ML17056B314: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING DATA REPORT                            DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
{{#Wiki_filter:OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
: 1. Unit Name: Nine Mile Point Unit //1
: 1. Unit Name: Nine Mile Point Unit //1
: 2. Reporting Period: 5/1/89 through 5/31/89                                     Notes 3 Licensed Thermal Power (MWt):
: 2. Reporting Period:
  ~                                                    1850
5/1/89 through 5/31/89 3 ~ Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):                         640
1850
: 5. Design Electrical Rating (Net MWe):                   620
: 4. Nameplate Rating (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):             630
640
: 7. Maximum Dependable Capacity (Net MWe):               610
: 5. Design Electrical Rating (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number   3 through 7) Since Last Report, Give Reasons:
620
: 9. Power Level To Which Restricted,   IfAny (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 10. Reasons For Restrictions,   IfAny:
630
This Month           Yr-to-Date       Cumulative
: 7. Maximum Dependable Capacity (Net MWe):
: 11. Hours in Reporting Period                                 744.0              3,623.0        172,752.2
610
: 12. Number   of Hours Reactor Was Critical                       0.0                  0.0        115,234.3
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
: 13. Reactor Reserve Shutdown Hours                               0.0                  0.0            1,204.2
Notes
: 14. Hours Generator On-Line                                       0.0                  0.0        112,117.2
: 9. Power Level To Which Restricted, IfAny (Net MWe):
: 15. Unit Reserve Shutdown Hours                                 0.0                  0.0              20.4
: 10. Reasons For Restrictions, IfAny:
: 16. Gross Thermal Energy Generated (MWH)                         0.0                  0.0    188,473,132.0
This Month Yr-to-Date Cumulative
: 17. Gross Electrical Energy Generated (MWH)                       0.0                  0.0      62)473p070 0
: 11. Hours in Reporting Period
: 18. Net Electrical Energy Generated (MWH)                         0.0                  0.0      60,524,382.0
: 12. Number ofHours Reactor Was Critical
: 19. Unit Service Factor                                           0.0                  0.0              64.9
: 13. Reactor Reserve Shutdown Hours
: 20. Unit Availability Factor                                      0.0                  0.0              64.9
: 14. Hours Generator On-Line
: 21. Unit Capacity Factor (Using MDC Net)                         0.0                  0.0              57.4
: 15. Unit Reserve Shutdown Hours
: 22. Unit Capacity Factor (Using DER Net)                         0.0                  0.0              56,5
: 16. Gross Thermal Energy Generated (MWH)
: 23. Unit Forced   Outage Rate                                 100.0                100.0              20.8
: 17. Gross Electrical Energy Generated (MWH)
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration     of Each):
: 18. Net Electrical Energy Generated (MWH)
Refuel outa e started on anunr 22 I 88.
: 19. Unit Service Factor
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast         Achieved IN1TIALCR1TICAL1TY INlTIALELECTRIC1TY COMMERCIAL OPERATION p P10207 1 02200 129'50QQ22Q 9pDR"     ADOCK           PDR R
: 20. Unit AvailabilityFactor
: 21. Unit Capacity Factor (Using MDC Net)
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anunr 22 I 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):
88.
3,623.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 172,752.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62)473p070 0 60,524,382.0 64.9 64.9 57.4 56,5 20.8
: 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved IN1TIALCR1TICAL1TY INlTIALELECTRIC1TY COMMERCIALOPERATION 9 1 02200 129'50QQ22Q p P10207 pDR" ADOCK PDR R


4 Py lg l}}
4 lg Py l}}

Latest revision as of 12:23, 9 January 2025

Revised Monthly Operating Rept for May 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B314
Person / Time
Site: Nine Mile Point 
Issue date: 05/31/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200129
Download: ML17056B314 (2)


Text

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:

(315) 349-2443

1. Unit Name: Nine Mile Point Unit //1
2. Reporting Period:

5/1/89 through 5/31/89 3 ~ Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

640

5. Design Electrical Rating (Net MWe):

620

6. Maximum Dependable Capacity (Gross MWe):

630

7. Maximum Dependable Capacity (Net MWe):

610

8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:

Notes

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period
12. Number ofHours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anunr 22 I 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):

88.

3,623.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 172,752.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62)473p070 0 60,524,382.0 64.9 64.9 57.4 56,5 20.8

26. Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved IN1TIALCR1TICAL1TY INlTIALELECTRIC1TY COMMERCIALOPERATION 9 1 02200 129'50QQ22Q p P10207 pDR" ADOCK PDR R

4 lg Py l