MONTHYEARML19330B5211980-07-25025 July 1980 Responds to IE Bulletin 80-17,Suppl 2, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Mod Required for Units 1 & 2 Vent Sys Since as-built Sys Satisfies Requirements of Bulletin Project stage: Other ML19330B5231980-07-25025 July 1980 Responds to IE Bulletin 80-14, Degradation of BWR Scram Discharge Vol Capability. Investigation to Determine How Frequently Scram Discharge Vol Vent & Drain Valves Should Be Tested Underway Project stage: Other ML19327A5331980-07-28028 July 1980 Responds to IE Bulletin 80-17.Provides Manual & Automatic Scram Test Results.Scram Discharge Vol Vent Lines Verified & Emergency Operating Procedure Changes Completed Project stage: Other ML19327A5271980-07-31031 July 1980 Responds to IE Bulletin 80-17 & Provides Manual Scram Test Results.Scram Discharge Vol Vents Lines Verified as Functional & Full Operator Training to Be Completed as of 800802.Recirculation Pump Trip Installed Project stage: Other ML19331B9341980-08-0505 August 1980 Responds to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. Automatic Scram Performed & Scram Discharge Vol Responded Properly.Automatic Scram Test Results Enncl Project stage: Other ML19340B1791980-10-10010 October 1980 Responds to NRC Requesting Tech Spec Mods Re Scram Discharge Vol.Present Tech Specs Assume Control Drive Sys Operability & Scram Discharge Vol Piping Is Sized to Assure Complete Scram.Mods Will Not Increase Reliability Project stage: Other ML19344B5081980-10-14014 October 1980 Responds to Mar 1980 Comments Made at White House Issues Briefing session.NUREG-0625 Is Not Intended to Be Sole Basis for Judging Sites.Evacuation Plans Considered in Licensing Actions Leading to Cp.Foundation Will Be Evaluated Project stage: Other ML19336A7591980-10-24024 October 1980 Responds to 801001 Request Re Participation in Development of Scram Sys Design & Performance Criteria.Not Active Member in Subgroup Considering Criteria.Plans to Consolidate Reviews of Design Rather than Performing Separate Reviews Project stage: Other ML19347C9811981-02-26026 February 1981 Application for Amend to Licenses NPF-5 & DPR-57,submitted as Proposed Changes to Tech Specs Re BWR Scram Sys Design Project stage: Request ML19341C7971981-02-26026 February 1981 Semiannual Rept,Plant Radioactive Effluent Releases,Jul-Dec 1980 Project stage: Request ML19347C9841981-02-26026 February 1981 Tech Spec Tables 3.6.3-1,3.7-1 & Page 3.7-20 for Primary Containment Isolation Valves Project stage: Other ML19347C9971981-03-0404 March 1981 Submits Addl Info Re BWR Scram Discharge Sys Mods,Per 801001 Request.Mods Will Be Implemented as Needed to Result in Conformance to Owners Group Criteria by End of 1982 Provided Qualified Equipment Is Commercially Available Project stage: Other ML19350A6301981-03-0606 March 1981 Notifies That Util 801010 Commitments to BWR Scram Discharge Sys long-term Mods Do Not Satisfy NRC Criteria.Revised Tech Specs Must Be Proposed at Least 3 Months in Advance of Mod Completion Dates Project stage: Other ML20010E8921981-09-0101 September 1981 Forwards Franklin Research Ctr Request for Addl Info Re BWR Scram Discharge Vol long-term Mods.Info Requested within 45 Days of Receipt of Ltr Project stage: RAI ML19280B1321981-10-0101 October 1981 Responds to 810901 Request for Addl Info from Franklin Research Ctr Re Util 810226 Proposed Tech Spec Mods for Scram Discharge Vol.Util Will Submit Amend to Unit 1 Rod Block Setpoint & Surveillance Requirements Project stage: Request ML20244B6631982-01-13013 January 1982 BWR Scram Discharge Vol Long-Term Mods, Technical Evaluation Rept Project stage: Other ML20244B6661982-01-13013 January 1982 BWR Scram Discharge Vol Long-Term Mods,Ga Power Co,Hatch Nuclear Plant,Unit 1, Technical Evaluation Rept Project stage: Other ML20053A1881982-05-18018 May 1982 Requests Extension of 821231 Commitment Date for Installation of Qualified Level Transmitters in Scram Discharge Sys to 831231 Project stage: Other ML20085B1651983-06-24024 June 1983 Order Confirming Licensee Commitments to Install Mods to Scram Discharge Sys by 831231 Project stage: Other ML20080J1161983-09-19019 September 1983 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs to Reflect Mods to Scram Discharge Sys,As Required by NRC Project stage: Request ML20080J1371983-09-19019 September 1983 Proposed Tech Spec Changes Re Scram Discharge Sys Project stage: Other ML20080P6381983-10-0303 October 1983 Requests That Re Proposed Tech Spec Changes Concerning Scram Discharge Sys Be Superseded by 830919 Submittal Project stage: Other ML20083E0871983-12-14014 December 1983 Proposed Tech Spec Changes Re Scram Discharge Vol Closure Times Project stage: Other ML20083E0061983-12-14014 December 1983 Suppl to 830919 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs Re Scram Discharge Vol Closure Times Project stage: Request ML20083D8561983-12-20020 December 1983 Corrects Changing Tech Specs Re Scram Discharge Sys Operability.Outboard Scram Discharge Vol Vent & Drain Valves Close Vs Open within 5 After Closure of Inboard Valves Project stage: Other ML20083H7761983-12-22022 December 1983 Forwards Addl Info Re Requesting Substitution of Longer Values for Scram Discharge Vol Vent & Drain Valve Closure Times.Closure Times Proposed in Do Not Meet Acceptance Criteria in SER Project stage: Other ML20084D3391984-04-23023 April 1984 Submits Results of GE Review of 831222 Analysis of Scram Discharge Vol Vent & Drain Valve Closure Times in Excess of 30 S.Ge Does Not Concur W/Analysis.Closure Times Should Be Accepted as Is.Continued Plant Operation Justified Project stage: Other ML20092A4271984-06-14014 June 1984 Submits Schedule Requested in Re Implementation of Mods Resulting in Scram Discharge Vol Vent & Drain Valve Closure Times Which Meet GE Requirements of 30 S.Tests Will Be Performed to Determine Extent of Mods Project stage: Other ML20135G5101985-09-13013 September 1985 Application for Amends to Licenses DPR-57 & NPF-5,adding 60 Scram Discharge Vol Vent & Drain Valve Closure Time Requirement to Tech Specs.Fee Paid Project stage: Request ML20135G5191985-09-13013 September 1985 Proposed Tech Spec,Adding 60 Scram Discharge Vol Vent & Drain Valve Closure Time Requirement Project stage: Other ML20136J4051985-11-18018 November 1985 Responds to Request for Addl Info Re 850913 Application for Amends to Licenses DPR-57 & NPF-5,allowing 60 Closure Time Limit for Scram Discharge Vol Vent & Drain Valves.Figure 6.2.2 from GE NEDO-24342 Re Scram Sys Pipe Breaks Encl Project stage: Request ML20137F7721986-01-0606 January 1986 Proposed Tech Spec Changes Providing Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves Project stage: Other ML20137F3011986-01-0606 January 1986 Rev to 850913 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Spec to Provide Value of 45 Closure Time Requirement for Scram Discharge Vol Vent & Drain Valves for Unit 1 Project stage: Request ML20204A2781986-04-28028 April 1986 Forwards Request for Addl Info Re Request for Rev to Tech Specs to Reflect Addition of Closure of Containment Purge & Vent Valves on High Containment Radiation Signal.Response Requested within 60 Days Project stage: RAI ML20211G6301986-06-12012 June 1986 Forwards Request for Addl Info Re Util Listed Requests to Amend Tech Specs to Provide Closure Time Requirements for Scram Discharge Vol Vent & Drain Valves.Info Requested within 45 Days of Ltr Receipt Project stage: RAI ML20210T7521986-09-23023 September 1986 Responds to NRC 860612 Request for Addl Info Re Scram Discharge Vol Vent & Drain Valve Closure Times Project stage: Request ML20213G7521986-11-11011 November 1986 Forwards Bechtel Calculation Sheets Re CRD Scram Discharge Header Drain Piping Project stage: Other ML20214F3901987-05-13013 May 1987 Amends 136 & 75 to Licenses DPR-57 & NPF-5,respectively, Providing Closure Time Requirements for Scram Discharge Vol Vent & Drain Valves Project stage: Other ML20214F3951987-05-13013 May 1987 Safety Evaluation Supporting Amends 136 & 75 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval 1983-10-03
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
s oosi July 31, 1980 h
GeorgiaPower v.. uan,
me memn en mm United' States Nuclear Regulatory Commission Office of Inspection and Enforcement
REFERENCE:
Region II - Suite 3100 RII: JP0 101 Marietta Street, NW 50-321/50-366 Atlanta, Georgia 30302 I&E Bulletin 80-17 ATTENTION: Mr. James P. O'Reilly Gentlemen:
The following information is submitted in response to I&E Bulletin 80-17:
In accordance with Item 2 of the Bulletin, a manual scram was performed on July 26, 1980, on Hatch Unit 2.
The scram discharge volume responded properly during this test; however, two scram level switches, 2Cll-R013A and D were found to be failed and did not respond during the test. The failure of these switches did not affect the performance of the SDV, and no other problems were noted.
Investigation of the switch failure is continuing. The data requested in Item 2 is given in Attach-ment 1.
An automatic scram will be performed today, July 31, 1980, on Unit 2.
In accordance with Item 3, SDV vent lines were verified to be functional at the conclusion of the above tests.
In _accordance with Item 4e, full operator training will be completed as of August 2,1980.
In accordance with Item 7, both units have RPT installed for both Turbine Trips and Generator Load Rejections at power levels above 30%,
as well as ATWS RPT trips at a pressure setpoint of 1120 psig and a 3
level setpoint of -38 inches. This item is therefore not applicable.
Should you have any questions in this regard, please contact this office.
Very truly,yours, eh /bc
! f S
,/,V-/. A. Widner REB /mb
/
cEnclosure Sworn to and subscribed efore m this 31st day of July,1980 (gy,
/
Notary Puetic, Gwgia, State at targe My Corntmssion Empires Sept. 2o,1983 N9fary Public xc: Director of the Office of Inspection and Enforcement Director of the Division of Operating Reactors, Office of S
Nuclear Reactor Regulation i
8008060
'B 2 %
h
ATTACHMENT 1 HATCH UNIT 2 MANUAL SCRAM TEST RESULTS-Bulletin 80-17 Item #1 Description Results 2a All rod insert time, sec approx. 5.9 individual rod scram times:
avg. 06 notch insertion, sec 2.568 max. 06 notch insertion, sec 3.090 min. 06 notch insertion, sec 1.718 2b Scram solenoid valve solenoids Yes deenergized upon receipt of scram signals 2c Scram air relieved through backup valves Yes Backup valves remained open during presence of scram signal Yes 2d Time from scram initiation to: (sec closure of not drained alarm 24.2 switch closure of rod withdrawal block 38.73 switch closure of reactor scram switch 35.7 (avg.)
2e All sec Vent valve P010A opening time 9.1 Vent valve P010B open':..g time 9.7 Drain valve F0ll opening time 12.3 Vent valve F010A closing time 30.48 Vent valve F010B closing time 31.02 Drain valve F011 closing time 24.07 2f Delaf from scram initiation to closure of:
Vent valve F010A, sec 30.48 Vent valve F0108, sec 31.02 Drain valve F0ll, sec 24.07 29 SDV water analysis results:
Filterable solids, ppm 40 chlorides, ppb less than 50 turbidity, RTU 50 SiO, ppb (after filtering) 26 2
2h Time from scram reset to:
(min: sec)
North SDV bank, SDV scram switch 3:46.8 N0138 clears South SDV bank, SOV scram switch 7:05.4 N013C clears REB /mb-j 7/31/80
+
ATTACHMENT-1 (Cont'd)-
' HATCH UNIT 2 MANUAL SCRAM TEST RESUCTS Bulletin 80-17 Item #1 Description Resul ts 21 SDV & associated piping free of Yes water following scram 2j
~10 second delay on scram reset Yes functioning properly 2k Comparison of results OK 1
3
+
4 5
1 t
9 i'
i REB /mb l-7/31/80 S
+- -
i, y
-,, - -,