MONTHYEARML19330B5211980-07-25025 July 1980 Responds to IE Bulletin 80-17,Suppl 2, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Mod Required for Units 1 & 2 Vent Sys Since as-built Sys Satisfies Requirements of Bulletin Project stage: Other ML19330B5231980-07-25025 July 1980 Responds to IE Bulletin 80-14, Degradation of BWR Scram Discharge Vol Capability. Investigation to Determine How Frequently Scram Discharge Vol Vent & Drain Valves Should Be Tested Underway Project stage: Other ML19327A5331980-07-28028 July 1980 Responds to IE Bulletin 80-17.Provides Manual & Automatic Scram Test Results.Scram Discharge Vol Vent Lines Verified & Emergency Operating Procedure Changes Completed Project stage: Other ML19327A5271980-07-31031 July 1980 Responds to IE Bulletin 80-17 & Provides Manual Scram Test Results.Scram Discharge Vol Vents Lines Verified as Functional & Full Operator Training to Be Completed as of 800802.Recirculation Pump Trip Installed Project stage: Other ML19331B9341980-08-0505 August 1980 Responds to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. Automatic Scram Performed & Scram Discharge Vol Responded Properly.Automatic Scram Test Results Enncl Project stage: Other ML19340B1791980-10-10010 October 1980 Responds to NRC Requesting Tech Spec Mods Re Scram Discharge Vol.Present Tech Specs Assume Control Drive Sys Operability & Scram Discharge Vol Piping Is Sized to Assure Complete Scram.Mods Will Not Increase Reliability Project stage: Other ML19344B5081980-10-14014 October 1980 Responds to Mar 1980 Comments Made at White House Issues Briefing session.NUREG-0625 Is Not Intended to Be Sole Basis for Judging Sites.Evacuation Plans Considered in Licensing Actions Leading to Cp.Foundation Will Be Evaluated Project stage: Other ML19336A7591980-10-24024 October 1980 Responds to 801001 Request Re Participation in Development of Scram Sys Design & Performance Criteria.Not Active Member in Subgroup Considering Criteria.Plans to Consolidate Reviews of Design Rather than Performing Separate Reviews Project stage: Other ML19347C9811981-02-26026 February 1981 Application for Amend to Licenses NPF-5 & DPR-57,submitted as Proposed Changes to Tech Specs Re BWR Scram Sys Design Project stage: Request ML19341C7971981-02-26026 February 1981 Semiannual Rept,Plant Radioactive Effluent Releases,Jul-Dec 1980 Project stage: Request ML19347C9841981-02-26026 February 1981 Tech Spec Tables 3.6.3-1,3.7-1 & Page 3.7-20 for Primary Containment Isolation Valves Project stage: Other ML19347C9971981-03-0404 March 1981 Submits Addl Info Re BWR Scram Discharge Sys Mods,Per 801001 Request.Mods Will Be Implemented as Needed to Result in Conformance to Owners Group Criteria by End of 1982 Provided Qualified Equipment Is Commercially Available Project stage: Other ML19350A6301981-03-0606 March 1981 Notifies That Util 801010 Commitments to BWR Scram Discharge Sys long-term Mods Do Not Satisfy NRC Criteria.Revised Tech Specs Must Be Proposed at Least 3 Months in Advance of Mod Completion Dates Project stage: Other ML20010E8921981-09-0101 September 1981 Forwards Franklin Research Ctr Request for Addl Info Re BWR Scram Discharge Vol long-term Mods.Info Requested within 45 Days of Receipt of Ltr Project stage: RAI ML19280B1321981-10-0101 October 1981 Responds to 810901 Request for Addl Info from Franklin Research Ctr Re Util 810226 Proposed Tech Spec Mods for Scram Discharge Vol.Util Will Submit Amend to Unit 1 Rod Block Setpoint & Surveillance Requirements Project stage: Request ML20244B6631982-01-13013 January 1982 BWR Scram Discharge Vol Long-Term Mods, Technical Evaluation Rept Project stage: Other ML20244B6661982-01-13013 January 1982 BWR Scram Discharge Vol Long-Term Mods,Ga Power Co,Hatch Nuclear Plant,Unit 1, Technical Evaluation Rept Project stage: Other ML20053A1881982-05-18018 May 1982 Requests Extension of 821231 Commitment Date for Installation of Qualified Level Transmitters in Scram Discharge Sys to 831231 Project stage: Other ML20085B1651983-06-24024 June 1983 Order Confirming Licensee Commitments to Install Mods to Scram Discharge Sys by 831231 Project stage: Other ML20080J1161983-09-19019 September 1983 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs to Reflect Mods to Scram Discharge Sys,As Required by NRC Project stage: Request ML20080J1371983-09-19019 September 1983 Proposed Tech Spec Changes Re Scram Discharge Sys Project stage: Other ML20080P6381983-10-0303 October 1983 Requests That Re Proposed Tech Spec Changes Concerning Scram Discharge Sys Be Superseded by 830919 Submittal Project stage: Other ML20083E0871983-12-14014 December 1983 Proposed Tech Spec Changes Re Scram Discharge Vol Closure Times Project stage: Other ML20083E0061983-12-14014 December 1983 Suppl to 830919 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs Re Scram Discharge Vol Closure Times Project stage: Request ML20083D8561983-12-20020 December 1983 Corrects Changing Tech Specs Re Scram Discharge Sys Operability.Outboard Scram Discharge Vol Vent & Drain Valves Close Vs Open within 5 After Closure of Inboard Valves Project stage: Other ML20083H7761983-12-22022 December 1983 Forwards Addl Info Re Requesting Substitution of Longer Values for Scram Discharge Vol Vent & Drain Valve Closure Times.Closure Times Proposed in Do Not Meet Acceptance Criteria in SER Project stage: Other ML20084D3391984-04-23023 April 1984 Submits Results of GE Review of 831222 Analysis of Scram Discharge Vol Vent & Drain Valve Closure Times in Excess of 30 S.Ge Does Not Concur W/Analysis.Closure Times Should Be Accepted as Is.Continued Plant Operation Justified Project stage: Other ML20092A4271984-06-14014 June 1984 Submits Schedule Requested in Re Implementation of Mods Resulting in Scram Discharge Vol Vent & Drain Valve Closure Times Which Meet GE Requirements of 30 S.Tests Will Be Performed to Determine Extent of Mods Project stage: Other ML20135G5101985-09-13013 September 1985 Application for Amends to Licenses DPR-57 & NPF-5,adding 60 Scram Discharge Vol Vent & Drain Valve Closure Time Requirement to Tech Specs.Fee Paid Project stage: Request ML20135G5191985-09-13013 September 1985 Proposed Tech Spec,Adding 60 Scram Discharge Vol Vent & Drain Valve Closure Time Requirement Project stage: Other ML20136J4051985-11-18018 November 1985 Responds to Request for Addl Info Re 850913 Application for Amends to Licenses DPR-57 & NPF-5,allowing 60 Closure Time Limit for Scram Discharge Vol Vent & Drain Valves.Figure 6.2.2 from GE NEDO-24342 Re Scram Sys Pipe Breaks Encl Project stage: Request ML20137F7721986-01-0606 January 1986 Proposed Tech Spec Changes Providing Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves Project stage: Other ML20137F3011986-01-0606 January 1986 Rev to 850913 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Spec to Provide Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves for Unit 1 Project stage: Request ML20204A2781986-04-28028 April 1986 Forwards Request for Addl Info Re Request for Rev to Tech Specs to Reflect Addition of Closure of Containment Purge & Vent Valves on High Containment Radiation Signal.Response Requested within 60 Days Project stage: RAI ML20211G6301986-06-12012 June 1986 Forwards Request for Addl Info Re Util Listed Requests to Amend Tech Specs to Provide Closure Time Requirements for Scram Discharge Vol Vent & Drain Valves.Info Requested within 45 Days of Ltr Receipt Project stage: RAI ML20210T7521986-09-23023 September 1986 Responds to NRC 860612 Request for Addl Info Re Scram Discharge Vol Vent & Drain Valve Closure Times Project stage: Request ML20213G7521986-11-11011 November 1986 Forwards Bechtel Calculation Sheets Re CRD Scram Discharge Header Drain Piping Project stage: Other ML20214F3901987-05-13013 May 1987 Amends 136 & 75 to Licenses DPR-57 & NPF-5,respectively, Providing Closure Time Requirements for Scram Discharge Vol Vent & Drain Valves Project stage: Other ML20214F3951987-05-13013 May 1987 Safety Evaluation Supporting Amends 136 & 75 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval 1983-10-03
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
r qqZ b
August 5, 1980 GeorgiaPower u 2. wone,
[
n souvvm m :rcgystem U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement
REFERENCE:
Region II - Suite 3100 RII: JP0 101 Marietta Street, NW 50-321/50-366 Atlanta, Georgia 30303 I&E Bulletin 80-17 ATTENTION: Mr. James P. O'Reilly Gentlemen:
The following information is submitted in response to I&E Bulletin 80-17.
In accordance with Item 2 of the Bulletin, an automatic scram was performed on July 31, 1980. The scram discharge volume responded properly, and no problems were noted. The data requested are givea in Attachment 1.
In accordance with Item 3, SDV vent lines were verified to be functional at the conclusion of the above tests.
In accordance with Item 6c, our A/E has completed a 10 CFR 50.59 review covering the operation of the Standby Liquid Control System with both pumps.
The evaluation indicates that the system, as designed, cannot be operated safely with both pumps running and the reactor at maximum ATWS pressure of 1297 psia. Details of the review will be furnished on request.
This completes our response to I&E Bulletin 80-17 and Supplement 2.
Responses to Supplement I will be submitted at a later date.
Please contact this office if you have any questions in this regard.
Very truly yours, YJ. W&
W. A. Widner REB /mb Enclosure worn to and subscribed before me this 5th day of August, 1980.
/)[Tg/
Notary Puohc. Georgia, state at targe ff_,,
My Commesson Espres Sept. 20,1983
.5 Notary Public
///
xc: Director of the Office of Inspection and Enforcement Director of the Division of Operating Reactors, Offi.ce of Nuclear Reactor Regulation 8008130 gg
n w..
g ATTACHMENT ~l HATCH' UNIT 2' AUTOMATIC SCRAM TEST RESULTS Bulletin 80-17 Item #
Description Results
- 2a All rod insert times 6.0 sec
. avg. 06 notch insertion, sec 2.412 sec max. 06 notch insertion, sec 4.424 sec min. 06 notch insertion, sec 2.144 sec 2b Scram solenoid valve solenoids deenergized upon receipt of scram signal yes 2c Scram air relieved through backup valves yes Backup valves remained open during presence of scram signal yes 2d
-Time from scram initiation to:
closure of not drained alarm switch 24.7 sec closure of rod withdrawal block switch 40.42 sec closure of reactor scram switch (avg.)
36.07 sec 2e vent valve F010A opening time 7.98 sec vent valve F010B opening time 9.08 sec drain valve F0ll opening time 11.9 sec vent valve F010A closing time 30.43 sec vent valve F010B closing time 32.22 sec
- drain valve F0ll closing time 24.7 sec 2f Delay from scram initiation to closure of vent valve F010A 30.43 sec vent valve F010B 32.22 sec drain valve F0li 24.07 sec 2g SDV~ water analysis filterable solids 2500 ppb turbidity 23 RTU SiO2 28 ppb chlorides less than 50 ppb 2h-Time from scram reset to north SDV bank, SDV switch R0130 clears 7', 45" south SDV bank, SDV switch R013D clears 7', 04" 211 SDV and associated piping free of residual water;following the scram reset Yes 2j 10 sec delay on scram reset
. functioning properly yes 2k-Comparison of results yes RES/mb 8/5/80 l
s c