{{#Wiki_filter:ATTACHMENT 2TOAEP:NRC:0956G EXISTINGTECHNICAL SPECIFICATIONS PAGESMARKEDTOREFLECTPROPOSEDCHANGES93120100ib 931117PDRADOCK05000315PDR UNinimumChannelsgmMMPasteCasHoldupS;.scamExplosive GasAonicor."..z
{{#Wiki_filter:ATTACHMENT 2 TO AEP:NRC:0956G EXISTING TECHNICAL SPECIFICATIONS PAGES MARKED TO REFLECT PROPOSED CHANGES 93120100ib 931117 PDR ADOCK 05000315 PDR U Ninimum Channels gmMM Paste Cas Holdup S;.scam Explosive Gas Aonicor."..z
.'s=-ma.yrouenoHdHonitor.".''.'cI~(1)(2)b.OxygsnMonitor~.gcQC-370)30292.Condenser Evacuacion Syscema,NobleCasAccivi=yMonitor(SRA-1905) b.PlowRaceMonitor:SPR-'01)(1-NR-054 and/orSRA-1910)
.'s=-m a.y rouen o H d Honitor.".''.'c I~(1)(2)b.Oxygsn Monitor~.gc QC-370)30 29 2.Condenser Evacuacion Syscem a, Noble Cas Accivi=y Monitor (SRA-1905) b.Plow Race Monitor: SPR-'01)(1-NR-054 and/or SRA-1910)(1)(1)(1)28 27 27 t:nit Vane.Auxiliary 3u'ding Vencilacion System a.Noble Gas Accivl=;..'Loni"or (VRS-l.505.
(1)(1)(1)282727t:nitVane.Auxiliary 3u'dingVencilacion Systema.NobleGasAccivl=;.
b.iodine Sampler Carer dge.or".R~~c.Part''cul,ace Sample="e for':RS~'.=.'.fluent Svsca..==Rata R,-0'nd/o=".=="-'101 Sa p'er"'-Rata.".easur'ng"a I''ce"..=S-1521) 28 32 32 27 27 V~4 4 a.Aux Idol b.Aux Par d''.".g Vent.."scam
.'Loni"or (VRS-l.505.
'e Gas Accivi=y;'cor (VRS-1505)
b.iodineSamplerCarerdge.or".R~~c.Part''cul,ace Sample="efor':RS~'.=.'.fluentSvsca..==RataR,-0'nd/o=".=="-'101Sap'er"'-Rata.".easur'ng "aI''ce"..=S-1521) 2832322727V~44a.AuxIdolb.AuxPard''.".gVent.."scam
Suil.ding Vane.rscan t'ula ca S amp l.e r f o r"RS-150'.re*a 32 5.'Paste Gas Holdup Svs""..a.Hob l.e Gas Ac t iv'': Aonitor Providing Alarm and Terminac'-="" of Gas Decav.an<."-.a" eases (VRS-'505) 2%*'4'k 33 O.Gland Seal Exhaust a.noble Gas Accivi=':.'(oni"or (sRA-l.8051 o.Floe Race lonitor S.=R-'01)(1-.'R-054 and/or SPA'';0)i 1)(1)(1)28 27 27 i1 C CAAV.I1MTT 1 3/4 3-63 Amendment No~I~o  
'eGasAccivi=y;'cor(VRS-1505)
Suil.ding Vane.rscant'ulacaSampl.erfor"RS-150'.re*a325.'PasteGasHoldupSvs""..a.Hobl.eGasActiv'':AonitorProviding AlarmandTerminac'-=""
ofGasDecav.an<."-.a"eases(VRS-'505) 2%*'4'k33O.GlandSealExhausta.nobleGasAccivi=':
.'(oni"or (sRA-l.8051 o.FloeRacelonitorS.=R-'01)(1-.'R-054 and/orSPA'';0)i1)(1)(1)282727i1CCAAV.I1MTT13/43-63Amendment No~I~o  


TABLE3.3-1,3(Conc.)*Acall,times*~Duringvastegas.oupsystem~-s-emoperacion (treatment forprimarysystemgases)****During releasesviathispath~ay.ForPurgePurPosesonlv,seeTechnical SPecifications 3.3.3.10, Table3.3.l3andTable4.3-9(Items3.a,S.a'nbochcables)fornon-purging requirements associated vichthisinscrumenc.2Forgasdecaytankreleasesonly,seeItem3(UnitVent,Auxiliary BuildingVentilacion System)foraddicional requirements.
TABLE 3.3-1,3 (Conc.)*Ac all, times*~During vaste gas.o up system~-s-em operacion (treatment for primary system gases)****During releases via this path~ay.For Purge PurPoses onlv, see Technical SPecifications 3.3.3.10, Table 3.3.l3 and Table 4.3-9 (Items 3.a, S.a'n boch cables)for non-purging requirements associated vi ch this ins crumenc.2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilacion System)for addicional requirements.
Thewastegasholdupsystemexplosive gasmonitoring syscemmaybeinoperable loxygenarecobecaicenandanalyzedeveryl2hours.COOKNUCLEARPLANT-UNIT3/43-64AMENDMENT HO.'N s~sTA3ZS4.3-9CHANNELSOURCEC~K'iaC1QQtNELFUNCTZONALXQXpasteGasHo1dupSystemExplosive CssHooloorioS Sys=oos.HydroSooMonitor%&BR~-HQab.Oxygen-Monicor(4~Mope-c.Oxygen~~Monicor(hlc.',QC-370)
The waste gas holdup system explosive gas monitoring syscem may be inoperable loxygen are co be caicen and analyzed every l2 hours.COOK NUCLEAR PLANT-UNIT 3/4 3-64 AMENDMENT HO.'N s~s TA3ZS 4.3-9 CHANNEL SOURCE C~K'ia C1QQtNEL FUN CTZONAL XQX paste Gas Ho1dup System Explosive Css HooloorioS Sys=oo s.HydroSoo Monitor%&BR~-HQa b.Oxygen-Monicor (4~M ope-c.Oxygen~~Monicor (hlc.',QC-370)
NhQ(3)Q(4)Q(4)2.Condenser Evacuation Systema.NobleCasActivityMonicor(SRA.-1905) b.SystemEffluentFlowRace(SFR-401.
Nh Q(3)Q(4)Q(4)2.Condenser Evacuation System a.Noble Cas Activity Monicor (SRA.-1905) b.System Effluent Flow Race (SFR-401.1-MR-054, SRA-1910)D*%'A R(2)Q(l)3.Auxiliary Building Ventilation System a.Noble Gas Activ';Monitor (VRS-1505) b.Iodine Sampler (For VRS-1503)c.Particulate Sample".'..""or'RS-'01)d.Svscem Ef=luenc."-ow Race.".eas remenc"evice JFR-315.'u&-054.RS-15 e.Sampler."-~ow Race Measuremen" Device (VFS-1521)10)Dx R(2)NA Q(l)iNA NA Containment Purge System a.Aux.Buildi.ng Vent.S'stem Noble Cas Accivity Monk to r (VRS-1505)b.Aux.Building Venc.S'seem Particulate Sampler (For VRS-1501)<<*X NA R(2 NA Q(1)NA 5.'<<aste Cas Holdup Svscem a.Noble Gas Accivic'onitor Providing.Alarm&Terminacion of Cas Decay Tank Releases (VRS-1505)
1-MR-054, SRA-1910)D*%'AR(2)Q(l)3.Auxiliary BuildingVentilation Systema.NobleGasActiv';Monitor(VRS-1505) b.IodineSampler(ForVRS-1503) c.Particulate Sample".'..""or'RS-'01)d.SvscemEf=luenc."-owRace.".easremenc"eviceJFR-315.'u&-054.RS-15e.Sampler."-~owRaceMeasuremen" Device(VFS-1521)10)DxR(2)NAQ(l)iNANAContainment PurgeSystema.Aux.Buildi.ng Vent.S'stemNobleCasAccivityMonktor(VRS-1505)b.Aux.BuildingVenc.S'seemParticulate Sampler(ForVRS-1501)
R(2)Q(5)D.C.COOK-UNIT 1 3-66 A endmenc No.9.>~9 TABLE 3.3-13 Minhaue Channels Qamhla Waste Cas Holdup System 3 Explosive Cas Monitoring System a.Hydr'ogen Monitor (g6-bk)Cgc;l~~(1)b.Oxygen Mont.tor (g~,~C,-f4-c~(2)QC-370)29 2.Condenser Evacuation System a.Noble Cas Activity Monitor (SRA-2905) b.Flov Rate Monitor (SFR-401)(2-MR-054 and/or SRA-2910)3.Unit Vent, Auxiliary Building Ventilation System a.Noble Cas Activity Monitor (VRS-2505) b.Iodine Sampler Cartridge for VRS-2503 c.Particulate Sampler Filter for VRS-2501 d.Ef'fluent System Flov Rate Measuring Device (VFR-315)(2-MR-054 and/or VRS-2510)e.Sampler Flov Rate Measuring Devi.ce (VFS-2521)
<<*XNAR(2NAQ(1)NA5.'<<asteCasHoldupSvscema.NobleGasAccivic'onitor Providing
(1)(1)(1)28 2?2T'8 32 32 27 27 27 Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-2505) b.Aux.But.lding Vent.System Particulate Sampler f'r VRS-2501 5.@as te Cas Holdup System a.Noble Cas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-2505)
.Alarm&Terminacion ofCasDecayTankReleases(VRS-1505)
**~1 31 32 33~6.Gland.Seal Exhaust a.Noble Cas Activity Monitor (SRA-2805) b.Flov Rate Monitor (SFR-201)(2-MR-054 and/or SRA 2810)D.C.COOK-UNIT 2 (1)'(1)(1)3/4 3-59*~28**+4 27 27 h nd nt No.dd>'"
R(2)Q(5)D.C.COOK-UNIT13-66AendmencNo.9.>~9 TABLE3.3-13MinhaueChannelsQamhlaWasteCasHoldupSystem3Explosive CasMonitoring Systema.Hydr'ogen Monitor(g6-bk)Cgc;l~~(1)b.OxygenMont.tor(g~,~C,-f4-c~(2)QC-370)292.Condenser Evacuation Systema.NobleCasActivityMonitor(SRA-2905) b.FlovRateMonitor(SFR-401)
TABLE 3.3-13 (Cont.)*At all times cern operation (treatment for primary system gases)**During waste gas holduo svscem o~*~During releases via this pacnway F For purge purposes on rposes onlv see Technical Specifications 3~3~3~10 Table 3.3-13 and!Table.4, 3 9 (1 cems 3.a, 5.a in boch tables')for non-purging requirements associated with this instrument.
(2-MR-054 and/orSRA-2910) 3.UnitVent,Auxiliary BuildingVentilation Systema.NobleCasActivityMonitor(VRS-2505) b.IodineSamplerCartridge forVRS-2503c.Particulate SamplerFilterforVRS-2501d.Ef'fluent SystemFlovRateMeasuring Device(VFR-315)
For gas decay tank releases only, see item 3 (Unit Vent, Auxiliary Building Ventilation System)for additional requirements.
(2-MR-054 and/orVRS-2510) e.SamplerFlovRateMeasuring Devi.ce(VFS-2521)
The waste gas holdup system explosive gas monicori'ng syscem may be inoperable oxygen are to be taken and analyzed every 12 hours.COOK NUCLEAR PLANT-UNIT 2 3/4 3>>60 AMENDMENT NO.PP>114 C CHANNEL SOURCE CHANNEL C''HKQ<CKeNEL FUNCTIONAL X@X gasce Gas Holdup System Explosive Gas Monitoring System a.Hydrogen~~
(1)(1)(1)282?2T'83232272727Containment PurgeSystema.Aux.BuildingVent.SystemNobleGasActivityMonitor(VRS-2505) b.Aux.But.lding Vent.SystemParticulate Samplerf'rVRS-25015.@asteCasHoldupSystema.NobleCasActivityMonitorProviding AlarmandTermination ofGasDecayTankReleases(VRS-2505)
Monitor (+6-3+)CvC-~e b.Oxygen~~~'tonicor (~~)CzC-l~~c.Oxygen Monitor (hlc..QC-3 0)2.Condenser Evacuacion System a.Noble Gas Activity Nonitor (SRA-2905) b.System Effluenc Flow Race (SFR-401.2-HR-054, SRA-2910)Nh&#xc3;A~~NA...N o~~Q(3)Q(4)Q(4).R(2)" Q(l)3..Auxiliary Building Vencilacion System a.Noble Cas Accivi"v Aonitor (VRS-2505) b.Iodine Sampler (For VRS~2503)c.Particulace Sample: (cor VRS-250')d.S vs cern=""1 enc: 'w Rate.".easure.
**~1313233~6.Gland.SealExhausta.NobleCasActivityMonitor(SRA-2805) b.FlovRateMonitor(SFR-201)
enc Device (V.R-315.2-.'cR,-054.
(2-MR-054 and/orSRA2810)D.C.COOK-UNIT2(1)'(1)(1)3/43-59*~28**+42727hndntNo.dd>'"
':RS-e.Sampler F'ow Rate measurement Device (Vc 5-252'.)2510)0*NA VA NA YA R(2)iVA VA Q(l)NA NA Conminment Purge System a.Aux.'Building Vent.System Noble Gas Accivit.r'tonitor (VRS-2505) b.Aux.Building Venc.5'rs"em Par ticu1 a te S amp 1e.(For VRS~2501)<<*'4 NA R(2)NA Q(1)VA'<<asce Cas HoLdup Svs=em a.Noble Gas Activity Monitor Providing Alarm&Terminacion of'Cas Decay Tank Releases (VRS~2505)o**R(2)Q(5)D.C.COOK.UNIT 2 3r4 3-62 Amendment No.8 114 ATTACHMENT 3 TO AEP:NRC:0956G PROPOSED REVISED TECHNICAL SPECIFICATION PAGES  
TABLE3.3-13(Cont.)*Atalltimescernoperation (treatment forprimarysystemgases)**Duringwastegasholduosvscemo~*~During releasesviathispacnwayFForpurgepurposesonrposesonlvseeTechnical Specifications 3~3~3~10Table3.3-13and!Table.4,39(1cems3.a,5.ainbochtables')fornon-purgingrequirements associated withthisinstrument.
Forgasdecaytankreleasesonly,seeitem3(UnitVent,Auxiliary BuildingVentilation System)foradditional requirements.
Thewastegasholdupsystemexplosive gasmonicori'ng syscemmaybeinoperable oxygenaretobetakenandanalyzedevery12hours.COOKNUCLEARPLANT-UNIT23/43>>60AMENDMENT NO.PP>114 CCHANNELSOURCECHANNELC''HKQ<CKeNELFUNCTIONAL X@XgasceGasHoldupSystemExplosive GasMonitoring Systema.Hydrogen~~
Monitor(+6-3+)CvC-~eb.Oxygen~~~'tonicor(~~)CzC-l~~c.OxygenMonitor(hlc..QC-30)2.Condenser Evacuacion Systema.NobleGasActivityNonitor(SRA-2905) b.SystemEffluencFlowRace(SFR-401.
2-HR-054, SRA-2910)
Nh&#xc3;A~~NA...No~~Q(3)Q(4)Q(4).R(2)"Q(l)3..Auxiliary BuildingVencilacion Systema.NobleCasAccivi"vAonitor(VRS-2505) b.IodineSampler(ForVRS~2503)c.Particulace Sample:(corVRS-250')
d.Svscern=""1enc:'wRate.".easure.
encDevice(V.R-315.
2-.'cR,-054.
':RS-e.SamplerF'owRatemeasurement Device(Vc5-252'.)2510)0*NAVANAYAR(2)iVAVAQ(l)NANAConminment PurgeSystema.Aux.'Building Vent.SystemNobleGasAccivit.r
'tonitor(VRS-2505) b.Aux.BuildingVenc.5'rs"emParticu1ateSamp1e.(ForVRS~2501)<<*'4NAR(2)NAQ(1)VA'<<asceCasHoLdupSvs=ema.NobleGasActivityMonitorProviding Alarm&Terminacion of'CasDecayTankReleases(VRS~2505)o**R(2)Q(5)D.C.COOK.UNIT23r43-62Amendment No.8114 ATTACHMENT 3TOAEP:NRC:0956G PROPOSEDREVISEDTECHNICAL SPECIFICATION PAGES  


~~'l~TABLE33-13Radioactive GaseousEffluentMonitorin Instrumentation Instrument Instrument MinimumChannels~OemableAlicabilit CTION1.WasteGasHoldupSystemExplosive GasMonitoring System~a.HydrogenMonitor(QC-1400) b.OxygenMonitor(QC-1400, QC-370)(1)(2)30292.Condenser Evacuation Systema.NobleGasActivityMonitor(SRA-1905) b.FlowRateMoni.tor(SFR-401)
~~'l~TABLE 3 3-13 Radioactive Gaseous Effluent Monitorin Instrumentation Instrument Instrument Minimum Channels~Oem able A licabilit CTION 1.Waste Gas Holdup System Explosive Gas Monitoring System~a.Hydrogen Monitor (QC-1400)b.Oxygen Monitor (QC-1400, QC-370)(1)(2)30 29 2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-1905) b.Flow Rate Moni.tor(SFR-401)
(1-MR-054 and/orSRA-1910)
(1-MR-054 and/or SRA-1910)(1)(1)(1)28 27 27 3.Unit Vent.Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-1505) b.Iodine Sampler Cartridge for VRS-1503 c.Particulate Sampler Filter for VRS-1501 d.Effluent System Flow Rate Measuring Device (VFR-315)(1-MR-054 and/or VRS-1510)e.Sampler Flow Rate Measuring Device (VFS-1521) 28 32 32 27 27 27 4.Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-1505) b.Aux.Building Vent.System Particulate Sampler for VRS-1501 31 32 5.Waste Gas Holdup System a.Noble Gas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-1505) 33 COOK NUCLEAR PLANT-UNIT 1 3/4 3-63 AMENDMENT NO.84, TABLE 3.3-13 (Cont)Instrument Instrument Minimum Channels~Oerable ACTION 6.Gland Seal Exhaust a.Noble Gas Activity Monitor (SRA-1805) b.Flow Rate Monitor(SFR-201)
(1)(1)(1)2827273.UnitVent.Auxiliary BuildingVentilation Systema.NobleGasActivityMonitor(VRS-1505) b.IodineSamplerCartridge forVRS-1503c.Particulate SamplerFilterforVRS-1501d.EffluentSystemFlowRateMeasuring Device(VFR-315)
(1-MR-054 and/or SRA 1810)28 27 27*At all times**During'waste gas holdup system operation (treatment for primary system gases)****During releases via this pathway 1 For purge purposes only.See Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables)for non-purging requirements associated with this instrument.
(1-MR-054 and/orVRS-1510) e.SamplerFlowRateMeasuring Device(VFS-1521) 2832322727274.Containment PurgeSystema.Aux.BuildingVent.SystemNobleGasActivityMonitor(VRS-1505) b.Aux.BuildingVent.SystemParticulate SamplerforVRS-150131325.WasteGasHoldupSystema.NobleGasActivityMonitorProviding AlarmandTermination ofGasDecayTankReleases(VRS-1505) 33COOKNUCLEARPLANT-UNIT13/43-63AMENDMENT NO.84, TABLE3.3-13(Cont)Instrument Instrument MinimumChannels~OerableACTION6.GlandSealExhausta.NobleGasActivityMonitor(SRA-1805) b.FlowRateMonitor(SFR-201)
2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System)for additional requirements.
(1-MR-054 and/orSRA1810)282727*Atalltimes**During'waste gasholdupsystemoperation (treatment forprimarysystemgases)****Duringreleasesviathispathway1Forpurgepurposesonly.SeeTechnical Specifications 3.3.3.10, Table3.3-13andTable4.3-9(Items3.a,5.ainbothtables)fornon-purging requirements associated withthisinstrument.
3 The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one oxygen monitor.During this time grab samples for oxygen are to be taken and analyzed every 12 hours.COOK NUCLEAR PLANT-UNIT 1 3/4 3-64 AMENDMENT NO.
2Forgasdecaytankreleasesonly,seeItem3(UnitVent,Auxiliary BuildingVentilation System)foradditional requirements.
TABLE 4.3-9 Radioactive Gaseous Effluent Monitorin Instrumentation Surveillance Re uirements Instrument Instrument CHANNEL CHECK SOURCE CHECK CHANNEL CHANNEL FUNCTIONAL CALIBRATION TEST 1.Waste Gas Holdup System Explosive Gas Monitoring System a.Hydrogen Monitor (QC-1400)b.Oxygen Monitor (QC-1400)Oxygen%'***
3Thewastegasholdupsystemexplosive gasmonitoring systemmaybeinoperable forupto160daysonaone-timebasisforthepurposeofreplacing oneoxygenmonitor.Duringthistimegrabsamplesforoxygenaretobetakenandanalyzedevery12hours.COOKNUCLEARPLANT-UNIT13/43-64AMENDMENT NO.
TABLE4.3-9Radioactive GaseousEffluentMonitorin Instrumentation Surveillance Reuirements Instrument Instrument CHANNELCHECKSOURCECHECKCHANNELCHANNELFUNCTIONAL CALIBRATION TEST1.WasteGasHoldupSystemExplosive GasMonitoring Systema.HydrogenMonitor(QC-1400) b.OxygenMonitor(QC-1400)
Oxygen%'***
Monitor(Alt.,QC-370)
Monitor(Alt.,QC-370)
D*~D***D***NANANAQ(3)Q(4)Q(4)2.Condenser Evacuation Systema.NobleGasActivityMonitor(SRA-1905) b.SystemEffluentFlowRate(SFR-401, 1-MR-054, SRA-1910)
D*~D***D***NA NA NA Q(3)Q(4)Q(4)2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-1905) b.System Effluent Flow Rate (SFR-401, 1-MR-054, SRA-1910)D**D**NA R(2)Q(1)3.Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-1505) b.Iodine Sampler (For VRS-1503)c..Particulate Sampler (For VRS-1501)d.System Effluent Flow Rate Measurement Device (VFR-315, 1-MR-054, VRS-1510)e.Sampler Flow Rate Measurement Device (VFS-1521)
D**D**NAR(2)Q(1)3.Auxiliary BuildingVentilation Systema.NobleGasActivityMonitor(VRS-1505) b.IodineSampler(ForVRS-1503) c..Particulate Sampler(ForVRS-1501) d.SystemEffluentFlowRateMeasurement Device(VFR-315, 1-MR-054, VRS-1510) e.SamplerFlowRateMeasurement Device(VFS-1521)
D*D*NA NA NA NA R(2)NA NA Q(1)NA 4, Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-1505) b.Aux.Building Vent.System Particulate Sampler (For VRS-1501)COOK NUCLEAR PLANT-UNIT 1 D**NA 3/4 3-66 R(2)NA Q(l)NA AMENDMENT NO.
D*D*NANANANAR(2)NANAQ(1)NA4,Containment PurgeSystema.Aux.BuildingVent.SystemNobleGasActivityMonitor(VRS-1505) b.Aux.BuildingVent.SystemParticulate Sampler(ForVRS-1501)
TABLE 3.3-13 Radioactive Gaseous Effluent Monitorin Instrumentatio Instrument Instrument Minimum Channels~Oerable A licabilit ACTION 1.Waste Gas Holdup System Explosive Gas Monitoring System a.Hydrogen Monitor (QC-1400)b, Oxygen Monitor (QC-1400, QC-370)(1)(2)30 29 2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-2905) b.Flow Rate Monitor (SFR-401)(2-MR-054 and/or SRA-2910)(1)(1)(1)28 27 27 3.Unit Vent, Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-2505) b.Iodine Sampler Cartridge for VRS-2503 c.Particulate Sampler Filter for VRS-2501 d.Effluent System Flow Rate Measuring Device (VFR-315)(2-MR-054 and/or VRS-2510)e.Sampler Flow Rate Measuring Device (VFS-2521) 28 32 32 27 27 27 4.Containment Purge System a.Aux.Building Vent System Noble Gas Activity Monitor (VRS-2505) b.Aux.Building Vent.System Particulate Sample for VRS-2501 31 32 5.Waste Gas Holdup System a.Noble Gas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-2505) 33 COOK NUCLEAR PLANT-UNIT 2 3/4 3-59 AMENDMENT NO.80, f~~e ,~I TABLE 3.3-13 (Cont)Instrument Instrument Minimum Channels~Oeaable A licabilit ACTION 6.Gland Seal Exhaust a.Noble Gas Activity Monitor (SRA-2805) b.Flow Rate Monitor (SFR-201)(2-MR-054 and/or SRA 2810)(1)(1)(1)28 27 27*At all times.**During waste gas holdup system operation (treatment for primary system gases)****During releases via this pathway.1 For purge purposes only, see Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables)for non-purging requirements associated with this instrument.
COOKNUCLEARPLANT-UNIT1D**NA3/43-66R(2)NAQ(l)NAAMENDMENT NO.
2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System)for additional requirements.
TABLE3.3-13Radioactive GaseousEffluentMonitorin Instrumentatio Instrument Instrument MinimumChannels~OerableAlicabilit ACTION1.WasteGasHoldupSystemExplosive GasMonitoring Systema.HydrogenMonitor(QC-1400) b,OxygenMonitor(QC-1400, QC-370)(1)(2)30292.Condenser Evacuation Systema.NobleGasActivityMonitor(SRA-2905) b.FlowRateMonitor(SFR-401)
3 The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one oxygen monitor.During this time grab samples for oxygen are to be taken'and analyzed every 12 hours.COOK NUCLEAR PLANT-UNIT 2 3/4 3-60 AMENDMENT NO.80, TABLE 4.3-9 Radioactive Gaseous Effluent Monitorin Instrumentation Surveillance Re uirements Instrument Instrument CHANNEL CHECK SOURCE CHECK CHANNEL CALIBRATION CHANNEL FUNCTIONAL TEST 1.Waste Gas Holdup System Explosive Gas Monitoring System a.Hydrogen Monitor (QC-1400)b.Oxygen Monitor (QC-1400)c.Oxygen+***
(2-MR-054 and/orSRA-2910)
Monitor (Alt.QC-370)NA NA NA Q(3)Q(4)Q(4)2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-2905) b.System Effluent Flow Rate (SFR-401, 2-MR-054, SRA-2910)3.Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-2505) b.Iodine Sampler (For VRS-2503)c.Particulate Sampler (For VRS-2501)d.System Effluent Flow Rate Measure-ment Device (VFR-315, 2-MR-054, VRS-2510)e.Sampler Flow Rate Measurement Device (VFS-2521) 4.Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-2505) b.Aux.Building Vent System Particulate Sampler (For VRS-2501)D**D*D*NA NA NA NA NA NA R(2)R(2)NA NA R(2)NA Q(1)Q(1)NA NA Q(1)NA COOK NUCLEAR PLANT-UNIT 2 3/4 3-62 AMENDMENT NO.80,}}
(1)(1)(1)2827273.UnitVent,Auxiliary BuildingVentilation Systema.NobleGasActivityMonitor(VRS-2505) b.IodineSamplerCartridge forVRS-2503c.Particulate SamplerFilterforVRS-2501d.EffluentSystemFlowRateMeasuring Device(VFR-315)
(2-MR-054 and/orVRS-2510) e.SamplerFlowRateMeasuring Device(VFS-2521) 2832322727274.Containment PurgeSystema.Aux.BuildingVentSystemNobleGasActivityMonitor(VRS-2505) b.Aux.BuildingVent.SystemParticulate SampleforVRS-250131325.WasteGasHoldupSystema.NobleGasActivityMonitorProviding AlarmandTermination ofGasDecayTankReleases(VRS-2505) 33COOKNUCLEARPLANT-UNIT23/43-59AMENDMENT NO.80, f~~e,~ITABLE3.3-13(Cont)Instrument Instrument MinimumChannels~OeaableAlicabilit ACTION6.GlandSealExhausta.NobleGasActivityMonitor(SRA-2805) b.FlowRateMonitor(SFR-201)
(2-MR-054 and/orSRA2810)(1)(1)(1)282727*Atalltimes.**Duringwastegasholdupsystemoperation (treatment forprimarysystemgases)****Duringreleasesviathispathway.1Forpurgepurposesonly,seeTechnical Specifications 3.3.3.10, Table3.3-13andTable4.3-9(Items3.a,5.ainbothtables)fornon-purging requirements associated withthisinstrument.
2Forgasdecaytankreleasesonly,seeItem3(UnitVent,Auxiliary BuildingVentilation System)foradditional requirements.
3Thewastegasholdupsystemexplosive gasmonitoring systemmaybeinoperable forupto160daysonaone-timebasisforthepurposeofreplacing oneoxygenmonitor.Duringthistimegrabsamplesforoxygenaretobetaken'andanalyzedevery12hours.COOKNUCLEARPLANT-UNIT23/43-60AMENDMENT NO.80, TABLE4.3-9Radioactive GaseousEffluentMonitorin Instrumentation Surveillance Reuirements Instrument Instrument CHANNELCHECKSOURCECHECKCHANNELCALIBRATION CHANNELFUNCTIONAL TEST1.WasteGasHoldupSystemExplosive GasMonitoring Systema.HydrogenMonitor(QC-1400) b.OxygenMonitor(QC-1400) c.Oxygen+***
Monitor(Alt.QC-370)NANANAQ(3)Q(4)Q(4)2.Condenser Evacuation Systema.NobleGasActivityMonitor(SRA-2905) b.SystemEffluentFlowRate(SFR-401, 2-MR-054, SRA-2910) 3.Auxiliary BuildingVentilation Systema.NobleGasActivityMonitor(VRS-2505) b.IodineSampler(ForVRS-2503) c.Particulate Sampler(ForVRS-2501) d.SystemEffluentFlowRateMeasure-mentDevice(VFR-315, 2-MR-054, VRS-2510) e.SamplerFlowRateMeasurement Device(VFS-2521) 4.Containment PurgeSystema.Aux.BuildingVent.SystemNobleGasActivityMonitor(VRS-2505) b.Aux.BuildingVentSystemParticulate Sampler(ForVRS-2501)
D**D*D*NANANANANANAR(2)R(2)NANAR(2)NAQ(1)Q(1)NANAQ(1)NACOOKNUCLEARPLANT-UNIT23/43-62AMENDMENT NO.80,}}

Revision as of 08:23, 6 July 2018

Proposed TS Tables 3.3-13 & 4.3-9 Re Waste Gas Holdup Monitoring Sys
ML17331B076
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/17/1993
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B075 List:
References
NUDOCS 9312010016
Download: ML17331B076 (16)


Text

ATTACHMENT 2 TO AEP:NRC:0956G EXISTING TECHNICAL SPECIFICATIONS PAGES MARKED TO REFLECT PROPOSED CHANGES 93120100ib 931117 PDR ADOCK 05000315 PDR U Ninimum Channels gmMM Paste Cas Holdup S;.scam Explosive Gas Aonicor."..z

.'s=-m a.y rouen o H d Honitor."..'c I~(1)(2)b.Oxygsn Monitor~.gc QC-370)30 29 2.Condenser Evacuacion Syscem a, Noble Cas Accivi=y Monitor (SRA-1905) b.Plow Race Monitor: SPR-'01)(1-NR-054 and/or SRA-1910)(1)(1)(1)28 27 27 t:nit Vane.Auxiliary 3u'ding Vencilacion System a.Noble Gas Accivl=;..'Loni"or (VRS-l.505.

b.iodine Sampler Carer dge.or".R~~c.Partcul,ace Sample="e for':RS~'.=.'.fluent Svsca..==Rata R,-0'nd/o=".=="-'101 Sa p'er"'-Rata.".easur'ng"a Ice"..=S-1521) 28 32 32 27 27 V~4 4 a.Aux Idol b.Aux Par d.".g Vent.."scam

'e Gas Accivi=y;'cor (VRS-1505)

Suil.ding Vane.rscan t'ula ca S amp l.e r f o r"RS-150'.re*a 32 5.'Paste Gas Holdup Svs""..a.Hob l.e Gas Ac t iv: Aonitor Providing Alarm and Terminac'-="" of Gas Decav.an<."-.a" eases (VRS-'505) 2%*'4'k 33 O.Gland Seal Exhaust a.noble Gas Accivi=':.'(oni"or (sRA-l.8051 o.Floe Race lonitor S.=R-'01)(1-.'R-054 and/or SPA;0)i 1)(1)(1)28 27 27 i1 C CAAV.I1MTT 1 3/4 3-63 Amendment No~I~o

TABLE 3.3-1,3 (Conc.)*Ac all, times*~During vaste gas.o up system~-s-em operacion (treatment for primary system gases)****During releases via this path~ay.For Purge PurPoses onlv, see Technical SPecifications 3.3.3.10, Table 3.3.l3 and Table 4.3-9 (Items 3.a, S.a'n boch cables)for non-purging requirements associated vi ch this ins crumenc.2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilacion System)for addicional requirements.

The waste gas holdup system explosive gas monitoring syscem may be inoperable loxygen are co be caicen and analyzed every l2 hours.COOK NUCLEAR PLANT-UNIT 3/4 3-64 AMENDMENT HO.'N s~s TA3ZS 4.3-9 CHANNEL SOURCE C~K'ia C1QQtNEL FUN CTZONAL XQX paste Gas Ho1dup System Explosive Css HooloorioS Sys=oo s.HydroSoo Monitor%&BR~-HQa b.Oxygen-Monicor (4~M ope-c.Oxygen~~Monicor (hlc.',QC-370)

Nh Q(3)Q(4)Q(4)2.Condenser Evacuation System a.Noble Cas Activity Monicor (SRA.-1905) b.System Effluent Flow Race (SFR-401.1-MR-054, SRA-1910)D*%'A R(2)Q(l)3.Auxiliary Building Ventilation System a.Noble Gas Activ';Monitor (VRS-1505) b.Iodine Sampler (For VRS-1503)c.Particulate Sample".'..""or'RS-'01)d.Svscem Ef=luenc."-ow Race.".eas remenc"evice JFR-315.'u&-054.RS-15 e.Sampler."-~ow Race Measuremen" Device (VFS-1521)10)Dx R(2)NA Q(l)iNA NA Containment Purge System a.Aux.Buildi.ng Vent.S'stem Noble Cas Accivity Monk to r (VRS-1505)b.Aux.Building Venc.S'seem Particulate Sampler (For VRS-1501)<<*X NA R(2 NA Q(1)NA 5.'<<aste Cas Holdup Svscem a.Noble Gas Accivic'onitor Providing.Alarm&Terminacion of Cas Decay Tank Releases (VRS-1505)

R(2)Q(5)D.C.COOK-UNIT 1 3-66 A endmenc No.9.>~9 TABLE 3.3-13 Minhaue Channels Qamhla Waste Cas Holdup System 3 Explosive Cas Monitoring System a.Hydr'ogen Monitor (g6-bk)Cgc;l~~(1)b.Oxygen Mont.tor (g~,~C,-f4-c~(2)QC-370)29 2.Condenser Evacuation System a.Noble Cas Activity Monitor (SRA-2905) b.Flov Rate Monitor (SFR-401)(2-MR-054 and/or SRA-2910)3.Unit Vent, Auxiliary Building Ventilation System a.Noble Cas Activity Monitor (VRS-2505) b.Iodine Sampler Cartridge for VRS-2503 c.Particulate Sampler Filter for VRS-2501 d.Ef'fluent System Flov Rate Measuring Device (VFR-315)(2-MR-054 and/or VRS-2510)e.Sampler Flov Rate Measuring Devi.ce (VFS-2521)

(1)(1)(1)28 2?2T'8 32 32 27 27 27 Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-2505) b.Aux.But.lding Vent.System Particulate Sampler f'r VRS-2501 5.@as te Cas Holdup System a.Noble Cas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-2505)

    • ~1 31 32 33~6.Gland.Seal Exhaust a.Noble Cas Activity Monitor (SRA-2805) b.Flov Rate Monitor (SFR-201)(2-MR-054 and/or SRA 2810)D.C.COOK-UNIT 2 (1)'(1)(1)3/4 3-59*~28**+4 27 27 h nd nt No.dd>'"

TABLE 3.3-13 (Cont.)*At all times cern operation (treatment for primary system gases)**During waste gas holduo svscem o~*~During releases via this pacnway F For purge purposes on rposes onlv see Technical Specifications 3~3~3~10 Table 3.3-13 and!Table.4, 3 9 (1 cems 3.a, 5.a in boch tables')for non-purging requirements associated with this instrument.

For gas decay tank releases only, see item 3 (Unit Vent, Auxiliary Building Ventilation System)for additional requirements.

The waste gas holdup system explosive gas monicori'ng syscem may be inoperable oxygen are to be taken and analyzed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.COOK NUCLEAR PLANT-UNIT 2 3/4 3>>60 AMENDMENT NO.PP>114 C CHANNEL SOURCE CHANNEL CHKQ<CKeNEL FUNCTIONAL X@X gasce Gas Holdup System Explosive Gas Monitoring System a.Hydrogen~~

Monitor (+6-3+)CvC-~e b.Oxygen~~~'tonicor (~~)CzC-l~~c.Oxygen Monitor (hlc..QC-3 0)2.Condenser Evacuacion System a.Noble Gas Activity Nonitor (SRA-2905) b.System Effluenc Flow Race (SFR-401.2-HR-054, SRA-2910)NhÃA~~NA...N o~~Q(3)Q(4)Q(4).R(2)" Q(l)3..Auxiliary Building Vencilacion System a.Noble Cas Accivi"v Aonitor (VRS-2505) b.Iodine Sampler (For VRS~2503)c.Particulace Sample: (cor VRS-250')d.S vs cern=""1 enc: 'w Rate.".easure.

enc Device (V.R-315.2-.'cR,-054.

':RS-e.Sampler F'ow Rate measurement Device (Vc 5-252'.)2510)0*NA VA NA YA R(2)iVA VA Q(l)NA NA Conminment Purge System a.Aux.'Building Vent.System Noble Gas Accivit.r'tonitor (VRS-2505) b.Aux.Building Venc.5'rs"em Par ticu1 a te S amp 1e.(For VRS~2501)<<*'4 NA R(2)NA Q(1)VA'<<asce Cas HoLdup Svs=em a.Noble Gas Activity Monitor Providing Alarm&Terminacion of'Cas Decay Tank Releases (VRS~2505)o**R(2)Q(5)D.C.COOK.UNIT 2 3r4 3-62 Amendment No.8 114 ATTACHMENT 3 TO AEP:NRC:0956G PROPOSED REVISED TECHNICAL SPECIFICATION PAGES

~~'l~TABLE 3 3-13 Radioactive Gaseous Effluent Monitorin Instrumentation Instrument Instrument Minimum Channels~Oem able A licabilit CTION 1.Waste Gas Holdup System Explosive Gas Monitoring System~a.Hydrogen Monitor (QC-1400)b.Oxygen Monitor (QC-1400, QC-370)(1)(2)30 29 2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-1905) b.Flow Rate Moni.tor(SFR-401)

(1-MR-054 and/or SRA-1910)(1)(1)(1)28 27 27 3.Unit Vent.Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-1505) b.Iodine Sampler Cartridge for VRS-1503 c.Particulate Sampler Filter for VRS-1501 d.Effluent System Flow Rate Measuring Device (VFR-315)(1-MR-054 and/or VRS-1510)e.Sampler Flow Rate Measuring Device (VFS-1521) 28 32 32 27 27 27 4.Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-1505) b.Aux.Building Vent.System Particulate Sampler for VRS-1501 31 32 5.Waste Gas Holdup System a.Noble Gas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-1505) 33 COOK NUCLEAR PLANT-UNIT 1 3/4 3-63 AMENDMENT NO.84, TABLE 3.3-13 (Cont)Instrument Instrument Minimum Channels~Oerable ACTION 6.Gland Seal Exhaust a.Noble Gas Activity Monitor (SRA-1805) b.Flow Rate Monitor(SFR-201)

(1-MR-054 and/or SRA 1810)28 27 27*At all times**During'waste gas holdup system operation (treatment for primary system gases)****During releases via this pathway 1 For purge purposes only.See Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables)for non-purging requirements associated with this instrument.

2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System)for additional requirements.

3 The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one oxygen monitor.During this time grab samples for oxygen are to be taken and analyzed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.COOK NUCLEAR PLANT-UNIT 1 3/4 3-64 AMENDMENT NO.

TABLE 4.3-9 Radioactive Gaseous Effluent Monitorin Instrumentation Surveillance Re uirements Instrument Instrument CHANNEL CHECK SOURCE CHECK CHANNEL CHANNEL FUNCTIONAL CALIBRATION TEST 1.Waste Gas Holdup System Explosive Gas Monitoring System a.Hydrogen Monitor (QC-1400)b.Oxygen Monitor (QC-1400)Oxygen%'***

Monitor(Alt.,QC-370)

D*~D***D***NA NA NA Q(3)Q(4)Q(4)2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-1905) b.System Effluent Flow Rate (SFR-401, 1-MR-054, SRA-1910)D**D**NA R(2)Q(1)3.Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-1505) b.Iodine Sampler (For VRS-1503)c..Particulate Sampler (For VRS-1501)d.System Effluent Flow Rate Measurement Device (VFR-315, 1-MR-054, VRS-1510)e.Sampler Flow Rate Measurement Device (VFS-1521)

D*D*NA NA NA NA R(2)NA NA Q(1)NA 4, Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-1505) b.Aux.Building Vent.System Particulate Sampler (For VRS-1501)COOK NUCLEAR PLANT-UNIT 1 D**NA 3/4 3-66 R(2)NA Q(l)NA AMENDMENT NO.

TABLE 3.3-13 Radioactive Gaseous Effluent Monitorin Instrumentatio Instrument Instrument Minimum Channels~Oerable A licabilit ACTION 1.Waste Gas Holdup System Explosive Gas Monitoring System a.Hydrogen Monitor (QC-1400)b, Oxygen Monitor (QC-1400, QC-370)(1)(2)30 29 2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-2905) b.Flow Rate Monitor (SFR-401)(2-MR-054 and/or SRA-2910)(1)(1)(1)28 27 27 3.Unit Vent, Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-2505) b.Iodine Sampler Cartridge for VRS-2503 c.Particulate Sampler Filter for VRS-2501 d.Effluent System Flow Rate Measuring Device (VFR-315)(2-MR-054 and/or VRS-2510)e.Sampler Flow Rate Measuring Device (VFS-2521) 28 32 32 27 27 27 4.Containment Purge System a.Aux.Building Vent System Noble Gas Activity Monitor (VRS-2505) b.Aux.Building Vent.System Particulate Sample for VRS-2501 31 32 5.Waste Gas Holdup System a.Noble Gas Activity Monitor Providing Alarm and Termination of Gas Decay Tank Releases (VRS-2505) 33 COOK NUCLEAR PLANT-UNIT 2 3/4 3-59 AMENDMENT NO.80, f~~e ,~I TABLE 3.3-13 (Cont)Instrument Instrument Minimum Channels~Oeaable A licabilit ACTION 6.Gland Seal Exhaust a.Noble Gas Activity Monitor (SRA-2805) b.Flow Rate Monitor (SFR-201)(2-MR-054 and/or SRA 2810)(1)(1)(1)28 27 27*At all times.**During waste gas holdup system operation (treatment for primary system gases)****During releases via this pathway.1 For purge purposes only, see Technical Specifications 3.3.3.10, Table 3.3-13 and Table 4.3-9 (Items 3.a, 5.a in both tables)for non-purging requirements associated with this instrument.

2 For gas decay tank releases only, see Item 3 (Unit Vent, Auxiliary Building Ventilation System)for additional requirements.

3 The waste gas holdup system explosive gas monitoring system may be inoperable for up to 160 days on a one-time basis for the purpose of replacing one oxygen monitor.During this time grab samples for oxygen are to be taken'and analyzed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.COOK NUCLEAR PLANT-UNIT 2 3/4 3-60 AMENDMENT NO.80, TABLE 4.3-9 Radioactive Gaseous Effluent Monitorin Instrumentation Surveillance Re uirements Instrument Instrument CHANNEL CHECK SOURCE CHECK CHANNEL CALIBRATION CHANNEL FUNCTIONAL TEST 1.Waste Gas Holdup System Explosive Gas Monitoring System a.Hydrogen Monitor (QC-1400)b.Oxygen Monitor (QC-1400)c.Oxygen+***

Monitor (Alt.QC-370)NA NA NA Q(3)Q(4)Q(4)2.Condenser Evacuation System a.Noble Gas Activity Monitor (SRA-2905) b.System Effluent Flow Rate (SFR-401, 2-MR-054, SRA-2910)3.Auxiliary Building Ventilation System a.Noble Gas Activity Monitor (VRS-2505) b.Iodine Sampler (For VRS-2503)c.Particulate Sampler (For VRS-2501)d.System Effluent Flow Rate Measure-ment Device (VFR-315, 2-MR-054, VRS-2510)e.Sampler Flow Rate Measurement Device (VFS-2521) 4.Containment Purge System a.Aux.Building Vent.System Noble Gas Activity Monitor (VRS-2505) b.Aux.Building Vent System Particulate Sampler (For VRS-2501)D**D*D*NA NA NA NA NA NA R(2)R(2)NA NA R(2)NA Q(1)Q(1)NA NA Q(1)NA COOK NUCLEAR PLANT-UNIT 2 3/4 3-62 AMENDMENT NO.80,