ML20137F772: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 21: Line 21:
{{#Wiki_filter:.
{{#Wiki_filter:.
GeorgiaPower1 ATIAW W l NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATQi NUGEAR PLANT UNIT 1 PAGE REVISION INSTRUCTIOtE
GeorgiaPower1 ATIAW W l NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATQi NUGEAR PLANT UNIT 1 PAGE REVISION INSTRUCTIOtE
              %e proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:
%e proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:
Remove Page                         Insert Page 3.3-7a                             3.3-7a
Remove Page Insert Page 3.3-7a 3.3-7a
                                -y P
-y P
mm
mm


~ g.ff,\
~ g.ff,\\
                                            ~
~
                                                                                                                    ~
~
G                 ,
G LIMITING CONDITION FOR-OPERATION SURVEILLANCE REQUIREMENTS
LIMITING CONDITION FOR-OPERATION                               SURVEILLANCE REQUIREMENTS
[:
[:
ji- "                  3.3;I' Scram Discharge Volume Vent-                   .4.3.I Scram Discharge Volume Vent
ji 3.3;I' Scram Discharge Volume Vent-
                            - and Drain valves                                         ana Orain valves                     .        ,
.4.3.I Scram Discharge Volume Vent
x            During' reactor power operation,-               1. Valve Position Verification all scram' discharge volume vent
- and Drain valves ana Orain valves During' reactor power operation,-
        -                        and drain valves shall be                           Each scram discharge volume vent operable. If this specification                     and drain valve shall be verified
1.
:cannot be met, an orderly shut-                       to be in the open position
Valve Position Verification x
* at ldown shal' be initiated and                         least once per 31 days.
all scram' discharge volume vent and drain valves shall be Each scram discharge volume vent operable. If this specification and drain valve shall be verified
the_ react r shall be placed in
:cannot be met, an orderly shut-to be in the open position
            ,.                    the Hot-Shutdown Condition                     2. Valve Testing
* at ldown shal' be initiated and least once per 31 days.
                                'within-12 hours.
the_ react r shall be placed in the Hot-Shutdown Condition 2.
Valve Testing
'within-12 hours.
: a. Each scram discharge volume vent and drain valve shall be operated through at least one complete cycle of full travel at least once per 92 days.
: a. Each scram discharge volume vent and drain valve shall be operated through at least one complete cycle of full travel at least once per 92 days.
: b. At least once per 18 months, it shall be verifiet' that the scram discharge! volume venteand drain valves:-
: b. At least once per 18 months, it shall be verifiet' that the scram discharge! volume venteand drain valves:-
: 1. Close within 45 seconds   l after receipt of a signal for control rods to scram, and
1.
;g
Close within 45 seconds l
: 2. Open when the scram signal is reset.
after receipt of a signal for control rods to scram, and
;g 2.
Open when the scram signal is reset.
y
y
                      *These valves may be closed intermittently for testing under administrative
*These valves may be closed intermittently for testing under administrative controls.
                ,      controls.
3.3-7a p
3.3-7a p
_ . _ _ . . - . ~ . . _ . - -
. ;; :,3p;.7 L...n.
                                                                                                ..      . ;; :,3p;.7    . L ...n.
_. _ _.. -. ~.. _. - -
__..}}
__..}}

Latest revision as of 23:34, 11 December 2024

Proposed Tech Spec Changes Providing Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves
ML20137F772
Person / Time
Site: Hatch  
Issue date: 01/06/1986
From:
GEORGIA POWER CO.
To:
Shared Package
ML20137F304 List:
References
TAC-53327, TAC-53328, NUDOCS 8601170577
Download: ML20137F772 (2)


Text

.

GeorgiaPower1 ATIAW W l NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATQi NUGEAR PLANT UNIT 1 PAGE REVISION INSTRUCTIOtE

%e proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

Remove Page Insert Page 3.3-7a 3.3-7a

-y P

mm

~ g.ff,\\

~

~

G LIMITING CONDITION FOR-OPERATION SURVEILLANCE REQUIREMENTS

[:

ji 3.3;I' Scram Discharge Volume Vent-

.4.3.I Scram Discharge Volume Vent

- and Drain valves ana Orain valves During' reactor power operation,-

1.

Valve Position Verification x

all scram' discharge volume vent and drain valves shall be Each scram discharge volume vent operable. If this specification and drain valve shall be verified

cannot be met, an orderly shut-to be in the open position
  • at ldown shal' be initiated and least once per 31 days.

the_ react r shall be placed in the Hot-Shutdown Condition 2.

Valve Testing

'within-12 hours.

a. Each scram discharge volume vent and drain valve shall be operated through at least one complete cycle of full travel at least once per 92 days.
b. At least once per 18 months, it shall be verifiet' that the scram discharge! volume venteand drain valves:-

1.

Close within 45 seconds l

after receipt of a signal for control rods to scram, and

g 2.

Open when the scram signal is reset.

y

  • These valves may be closed intermittently for testing under administrative controls.

3.3-7a p

. ;; :,3p;.7 L...n.

_. _ _.. -. ~.. _. - -

__..