ML19350A630

From kanterella
Jump to navigation Jump to search

Notifies That Util 801010 Commitments to BWR Scram Discharge Sys long-term Mods Do Not Satisfy NRC Criteria.Revised Tech Specs Must Be Proposed at Least 3 Months in Advance of Mod Completion Dates
ML19350A630
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/06/1981
From: Reid R
Office of Nuclear Reactor Regulation
To: Widner W
GEORGIA POWER CO.
References
TAC-42218, TAC-42219, NUDOCS 8103160589
Download: ML19350A630 (2)


Text

4 j{0$

d#*%

j UNITED STATES

/'t jkeg.

NUCLEAR REGULATORY COMMISSION 1

%,.;.Cq#,, lj WASHINGTON, 0. C. 20555 March 6, 1981 Dockets Nos. E0-321/366

,e A

e

/

Mr. William A. Widner Af47 Vice President - Engineering C

%, %*/gI88/g 9

7

,,4 Georgia Power Company

%=

P. O. Box 4545 1

Atlanta, Georgia 30302 3

Dear Mr. Widner:

.gi

SUBJECT:

BWR SCRAM DISCHARGE SYSTEM-LONG TERM MODIFICATIONS

Reference:

(a) Your letter of October 10, 1980 The staff has reviewed Reference (a) and determined that your commitments do not satisfy our criteria. We request that you modify your comitments to comply with the following:

1.

Revised TS's may be required prior to operatidh with the modified systems and if so, must be proposed at least 3 months in advance of the modification completion dates.

Address any questions you may have on the Long Term Program to Mr. John N. Hannon, Lead Engineer, on (301) 492-9796.

Please provide a response to this request within 30 days of receipt.

Thank you for your cooperation.

Sincerely,

& ',[l).l.

(

d l

Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing cc: See next page I

i

.s 20s 2 e oS1rt.

/

m

I Hatch 1/2 Georgia Power Company 50-321/366 cc w/ enclosure (s):

G. F. Trowbridge, Esq.

Director, Criteria and Standards Division Shaw, Pittman, Potts and Trowbridge*

1800 M Street, N.W.

Office of Radiation Programs (ANR-460)

Washington, D. C.

20036 U. S. Environmental Protection Agency Washington, D. C.

20460 Ruble A. Thomas Vice President-

  • P. O. Box 2625 Sou'.hern Services, Inc.

Biruingham, Alabama 35202 Ozen Batum Charles H. Badger l

P. O. Box 2625 Office of Planning and Budget Southern Services, Inc.

Roon 610

, Bimingham, Alabama 35202 270 Washington Street, S.W.

Atlanta, Georgia 30334

.Mr. H. B. Lee, Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 Mr. L. T. Gucwa Georgia Power Company Engineering Department F. C. Ecx 4545 Atlanta, Georgia 30302 Mr. Max Manry' Georgia Power Comoany Edwin I. Hatch Plant P. O. Box 442 Baxley, Georgia 31513 U. S. Environmental Protection Agency

' Region II Office ATTN:

EIS COORDINATOR 345 Courtland Street, N.E.

Atlanta, Georgia 30308 Appling County Public Library 301 City Hall Drive Baxley, Georgia.31513 i

Mr. R. F. Rodgers U.S. Nuclear Regulatory Commission Route 1, P. O. Box 279 Baxley, Georgia 31513 4

=

l

.