Category:Letter
MONTHYEARIR 05000285/20240032024-10-29029 October 2024 NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 – NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 – Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, SHPO; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commissions Analysis of Omaha Public Power Districts Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements ML20071E1042020-03-25025 March 2020 Issuance of Amendment to Change the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan to Reflect an ISFSI-Only Configuration ML19297D6772019-12-11011 December 2019 Issuance of Amendment to Revise the Permanently Defueled Technical Specifications to Align to the Requirements for Permanent Removal of Spent Fuel from the Spent Fuel Pool ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18068A1652018-03-0909 March 2018 Correction to Page 1 of Attachment to Enclosure 1 for Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17179A1782017-06-29029 June 2017 Correction to Technical Specification Definitions - Page 7 for Amendment No. 286, Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and ... LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2017-05-15015 May 2017 Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16182A3632016-08-19019 August 2016 Issuance of Amendment No. 289, Request to Adopt Technical Specification Task Force (TSTF)-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML16139A8042016-06-0808 June 2016 Issuance of Amendment No. 288, Request to Adopt Technical Specifications Task Force (TSTF)-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6b & 6c ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1015202962010-06-0202 June 2010 License Amendment, Issuance of Amendment No. 265, Revise Technical Specification 2.15, Table 2-5, Note C for Safety Valve Acoustic Position Indication (Emergency Circumstances) ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e ML0925405912009-10-0909 October 2009 License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip ML0919005692009-07-24024 July 2009 Unit No.1 - Issuance of Amendment No. 261, Modify Transformer Allowed Outage Time in Technical Specification 2.7(2) and Delete Associated 2.7(2) Special Reporting Requirements in TS 5.9.3j ML0916205692009-07-24024 July 2009 Issuance of Amendment 262, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0912801022009-07-22022 July 2009 Issuance of Amendment No. 260, Modification of Surveillance Requirements in TS 3.6(3), Containment Recirculating Air Cooling and Filtering System & Removal of License Conditions ML0832606972009-05-12012 May 2009 Issuance of Amendment No. 259, Revise Technical Specifications to Correct Typographical Errors and Make Administrative Clarifications ML0907108912009-03-27027 March 2009 License Amendment, Issuance of Amendment No. 258, Revise Limiting Condition for Operation 2.7(2)j in TS 2.7, Electrical Systems, to Clarify Allowed Outage Time for Emergency Diesel Generators ML0730903612007-12-17017 December 2007 Issuance of Amendment No. 251, Modify Technical Specification Requirements to Support Addition of Safety-Related Swing Inverters to 120 Volt AC Buses ML0720400972007-07-26026 July 2007 Conforming License Amendment to Incorporate the Mitigation Strategies of Commission Order EA-02-026 (Tac No. MD4534) ML0720402832007-07-26026 July 2007 Revised Pages of Facility Operating License DPR-40 to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 ML0706102692007-06-0606 June 2007 Issuance of Amendment No. 250 Adoption of TSTF-447 to Delete Requirements for Hydrogen Purge System - CLIIP 2024-01-31
[Table view] Category:Safety Evaluation
MONTHYEARML24019A1682024-01-31031 January 2024 Safety Evaluation Report for Approval of License Termination Plan ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML19297D6742019-12-0909 December 2019 FCS ISFSI Only Tech Specs SER ML18017B0052018-03-30030 March 2018 Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009) ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17144A2462017-06-21021 June 2017 Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16141A7392016-05-27027 May 2016 Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines ML16104A0742016-04-15015 April 2016 Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection Interval ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML16041A3082016-02-19019 February 2016 Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15232A0032015-08-21021 August 2015 Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection Interval ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14323A5992014-12-0202 December 2014 Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage ML14316A1672014-11-19019 November 2014 Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13141A6082013-06-25025 June 2013 Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML13017A4672013-01-31031 January 2013 Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule ML12333A1192012-12-31031 December 2012 Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1122702902011-08-18018 August 2011 Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1022101332010-08-20020 August 2010 Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection Interval ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e 2024-01-31
[Table view] |
Text
December 17, 2007 Mr. David J. Bannister Site Director Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE:
MODIFY TECHNICAL SPECIFICATION REQUIREMENTS TO SUPPORT ADDITION OF SAFETY-RELATED SWING INVERTERS TO 120 VOLT AC BUSES (TAC NO. MD6221)
Dear Mr. Bannister:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 251 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1.
The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated July 31, 2007.
The amendment revises TS 2.7(1), Electrical Systems - Minimum Requirements, TS 2.7(2),
Electrical Systems - Modification of Minimum Requirements, and TS 3.7(5), Emergency Power System Periodic Tests - Required Safety Related Inverters. The licensee is adding two safety-related swing inverters to the 120 Volt alternating current instrument buses. The TS changes reflect modifications made to the plant and are needed to take advantage of the additional operational flexibility the swing inverters will provide.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosures:
- 1. Amendment No. 251 to DPR-40
- 2. Safety Evaluation cc w/encls: See next page
Pkg ML073090357, Amdt/License ML073090361, TS Pgs ML073090373
- See previous concurrence *SE Input Memo OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EEEB OGC - NLO NRR/LPL4/BC NAME AWang JBurkhardt** GWilson* JRund** THiltz**
DATE 12/14/07 11/8/07 10/24/07 11/21/07 12/14/07 Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn Mr. Joe L. McManis ATTN: James R. Curtiss, Esq. Manager - Nuclear Licensing 1700 K Street, N.W. Omaha Public Power District Washington, DC 20006-3817 Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Chairman Fort Calhoun, NE 68023-0550 Washington County Board of Supervisors P.O. Box 466 Ms. Melanie Rasmussen Blair, NE 68008 Radiation Control Program Officer Bureau of Radiological Health Mr. John Hanna, Resident Inspector Iowa Department of Public Health U.S. Nuclear Regulatory Commission Lucas State Office Building, 5th Floor P.O. Box 310 321 East 12th Street Fort Calhoun, NE 68023 Des Moines, IA 50319 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007
OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 251 Renewed License No. DPR-40
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Omaha Public Power District (the licensee), dated July 31, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, Renewed Facility Operating License No. DPR-40 is amended by changes as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-40 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License No. DPR-40 and Technical Specifications Date of Issuance: December 17, 2007
ATTACHMENT TO LICENSE AMENDMENT NO. 251 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following pages of the Renewed Facility Operating License No. DPR-40 and the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
License Page REMOVE INSERT 3 3 Technical Specifications REMOVE INSERT 2.7 - Page 1 2.7 - Page 1 2.7 - Page 2 2.7 - Page 2 2.7 - Page 4 2.7 - Page 4 2.7 - Page 5 2.7 - Page 5 2.7 - Page 6 2.7 - Page 6 2.7 - Page 7 2.7 - Page 7 2.7 - Page 8 2.7 - Page 8 3.7 - Page 3 3.7 - Page 3
-- 3.7 - Page 4
(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.
- 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is, subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
A. Maximum Power Level Omaha Public Power District is authorized to operate the Fort Calhoun Station, Unit 1, at steady state reactor core power levels not in excess of 1500 megawatts thermal (rate power).
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251 are hereby incorporated in the license. Omaha Public Power District shall operate the facility in accordance with the Technical Specifications.
C. Security and Safeguards Contingency Plans The Omaha Public Power District shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: AFort Calhoun Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan,@ submitted by letter dated May 19, 2006.
Renewed Operating License No. DPR-40 Amendment No. 251 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 251 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-40 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285
1.0 INTRODUCTION
By application dated July 31, 2007 (Agencywide Documents Access and Management System Accession No. ML072150050), Omaha Public Power District (the licensee) requested changes to the Technical Specifications (TS) (Appendix A to Renewed Facility Operating License No.
DPR-40) for the Fort Calhoun Station, Unit No. 1 (FCS).
The proposed amendment would revise would revise TS 2.7(1), Electrical Systems - Minimum Requirements, TS 2.7(2), Electrical Systems - Modification of Minimum Requirements, and TS 3.7(5), Emergency Power System Periodic Tests - Required Safety Related Inverters. The licensee proposed adding two safety-related swing inverters to the 120 Volt (V) alternating current (ac) instrument buses. Specifically, the proposed changes would revise Limiting Conditions for Operation (LCO) TSs 2.7(1) and 2.7(2) to take advantage of the additional operational flexibility the swing inverters will provide. In addition, editorial changes to correct spelling and formatting errors were made to TS 2.7 and TS 3.7.5.
2.0 REGULATORY EVALUATION
FCS was licensed for construction prior to May 21, 1971, and at that time committed to the draft General Design Criteria (GDC). The draft GDC, which is similar to Appendix A, General Design Criteria for Nuclear Power Plans in Part 50 of Title 10 of the Code of Federal Regulations (10 CFR), that govern emergency power at FCS are Criterion 24 and Criterion 39 from the FCS Updated Safety Analysis Report. The U.S. Nuclear Regulatory Commission (NRC) staff used the following requirements to review the licensees amendment request:
Criterion 24 - Emergency Power for Protection Systems In the event of loss of all offsite power, sufficient alternate sources of power shall be provided to permit the required functioning of the protection systems.
This criterion is met. Emergency power is available from two completely independent diesel generator (DG) sets and from two completely independent 125 volt d-c [direct current] systems for essential d-c loads.
The independent diesel generator supply systems are located in the plant and are connected to separate buses. Both generator sets independently start automatically upon loss of auxiliary power and are ready to accept load within 10 seconds of loss of normal supply power. Starting power is self-contained within each DG. Each DG has sufficient capacity to start in sequence the loads required for the engineered safeguards equipment for the maximum hypothetical accident concurrent with loss of outside power.
This capacity is adequate to provide a safe and orderly plant shutdown and maintain the plant in a safe condition.
Each of the two 125 volt d-c batteries is capable of supplying essential station d-c load for eight hours and may be charged by the generator power supply.
Facilities are included to permit periodic starting and running of the DGs without interrupting plant operation. Diesel units are synchronized to the bus and loaded periodically to ensure readiness for emergency services.
Criterion 39 - Emergency Power for Engineered Safety Features Alternate power systems shall be provided and designed with adequate independency, redundancy, capacity and testability to permit the functioning required of the engineered safety features. As a minimum, the onsite power system and the offsite power system shall each independently provide this capacity assuming a failure of a single active component in each power system.
This criterion is met. Offsite power to the plant is available via the 161 kV [kiloVolt] line and after the unit is tripped, via backfeed from the 345 kV system through the main and unit auxiliary transformers.
When the unit is tripped and the 161 kV supply is not available, the motor-operated disconnect switch in the generator main leads is opened and the supply to the unit auxiliary transformers is re-established. Switch operation is accomplished by a motor operator supplied from the station battery.
Onsite power is provided by two diesel generator sets. Each independent diesel generator set is adequate for supplying the minimum engineered safeguards equipment for the maximum hypothetical accident concurrent with loss of outside power.
Station batteries provide onsite power for instrument and control systems. These batteries will be subject to rigorous inspection and maintenance. Periodically, the charger voltage is manually lowered to test batteries capability to assume load at the appropriate bus voltage.
The diesel generator facilities permit periodic starting and running during normal plant operations.
3.0 TECHNICAL EVALUATION
3.1 Design of FCS Instrument AC System The ac instrument system is comprised of six separate buses, four of which supply power to safety-related instrumentation. Each instrument bus is supplied by a separate solid-state inverter from the dc system. Instrument buses A, C, and 1 are supplied from dc bus 1, and instrument buses B, D, and 2 are supplied from dc bus 2. The instrument buses provide annunciation in the main control room upon detection of low bus voltage.
Safety-related inverters A, B, C, and D are rated 7.5 kV-amperes (KVA) at 120 V nominal, single phase. Non-safety related inverters 1 and 2 are rated 10 KVA at 120 V nominal, single phase.
Each inverter has its own annunciator point in the control room, which is actuated when the inverter is in an off-normal condition.
Instrument buses A and C, supplied from dc bus 1, have a manual bus tie for use only when an inverter is out-of-service for maintenance. Instrument buses B and D, supplied from dc bus 2, are similarly arranged. Each of the instrument inverters, which supply power to the instrument buses, also has a 480 V ac bypass source that supplies power to the bus if there is an inverter failure or if inverter maintenance is necessary. In the event of inverter failure, the load on the inverter is automatically transferred to the bypass source.
Each inverter supplying the instrument buses operates in synchronism with the auxiliary power system to avoid the beat frequencies that can occur in an asynchronous system. This also provides a smooth transfer to and from the bypass source. Each inverter reverts to an internal frequency reference when the system reference synchronization voltage source is lost.
The licensee stated that it will be adding two swing inverters to the 120 V ac instrument buses, as well as replacing the four currently installed safety-related inverters and the two non-safety related inverters installed on dc buses 1 and 2. The installation of an additional safety-related swing inverter on each dc bus would allow one of the other safety-related inverters on the bus to be taken offline for maintenance or repair. Changes to the FCS TSs are needed to take advantage of the additional operational flexibility the swing inverters would provide.
3.2 Evaluation of Proposed Changes In its letter dated July 31, 2007, the licensee proposed a license amendment to the TSs for FCS. The proposed changes would revise LCOs for TSs 2.7(1), Electrical Systems - Minimum Requirements, and TS 2.7(2), Electrical Systems - Modification of Minimum Requirements. In addition, the title for TS 3.7(5), Emergency Power System Periodic Tests - Required Safety Related Inverters, will be revised.
The NRC staff reviewed and evaluated each of the proposed changes to the FCS TS as follows:
3.2.1 The licensee proposed the following change to TS 2.7(1)j:
Revise 2.7(1)j to require two inverters on dc bus No. 1 and two inverters on dc bus No. 2 to be operable in the following combinations:
125 V dc Bus No. 1 Inverter A and inverter C; or inverter A and associated swing inverter; or inverter C and associated swing inverter; AND 125 V dc Bus No. 2 Inverter B and inverter D; or inverter B and associated swing inverter; or inverter D and associated swing inverter.
Evaluation of TS 2.7(1)j The proposed change to TS 2.7(1)j addresses acceptable combinations of swing and non-swing inverters to ensure operability of the instrument buses. The proposed change to TS 2.7(1)j takes advantage of the operational flexibility gained by the addition of two swing inverters but does not reduce the requirement to have a total of four inverters operable. The minimum requirement for operability of each instrument bus is to be connected to two safety-related inverters.
The licensee proposed using the term required since the proposed change to TS 2.7(1)j allows operability to be achieved with various combinations of inverters. The licensee stated that the term required is also needed to distinguish that an out-of-service inverter may be inoperable indefinitely with no effect on TS 2.7(1)j operability. The indefinite period presumes that the conditions of TS 2.7(1)j are met (i.e., the appropriate combination of safety-related inverters are connected to each instrument bus). The NRC staff finds the use of the term required acceptable as this change would not decrease either the number of inverters required to be operable or their ability to supply power to the instrument buses.
The NRC staff finds that the proposed changes are conservative and maintain the requirement for independence and redundancy between buses. Based on this information, the NRC staff concludes that there is a reasonable assurance that safe plant conditions will continue to be maintained; therefore, the proposed changes are acceptable.
3.2.2 The licensee proposed the following change to LCO 2.7(2)o:
Revise TS 2.7(2)o to indicate that one of the required inverters may be inoperable for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Evaluation of LCO 2.7(2)o
The proposed change to TS 2.7(2)o would allow one of the four required inverters to be inoperable for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided the reactor protective system and engineered safeguards systems instrument channels supplied by the remaining three required inverters are all operable and the 120 V ac instrument bus associated with the inoperable inverter is powered from its associated inverter bypass source. This change would maintain the current TS allowance for one of the required inverters to be inoperable for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided all current TS requirements for operability are met.
While continued operation for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with one required inverter inoperable would be allowed, the addition of the two safety-related inverters is expected to decrease the amount of time that FCS would operate with less than four inverters since the design would allow the inoperable inverter to be replaced by its associated swing (or non-swing) inverter.
Based on the above, the NRC staff concludes that there is a reasonable assurance that safe plant conditions will continue to be maintained; therefore, the proposed changes are acceptable.
3.2.3 The licensee proposed several editorial changes to TS 2.7(2):
Correct spelling and formatting errors in TS 2.7(2).
Evaluation of TS 2.7(2)
The NRC staff finds that the proposed changes do not change any requirements, and are administrative in nature and therefore, are acceptable.
3.2.4. The licensee proposed to change the heading in LCO 3.7(5):
Revise 3.7(5) to replace the heading of "Inverters A, B, C, and D" with "Required Safety Related Inverters."
Evaluation of LCO 3.7(5) Change (1)
The proposed change would revise the title of TS 3.7(5). This change would not alter the requirement to monitor the output parameters (voltage, frequency, and bus alignment) of all required safety-related inverters on a weekly basis. However, the licensee stated that weekly surveillance testing of out-of-service inverters will not be performed. The licensee further noted that voltage, frequency, and bus alignment of an out-of-service inverter will be verified prior to declaring it operable and placing it in-service.
Based on the above, the NRC staff concludes that this is an editorial change in nature and there is a reasonable assurance that safe plant conditions will continue to be maintained; therefore, the proposed changes are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 49582 dated August 28, 2007). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: Delza Mas-Penaranda Matthew McConnell Date: December 17, 2007