclear Operations shall be reissued to all station personnel on an annual basis, 6.2 ORGANIZATION ONSITE AND OFFSITE ORGANIZATIONS 6.2.1 Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.Lines of authority, responsibility, and communication shall be established and defined for the highest management level through intermediate levels to and including all operating organization positions.

These relationships shall be documented and updated, as appropriate, in the form of organizational charts.These organizational charts will be documented in the FSAR and updated in accordance with 10 CFR 50.71(e).b.The Plant Manager shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.C.The Vice President-Nuclear Operations shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.d.The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager;however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

FACILITY STAFF 6.2.2 The Facility organization shall be subject to the following:

a.Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6'-1.COOK NUCLEAR PLANT-UNIT 1 6-1 AMENDMENT NO.

ADMINISTRATIVE CONTROLS b.At least one licensed Operator shall be in the control room when fuel is in the reactor.In addition, while the unit is in Mode 1, 2, 3, or 4, at least one licensed Senior Operator shall be in the control room.*c.An individual qualified in radiation protection procedures shall I be on site when fuel is in the reactor.d.All CORE ALTERATIONS shall be directly supervised by a licensed Senior Operator trained or qualified in refueling and CORE ALTERATIONS (SO-CA)who has no other concurrent responsibilities during this operation.

e.A site fire brigade of at onsite at all times.The of the minimum shift crew or any personnel required fire emergency.

least 5 members*shall be maintained fire brigade shall not include 3 members necessary for safe shutdown of the unit for other essential functions during a f.The amount of overtime worked by plant staff members performing safety-related functions must be limited in accordance with NRC Policy Statement on working hours (Generic Letter 82-12).g.The Shift Supervisor, Assistant Shift Supervisor, and Unit Supervisor shall hold a Senior Operator License.h.The Operations Superintendent must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor and one mid-level Operations Production Supervisor shall hold a current Senior Operator Licensees*The individual qualified in radiation protection procedures and the composition of the fire brigade may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected absence provided immediate action is taken to fill the required positions.

COOK NUCLEAR PLANT-UNIT 1 6-2 AMENDMENT NO.

ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1)the Plant Radiation Protection Manager, who shall meet or exceed qualifications of f Regulatory Guide 1.8, September 1975, (2)the Shift Technical Advisor, who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents and, (3)the Operations Superintendent must hold or have held a Senior Operator License as specified in Section 6.2.2.h.6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COMMITTEE PNSRC FUNCTION 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to nuclear safety.COMPOSITION 6.5.1.2 The PNSRC shall be composed of Assistant Plant Managers, Department Superintendents, or supervisory personnel reporting directly to the Plant Manager, Assistant Plant Managers or Department Superintendents from the functional areas listed below: Licensing Activities Safety&Assessment Operations Technical Support Radiation Protection Maintenance The Chairman, his alternate and other members and their alternates of the PNSRC shall be designated by the Plant Manager.In addition to the Chairman, the PNSRC membership shall consist of one individual from each of the areas designated above.PNSRC members and alternates shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.

The nuclear power plant operations individual shall meet the qualifications of Section 4.2.2 of ANSI N18.1-1971 except for the requirement to hold a current Senior Operator License.The operations individual must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor.The maintenance individual shall meet the qualifications of Section 4.2.3 of ANSI N18.1-1971.

COOK NUCLEAR PLANT-UNIT 1 6-4 AMENDMENT NO.

ADMINISTRATIVE CONTROLS'I h.Performance of special reviews, investigations of analyses and reports thereon as requested by the Chairman of the NSDRC.i.Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.j.Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.k.Review of any accidental, unplanned, or uncontrolled radioactive release including the preparation of reports covering evaluations, recommendations, and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Vice President-Nuclear Operations and to the NSDRC.1.Review of changes to the PROCESS CONTROL PROGRAM, OFFSITE DOSE CALCULATION MANUAL, and radwaste treatment system.AUTHORITY 6.5.1.7 The PNSRC shall: a.Recommend to the Plant Manager written approval or disapproval of items considered under 6.5.1.6 (a)through (d)above.b.Render determinations in writing with regard to whether or not each item considered under 6.5.1.6 (a)through (c)and (e)above constitutes an unreviewed safety question.Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice President-Nuclear Operations and the NSDRC of disagreement between the PNSRC and the Plant Manager;however, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.RECORDS 6.5.1.8 The PNSRC shall maintain written minutes of each meeting and copies shall be provided to the Chairman of the NSDRC.6.5.2 NUCLEAR SAFETY AND DESIGN REVIEW COMMITTEE NSDRC FUNCTION 6.5.2.1 The NSDRC shall function to provide independent review and audit of designated activities in the areas of: a.nuclear power plant operations b.nuclear engineering COOK NUCLEAR PLANT-UNIT 1 6-6 AMENDMENT NO.

ADMINISTRATIVE CONTROLS CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NSDRC Chairman to provide expert advice to the NSDRC.MEETING FRE UENCY 6.5.2.5 The NSDRC shall meet at least once per six months.gUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting shall be eight members, of whom no more than two shall be designated or temporary alternates.

The Chairman or acting Chairman+shall be present for all NSDRC meetings.If the number of members present*is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operations of the facility.For the purpose of a quorum, only the Plant Manager is considered to have line responsibility.

REVIEW 6.5.2.7.The NSDRC is responsible for assuring that independent**

reviews of the following are performed:

a.The safety evaluations for 1)changes to procedures, equipment or systems and 2)tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.b.Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.c.Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.d.Proposed changes in Technical Specifications or this operating license.e.Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.

  • Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis.If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.**Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.

COOK NUCLEAR PLANT-UNIT 1 6-8 AMENDMENT NO.

ADM'ENISTRATIVE CONTROLS shall be approved by the appropriate department head as previously designated in writing by the Plant Manager.The Plant Manager shall approve Security Plan implementing procedures, Emergency Plan implementing procedures and Plant Manager Procedures'emporary changes to procedures which do not change the intent of the approved procedures shall be approved for implementation by two members of the plant staff, at least one of whom holds a Senior Operator license, and documented.

The temporary changes shall be approved by the original approval authority within 14 days of implementation.

For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change prior to implementation.

Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the Plant Manager.Each such modification shall be reviewed (reference T/S 6.5.3.1.e) by a qualified (reference T/S 6.5.3.1.d) individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modifications'roposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the Plant Manager.Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report or Technical Specifications shall be prepared, reviewed, and approved.Each such test or experiment shall be reviewed by qualified individuals/groups other than the individual/group which prepared the proposed test or experiment to assure cross-disciplinary review as appropriate for the proposed test or experiment.

Proposed tests and experiments shall be approved before implementation by the Plant Manager.Individuals who conducted the reviews performed in the accordance with Specification 6.5.3.1a, 6.5.3.lb, and 6.5.3.lc, shall be members of the plant management staff previously designated by the Plant Manager and shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.

Each such review shall include a determination of whether or not additional, cross-disciplinary review is necessary.

If deemed necessary, such review shall be performed by qualified personnel of the appropriate discipline.

Each review shall include a determination of whether or not an unreviewed safety question is involved.Pursuant to 10 CFR 50.59, NRC approval of items involving unreviewed safety questions shall be obtained prior to the Plant Manager approval for implementation.

f.The Emergency Plan and implementing procedures shall be reviewed at least once per 12 months.Recommended changes to the COOK NUCLEAR PLANT-UNIT 1 6-11 AMENDMENT NO.

ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant Manager shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.6.1.2 The Shift Supervisor (or during his absence from the control room complex, a designated individual) shall be responsible for the control room command function.A management directive to this effect signed by the Vice President-Nuclear Operations shall be reissued to all station personnel on an annual basis.6.2 ORGANIZATION ONSITE AND OFFSITE ORGANIZATIONS 6.2.1 ,Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.Lines of authority, responsibility, and communication shall be established and defined for the highest management level through intermediate levels to and including all operating organization positions.

These relationships shall be documented and updated, as appropriate, in the form of organizational charts.These organizational charts will be documented in the FSAR and updated in accordance with 10 CFR 50.71(e).b.The Plant Manager shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.The Vice President-Nuclear Operations shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.d.The individuals who train the operating staff and those who carry ou't health physics and quality assurance functions may report to the appropriate onsite manager;however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

FACILITY STAFF 6.2.2 The Facility organization shall be subject to the following:

a.Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.COOK NUCLEAR PLANT-UNIT 2 6-1 AMENDMENT NO.

ADMINISTRATIVE CONTROLS b.At least one licensed Operator shall be in the control room when fuel is in the reactor.In addition, while the unit is in Mode 1, 2, 3, or 4, at least one licensed Senior Operator shall be in the control room.c.An individual*

qualified in radiation protection procedures shall be on site when fuel is in the reactor.d.All CORE ALTERATIONS shall be directly supervised by a licensed Senior Operator trained or qualified in refueling and CORE ALTERATIONS (SO-CA)who has no other concurrent responsibilities during this operation.

e.A site fire brigade of at onsite at all times.The of the minimum shift crew or any personnel required fire emergency.

least 5 members*shall be maintained fire brigade shall not include 3 members necessary for safe shutdown of the unit for other essential functions during a f.The amount of overtime worked by plant staff members performing safety-related functions must be limited in accordance with NRC Policy Statement on working hours (Generic Letter 82-12).g The Shift Supervisor, Assistant Shift Supervisor, and Unit Supervisor shall hold a Senior Operator License.The Operations Superintendent must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor and one mid-level Operations Production Supervisor shall hold a current Senior Operator License.*The individual qualified in radiation protection procedures and the composition of the fire brigade may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected absence provided immediate action is taken to fill the required positions.

COOK NUCLEAR PLANT-UNIT 2 6-2 AMENDMENT NO.

ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF UALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1)the Plant Radiation Protection Manager, who shall meet or exceed qualifications of Regulatory Guide 1.8, September 1975, (2)the Shift Technical Advisor, who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents and, (3)the Operations Superintendent must hold or have held a Senior Operator License as specified in Section 6.2'.h.6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager and shall meet or I exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and of 10 CFR Part 55.6.5 REVIEW AND AUDIT 6.5.1 PLANT NUCLEAR SAFETY REVIEW COMMITTEE PNSRC FUNCTION 6.5.1.1 The PNSRC shall function to advise the Plant Manager on all matters related to'uclear safety.COMPOSITION 6.5.1.2 The PNSRC shall be composed of Assistant Plant Managers, Department Superintendents, or supervisory personnel reporting directly to the Plant Manager, Assistant Plant Managers or Department Superintendents from the functional areas listed below: Licensing Activities Safety&Assessment Operations Technical Support Radiation Protection Maintenance The Chairman, his alternate and other members and their alternates of the PNSRC-shall be designated by the Plant Manager.In addition to the Chairman, the PNSRC membership shall consist of one individual from each of the areas designated above.PNSRC members and alternates shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.

The nuclear power plant operations individual shall meet the qualifications of Section 4.2.2 of ANSI N18.1-1971 except for the requirement to hold a current Senior Operator License.The operations individual must hold or have held a Senior Operator License at Cook Nuclear Plant or a similar reactor.The maintenance individual shall meet the qualifications of Section 4.2.3 of ANSI N18.1-1971.

COOK NUCLEAR PLANT-UNIT 2 6-4 AMENDMENT NO.

ADMINISTRATIVE CONTROLS h.Performance of special reviews, investigations of analyses and reports thereon as requested by the Chairman of the NSDRC.i.Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.j.Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the NSDRC.k.Review of any accidental, unplanned, or uncontrolled radioactive release including the preparation of reports covering evaluations, recommendations, and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Vice President-Nuclear Operations and to the NSDRC.1.Review of changes to the PROCESS CONTROL PROGRAM, OFFSITE DOSE CALCULATION MANUAL, and radwaste treatment system.AUTHORITY 6.5.1.7 The PNSRC shall: a.Recommend to the Plant Manager written approval or disapproval of items considered under 6.5.1.6 (a)through (d)above.b.Render determinations in writing with regard to whether or not each item considered under 6.5.1.6 (a)through (c)and (e)above constitutes an unreviewed safety question.Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice President-Nuclear Operations and the NSDRC of disagreement between the PNSRC and the Plant Manager;however, the Plant Manager shall have responsibility for resolution of such disagreements pursuant to 6.1~1 above.RECORDS 6.5.1.8 The PNSRC shall maintain written minutes of each meeting and copies shall be provided to the Chairman of the NSDRC.6.5.2 NUCLEAR SAFETY AND DESIGN REVIEW COMMITTEE NSDRC FUNCTION 6.5.2.1 The NSDRC shall function to provide independent review and audit of designated activities in the areas of: a.nuclear power plant operations b.nuclear engineering COOK NUCLEAR PLANT-UNIT 2 6-6 AMENDMENT NO.

ADMINISTRATIVE CONTROLS CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NSDRC Chairman to provide expert advice to the NSDRC.MEETING FRE UENCY 6.5.2.5 The NSDRC shall meet at least once per six months.QUORUM 6.5.2.6 A quorum, the minimum number of regular members and alternates required to hold a NSDRC meeting shall be eight members, of whom no more than two shall be designated or temporary alternates.

The Chairman or acting Chairman shall be present for all NSDRC meetings.If the number of members present*is greater than a quorum, then the majority participating and voting at the meeting shall not have line responsibility for operations of the facility.For the purpose of a quorum, only the Plant Manager is considered to have line responsibility.

REVIEW 6.5.2.7.The NSDRC is responsible for assuring that independent**

reviews of the following are performed:

a.The safety evaluations for 1)changes to procedures, equipment or systems and 2)tests or experiments completed under the provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.b.Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in 10 CFR 50.59.c.Proposed tests or experiments which involve an unreviewed safety question as defined in 10 CFR 50.59.d.Proposed changes in Technical Specifications or this operating license.e.Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.

Regular NSDRC members are expected to attend the meeting whenever possible, and alternates may attend as voting members only on an irregular basis.If both a regular member and his alternate attend a meeting, only the regular member may participate as a voting member, and the alternate is considered a guest.**Independent reviews may be performed by groups which report directly to the NSDRC and which must have NSDRC membership participation.

COOK NUCLEAR PLANT-UNIT 2 6-8 AMENDMENT NO.

E V~'DMINISTRATIVE CONTROLS shall be approved by the appropriate department head as previously designated in writing by the Plant Manager.The Plant Manager shall approve Security Plan implementing procedures, Emergency Plan implementing procedures and Plant Manager Procedures.

Temporary changes to procedures which do not change the intent of the approved procedures shall be approved for implementation by two members of the plant staff, at least one of whom holds a Senior Operator license, and documented.

The temporary changes shall be approved by the original approval authority within 14 days of implementation.

For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change prior to implementation.

Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the Plant Manager.Each such modification shall be reviewed (reference T/S 6.5.3.1.e) by a qualified (reference T/S 6.5.3.l.d) individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modifications.

Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the Plant Manager.Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report or Technical Specifications shall be prepared, reviewed, and approved.Each such test or experiment shall be reviewed by qualified individuals/groups other than the individual/group which prepared the proposed test or experiment to assure cross-disciplinary review as appropriate for the proposed test or experiment.

Proposed tests and experiments shall be approved before implementation by the Plant Manager.Individuals who conducted the reviews performed in the accordance with Specification 6.5.3.1a, 6.5.3.1b, and 6'.3.1c, shall be members of the plant management staff previously designated by the Plant Manager and shall meet or exceed the minimum qualifications of ANSI N18.1-1971 Section 4.4 for comparable positions.

Each such review shall include a determination of whether or not additional, cross-disciplinary review is necessary.

If deemed necessary, such review shall be performed by qualified personnel of the appropriate discipline.

e.Each review shall include a determination of whether or not an unreviewed safety question is involved.Pursuant to 10 CFR 50.59, NRC approval of items involving unreviewed safety questions shall be obtained prior to the Plant Manager approval for implementation.

The Emergency Plan and implementing procedures shall be reviewed at least once per 12 months.Recommended changes to the COOK NUCLEAR PLANT-UNIT 2.6-11 AMENDMENT NO.