Proposed Tech Spec,Adding 60 Scram Discharge Vol Vent & Drain Valve Closure Time Requirement
ML20135G519
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/13/1985
From:
GEORGIA POWER CO.
To:
Shared Package
ML20135G511 List:
References
TAC-53327, TAC-53328, NUDOCS 8509190341
Download: ML20135G519 (2)


Text

[

LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENTS 3.3.I Scram Discharge Volume Vent 4.3.I Scram Discharge Volume Vent and Drain valves and Drain valves During reactor power operation, 1.

Valve Position Verification all scram discharge volume vent and drain valves shAll be Each scram discharge volume vent operable.

If this specification and drain valve shall be verified cannot be met, an orderly shut-to be in the open position

  • at

+

down shall be. initiated and least once per 31 days, the reactor shall be placed in the Hot Shutdown Condition 2.

Valve Testing within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

a. Each scram discharge volume vent and drain valve shall be operated through at least one complete cycle of full travel at least once per 92 days.
b. At least once per 18 months, it shall be verified that the scram discharge volume vent and drain valves:

1.

Close within 60 seconds l

after receipt of a signal for control rods to scram, and 2.

Open when the scram signal is reset.

  • These valves may be closed intermittently for testing under administrative controls.

3.3-7a 8509190341 850913 DR ADOCK 05000321 p

PDR

REACTIVITY CON'IROL SYSTEMS 3/4.1.6 SCRAM DISCHARGE VOLUME VEKr AND DRAIN VALVES LIMITING CONDITION FOR OPERATION 3.1.6.1 All scram discharge volume vent and drain valves shall be OPERABLE.

APPLICABILITY: Conditions 1 and 2.

ACTION: With any scram discharge volume vent or drain valve inoperable, be in at least HDT SHlTTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILIANCE REQUIREMENTS 4.1.6.1 The scram discharge volume vent and drain valves shall be demonstrated OPERABLE by:

a.

At least once per 31 days verifying each valve to be open.

a b.

At least once per 92 days cycling each valve through at least one complete cycle of travel.

c.

At least once per 18 months, by verifying that the drain and vent valves:

1.

Close within 60 seconds after receipt of a signal for control rods to scram, and

]

2.

Open when the scram signal is reset.

  • These valves may be closed intermittently for testing under administrative controls.