Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24019A16831 January 2024Safety Evaluation Report for Approval of License Termination Plan
ML21271A5993 August 2021License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2Fitness for Duty
Fire Barrier
Coatings
Exemption Request
Pandemic
COVID-19
Scaffolding
ML20056E48726 February 2020Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM)Cyber Security
ML19297D6749 December 2019FCS ISFSI Only Tech Specs SERHigh Radiation Area
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Locked High Radiation Area
B.5.b
Aging Management
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Fire Protection Program
ML18017B00530 March 2018Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009)
ML18047A66128 March 2018Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236)Cyber Security
ML18010A0876 March 2018Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192)Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Probabilistic Risk Assessment
Cyber Security
Locked High Radiation Area
Missed surveillance
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Exemption Request
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
ML17338A17219 January 2018Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235)Shutdown Margin
Hydrostatic
Cyber Security
ML17276B28612 December 2017Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036)Offsite Dose Calculation Manual
Process Control Program
Exemption Request
Minimum staff
Fire Protection Program
ML17263B19811 December 2017Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003)Probabilistic Risk Assessment
B.5.b
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Exemption Request
Earthquake
Control of Heavy Loads
Fuel cladding
Grace period
Fatality
ML17289A06022 November 2017Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184)Cyber Security
ML17275A26421 November 2017Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285Offsite Dose Calculation Manual
Process Control Program
Exemption Request
Minimum staff
Fire Protection Program
ML17278A60717 November 2017Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013)Safe Shutdown
Hydrostatic
Earthquake
ML17165A46528 July 2017Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437)
ML17123A34827 July 2017Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled ConditionMinimum staff
ML17144A24621 June 2017Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling ManagementMinimum staff
Backfit
ML17053A0997 April 2017Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled ConditionSafe Shutdown
Large early release frequency
Fire Protection Program
ML16141A73927 May 2016Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation GuidelinesAging Management
ML16104A07415 April 2016Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
ML16084A7555 April 2016Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIPCyber Security
ML15307A01323 February 2016Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a DefinitionTime of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Cyber Security
Locked High Radiation Area
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
ML16041A30819 February 2016Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing IntervalBoric Acid
Incorporated by reference
Power-Operated Valves
Grace period
ML15288A00515 December 2015Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorsUltimate heat sink
Cyber Security
Spent Fuel Pool Instrumentation
Fuel cladding
ML15294A27919 November 2015Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation DateCyber Security
ML15232A00321 August 2015Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection IntervalBoric Acid
Hydrostatic
Pressure Boundary Leakage
Scaffolding
ML15209A80210 August 2015Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section IIICyber Security
Earthquake
ML15111A39930 June 2015Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a FloodSafe Shutdown
Safe Shutdown Earthquake
Operator Manual Action
Cyber Security
Design basis earthquake
Earthquake
ML15035A20327 March 2015Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation MonitorsCyber Security
Safeguards Contingency Plan
ML15015A41320 February 2015Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance RequirementCyber Security
Surveillance Frequency Control Program
ML14356A01229 December 2014Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 MonthsSafe Shutdown
Anticipated operational occurrence
Hydrostatic
Cyber Security
Grace period
ML14328A81422 December 2014Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3Enforcement Discretion
Cyber Security
Power change
ML14323A5992 December 2014Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage
ML14316A16719 November 2014Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary BuildingTime of Discovery
ML14279A2756 November 2014Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 MonthsHydrostatic
Cyber Security
ML14209A0277 August 2014Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break AnalysisSafe Shutdown Earthquake
Cyber Security
Dissimilar Metal Weld
ML14098A09216 June 2014Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Temporary Modification
Cyber Security
Multiple Spurious Operation
Thermoset
Large early release frequency
Safeguards Contingency Plan
Hemyc
Exemption Request
Power-Operated Valves
Power Operated Valves
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Scaffolding
ML14003A00328 January 2014Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response PlanHydrostatic
Cyber Security
ML13296A58425 October 2013Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances)Coatings
Cyber Security
Functionality Assessment
Through-Wall Leak
ML13203A07026 July 2013Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances)Safe Shutdown
Tornado Missile
Cyber Security
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Earthquake
ML13141A60825 June 2013Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications AssessmentFLEX
Fukushima Dai-Ichi
ML13070A04229 March 2013Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis ReportProbabilistic Risk Assessment
Cyber Security
Safeguards Contingency Plan
ML13043A66128 February 2013Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation CircuitsTime of Discovery
Anticipated operational occurrence
Cyber Security
ML13017A46731 January 2013Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule
ML12333A11931 December 2012Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6)Anticipated operational occurrence
Cyber Security
Process Control Program
ML11262040230 September 2011Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical SpecificationsCyber Security
Safeguards Contingency Plan
ML11186157131 August 2011Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)cShutdown Margin
Cyber Security
ML11227029018 August 2011Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection IntervalBoric Acid
Non-Destructive Examination
Incorporated by reference
Dissimilar Metal Weld
DM weld
ML11180109427 July 2011Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation ScheduleCyber Security
ML10221013320 August 2010Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection IntervalIncorporated by reference
Dissimilar Metal Weld
ML10091007714 May 2010License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e