ML20137F772
Letter Sequence Other | |
---|---|
Administration Results
Other: ML20080J137, ML20083D856, ML20083E087, ML20083H776, ML20084D339, ML20092A427, ML20135G519, ML20137F772, ML20213G752 | |
MONTHYEARML20080J1371983-09-19019 September 1983
[Table View]Proposed Tech Spec Changes Re Scram Discharge Sys Project stage: Other ML20080J1161983-09-19019 September 1983 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs to Reflect Mods to Scram Discharge Sys,As Required by NRC Project stage: Request ML20083E0871983-12-14014 December 1983 Proposed Tech Spec Changes Re Scram Discharge Vol Closure Times Project stage: Other ML20083E0061983-12-14014 December 1983 Suppl to 830919 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs Re Scram Discharge Vol Closure Times Project stage: Request ML20083D8561983-12-20020 December 1983 Corrects Changing Tech Specs Re Scram Discharge Sys Operability.Outboard Scram Discharge Vol Vent & Drain Valves Close Vs Open within 5 After Closure of Inboard Valves Project stage: Other ML20083H7761983-12-22022 December 1983 Forwards Addl Info Re Requesting Substitution of Longer Values for Scram Discharge Vol Vent & Drain Valve Closure Times.Closure Times Proposed in Do Not Meet Acceptance Criteria in SER Project stage: Other ML20084D3391984-04-23023 April 1984 Submits Results of GE Review of 831222 Analysis of Scram Discharge Vol Vent & Drain Valve Closure Times in Excess of 30 S.Ge Does Not Concur W/Analysis.Closure Times Should Be Accepted as Is.Continued Plant Operation Justified Project stage: Other ML20092A4271984-06-14014 June 1984 Submits Schedule Requested in Re Implementation of Mods Resulting in Scram Discharge Vol Vent & Drain Valve Closure Times Which Meet GE Requirements of 30 S.Tests Will Be Performed to Determine Extent of Mods Project stage: Other ML20135G5101985-09-13013 September 1985 Application for Amends to Licenses DPR-57 & NPF-5,adding 60 Scram Discharge Vol Vent & Drain Valve Closure Time Requirement to Tech Specs.Fee Paid Project stage: Request ML20135G5191985-09-13013 September 1985 Proposed Tech Spec,Adding 60 Scram Discharge Vol Vent & Drain Valve Closure Time Requirement Project stage: Other ML20136J4051985-11-18018 November 1985 Responds to Request for Addl Info Re 850913 Application for Amends to Licenses DPR-57 & NPF-5,allowing 60 Closure Time Limit for Scram Discharge Vol Vent & Drain Valves.Figure 6.2.2 from GE NEDO-24342 Re Scram Sys Pipe Breaks Encl Project stage: Request ML20137F7721986-01-0606 January 1986 Proposed Tech Spec Changes Providing Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves Project stage: Other ML20137F3011986-01-0606 January 1986 Rev to 850913 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Spec to Provide Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves for Unit 1 Project stage: Request ML20204A2781986-04-28028 April 1986 Forwards Request for Addl Info Re Request for Rev to Tech Specs to Reflect Addition of Closure of Containment Purge & Vent Valves on High Containment Radiation Signal.Response Requested within 60 Days Project stage: RAI ML20211G6301986-06-12012 June 1986 Forwards Request for Addl Info Re Util Listed Requests to Amend Tech Specs to Provide Closure Time Requirements for Scram Discharge Vol Vent & Drain Valves.Info Requested within 45 Days of Ltr Receipt Project stage: RAI ML20210T7521986-09-23023 September 1986 Responds to NRC 860612 Request for Addl Info Re Scram Discharge Vol Vent & Drain Valve Closure Times Project stage: Request ML20213G7521986-11-11011 November 1986 Forwards Bechtel Calculation Sheets Re CRD Scram Discharge Header Drain Piping Project stage: Other 1985-11-18 |
ML20137F772 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 01/06/1986 |
From: | GEORGIA POWER CO. |
To: | |
Shared Package | |
ML20137F304 | List: |
References | |
TAC-53327, TAC-53328, NUDOCS 8601170577 | |
Download: ML20137F772 (2) | |
Similar Documents at Hatch | |
---|---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212J2721999-10-0101 October 1999
[Table view]Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained ML20073G9631994-09-23023 September 1994 Proposed Improved Ts,Rev E ML20073D3231994-09-20020 September 1994 Proposed Tech Specs Change to Unit 1 TSs Re EDG Operability Requirements During Reactor Shut Down Conditions ML20072V3641994-08-31031 August 1994 Proposed Tech Specs Re Improved Standard Ts,Rev D ML20072H0571994-08-16016 August 1994 Proposed TS 3.9.C,allowing Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys ML20072E4021994-08-0808 August 1994 Proposed Tech Specs Re Rev Insertion Instructions Rev C ML20072B7541994-08-0404 August 1994 Proposed Tech Specs Re Traversing Incore Probe Operability Requirements ML20071H8381994-07-19019 July 1994 Proposed TS 3.3.6.6,allowing Less than Four Traversing in- Core Probe Machines to Be Operable ML20071H6851994-07-0808 July 1994 Proposed Tech Specs Re Improved Std Insertion Instructions, Consistent w/NUREG-1433 ML20069J3101994-06-0707 June 1994 Proposed Tech Specs Allowing Planned Testing at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt ML20059E9231994-01-0606 January 1994 Revised Proposed TS Pages for Increase in Allowable MSIV Leakage Rate & Deletion of MSIV Leakage Control Sys ML20059L2051993-11-0909 November 1993 Proposed Tech Specs Changing Unit 1,Section 4.9 & Unit 2, Section 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20058P8881993-10-19019 October 1993 Proposed Tech Specs Re Time Delay for RPS Electric Power Monitoring Sys Trips ML20046B6061993-07-30030 July 1993 Proposed Tech Specs for Implementation of New 10CFR20 Requirements ML20046B5561993-07-27027 July 1993 Proposed Tech Specs Showing Original & Unrelated Changes Re Removal of Main Steam Line Radiation Monitor Trips ML20045E7281993-06-28028 June 1993 Proposed TS 3.7.A.4 & 3.6.4.1 for Units 1 & 2,respectively, Allowing One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing 1999-07-29 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML20212J2721999-10-0101 October 1999
[Table view]Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20210A4041999-07-15015 July 1999 Ei Hatch Nuclear Plant Unit 1,Extended Power Uprate Startup Test Rept for Cycle 19 ML20204J6031999-03-19019 March 1999 Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15 ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20217A0861998-04-30030 April 1998 Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 181998-02-17017 February 1998 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% HL-5438, Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 141997-07-21021 July 1997 Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant HL-5192, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 171996-07-18018 July 1996 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20212C1491996-05-31031 May 1996 Stability Monitor ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100P1041996-03-0404 March 1996 Ei Hatch Nuclear Plant Unit 2 Power Uprate Startup Test Rept for Cycle 13 ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained 1999-07-29 |
Text
.
GeorgiaPower1 ATIAW W l NRC DOGET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATQi NUGEAR PLANT UNIT 1 PAGE REVISION INSTRUCTIOtE
%e proposed change to Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:
Remove Page Insert Page 3.3-7a 3.3-7a
-y P
mm
~ g.ff,\
~
~
G ,
LIMITING CONDITION FOR-OPERATION SURVEILLANCE REQUIREMENTS
[:
ji- " 3.3;I' Scram Discharge Volume Vent- .4.3.I Scram Discharge Volume Vent
- and Drain valves ana Orain valves . ,
x During' reactor power operation,- 1. Valve Position Verification all scram' discharge volume vent
- and drain valves shall be Each scram discharge volume vent operable. If this specification and drain valve shall be verified
- cannot be met, an orderly shut- to be in the open position
- at ldown shal' be initiated and least once per 31 days.
the_ react r shall be placed in
,. the Hot-Shutdown Condition 2. Valve Testing
'within-12 hours.
- a. Each scram discharge volume vent and drain valve shall be operated through at least one complete cycle of full travel at least once per 92 days.
- b. At least once per 18 months, it shall be verifiet' that the scram discharge! volume venteand drain valves:-
- 1. Close within 45 seconds l after receipt of a signal for control rods to scram, and
- g
- 2. Open when the scram signal is reset.
y
- These valves may be closed intermittently for testing under administrative
, controls.
3.3-7a p
_ . _ _ . . - . ~ . . _ . - -
.. . ;; :,3p;.7 . L ...n.
__..