| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 20, 2015 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC-2-4 Blair, NE 68008 SUBJECT: FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATION SECTION 3.2, TABLE 3-5, TO ADD A NEW SURVEILLANCE REQUIREMENT TO VERIFY CERTAIN VALVE POSITIONS (TAC NO. MF4089) Dear Mr. Cortopassi: The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 280 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 30, 2014, as supplemented by letter dated January 27, 2015. The amendment revises TS section 3.2, Table 3-5, for Fort Calhoun Station, Unit No. 1, to add a new surveillance requirement to verify the correct position of the valves required to restrict flow in the high pressure safety injection system. A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285 Enclosures: 1. Amendment No. 280 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 280 Renewed License No. DPR-40 1. The Nuclear Regulatory Commission (the Commission) has found that: A The application for amendment by the Omaha Public Power District (the licensee), dated April 30, 2014, as supplemented by letter dated January 27, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. Enclosure 1 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 20, 2015 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC 4 Blair, NE 68008 |
| -2 -2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes as indicated in the attachment to this license amendment, and paragraph 3.8. of Renewed Facility Operating License No. DPR-40 is hereby amended to read as follows: 8. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280, are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications. 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance. Attachment: Changes to the Renewed Facility Operating License No. DPR-40 and Technical Specifications FOR THE NUCLEAR REGULA TORY COMMISSION Eric R. Oesterle, Acting Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance: February 20, 2015 ATTACHMENT TO LICENSE AMENDMENT NO. 280 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following pages of the Renewed Facility Operating License No. DPR-40 and the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. License Page REMOVE INSERT -3--3-Technical Specifications REMOVE 3.2-Page 5 3.2 -Page 15 INSERT 3.2 -Page 5 3.2 -Page 15
| | |
| -3 -(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5) Pursuant to the Act and 1 O CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility. 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is, subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: A Maximum Power Level Omaha Public Power District is authorized to operate the Fort Calhoun Station, Unit 1, at steady state reactor core power levels not in excess of 1500 megawatts thermal (rate power). B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280 are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications. C. Security and Safeguards Contingency Plans The Omaha Public Power District shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fort Calhoun Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan," submitted by letter dated May 19, 2006. OPPD shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The OPPD CSP was approved by License Amendment No. 266. Renewed Operating License No. DPR-40 Amendment No. 280 TECHNICAL SPECIFICATIONS 3.0 SURVEILLANCE REQUIREMENTS 3.0 SURVEILLANCE REQUIREMENTS 3.2 Equipment and Sampling Tests (continued) Table 3-5, Item 8b verifies that primary to secondary LEAKAGE is less or equal to 150 gallons per day through any one SG. Satisfying the primary to secondary LEAKAGE limit ensures that the operational LEAKAGE performance criterion in the Steam Generator Program is met. If this surveillance requirement is not met, compliance with LCO 3.17, "Steam Generator Tube Integrity," should be evaluated. The 150 gallons per day limit is measured at room temperature as described in Reference 5. The operational LEAKAGE rate limit applies to LEAKAGE through any one SG. If it is not practical to assign the LEAKAGE to an individual SG, all the primary to secondary LEAKAGE should be conservatively assumed to be from one SG. The Surveillance is modified by a footnote which states that the Surveillance is not required to be performed until 12 hours after establishment of steady state operation. For RCS primary to secondary LEAKAGE determination, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows. The Surveillance Frequency of daily is a reasonable interval to trend primary to secondary LEAKAGE and recognizes the importance of early leakage detection in the prevention of accidents. The primary to secondary LEAKAGE is determined using continuous process radiation monitors or radiochemical grab sampling in accordance with the EPRI guidelines (Ref. 5). Table 3-5, Item 25 verifies adequate measurements are taken to ensure that facility protective actions will be taken (and power operation will be terminated) in the event of high and/or low river level conditions. The high river level limit of less than 1004 feet mean sea level is based on the maximum elevation at which facility flood control measures provide protection to safety related equipment (i.e., due to restricted access/egress to the intake structure veranda once the flood barriers are installed prior to river level reaching 1004 feet msl). A continuous watch will be established at 1002 feet mean sea level to provide adequate response time for rising river levels in accordance with the abnormal operating procedure. The river level surveillance requirement specified also ensures sufficient net positive suction head is available for operating the RW pumps. The minimum river level of 976 feet 9 inches provides adequate suction to the RW pumps for cooling plant components. The surveillance frequency of "Daily" is a reasonable interval and models guidance provided in NUREG-0212, Revision 2, "Standard Technical Specifications for Combustion Engineering Pressurized Water Reactors," Section 4.7.6. This surveillance requirement verifies that the Missouri River water level is maintained at a level greater than or equal to 976 feet 9 inches mean sea level. A continuous watch is established to monitor the river level when the river level reaches 980 feet mean sea level to assure no sudden loss of water supply occurs. Table 3-5, Item 26 verifies the proper position of stops on high pressure safety injection system valves. The valves have stops to position them properly so that flow is restricted to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The refueling frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned transients if the Surveillance were performed with the reactor at power. References 1) USAR, Section 9.10 2) ASTM 04057, ASTM 0975, ASTM 04176, ASTM 02622, ASTM 0287, ASTM 6217, ASTM 02709 3) ASTM 0975, Table 1 4) Regulatory Guide 1.137 5) EPRI, "Pressurized Water Reactor Primary-to-Secondary Leak Guidelines." 3.2 -Page 5 Amendment No. 229,246,257,274, 280 TSBC-09 003 0, 14 001 0, 14 003 0 TECHNICAL SPECIFICATIONS TABLE 3-5 MINIMUM FREQUENCIES FOR EQUIPMENT TESTS 25. River Level 26. HPSI Throttle Valves Test Verify water level is within limits by measurement at least once per 24 hours, when the water level is less than 1004 feet and greater than or equal to 976 feet 9 inches above mean sea levels. Verify, for each HPSI throttle valve listed below, each position stop is in the correct position. HCV-311 HCV-314 HCV-317 HCV-320 HCV-312 HCV-315 HCV-318 HCV-321 1 The provisions of Technical Specification 3.0.1 and 3.0.5 do not apply. Frequency D R USAR Section Reference 9.8 2 Whenever the system is at or above operating temperature and pressure. 3 Not applicable to primary to secondary LEAKAGE. 4Verify primary to secondary LEAKAGE is:::; 150 gallons per day through any one SG. This surveillance is not required to be performed until 12 hours after establishment of steady state operation. 5 Tests shall be performed in accordance with applicable section(s) of ANSI N510-1980. 3.2 -Page 14 Amendment No. 188, 221, 239.246.257. 274. 'J7+, 280 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 280 TO RENEWED FACILITY 1.0 INTRODUCTION OPERATING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285 By application dated April 30, 2014, as supplemented by letter dated January 27, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 14125A239 and ML 15027 A622, respectively), Omaha Public Power District (OPPD, the licensee) requested changes to the Technical Specifications (TSs; Appendix A to Renewed Facility Operating License No. DPR-40) for the Fort Calhoun Station, Unit No. 1 (FCS). The proposed amendment would revise TS section 3.2, "Equipment and Sampling Tests," Table 3-5, "Minimum Frequencies for Equipment Tests,'' for FCS to add a new surveillance requirement (SR) to verify the correct position of the valves required to restrict flow in the high pressure safety injection system (HPSI). Specifically, the licensee proposes to add a new SR, Item 26, to TS 3.2, Table 3-5. Item 26 would require, for each of the following HPSI throttle valves, verification on an 18-month frequency (R) that each position stop is in the correct position: HCV-311/HCV-312, HCV-314/HCV-315, HCV-317/HCV-318, and HCV-320/HCV-321. The supplemental letter dated January 27, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Register on August 19, 2014 (79 FR 49108). 2.0 REGULATORY EVALUATION Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. In Section 50.36, "Technical specifications," of Title 10 of the Code of Federal Regulations (10 CFR), the NRC established its regulatory requirements related to the content of TSs. Pursuant to 10 CFR 50.36, TSs are required to Enclosure 2
| | ==SUBJECT:== |
| -2 -include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings, (2) limiting conditions for operation, (3) SRs, (4) design features, and (5) administrative controls. The rule does not specify the particular requirements to be included in a plant's TSs. The regulations in 10 CFR 50.36(c)(3) state that Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. FCS was licensed for construction prior to the issuance of 10 CFR Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," but at that time committed to the draft General Design Criteria (GDC). The draft GDC are contained in Appendix G of the FCS Updated Safety Evaluation Report (USAR) and are similar to those contained in 10 CFR Part 50, Appendix A. The applicable GDCs of Appendix G of the FCS USAR to this proposed change are:
| | FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATION SECTION 3.2, TABLE 3-5, TO ADD A NEW SURVEILLANCE REQUIREMENT TO VERIFY CERTAIN VALVE POSITIONS (TAC NO. MF4089) |
| | |
| | ==Dear Mr. Cortopassi:== |
| | The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 280 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 30, 2014, as supplemented by letter dated January 27, 2015. The amendment revises TS section 3.2, Table 3-5, for Fort Calhoun Station, Unit No. 1, to add a new surveillance requirement to verify the correct position of the valves required to restrict flow in the high pressure safety injection system. A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285 |
| | |
| | ==Enclosures:== |
| | 1. Amendment No. 280 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 280 Renewed License No. DPR-40 1. The Nuclear Regulatory Commission (the Commission) has found that: A The application for amendment by the Omaha Public Power District (the licensee), dated April 30, 2014, as supplemented by letter dated January 27, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. Enclosure 1 2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes as indicated in the attachment to this license amendment, and paragraph 3.8. of Renewed Facility Operating License No. DPR-40 is hereby amended to read as follows: 8. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280, are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications. 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance. |
| | |
| | ==Attachment:== |
| | Changes to the Renewed Facility Operating License No. DPR-40 and Technical Specifications FOR THE NUCLEAR REGULA TORY COMMISSION Eric R. Oesterle, Acting Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance: February 20, 2015 ATTACHMENT TO LICENSE AMENDMENT NO. 280 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following pages of the Renewed Facility Operating License No. DPR-40 and the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. License Page REMOVE INSERT Technical Specifications REMOVE 3.2-Page 5 3.2 -Page 15 INSERT 3.2 -Page 5 3.2 -Page 15 (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5) Pursuant to the Act and 1 O CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility. 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is, subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: A Maximum Power Level Omaha Public Power District is authorized to operate the Fort Calhoun Station, Unit 1, at steady state reactor core power levels not in excess of 1500 megawatts thermal (rate power). B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280 are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications. C. Security and Safeguards Contingency Plans The Omaha Public Power District shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fort Calhoun Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan," submitted by letter dated May 19, 2006. OPPD shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The OPPD CSP was approved by License Amendment No. 266. Renewed Operating License No. DPR-40 Amendment No. 280 TECHNICAL SPECIFICATIONS 3.0 SURVEILLANCE REQUIREMENTS 3.0 SURVEILLANCE REQUIREMENTS 3.2 Equipment and Sampling Tests (continued) Table 3-5, Item 8b verifies that primary to secondary LEAKAGE is less or equal to 150 gallons per day through any one SG. Satisfying the primary to secondary LEAKAGE limit ensures that the operational LEAKAGE performance criterion in the Steam Generator Program is met. If this surveillance requirement is not met, compliance with LCO 3.17, "Steam Generator Tube Integrity," should be evaluated. The 150 gallons per day limit is measured at room temperature as described in Reference 5. The operational LEAKAGE rate limit applies to LEAKAGE through any one SG. If it is not practical to assign the LEAKAGE to an individual SG, all the primary to secondary LEAKAGE should be conservatively assumed to be from one SG. The Surveillance is modified by a footnote which states that the Surveillance is not required to be performed until 12 hours after establishment of steady state operation. For RCS primary to secondary LEAKAGE determination, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows. The Surveillance Frequency of daily is a reasonable interval to trend primary to secondary LEAKAGE and recognizes the importance of early leakage detection in the prevention of accidents. The primary to secondary LEAKAGE is determined using continuous process radiation monitors or radiochemical grab sampling in accordance with the EPRI guidelines (Ref. 5). Table 3-5, Item 25 verifies adequate measurements are taken to ensure that facility protective actions will be taken (and power operation will be terminated) in the event of high and/or low river level conditions. The high river level limit of less than 1004 feet mean sea level is based on the maximum elevation at which facility flood control measures provide protection to safety related equipment (i.e., due to restricted access/egress to the intake structure veranda once the flood barriers are installed prior to river level reaching 1004 feet msl). A continuous watch will be established at 1002 feet mean sea level to provide adequate response time for rising river levels in accordance with the abnormal operating procedure. The river level surveillance requirement specified also ensures sufficient net positive suction head is available for operating the RW pumps. The minimum river level of 976 feet 9 inches provides adequate suction to the RW pumps for cooling plant components. The surveillance frequency of "Daily" is a reasonable interval and models guidance provided in NUREG-0212, Revision 2, "Standard Technical Specifications for Combustion Engineering Pressurized Water Reactors," Section 4.7.6. This surveillance requirement verifies that the Missouri River water level is maintained at a level greater than or equal to 976 feet 9 inches mean sea level. A continuous watch is established to monitor the river level when the river level reaches 980 feet mean sea level to assure no sudden loss of water supply occurs. Table 3-5, Item 26 verifies the proper position of stops on high pressure safety injection system valves. The valves have stops to position them properly so that flow is restricted to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The refueling frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned transients if the Surveillance were performed with the reactor at power. References 1) USAR, Section 9.10 2) ASTM 04057, ASTM 0975, ASTM 04176, ASTM 02622, ASTM 0287, ASTM 6217, ASTM 02709 3) ASTM 0975, Table 1 4) Regulatory Guide 1.137 5) EPRI, "Pressurized Water Reactor Primary-to-Secondary Leak Guidelines." 3.2 -Page 5 Amendment No. 229,246,257,274, 280 TSBC-09 003 0, 14 001 0, 14 003 0 TECHNICAL SPECIFICATIONS TABLE 3-5 MINIMUM FREQUENCIES FOR EQUIPMENT TESTS 25. River Level 26. HPSI Throttle Valves Test Verify water level is within limits by measurement at least once per 24 hours, when the water level is less than 1004 feet and greater than or equal to 976 feet 9 inches above mean sea levels. Verify, for each HPSI throttle valve listed below, each position stop is in the correct position. HCV-311 HCV-314 HCV-317 HCV-320 HCV-312 HCV-315 HCV-318 HCV-321 1 The provisions of Technical Specification 3.0.1 and 3.0.5 do not apply. Frequency D R USAR Section Reference 9.8 2 Whenever the system is at or above operating temperature and pressure. 3 Not applicable to primary to secondary LEAKAGE. 4Verify primary to secondary LEAKAGE is:::; 150 gallons per day through any one SG. This surveillance is not required to be performed until 12 hours after establishment of steady state operation. 5 Tests shall be performed in accordance with applicable section(s) of ANSI N510-1980. 3.2 -Page 14 Amendment No. 188, 221, 239.246.257. 274. 'J7+, 280 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 280 TO RENEWED FACILITY |
| | |
| | ==1.0 INTRODUCTION== |
| | OPERATING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285 By application dated April 30, 2014, as supplemented by letter dated January 27, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 14125A239 and ML 15027 A622, respectively), Omaha Public Power District (OPPD, the licensee) requested changes to the Technical Specifications (TSs; Appendix A to Renewed Facility Operating License No. DPR-40) for the Fort Calhoun Station, Unit No. 1 (FCS). The proposed amendment would revise TS section 3.2, "Equipment and Sampling Tests," Table 3-5, "Minimum Frequencies for Equipment Tests,'' for FCS to add a new surveillance requirement (SR) to verify the correct position of the valves required to restrict flow in the high pressure safety injection system (HPSI). Specifically, the licensee proposes to add a new SR, Item 26, to TS 3.2, Table 3-5. Item 26 would require, for each of the following HPSI throttle valves, verification on an 18-month frequency (R) that each position stop is in the correct position: HCV-311/HCV-312, HCV-314/HCV-315, HCV-317/HCV-318, and HCV-320/HCV-321. The supplemental letter dated January 27, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Register on August 19, 2014 (79 FR 49108). |
| | |
| | ==2.0 REGULATORY EVALUATION== |
| | Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. In Section 50.36, "Technical specifications," of Title 10 of the Code of Federal Regulations (10 CFR), the NRC established its regulatory requirements related to the content of TSs. Pursuant to 10 CFR 50.36, TSs are required to Enclosure 2 include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings, (2) limiting conditions for operation, (3) SRs, (4) design features, and (5) administrative controls. The rule does not specify the particular requirements to be included in a plant's TSs. The regulations in 10 CFR 50.36(c)(3) state that Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. FCS was licensed for construction prior to the issuance of 10 CFR Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," but at that time committed to the draft General Design Criteria (GDC). The draft GDC are contained in Appendix G of the FCS Updated Safety Evaluation Report (USAR) and are similar to those contained in 10 CFR Part 50, Appendix A. The applicable GDCs of Appendix G of the FCS USAR to this proposed change are: |
| * Draft GDC 44 -Emergency Core Cooling Systems Capability, requires an emergency core cooling system (ECCS) design that meets performance criteria | | * Draft GDC 44 -Emergency Core Cooling Systems Capability, requires an emergency core cooling system (ECCS) design that meets performance criteria |
| * Draft GDC 45 -Inspection of Emergency Core Cooling Systems, requires an ECCS design that meets inspection requirements | | * Draft GDC 45 -Inspection of Emergency Core Cooling Systems, requires an ECCS design that meets inspection requirements |
| * Draft GDC 46 -Testing of Emergency Core Cooling Systems Components, requires components that meeting testing requirements, and | | * Draft GDC 46 -Testing of Emergency Core Cooling Systems Components, requires components that meeting testing requirements, and |
| * Draft GDC 47 -Testing of Emergency Core Cooling Systems, requires an ECCS design that meets testing requirements. 3.0 TECHNICAL EVALUATION 3.1 Proposed Changes The licensee proposed the following addition to TS 3.2, Table 3-5: Frequency 26. HPSI Throttle Valves Verify, for each HPSI throttle valve listed R below, each position stop is in the correct position. HCV-311 HCV-314 HCV-317 HCV-320 HCV-312 HCV-315 HCV-318 HCV-321 | | * Draft GDC 47 -Testing of Emergency Core Cooling Systems, requires an ECCS design that meets testing requirements. |
| -3 -The licensee also provided revised TS Bases for TS 3.2 to reflect Volume 2, "Bases," of NUREG-1432, "Standard Technical Specifications -Combustion Engineering Plants," Revision 4 (STS), specifically STS Bases SR 3.5.2.9. 3.2 Summary of Technical Information Provided by the Licensee The licensee provided the following summary of Licensee Event Report (LER) 2013-003-01: 1 [ ... ] HPSI pump operation was identified as unreliable when operated in the extended flow region of the manufacturer's pump curve during an accident. The available net positive suction head was identified as insufficient to support pump operation in the extended flow region. During system benchmark testing, it was identified that the safety injection loop flows were imbalanced. Three (3) valves were identified as having higher flow coefficients (Cv) values than specified in the original design specifications. As a consequence, the licensee has set the HPSI discharge header isolation valve position to balance safety injection flow into the four reactor coolant system loops. Further, the licensee determined that valves in the low pressure safety injection (LPSI) flowpath do not have to be positioned to less than full-open and therefore are not included in the proposed SR. OPPD cited a letter from the NRC to the licensee dated June 30, 1977,2 which stated, in part, that: In view of the safety function associated with the proper setting of valves used to throttle flow in these systems, we consider it appropriate that periodic verification be made of these valve positions. Accordingly, we request that you determine if throttle valves are used to obtain the required flow distribution in the HPSI or LPSI systems. If throttle valves are used, we request that you propose changes to your technical specifications to incorporate the surveillance requirements given in the enclosure. The licensee proposed to add new SRs similar to STS to verify the correct position of the valves required to restrict flow. The valves to be verified are HCV-311/HCV-312, HPSI to Reactor Coolant Loop 1B Isolation valves, HCV-314/HCV-315, HPSI to Reactor Coolant Loop 1A Isolation valves, HCV-317/HCV-318, HPSI to Reactor Coolant Loop 2A Isolation valves, and HCV-320/HCV-321, HPSI to Reactor Coolant 2B Isolation valves. The valve positions would be verified on a refueling frequency. 3.3 NRC Staff Evaluation The NRC staff reviewed the license amendment request (LAR) by evaluating the submitted information, and verifying that the proposed SR is appropriate. The staff also reviewed the 1 Cortopassi, Louis P., "Licensee Event Report 2013-003, Revision 1, for the Fort Calhoun Station," dated November 27, 2013, LIC-13-0171, ADAMS Accession No. ML 13333A673. 2 Letter from NRG (G. Lear) to OPPD (T. E. Short) dated June 30, 1977 (NRC-77-0060).
| | |
| -4 -related LER and Integrated Inspection Report, which provided additional insight into the importance of the valve position to safety. The March 19, 2014, Integrated Inspection Report for FCS (ADAMS Accession No. ML 14078A666), provides a succinct history of the HPSI valves relative to flow balancing:3 Despite the constraints of the original design, in April 1977 the licensee removed the limit switch settings from the loop injection valves in an attempt to increase HPSI injection flow. This had the unrecognized and undesirable effect of defeating the original design intent of maintaining balanced loop injection flows. The licensee's emergency procedures still contained steps that directed the operators to maintain balanced injection flows, so the net effect of this design change was to move the flow balancing design feature from an automatic design feature to a manual operator action. In a letter dated June 30, 1977, the NRC staff notified OPPD of the safety importance of maintaining balanced loop injection flow rates from the HPSI and LPSI systems, and requested that the licensee determine if throttle valves were used in the design to achieve the required flow balance. The letter further requested that if throttle valves were used, the licensee should propose changes to the Technical Specifications to add a specific set of surveillance requirements that were included as an attachment to the NRC letter. The licensee provided a brief response to this letter on August 22, 1977, which stated that throttle valves were not used to obtain the needed flow distribution from the HPSI or LPSI systems. The licensee failed to inform the NRC that they had originally been designed with throttled loop injection valves, but had removed this important design feature just prior to receiving the letter from the NRC. As a result, the surveillance requirements described in the June 30, 1977 letter were not added to the Fort Calhoun Station Technical Specifications. As identified in LER 2013-003-01 and the NRC's letter dated June 1977, the proper position of valves that throttle the flow in the HPSI system is important to reliable system performance. The licensee stated in the LAR dated April 30, 2014, that the valves in the LPSI system flowpath are not required to be positioned less than full open. As such, the applicant is not proposing to add the valves in the LPSI flowpath to the SRs, consistent with the NRC's letter dated June 30, 1977. The NRC staff concludes that licensee's proposal to add the valves that are required to restrict the flow to the HPSI system, while not adding the valves that remain full-open in the LPSI system to the SRs in TS 3.2, Table 3-5, is acceptable. OPPD is proposing the frequency for the new SR with the notation of "R." Per Section 3.0.2 of the licensee's TSs, the notation "R" is defined with the title of "Refueling" and a frequency of 3 Hay, Michael. "Fort Calhoun -NRC Integrated Inspection Report Number 05000285/2014002 and Notices of Violations," dated March 19, 2014, ADAMS Accession No. ML 14078A666.
| | ==3.0 TECHNICAL EVALUATION== |
| -5 -"At least once per 18 months."4 This is consistent with the STS which state a frequency of "18 months or In accordance with the Surveillance Frequency Control Program".5 3.4 Conclusion The NRC staff evaluated the licensee's proposed changes and the impact of the proposed changes to the FCS TSs. Based on the above, the NRC staff determined that the proposed changes comply with the requirements of 10 CFR 50.36(c)(3) for SRs that assure the limiting conditions for operation will be met and with requirements of the applicable draft GDCs for ECCS in Appendix G of the FCS USAR. Therefore, the proposed changes to the FCS TS 3.2, Table 3-5 are acceptable. The regulation at 10 CFR 50.36(a)(1) states: "A summary statement of the bases or reasons for such specifications ... shall also be included in the application, but shall not become part of the technical specifications." The licensee may make changes to the TS Bases without prior NRC staff review and approval in accordance with the TS Bases Control Program, TS 5.20. Accordingly, along with the proposed TS changes, the licensee also submitted TS Bases changes corresponding to the proposed TS changes. The NRC staff determined that TS Bases changes are consistent with the proposed TS changes and provide the purpose for each requirement in the specification consistent with the Commission's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors dated July 22, 1993 (58 FR 39132). 4.0 STATE CONSULTATION In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments. 5.0 ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on August 19, 2014 (79 FR 49108). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 1 O CFR 51.22(b ), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. 4 Omaha Public Power District, Docket No. 50-285, Fort Calhoun Station, Unit 1 Renewed Facility Operating License No. DPR-40, ADAMS Accession No. ML053110488. 5 NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants," Revision 4.0, Volume 1, Specifications, April 2012, ADAMS Accession No. ML12102A165.
| | 3.1 Proposed Changes The licensee proposed the following addition to TS 3.2, Table 3-5: Frequency 26. HPSI Throttle Valves Verify, for each HPSI throttle valve listed R below, each position stop is in the correct position. HCV-311 HCV-314 HCV-317 HCV-320 HCV-312 HCV-315 HCV-318 HCV-321 The licensee also provided revised TS Bases for TS 3.2 to reflect Volume 2, "Bases," of NUREG-1432, "Standard Technical Specifications -Combustion Engineering Plants," Revision 4 (STS), specifically STS Bases SR 3.5.2.9. 3.2 Summary of Technical Information Provided by the Licensee The licensee provided the following summary of Licensee Event Report (LER) 2013-003-01: 1 [ ... ] HPSI pump operation was identified as unreliable when operated in the extended flow region of the manufacturer's pump curve during an accident. The available net positive suction head was identified as insufficient to support pump operation in the extended flow region. During system benchmark testing, it was identified that the safety injection loop flows were imbalanced. Three (3) valves were identified as having higher flow coefficients (Cv) values than specified in the original design specifications. As a consequence, the licensee has set the HPSI discharge header isolation valve position to balance safety injection flow into the four reactor coolant system loops. Further, the licensee determined that valves in the low pressure safety injection (LPSI) flowpath do not have to be positioned to less than full-open and therefore are not included in the proposed SR. OPPD cited a letter from the NRC to the licensee dated June 30, 1977,2 which stated, in part, that: In view of the safety function associated with the proper setting of valves used to throttle flow in these systems, we consider it appropriate that periodic verification be made of these valve positions. Accordingly, we request that you determine if throttle valves are used to obtain the required flow distribution in the HPSI or LPSI systems. If throttle valves are used, we request that you propose changes to your technical specifications to incorporate the surveillance requirements given in the enclosure. The licensee proposed to add new SRs similar to STS to verify the correct position of the valves required to restrict flow. The valves to be verified are HCV-311/HCV-312, HPSI to Reactor Coolant Loop 1B Isolation valves, HCV-314/HCV-315, HPSI to Reactor Coolant Loop 1A Isolation valves, HCV-317/HCV-318, HPSI to Reactor Coolant Loop 2A Isolation valves, and HCV-320/HCV-321, HPSI to Reactor Coolant 2B Isolation valves. The valve positions would be verified on a refueling frequency. 3.3 NRC Staff Evaluation The NRC staff reviewed the license amendment request (LAR) by evaluating the submitted information, and verifying that the proposed SR is appropriate. The staff also reviewed the 1 Cortopassi, Louis P., "Licensee Event Report 2013-003, Revision 1, for the Fort Calhoun Station," dated November 27, 2013, LIC-13-0171, ADAMS Accession No. ML 13333A673. 2 Letter from NRG (G. Lear) to OPPD (T. E. Short) dated June 30, 1977 (NRC-77-0060). |
| -6 -6.0 CONCLUSION The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor: D. Saenz, NRR/DSS/SRXB Date: February 20, 2015 February 20, 2015 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC-2-4 Blair, NE 68008 SUBJECT: FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATION SECTION 3.2, TABLE 3-5, TO ADD A NEW SURVEILLANCE REQUIREMENT TO VERIFY CERTAIN VALVE POSITIONS (TAC NO. MF4089) Dear Mr. Cortopassi: The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 280 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 30, 2014, as supplemented by letter dated January 27, 2015. The amendment revises TS section 3.2, Table 3-5, for Fort Calhoun Station, Unit No. 1, to add a new surveillance requirement to verify the correct position of the valves required to restrict flow in the high pressure safety injection system. A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285 Enclosures: Sincerely, IRA/ Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1. Amendment No. 280 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource ADAMS Accession No. ML15015A413 OFFICE NRR/DORULPL4-1 /PM NAME FLyon DATE 2/4/15 OFFICE OGC -NLO Subject to comment. NAME AGohosh DATE 2/19/15 RidsNrrDorlLpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource *memo dated RidsNrrPMFortCalhoun Resource RidsRgn4Mai1Center Resource DSaenz, NRR/DSS/SRXB NRR/DORULPL4-1 /LA NRR/DSS/STSB/BC NRR/DSS/SRXB/BC JBurkhardt RElliott CJackson* 2/3/15 2/11/15 1/6/15 NRR/DORULPL4-1 /BC(A) NRR/DORULPL4-1 /PM EOesterle FLyon 2/20/15 20/20/15 OFFICIAL RECORD COPY
| | related LER and Integrated Inspection Report, which provided additional insight into the importance of the valve position to safety. The March 19, 2014, Integrated Inspection Report for FCS (ADAMS Accession No. ML 14078A666), provides a succinct history of the HPSI valves relative to flow balancing:3 Despite the constraints of the original design, in April 1977 the licensee removed the limit switch settings from the loop injection valves in an attempt to increase HPSI injection flow. This had the unrecognized and undesirable effect of defeating the original design intent of maintaining balanced loop injection flows. The licensee's emergency procedures still contained steps that directed the operators to maintain balanced injection flows, so the net effect of this design change was to move the flow balancing design feature from an automatic design feature to a manual operator action. In a letter dated June 30, 1977, the NRC staff notified OPPD of the safety importance of maintaining balanced loop injection flow rates from the HPSI and LPSI systems, and requested that the licensee determine if throttle valves were used in the design to achieve the required flow balance. The letter further requested that if throttle valves were used, the licensee should propose changes to the Technical Specifications to add a specific set of surveillance requirements that were included as an attachment to the NRC letter. The licensee provided a brief response to this letter on August 22, 1977, which stated that throttle valves were not used to obtain the needed flow distribution from the HPSI or LPSI systems. The licensee failed to inform the NRC that they had originally been designed with throttled loop injection valves, but had removed this important design feature just prior to receiving the letter from the NRC. As a result, the surveillance requirements described in the June 30, 1977 letter were not added to the Fort Calhoun Station Technical Specifications. As identified in LER 2013-003-01 and the NRC's letter dated June 1977, the proper position of valves that throttle the flow in the HPSI system is important to reliable system performance. The licensee stated in the LAR dated April 30, 2014, that the valves in the LPSI system flowpath are not required to be positioned less than full open. As such, the applicant is not proposing to add the valves in the LPSI flowpath to the SRs, consistent with the NRC's letter dated June 30, 1977. The NRC staff concludes that licensee's proposal to add the valves that are required to restrict the flow to the HPSI system, while not adding the valves that remain full-open in the LPSI system to the SRs in TS 3.2, Table 3-5, is acceptable. OPPD is proposing the frequency for the new SR with the notation of "R." Per Section 3.0.2 of the licensee's TSs, the notation "R" is defined with the title of "Refueling" and a frequency of 3 Hay, Michael. "Fort Calhoun -NRC Integrated Inspection Report Number 05000285/2014002 and Notices of Violations," dated March 19, 2014, ADAMS Accession No. ML 14078A666. |
| | "At least once per 18 months."4 This is consistent with the STS which state a frequency of "18 months or In accordance with the Surveillance Frequency Control Program".5 3.4 Conclusion The NRC staff evaluated the licensee's proposed changes and the impact of the proposed changes to the FCS TSs. Based on the above, the NRC staff determined that the proposed changes comply with the requirements of 10 CFR 50.36(c)(3) for SRs that assure the limiting conditions for operation will be met and with requirements of the applicable draft GDCs for ECCS in Appendix G of the FCS USAR. Therefore, the proposed changes to the FCS TS 3.2, Table 3-5 are acceptable. The regulation at 10 CFR 50.36(a)(1) states: "A summary statement of the bases or reasons for such specifications ... shall also be included in the application, but shall not become part of the technical specifications." The licensee may make changes to the TS Bases without prior NRC staff review and approval in accordance with the TS Bases Control Program, TS 5.20. Accordingly, along with the proposed TS changes, the licensee also submitted TS Bases changes corresponding to the proposed TS changes. The NRC staff determined that TS Bases changes are consistent with the proposed TS changes and provide the purpose for each requirement in the specification consistent with the Commission's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors dated July 22, 1993 (58 FR 39132). |
| | |
| | ==4.0 STATE CONSULTATION== |
| | In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments. |
| | |
| | ==5.0 ENVIRONMENTAL CONSIDERATION== |
| | The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on August 19, 2014 (79 FR 49108). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 1 O CFR 51.22(b ), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. 4 Omaha Public Power District, Docket No. 50-285, Fort Calhoun Station, Unit 1 Renewed Facility Operating License No. DPR-40, ADAMS Accession No. ML053110488. 5 NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants," Revision 4.0, Volume 1, Specifications, April 2012, ADAMS Accession No. ML12102A165. |
| | |
| | ==6.0 CONCLUSION== |
| | The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor: D. Saenz, NRR/DSS/SRXB Date: February 20, 2015 February 20, 2015 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC 4 Blair, NE 68008 |
| | |
| | ==SUBJECT:== |
| | FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATION SECTION 3.2, TABLE 3-5, TO ADD A NEW SURVEILLANCE REQUIREMENT TO VERIFY CERTAIN VALVE POSITIONS (TAC NO. MF4089) |
| | |
| | ==Dear Mr. Cortopassi:== |
| | The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 280 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 30, 2014, as supplemented by letter dated January 27, 2015. The amendment revises TS section 3.2, Table 3-5, for Fort Calhoun Station, Unit No. 1, to add a new surveillance requirement to verify the correct position of the valves required to restrict flow in the high pressure safety injection system. A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285 |
| | |
| | ==Enclosures:== |
| | Sincerely, IRA/ Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1. Amendment No. 280 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource ADAMS Accession No. ML15015A413 OFFICE NRR/DORULPL4-1 /PM NAME FLyon DATE 2/4/15 OFFICE OGC -NLO Subject to comment. NAME AGohosh DATE 2/19/15 RidsNrrDorlLpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource *memo dated RidsNrrPMFortCalhoun Resource RidsRgn4Mai1Center Resource DSaenz, NRR/DSS/SRXB NRR/DORULPL4-1 /LA NRR/DSS/STSB/BC NRR/DSS/SRXB/BC JBurkhardt RElliott CJackson* 2/3/15 2/11/15 1/6/15 NRR/DORULPL4-1 /BC(A) NRR/DORULPL4-1 /PM EOesterle FLyon 2/20/15 20/20/15 OFFICIAL RECORD COPY |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARLIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements ML20071E1042020-03-25025 March 2020 Issuance of Amendment to Change the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan to Reflect an ISFSI-Only Configuration ML19297D6772019-12-11011 December 2019 Issuance of Amendment to Revise the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Spent Fuel Pool ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18068A1652018-03-0909 March 2018 Correction to Page 1 of Attachment to Enclosure 1 for Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17179A1782017-06-29029 June 2017 Correction to Technical Specification Definitions - Page 7 for Amendment No. 286, Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and ... LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16182A3632016-08-19019 August 2016 Issuance of Amendment No. 289, Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML16139A8042016-06-0808 June 2016 Issuance of Amendment No. 288, Request to Adopt Technical Specifications Task Force (TSTF)-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6b & 6c ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1015202962010-06-0202 June 2010 License Amendment, Issuance of Amendment No. 265, Revise Technical Specification 2.15, Table 2-5, Note C for Safety Valve Acoustic Position Indication (Emergency Circumstances) ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e ML0925405912009-10-0909 October 2009 License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip ML0919005692009-07-24024 July 2009 Unit No.1 - Issuance of Amendment No. 261, Modify Transformer Allowed Outage Time in Technical Specification 2.7(2) and Delete Associated 2.7(2) Special Reporting Requirements in TS 5.9.3j ML0916205692009-07-24024 July 2009 Issuance of Amendment 262, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0912801022009-07-22022 July 2009 Issuance of Amendment No. 260, Modification of Surveillance Requirements in TS 3.6(3), Containment Recirculating Air Cooling and Filtering System & Removal of License Conditions ML0832606972009-05-12012 May 2009 Issuance of Amendment No. 259, Revise Technical Specifications to Correct Typographical Errors and Make Administrative Clarifications ML0907108912009-03-27027 March 2009 License Amendment, Issuance of Amendment No. 258, Revise Limiting Condition for Operation 2.7(2)j in TS 2.7, Electrical Systems, to Clarify Allowed Outage Time for Emergency Diesel Generators ML0730903612007-12-17017 December 2007 Issuance of Amendment No. 251, Modify Technical Specification Requirements to Support Addition of Safety-Related Swing Inverters to 120 Volt AC Buses ML0720400972007-07-26026 July 2007 Conforming License Amendment to Incorporate the Mitigation Strategies of Commission Order EA-02-026 (Tac No. MD4534) ML0720402832007-07-26026 July 2007 Revised Pages of Facility Operating License DPR-40 to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 ML0706102692007-06-0606 June 2007 Issuance of Amendment No. 250 Adoption of TSTF-447 to Delete Requirements for Hydrogen Purge System - CLIIP 2024-01-31
[Table view] Category:Safety Evaluation
MONTHYEARML24019A1682024-01-31031 January 2024 Safety Evaluation Report for Approval of License Termination Plan ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML19297D6742019-12-0909 December 2019 FCS ISFSI Only Tech Specs SER ML18017B0052018-03-30030 March 2018 Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009) ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17144A2462017-06-21021 June 2017 Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16141A7392016-05-27027 May 2016 Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines ML16104A0742016-04-15015 April 2016 Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection Interval ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML16041A3082016-02-19019 February 2016 Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15232A0032015-08-21021 August 2015 Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection Interval ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14323A5992014-12-0202 December 2014 Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage ML14316A1672014-11-19019 November 2014 Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13141A6082013-06-25025 June 2013 Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML13017A4672013-01-31031 January 2013 Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule ML12333A1192012-12-31031 December 2012 Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1122702902011-08-18018 August 2011 Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1022101332010-08-20020 August 2010 Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection Interval ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e 2024-01-31
[Table view] Category:Technical Specifications
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors LIC-15-0076, License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2015-09-11011 September 2015 License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. LIC-15-0085, License Amendment Request 15-05; Application to Revise Technical Specification to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6B & 6C, Using the Consolidated Line Item.2015-09-11011 September 2015 License Amendment Request 15-05; Application to Revise Technical Specification to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6B & 6C, Using the Consolidated Line Item. LIC-15-0053, License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes2015-08-20020 August 2015 License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 LIC-14-0128, License Amendment Request (LAR) 14-10; One- Time Extension of Technical Specification Surveillance Requirements2014-11-0707 November 2014 License Amendment Request (LAR) 14-10; One- Time Extension of Technical Specification Surveillance Requirements ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14115A2972014-04-10010 April 2014 Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants ML14041A4082014-02-10010 February 2014 License Amendment Request (LAR) 14-01, One-Time Extension of Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3 ML14108A0442013-12-31031 December 2013 Omaha Public Power District Fort Calhoun Station Unit Radiological Environmental Operating Report for Technical Specification Section 5.94.b January 1, 2013 to December 31, 2013 ML14108A0422013-12-31031 December 2013 Omaha Public Power District Fort Calhoun Station Unit No. 1 - Annual Report for Technical Specification Section 5.94.a January 1, 2013 to December 31, 2013 ML12128A1702012-04-12012 April 2012 Technical Specification (TS) Basis Change Index, Page 2 of 2 and TS 2.10 - Page 18 LIC-12-0006, License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO)2012-02-10010 February 2012 License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO) LIC-12-0052, Annual Report for Technical Specification Section 5.9.4a2011-12-31031 December 2011 Annual Report for Technical Specification Section 5.9.4a LIC-10-0034, License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c.2010-07-12012 July 2010 License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c. LIC-10-0043, Supplement to Emergency License Amendment Request Revision to Technical Specification 2.15, Table 2-5 Note (C) for Safety Valve Acoustic Position Indication2010-06-0101 June 2010 Supplement to Emergency License Amendment Request Revision to Technical Specification 2.15, Table 2-5 Note (C) for Safety Valve Acoustic Position Indication ML0935611192010-01-22022 January 2010 Correction to Amendment No. 263 Request to Add Steam Generator Blowdown Isolation Requirements to Technical Specifications ML0925405912009-10-0909 October 2009 License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip ML0912502752009-05-0505 May 2009 Replacement Page TS 2.1 - Page 8, License Amendment Request for Administrative Revisions ML0907108912009-03-27027 March 2009 License Amendment, Issuance of Amendment No. 258, Revise Limiting Condition for Operation 2.7(2)j in TS 2.7, Electrical Systems, to Clarify Allowed Outage Time for Emergency Diesel Generators ML0911703682009-02-18018 February 2009 Updated Tech Spec Pages, from Licensee, License Amendment Request Lic 08-0078, Administrative Revisions to the Technical Specifications to Correct Typographical Errors and Provide Clarification LIC-09-0008, License Amendment Request for Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-01-30030 January 2009 License Amendment Request for Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. LIC-08-0074, License Amendment Request (LAR) 08-03, Clarify Technical Specification 2.7(2) Regarding Preferred Offsite Power Source, Transformer Allowed Outage Time (AOT)2008-07-31031 July 2008 License Amendment Request (LAR) 08-03, Clarify Technical Specification 2.7(2) Regarding Preferred Offsite Power Source, Transformer Allowed Outage Time (AOT) LIC-08-0049, License Amendment Request (LAR) Clarification of Technical Specification (TS) 2.7(2)j, Regarding Emergency Diesel Generators Allowed Outage Time2008-04-22022 April 2008 License Amendment Request (LAR) Clarification of Technical Specification (TS) 2.7(2)j, Regarding Emergency Diesel Generators Allowed Outage Time LIC-08-0008, License Amendment Request (LAR) Revision to Technical Specification (TS) 2.5(1)A, Auxiliary Feedwater (AFW) System.2008-02-0505 February 2008 License Amendment Request (LAR) Revision to Technical Specification (TS) 2.5(1)A, Auxiliary Feedwater (AFW) System. LIC-07-0084, License Amendment Request, Change to Diesel Generator Surveillance Testing.2007-10-0505 October 2007 License Amendment Request, Change to Diesel Generator Surveillance Testing. LIC-07-0082, License Amendment Request (LAR) Permanent Use of Sodium Tetraborate as the Containment Building Sump Buffering Agent.2007-09-11011 September 2007 License Amendment Request (LAR) Permanent Use of Sodium Tetraborate as the Containment Building Sump Buffering Agent. LIC-07-0046, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-05-16016 May 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0707100982007-04-0303 April 2007 Technical Specifications, Editorial Changes to Apply Certain Limiting Conditions for Operation Requirements ML0705905082007-02-28028 February 2007 License and Technical Specification Pages - Amendment No. 248 to Facility Operating License Relocation of T.S. 2.22, Toxic Gas Monitors, and T.S. Table 3-3, Item 29 to Updated Safety Analysis Report LIC-06-0146, License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Purge System Using the Consolidated Line Item Improvement Process.2006-12-20020 December 2006 License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Purge System Using the Consolidated Line Item Improvement Process. LIC-06-0147, License Amendment Request for Administrative Revisions to Fort Calhoun Station, Unit No. 1 Technical Specifications2006-12-20020 December 2006 License Amendment Request for Administrative Revisions to Fort Calhoun Station, Unit No. 1 Technical Specifications ML0631105582006-11-0707 November 2006 Technical Specifications, Revising TS Steam Generator Tube Suveillance Program ML0631202592006-10-27027 October 2006 Tech Spec Pages for Amendment 244 Modifications to Technical Specification 2.4, Containment Cooling to Reduce Operable Containment Spray Pumps ML0628604282006-10-10010 October 2006 Response to Request for Additional Information (RAI) Related to the Replacement of Trisodium Phosphate ML0624304022006-08-30030 August 2006 Revised License Amendment Request, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process and Deletion of Sleeving as a Steam Generator.. ML0624201602006-08-30030 August 2006 Tech Spec Pages for Amendment 241 Regarding Use of M5 Fuel Cladding ML0624301302006-06-27027 June 2006 Tech Spec Pages for Amendment 240 Deletion of Design Features in Technical Specifications 4.3.1.2b and 4.3.1.2c LIC-06-0063, Exigent LAR, Deletion of Design Features Technical Specifications Redundant to 10 CFR 50.68, Criticality Accident Requirements.2006-06-0202 June 2006 Exigent LAR, Deletion of Design Features Technical Specifications Redundant to 10 CFR 50.68, Criticality Accident Requirements. 2024-01-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 20, 2015 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC 4 Blair, NE 68008
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATION SECTION 3.2, TABLE 3-5, TO ADD A NEW SURVEILLANCE REQUIREMENT TO VERIFY CERTAIN VALVE POSITIONS (TAC NO. MF4089)
Dear Mr. Cortopassi:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 280 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 30, 2014, as supplemented by letter dated January 27, 2015. The amendment revises TS section 3.2, Table 3-5, for Fort Calhoun Station, Unit No. 1, to add a new surveillance requirement to verify the correct position of the valves required to restrict flow in the high pressure safety injection system. A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285
Enclosures:
1. Amendment No. 280 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 280 Renewed License No. DPR-40 1. The Nuclear Regulatory Commission (the Commission) has found that: A The application for amendment by the Omaha Public Power District (the licensee), dated April 30, 2014, as supplemented by letter dated January 27, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. Enclosure 1 2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes as indicated in the attachment to this license amendment, and paragraph 3.8. of Renewed Facility Operating License No. DPR-40 is hereby amended to read as follows: 8. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280, are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications. 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
Attachment:
Changes to the Renewed Facility Operating License No. DPR-40 and Technical Specifications FOR THE NUCLEAR REGULA TORY COMMISSION Eric R. Oesterle, Acting Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance: February 20, 2015 ATTACHMENT TO LICENSE AMENDMENT NO. 280 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following pages of the Renewed Facility Operating License No. DPR-40 and the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. License Page REMOVE INSERT Technical Specifications REMOVE 3.2-Page 5 3.2 -Page 15 INSERT 3.2 -Page 5 3.2 -Page 15 (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5) Pursuant to the Act and 1 O CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility. 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is, subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: A Maximum Power Level Omaha Public Power District is authorized to operate the Fort Calhoun Station, Unit 1, at steady state reactor core power levels not in excess of 1500 megawatts thermal (rate power). B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 280 are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications. C. Security and Safeguards Contingency Plans The Omaha Public Power District shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fort Calhoun Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan," submitted by letter dated May 19, 2006. OPPD shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The OPPD CSP was approved by License Amendment No. 266. Renewed Operating License No. DPR-40 Amendment No. 280 TECHNICAL SPECIFICATIONS 3.0 SURVEILLANCE REQUIREMENTS 3.0 SURVEILLANCE REQUIREMENTS 3.2 Equipment and Sampling Tests (continued) Table 3-5, Item 8b verifies that primary to secondary LEAKAGE is less or equal to 150 gallons per day through any one SG. Satisfying the primary to secondary LEAKAGE limit ensures that the operational LEAKAGE performance criterion in the Steam Generator Program is met. If this surveillance requirement is not met, compliance with LCO 3.17, "Steam Generator Tube Integrity," should be evaluated. The 150 gallons per day limit is measured at room temperature as described in Reference 5. The operational LEAKAGE rate limit applies to LEAKAGE through any one SG. If it is not practical to assign the LEAKAGE to an individual SG, all the primary to secondary LEAKAGE should be conservatively assumed to be from one SG. The Surveillance is modified by a footnote which states that the Surveillance is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation. For RCS primary to secondary LEAKAGE determination, steady state is defined as stable RCS pressure, temperature, power level, pressurizer and makeup tank levels, makeup and letdown, and RCP seal injection and return flows. The Surveillance Frequency of daily is a reasonable interval to trend primary to secondary LEAKAGE and recognizes the importance of early leakage detection in the prevention of accidents. The primary to secondary LEAKAGE is determined using continuous process radiation monitors or radiochemical grab sampling in accordance with the EPRI guidelines (Ref. 5). Table 3-5, Item 25 verifies adequate measurements are taken to ensure that facility protective actions will be taken (and power operation will be terminated) in the event of high and/or low river level conditions. The high river level limit of less than 1004 feet mean sea level is based on the maximum elevation at which facility flood control measures provide protection to safety related equipment (i.e., due to restricted access/egress to the intake structure veranda once the flood barriers are installed prior to river level reaching 1004 feet msl). A continuous watch will be established at 1002 feet mean sea level to provide adequate response time for rising river levels in accordance with the abnormal operating procedure. The river level surveillance requirement specified also ensures sufficient net positive suction head is available for operating the RW pumps. The minimum river level of 976 feet 9 inches provides adequate suction to the RW pumps for cooling plant components. The surveillance frequency of "Daily" is a reasonable interval and models guidance provided in NUREG-0212, Revision 2, "Standard Technical Specifications for Combustion Engineering Pressurized Water Reactors," Section 4.7.6. This surveillance requirement verifies that the Missouri River water level is maintained at a level greater than or equal to 976 feet 9 inches mean sea level. A continuous watch is established to monitor the river level when the river level reaches 980 feet mean sea level to assure no sudden loss of water supply occurs. Table 3-5, Item 26 verifies the proper position of stops on high pressure safety injection system valves. The valves have stops to position them properly so that flow is restricted to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The refueling frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned transients if the Surveillance were performed with the reactor at power. References 1) USAR, Section 9.10 2) ASTM 04057, ASTM 0975, ASTM 04176, ASTM 02622, ASTM 0287, ASTM 6217, ASTM 02709 3) ASTM 0975, Table 1 4) Regulatory Guide 1.137 5) EPRI, "Pressurized Water Reactor Primary-to-Secondary Leak Guidelines." 3.2 -Page 5 Amendment No. 229,246,257,274, 280 TSBC-09 003 0, 14 001 0, 14 003 0 TECHNICAL SPECIFICATIONS TABLE 3-5 MINIMUM FREQUENCIES FOR EQUIPMENT TESTS 25. River Level 26. HPSI Throttle Valves Test Verify water level is within limits by measurement at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, when the water level is less than 1004 feet and greater than or equal to 976 feet 9 inches above mean sea levels. Verify, for each HPSI throttle valve listed below, each position stop is in the correct position. HCV-311 HCV-314 HCV-317 HCV-320 HCV-312 HCV-315 HCV-318 HCV-321 1 The provisions of Technical Specification 3.0.1 and 3.0.5 do not apply. Frequency D R USAR Section Reference 9.8 2 Whenever the system is at or above operating temperature and pressure. 3 Not applicable to primary to secondary LEAKAGE. 4Verify primary to secondary LEAKAGE is:::; 150 gallons per day through any one SG. This surveillance is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation. 5 Tests shall be performed in accordance with applicable section(s) of ANSI N510-1980. 3.2 -Page 14 Amendment No. 188, 221, 239.246.257. 274. 'J7+, 280 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 280 TO RENEWED FACILITY
1.0 INTRODUCTION
OPERATING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285 By application dated April 30, 2014, as supplemented by letter dated January 27, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 14125A239 and ML 15027 A622, respectively), Omaha Public Power District (OPPD, the licensee) requested changes to the Technical Specifications (TSs; Appendix A to Renewed Facility Operating License No. DPR-40) for the Fort Calhoun Station, Unit No. 1 (FCS). The proposed amendment would revise TS section 3.2, "Equipment and Sampling Tests," Table 3-5, "Minimum Frequencies for Equipment Tests, for FCS to add a new surveillance requirement (SR) to verify the correct position of the valves required to restrict flow in the high pressure safety injection system (HPSI). Specifically, the licensee proposes to add a new SR, Item 26, to TS 3.2, Table 3-5. Item 26 would require, for each of the following HPSI throttle valves, verification on an 18-month frequency (R) that each position stop is in the correct position: HCV-311/HCV-312, HCV-314/HCV-315, HCV-317/HCV-318, and HCV-320/HCV-321. The supplemental letter dated January 27, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Register on August 19, 2014 (79 FR 49108).
2.0 REGULATORY EVALUATION
Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. In Section 50.36, "Technical specifications," of Title 10 of the Code of Federal Regulations (10 CFR), the NRC established its regulatory requirements related to the content of TSs. Pursuant to 10 CFR 50.36, TSs are required to Enclosure 2 include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings, (2) limiting conditions for operation, (3) SRs, (4) design features, and (5) administrative controls. The rule does not specify the particular requirements to be included in a plant's TSs. The regulations in 10 CFR 50.36(c)(3) state that Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. FCS was licensed for construction prior to the issuance of 10 CFR Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," but at that time committed to the draft General Design Criteria (GDC). The draft GDC are contained in Appendix G of the FCS Updated Safety Evaluation Report (USAR) and are similar to those contained in 10 CFR Part 50, Appendix A. The applicable GDCs of Appendix G of the FCS USAR to this proposed change are:
3.0 TECHNICAL EVALUATION
3.1 Proposed Changes The licensee proposed the following addition to TS 3.2, Table 3-5: Frequency 26. HPSI Throttle Valves Verify, for each HPSI throttle valve listed R below, each position stop is in the correct position. HCV-311 HCV-314 HCV-317 HCV-320 HCV-312 HCV-315 HCV-318 HCV-321 The licensee also provided revised TS Bases for TS 3.2 to reflect Volume 2, "Bases," of NUREG-1432, "Standard Technical Specifications -Combustion Engineering Plants," Revision 4 (STS), specifically STS Bases SR 3.5.2.9. 3.2 Summary of Technical Information Provided by the Licensee The licensee provided the following summary of Licensee Event Report (LER) 2013-003-01: 1 [ ... ] HPSI pump operation was identified as unreliable when operated in the extended flow region of the manufacturer's pump curve during an accident. The available net positive suction head was identified as insufficient to support pump operation in the extended flow region. During system benchmark testing, it was identified that the safety injection loop flows were imbalanced. Three (3) valves were identified as having higher flow coefficients (Cv) values than specified in the original design specifications. As a consequence, the licensee has set the HPSI discharge header isolation valve position to balance safety injection flow into the four reactor coolant system loops. Further, the licensee determined that valves in the low pressure safety injection (LPSI) flowpath do not have to be positioned to less than full-open and therefore are not included in the proposed SR. OPPD cited a letter from the NRC to the licensee dated June 30, 1977,2 which stated, in part, that: In view of the safety function associated with the proper setting of valves used to throttle flow in these systems, we consider it appropriate that periodic verification be made of these valve positions. Accordingly, we request that you determine if throttle valves are used to obtain the required flow distribution in the HPSI or LPSI systems. If throttle valves are used, we request that you propose changes to your technical specifications to incorporate the surveillance requirements given in the enclosure. The licensee proposed to add new SRs similar to STS to verify the correct position of the valves required to restrict flow. The valves to be verified are HCV-311/HCV-312, HPSI to Reactor Coolant Loop 1B Isolation valves, HCV-314/HCV-315, HPSI to Reactor Coolant Loop 1A Isolation valves, HCV-317/HCV-318, HPSI to Reactor Coolant Loop 2A Isolation valves, and HCV-320/HCV-321, HPSI to Reactor Coolant 2B Isolation valves. The valve positions would be verified on a refueling frequency. 3.3 NRC Staff Evaluation The NRC staff reviewed the license amendment request (LAR) by evaluating the submitted information, and verifying that the proposed SR is appropriate. The staff also reviewed the 1 Cortopassi, Louis P., "Licensee Event Report 2013-003, Revision 1, for the Fort Calhoun Station," dated November 27, 2013, LIC-13-0171, ADAMS Accession No. ML 13333A673. 2 Letter from NRG (G. Lear) to OPPD (T. E. Short) dated June 30, 1977 (NRC-77-0060).
related LER and Integrated Inspection Report, which provided additional insight into the importance of the valve position to safety. The March 19, 2014, Integrated Inspection Report for FCS (ADAMS Accession No. ML 14078A666), provides a succinct history of the HPSI valves relative to flow balancing:3 Despite the constraints of the original design, in April 1977 the licensee removed the limit switch settings from the loop injection valves in an attempt to increase HPSI injection flow. This had the unrecognized and undesirable effect of defeating the original design intent of maintaining balanced loop injection flows. The licensee's emergency procedures still contained steps that directed the operators to maintain balanced injection flows, so the net effect of this design change was to move the flow balancing design feature from an automatic design feature to a manual operator action. In a letter dated June 30, 1977, the NRC staff notified OPPD of the safety importance of maintaining balanced loop injection flow rates from the HPSI and LPSI systems, and requested that the licensee determine if throttle valves were used in the design to achieve the required flow balance. The letter further requested that if throttle valves were used, the licensee should propose changes to the Technical Specifications to add a specific set of surveillance requirements that were included as an attachment to the NRC letter. The licensee provided a brief response to this letter on August 22, 1977, which stated that throttle valves were not used to obtain the needed flow distribution from the HPSI or LPSI systems. The licensee failed to inform the NRC that they had originally been designed with throttled loop injection valves, but had removed this important design feature just prior to receiving the letter from the NRC. As a result, the surveillance requirements described in the June 30, 1977 letter were not added to the Fort Calhoun Station Technical Specifications. As identified in LER 2013-003-01 and the NRC's letter dated June 1977, the proper position of valves that throttle the flow in the HPSI system is important to reliable system performance. The licensee stated in the LAR dated April 30, 2014, that the valves in the LPSI system flowpath are not required to be positioned less than full open. As such, the applicant is not proposing to add the valves in the LPSI flowpath to the SRs, consistent with the NRC's letter dated June 30, 1977. The NRC staff concludes that licensee's proposal to add the valves that are required to restrict the flow to the HPSI system, while not adding the valves that remain full-open in the LPSI system to the SRs in TS 3.2, Table 3-5, is acceptable. OPPD is proposing the frequency for the new SR with the notation of "R." Per Section 3.0.2 of the licensee's TSs, the notation "R" is defined with the title of "Refueling" and a frequency of 3 Hay, Michael. "Fort Calhoun -NRC Integrated Inspection Report Number 05000285/2014002 and Notices of Violations," dated March 19, 2014, ADAMS Accession No. ML 14078A666.
"At least once per 18 months."4 This is consistent with the STS which state a frequency of "18 months or In accordance with the Surveillance Frequency Control Program".5 3.4 Conclusion The NRC staff evaluated the licensee's proposed changes and the impact of the proposed changes to the FCS TSs. Based on the above, the NRC staff determined that the proposed changes comply with the requirements of 10 CFR 50.36(c)(3) for SRs that assure the limiting conditions for operation will be met and with requirements of the applicable draft GDCs for ECCS in Appendix G of the FCS USAR. Therefore, the proposed changes to the FCS TS 3.2, Table 3-5 are acceptable. The regulation at 10 CFR 50.36(a)(1) states: "A summary statement of the bases or reasons for such specifications ... shall also be included in the application, but shall not become part of the technical specifications." The licensee may make changes to the TS Bases without prior NRC staff review and approval in accordance with the TS Bases Control Program, TS 5.20. Accordingly, along with the proposed TS changes, the licensee also submitted TS Bases changes corresponding to the proposed TS changes. The NRC staff determined that TS Bases changes are consistent with the proposed TS changes and provide the purpose for each requirement in the specification consistent with the Commission's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors dated July 22, 1993 (58 FR 39132).
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on August 19, 2014 (79 FR 49108). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 1 O CFR 51.22(b ), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. 4 Omaha Public Power District, Docket No. 50-285, Fort Calhoun Station, Unit 1 Renewed Facility Operating License No. DPR-40, ADAMS Accession No. ML053110488. 5 NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants," Revision 4.0, Volume 1, Specifications, April 2012, ADAMS Accession No. ML12102A165.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor: D. Saenz, NRR/DSS/SRXB Date: February 20, 2015 February 20, 2015 Mr. Louis P. Cortopassi Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC 4 Blair, NE 68008
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 -ISSUANCE OF AMENDMENT RE: REVISE TECHNICAL SPECIFICATION SECTION 3.2, TABLE 3-5, TO ADD A NEW SURVEILLANCE REQUIREMENT TO VERIFY CERTAIN VALVE POSITIONS (TAC NO. MF4089)
Dear Mr. Cortopassi:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 280 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 30, 2014, as supplemented by letter dated January 27, 2015. The amendment revises TS section 3.2, Table 3-5, for Fort Calhoun Station, Unit No. 1, to add a new surveillance requirement to verify the correct position of the valves required to restrict flow in the high pressure safety injection system. A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-285
Enclosures:
Sincerely, IRA/ Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1. Amendment No. 280 to DPR-40 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource ADAMS Accession No. ML15015A413 OFFICE NRR/DORULPL4-1 /PM NAME FLyon DATE 2/4/15 OFFICE OGC -NLO Subject to comment. NAME AGohosh DATE 2/19/15 RidsNrrDorlLpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource *memo dated RidsNrrPMFortCalhoun Resource RidsRgn4Mai1Center Resource DSaenz, NRR/DSS/SRXB NRR/DORULPL4-1 /LA NRR/DSS/STSB/BC NRR/DSS/SRXB/BC JBurkhardt RElliott CJackson* 2/3/15 2/11/15 1/6/15 NRR/DORULPL4-1 /BC(A) NRR/DORULPL4-1 /PM EOesterle FLyon 2/20/15 20/20/15 OFFICIAL RECORD COPY