Issue date | Title | Topic | |
---|---|---|---|
ML24019A168 | 31 January 2024 | Safety Evaluation Report for Approval of License Termination Plan | |
ML21271A599 | 3 August 2021 | License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 | Fitness for Duty Fire Barrier Coatings Exemption Request Pandemic COVID-19 Scaffolding |
ML20056E487 | 26 February 2020 | Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) | Cyber Security |
ML19297D674 | 9 December 2019 | FCS ISFSI Only Tech Specs SER | High Radiation Area Offsite Dose Calculation Manual Probabilistic Risk Assessment Locked High Radiation Area B.5.b Aging Management Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Fire Protection Program |
ML18017B005 | 30 March 2018 | Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009) | |
ML18047A661 | 28 March 2018 | Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) | Cyber Security |
ML18010A087 | 6 March 2018 | Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) | Boric Acid Time of Discovery Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Hydrostatic Probabilistic Risk Assessment Cyber Security Locked High Radiation Area Missed surveillance Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Exemption Request Fuel cladding Pressure Boundary Leakage Fire Protection Program |
ML17338A172 | 19 January 2018 | Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) | Shutdown Margin Hydrostatic Cyber Security |
ML17276B286 | 12 December 2017 | Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) | Offsite Dose Calculation Manual Process Control Program Exemption Request Minimum staff Fire Protection Program |
ML17263B198 | 11 December 2017 | Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) | Probabilistic Risk Assessment B.5.b Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Exemption Request Earthquake Control of Heavy Loads Fuel cladding Grace period Fatality |
ML17289A060 | 22 November 2017 | Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) | Cyber Security |
ML17275A264 | 21 November 2017 | Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 | Offsite Dose Calculation Manual Process Control Program Exemption Request Minimum staff Fire Protection Program |
ML17278A607 | 17 November 2017 | Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) | Safe Shutdown Hydrostatic Earthquake |
ML17165A465 | 28 July 2017 | Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) | |
ML17123A348 | 27 July 2017 | Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition | Minimum staff |
ML17144A246 | 21 June 2017 | Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management | Minimum staff Backfit |
ML17053A099 | 7 April 2017 | Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition | Safe Shutdown Large early release frequency Fire Protection Program |
ML16141A739 | 27 May 2016 | Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines | Aging Management |
ML16104A074 | 15 April 2016 | Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection Interval | Incorporated by reference |
ML16084A755 | 5 April 2016 | Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP | Cyber Security |
ML15307A013 | 23 February 2016 | Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition | Time of Discovery High Radiation Area Offsite Dose Calculation Manual Cyber Security Locked High Radiation Area Annual Radioactive Effluent Release Report Process Control Program Fire Protection Program |
ML16041A308 | 19 February 2016 | Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval | Boric Acid Incorporated by reference Power-Operated Valves Grace period |
ML15288A005 | 15 December 2015 | Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | Ultimate heat sink Cyber Security Spent Fuel Pool Instrumentation Fuel cladding |
ML15294A279 | 19 November 2015 | Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date | Cyber Security |
ML15232A003 | 21 August 2015 | Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection Interval | Boric Acid Hydrostatic Pressure Boundary Leakage Scaffolding |
ML15209A802 | 10 August 2015 | Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III | Cyber Security Earthquake |
ML15111A399 | 30 June 2015 | Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood | Safe Shutdown Safe Shutdown Earthquake Operator Manual Action Cyber Security Design basis earthquake Earthquake |
ML15035A203 | 27 March 2015 | Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors | Cyber Security Safeguards Contingency Plan |
ML15015A413 | 20 February 2015 | Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement | Cyber Security Surveillance Frequency Control Program |
ML14356A012 | 29 December 2014 | Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months | Safe Shutdown Anticipated operational occurrence Hydrostatic Cyber Security Grace period |
ML14328A814 | 22 December 2014 | Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 | Enforcement Discretion Cyber Security Power change |
ML14323A599 | 2 December 2014 | Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage | |
ML14316A167 | 19 November 2014 | Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building | Time of Discovery |
ML14279A275 | 6 November 2014 | Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months | Hydrostatic Cyber Security |
ML14209A027 | 7 August 2014 | Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis | Safe Shutdown Earthquake Cyber Security Dissimilar Metal Weld |
ML14098A092 | 16 June 2014 | Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Fire impairment Operator Manual Action Temporary Modification Cyber Security Multiple Spurious Operation Thermoset Large early release frequency Safeguards Contingency Plan Hemyc Exemption Request Power-Operated Valves Power Operated Valves Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Scaffolding |
ML14003A003 | 28 January 2014 | Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan | Hydrostatic Cyber Security |
ML13296A584 | 25 October 2013 | Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) | Coatings Cyber Security Functionality Assessment Through-Wall Leak |
ML13203A070 | 26 July 2013 | Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) | Safe Shutdown Tornado Missile Cyber Security Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Earthquake |
ML13141A608 | 25 June 2013 | Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment | FLEX Fukushima Dai-Ichi |
ML13070A042 | 29 March 2013 | Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report | Probabilistic Risk Assessment Cyber Security Safeguards Contingency Plan |
ML13043A661 | 28 February 2013 | Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits | Time of Discovery Anticipated operational occurrence Cyber Security |
ML13017A467 | 31 January 2013 | Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule | |
ML12333A119 | 31 December 2012 | Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) | Anticipated operational occurrence Cyber Security Process Control Program |
ML112620402 | 30 September 2011 | Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications | Cyber Security Safeguards Contingency Plan |
ML111861571 | 31 August 2011 | Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c | Shutdown Margin Cyber Security |
ML112270290 | 18 August 2011 | Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval | Boric Acid Non-Destructive Examination Incorporated by reference Dissimilar Metal Weld DM weld |
ML111801094 | 27 July 2011 | Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule | Cyber Security |
ML102210133 | 20 August 2010 | Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection Interval | Incorporated by reference Dissimilar Metal Weld |
ML100910077 | 14 May 2010 | License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e |