{{#Wiki_filter:OPERATING DATA REPORT                            DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
{{#Wiki_filter:OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
: 1. Unit Name: Nine Mile Poiat Unit //'I
: 1. Unit Name: Nine Mile Poiat Unit //'I
: 2. Reporting Period: 9/1/89 through 9/30/89                                     Notes
: 2. Reporting Period: 9/1/89 through 9/30/89
: 3. Licensed Thermal Power (MWt):                       1850
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):                         640
1850
: 5. Design Electrical Rating (Net MWe):                   620
: 4. Nameplate Rating (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):             630
640
: 7. Maximum Dependable Capacity (Net MWe):               610
: 5. Design Electrical Rating (Net MWe):
: 8. If Changes Occur in Capacity Ratings (items Number   3 through 7) Since Last Report, Give Reasons:
620
Power Level To Which Restricted,   IfAny (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 10. Reasons For Restrictions,   If Any:
630
This Month           Yr-to-Date       Cumulative
: 7. Maximum Dependable Capacity (Net MWe):
: 11. Hours in Reportiag Period                                 720.0              6,551.0        175,680.2
610
: 12. Number   of Hours Reactor   Was Critical                       0.0                  0.0        115,234.3
: 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
: 13. Reactor Reserve Shutdown Hours                                 0.0                  0.0          1,204.2
Notes Power Level To Which Restricted, IfAny (Net MWe):
: 14. Hours Generator On-Line                                       0.0                  0.0        1+,117.2
: 10. Reasons For Restrictions, IfAny:
: 15. Unit Reserve Shutdown Hours                                   0.0                  0.0              20.4
This Month Yr-to-Date Cumulative
: 16. Gross Thermal Eaergy Geaerated (MWH)                           0.0                  0.0    188~473~132 0
: 11. Hours in Reportiag Period
: 17. Gross Electrical Energy Generated (MWH)                       0.0                  0.0      62,473,070.0
: 12. Number ofHours Reactor Was Critical
: 18. Net Electrical Energy Generated (MWH)                         0.0                  0.0      60,524,382.0
: 13. Reactor Reserve Shutdown Hours
: 19. Unit Service Factor                                           0.0                  0.0              63.8
: 14. Hours Generator On-Line
: 20. Unit Availability Factor                                      0.0                  0.0              63.8
: 15. Unit Reserve Shutdown Hours
: 21. Unit Capacity Factor (Using MDC Net)                           0.0                  0.0              56.5
: 16. Gross Thermal Eaergy Geaerated (MWH)
: 22. Unit Capacity Factor (Using DER Net)                           0.0                  0.0              55.5
: 17. Gross Electrical Energy Generated (MWH)
: 23. Unit Forced Outage Rate                                     100.0                100.0              22.4
: 18. Net Electrical Energy Generated (MWH)
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration     of Each):
: 19. Unit Service Factor
Refuel outa e started on anua 22 1 88.
: 20. Unit AvailabilityFactor
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast         Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION
: 21. Unit Capacity Factor (Using MDC Net)
            '102200122'10207.     05000220 1
: 22. Unit Capacity Factor (Using DER Net)
PDR       ADOCK R     - -                PDR}}
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anua 22 1
720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):
88.
6,551.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 175,680.2 115,234.3 1,204.2 1+,117.2 20.4 188~473~132 0 62,473,070.0 60,524,382.0 63.8 63.8 56.5 55.5 22.4
: 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIALOPERATION
'102200122'10207.
1 PDR ADOCK 05000220 R
PDR}}

Latest revision as of 12:23, 9 January 2025

Revised Monthly Operating Rept for Sept 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B310
Person / Time
Site: Nine Mile Point 
Issue date: 09/30/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200122
Download: ML17056B310 (2)


Text

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:

(315) 349-2443

1. Unit Name: Nine Mile Poiat Unit //'I
2. Reporting Period: 9/1/89 through 9/30/89
3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

640

5. Design Electrical Rating (Net MWe):

620

6. Maximum Dependable Capacity (Gross MWe):

630

7. Maximum Dependable Capacity (Net MWe):

610

8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:

Notes Power Level To Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reportiag Period
12. Number ofHours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Eaergy Geaerated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anua 22 1

720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):

88.

6,551.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 175,680.2 115,234.3 1,204.2 1+,117.2 20.4 188~473~132 0 62,473,070.0 60,524,382.0 63.8 63.8 56.5 55.5 22.4

26. Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIALOPERATION

'102200122'10207.

1 PDR ADOCK 05000220 R

PDR