ML13269A437: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter: September 26, 2013 | ||
Mr. Adam C. Heflin, Senior Vice | |||
President and Chief Nuclear Officer | |||
Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 | Union Electric Company P.O. Box 620 Fulton, MO 65251 | ||
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF TI-186 INSPECTION (NRC INSPECTION REPORT 05000483/2013405) AND REQUEST FOR INFORMATION | SUBJECT: CALLAWAY PLANT - NOTIFICATION OF TI-186 INSPECTION (NRC INSPECTION REPORT 05000483/2013405) AND REQUEST FOR INFORMATION | ||
Dear Mr. Heflin: | |||
From December 2 to December 5, 2013, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the Temporary Instruction (TI)-186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats." In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Also, in order to demonstrate compliance with TI-186, we ask that you have the necessary staff members available to the inspection team to assist in any plant walk-throughs, interviews, and simulator demonstrations. | From December 2 to December 5, 2013, inspectors from the Nuclear Regulatory | ||
Commission's (NRC) Region IV office will perform the Temporary Instruction (TI)-186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats." In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have | |||
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Todd Witt of your licensing organization. If there are any questions about this inspection or the material requested, please contact Kelly Clayton, lead inspector, at (817) 200-1216 (kelly.clayton@nrc.gov) or Thomas Farina at (817) 200-1117 (thomas.farina@nrc.gov). | enclosed a request for documents needed for this inspection. It is important that all of these | ||
documents are up to date and complete in order to minimize the number of additional | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | documents requested during the preparation and/or the onsite portions of the inspection. Also, in order to demonstrate compliance with TI-186, we ask that you have the necessary staff members available to the inspection team to assist in any plant walk-throughs, interviews, and | ||
simulator demonstrations. | |||
Sincerely,/RA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
Docket: 50-483 License: NPF-30 | that our regulatory contact for this inspection will be Mr. Todd Witt of your licensing organization. If there are any questions about this inspection or the material requested, please contact Kelly Clayton, lead inspector, at (817) 200-1216 (kelly.clayton@nrc.gov) or Thomas Farina at (817) 200-1117 (thomas.farina@nrc.gov). | ||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control number. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | |||
A. Heflin - 2 - | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, /RA/ Vincent G. Gaddy, Chief Operations Branch | |||
Division of Reactor Safety | |||
Docket: 50-483 License: NPF-30 | |||
Enclosure: | |||
Inservice Inspection Document Request | Inservice Inspection Document Request | ||
cc: Electronic Distribution for Callaway Plant | |||
A. Heflin - 3 - | |||
ADAMS ACCESSION NUMBER: ML13269A437 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: KDC Publicly Available Non-Sensitive . Non-publicly Available Sensitive SOE:OB C:OB KClayton VGaddy /RA/ /RA/ 9/24/2013 9/26/2013 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
- 1 - Enclosure TI-186 INSPECTION DOCUMENT REQUEST FROM: Kelly Clayton Senior Operations Engineer, NRC RIV 817-200-1216 | |||
TO: Todd Witt Associate Licensing Engineer, Callaway Plant | |||
314-478-5346 SUBJECT: INFORMATION REQUEST TO SUPPORT DECEMBER 2-5, 2013, TI-186 INSPECTION, "INSPECTION OF PROCEDURES AND PROCESSES FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS" | |||
A. The following information is requested in order to support inspection preparation activities. Requested materials should be sent either electronically or hardcopy in | |||
order to arrive at the Region IV office no later than November 18, 2013. * Electronically: Via email, CD, or IMS Certrec and/or * Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV ATTN: Kelly Clayton 1600 E. Lamar Blvd Arlington, TX 76011 Document Request: * Procedure(s) that describe actions taken to address potential aircraft threat notifications onsite. This may include procedures that operations, security, emergency preparedness, and health physics staff use. | |||
* Plant specific analyses prepared to support the designed actions you have taken to address this issue in your procedures. Such analyses were described for support of site actions in the topical Regulatory Guide 1.214 (dated January 2009). * Training materials used to train the various affected groups when contacted with a potential aircraft threat (licensed operators, operators in training for a license, non-licensed operators, security, EP, HP, fire brigade, and other support staff, as | |||
examples). | |||
* If the site has conducted exercises or drills to evaluate the ability of staff to implement these procedures in the past, provide any documentation summarizing the results of these events. If any condition reports came out of the exercises/drills, provide those as well. | |||
* Copies of any assessments of your procedure and corrective action that came out of these activities (if applicable). * Lists of personnel in the following organizations that will be available for interviews while the inspection team is onsite: operations (licensed and non-licensed operators); security, fire brigade; health physics support; maintenance. | |||
}} | }} |
Revision as of 11:54, 22 March 2018
ML13269A437 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 09/26/2013 |
From: | Vincent Gaddy Operations Branch IV |
To: | Heflin A C Union Electric Co |
References | |
IR-13-405 IR-13-405 | |
Download: ML13269A437 (4) | |
See also: IR 05000483/2013405
Text
September 26, 2013
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF TI-186 INSPECTION (NRC INSPECTION REPORT 05000483/2013405) AND REQUEST FOR INFORMATION
Dear Mr. Heflin:
From December 2 to December 5, 2013, inspectors from the Nuclear Regulatory
Commission's (NRC) Region IV office will perform the Temporary Instruction (TI)-186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats." In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have
enclosed a request for documents needed for this inspection. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection. Also, in order to demonstrate compliance with TI-186, we ask that you have the necessary staff members available to the inspection team to assist in any plant walk-throughs, interviews, and
simulator demonstrations.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Todd Witt of your licensing organization. If there are any questions about this inspection or the material requested, please contact Kelly Clayton, lead inspector, at (817) 200-1216 (kelly.clayton@nrc.gov) or Thomas Farina at (817) 200-1117 (thomas.farina@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control number. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
A. Heflin - 2 -
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Vincent G. Gaddy, Chief Operations Branch
Division of Reactor Safety
Docket: 50-483 License: NPF-30
Enclosure:
Inservice Inspection Document Request
cc: Electronic Distribution for Callaway Plant
A. Heflin - 3 -
ADAMS ACCESSION NUMBER: ML13269A437 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: KDC Publicly Available Non-Sensitive . Non-publicly Available Sensitive SOE:OB C:OB KClayton VGaddy /RA/ /RA/ 9/24/2013 9/26/2013 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
- 1 - Enclosure TI-186 INSPECTION DOCUMENT REQUEST FROM: Kelly Clayton Senior Operations Engineer, NRC RIV 817-200-1216
TO: Todd Witt Associate Licensing Engineer, Callaway Plant
314-478-5346 SUBJECT: INFORMATION REQUEST TO SUPPORT DECEMBER 2-5, 2013, TI-186 INSPECTION, "INSPECTION OF PROCEDURES AND PROCESSES FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS"
A. The following information is requested in order to support inspection preparation activities. Requested materials should be sent either electronically or hardcopy in
order to arrive at the Region IV office no later than November 18, 2013. * Electronically: Via email, CD, or IMS Certrec and/or * Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV ATTN: Kelly Clayton 1600 E. Lamar Blvd Arlington, TX 76011 Document Request: * Procedure(s) that describe actions taken to address potential aircraft threat notifications onsite. This may include procedures that operations, security, emergency preparedness, and health physics staff use.
- Plant specific analyses prepared to support the designed actions you have taken to address this issue in your procedures. Such analyses were described for support of site actions in the topical Regulatory Guide 1.214 (dated January 2009). * Training materials used to train the various affected groups when contacted with a potential aircraft threat (licensed operators, operators in training for a license, non-licensed operators, security, EP, HP, fire brigade, and other support staff, as
examples).
- If the site has conducted exercises or drills to evaluate the ability of staff to implement these procedures in the past, provide any documentation summarizing the results of these events. If any condition reports came out of the exercises/drills, provide those as well.
- Copies of any assessments of your procedure and corrective action that came out of these activities (if applicable). * Lists of personnel in the following organizations that will be available for interviews while the inspection team is onsite: operations (licensed and non-licensed operators); security, fire brigade; health physics support; maintenance.