ML17056B314: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OPERATING | {{#Wiki_filter:OPERATING STATUS OPERATING DATAREPORT DOCKET NO.: | ||
50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: | |||
(315) 349-2443 | |||
: 1. Unit Name: Nine Mile Point Unit //1 | : 1. Unit Name: Nine Mile Point Unit //1 | ||
: 2. Reporting Period: 5/1/89 through 5/31/89 | : 2. Reporting Period: | ||
5/1/89 through 5/31/89 3 ~ Licensed Thermal Power (MWt): | |||
: 4. Nameplate Rating (Gross MWe): | 1850 | ||
: 5. Design Electrical Rating (Net MWe): | : 4. Nameplate Rating (Gross MWe): | ||
: 6. Maximum Dependable Capacity (Gross MWe): | 640 | ||
: 7. Maximum Dependable Capacity (Net MWe): | : 5. Design Electrical Rating (Net MWe): | ||
: 8. | 620 | ||
: 9. Power Level To Which Restricted, | : 6. Maximum Dependable Capacity (Gross MWe): | ||
: 10. Reasons For Restrictions, | 630 | ||
This Month | : 7. Maximum Dependable Capacity (Net MWe): | ||
: 11. Hours | 610 | ||
: 12. Number | : 8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons: | ||
: 13. Reactor Reserve Shutdown Hours | Notes | ||
: 14. Hours Generator On-Line | : 9. Power Level To Which Restricted, IfAny (Net MWe): | ||
: 15. Unit Reserve Shutdown Hours | : 10. Reasons For Restrictions, IfAny: | ||
: 16. Gross Thermal Energy Generated (MWH) | This Month Yr-to-Date Cumulative | ||
: 17. Gross Electrical Energy Generated (MWH) | : 11. Hours in Reporting Period | ||
: 18. Net Electrical Energy Generated (MWH) | : 12. Number ofHours Reactor Was Critical | ||
: 19. Unit Service Factor | : 13. Reactor Reserve Shutdown Hours | ||
: 20. Unit | : 14. Hours Generator On-Line | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 15. Unit Reserve Shutdown Hours | ||
: 22. Unit Capacity Factor (Using DER Net) | : 16. Gross Thermal Energy Generated (MWH) | ||
: 23. Unit | : 17. Gross Electrical Energy Generated (MWH) | ||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration | : 18. Net Electrical Energy Generated (MWH) | ||
: 19. Unit Service Factor | |||
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast | : 20. Unit AvailabilityFactor | ||
: 21. Unit Capacity Factor (Using MDC Net) | |||
: 22. Unit Capacity Factor (Using DER Net) | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anunr 22 I 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach): | |||
88. | |||
3,623.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 172,752.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62)473p070 0 60,524,382.0 64.9 64.9 57.4 56,5 20.8 | |||
: 26. Unit is Test Status (Prior to Commercial Operation): | |||
Forecast Achieved IN1TIALCR1TICAL1TY INlTIALELECTRIC1TY COMMERCIALOPERATION 9 1 02200 129'50QQ22Q p P10207 pDR" ADOCK PDR R | |||
4 Py | 4 lg Py l}} | ||
Latest revision as of 12:23, 9 January 2025
| ML17056B314 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/31/1989 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200129 | |
| Download: ML17056B314 (2) | |
Text
OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name: Nine Mile Point Unit //1
- 2. Reporting Period:
5/1/89 through 5/31/89 3 ~ Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anunr 22 I 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration ofEach):
88.
3,623.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 172,752.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62)473p070 0 60,524,382.0 64.9 64.9 57.4 56,5 20.8
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved IN1TIALCR1TICAL1TY INlTIALELECTRIC1TY COMMERCIALOPERATION 9 1 02200 129'50QQ22Q p P10207 pDR" ADOCK PDR R
4 lg Py l