Proposed Tech Spec Changes Providing Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves
ML20137F772
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/06/1986
From:
GEORGIA POWER CO.
To:
Shared Package
ML20137F304 List:
References
TAC-53327, TAC-53328, NUDOCS 8601170577
Download: ML20137F772 (2)


Text

.

GeorgiaPower1 ATIAW W l NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATQi NUGEAR PLANT UNIT 1 PAGE REVISION INSTRUCTIOtE

%e proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

Remove Page Insert Page 3.3-7a 3.3-7a

-y P

mm

~ g.ff,\

~

~

G ,

LIMITING CONDITION FOR-OPERATION SURVEILLANCE REQUIREMENTS

[:

ji- " 3.3;I' Scram Discharge Volume Vent- .4.3.I Scram Discharge Volume Vent

- and Drain valves ana Orain valves . ,

x During' reactor power operation,- 1. Valve Position Verification all scram' discharge volume vent

- and drain valves shall be Each scram discharge volume vent operable. If this specification and drain valve shall be verified

cannot be met, an orderly shut- to be in the open position
  • at ldown shal' be initiated and least once per 31 days.

the_ react r shall be placed in

,. the Hot-Shutdown Condition 2. Valve Testing

'within-12 hours.

a. Each scram discharge volume vent and drain valve shall be operated through at least one complete cycle of full travel at least once per 92 days.
b. At least once per 18 months, it shall be verifiet' that the scram discharge! volume venteand drain valves:-
1. Close within 45 seconds l after receipt of a signal for control rods to scram, and
g
2. Open when the scram signal is reset.

y

  • These valves may be closed intermittently for testing under administrative

, controls.

3.3-7a p