| {{#Wiki_filter:}} | | {{#Wiki_filter:From: Cox, Lee <lee.cox@dhhs.nc.gov> |
| | Sent: Tuesday, February 2, 2021 9:15 AM To: Mahoney, Michael |
| | |
| | ==Subject:== |
| | [External_Sender] RE: [External] State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Thanks Mike. I have reviewed and have no comments. |
| | W. Lee Cox, III Chief Division of Health Service Regulation, Radiation Protection Section NC Department of Health and Human Services Help protect your family and neighbors from COVID-19. |
| | Know the 3 Ws. Wear. Wait. Wash. |
| | #StayStrongNC and get the latest at nc.gov/covid19. |
| | Office: 919-814-2252 Mobile: 919-413-2506 lee.cox@dhhs.nc.gov 5505 Creedmoor Rd., Suite 100, Raleigh, NC 27612 1645 Mail Service Center 27699-1645 Twitter l Facebook l Instagram l YouTube l LinkedIn Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized State official. Unauthorized disclosure of juvenile, health, legally privileged, or otherwise confidential information, including confidential information relating to an ongoing State procurement effort, is prohibited by law. If you have received this email in error, please notify the sender immediately and delete all records of this email. |
| | From: Mahoney, Michael <Michael.Mahoney@nrc.gov> |
| | Sent: Tuesday, February 2, 2021 8:29 AM To: Cox, Lee <lee.cox@dhhs.nc.gov> |
| | |
| | ==Subject:== |
| | [External] State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - |
| | Revision Minimum RCS Flow Rate and Update COLR References CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. |
| | Good Morning Mr. Cox, We are near completion of an amendment for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), to revise Technical Specification 3/4.2.5, DNB [Departure from Nucleate Boiling] |
| | Parameters, and TS 6.9.1.6, Core Operating Limits Report in support of analysis development for HNP Cycle 24 and the introduction of reload batches of Framatome, Inc. (Framatome) GAIA (GAIA) fuel assemblies. TS 3/4.2.5 is revised to reflect a lower minimum Reactor Coolant System (RCS) flow rate, whereas TS 6.9.1.6.2 is revised to reflect the incorporation of the |
| | |
| | Framatome topical report EMF-2103(P)(A), Revision 3, Realistic Large Break LOCA [Loss-of-Coolant Accident] Methodology for Pressurized Water Reactors. TS 6.9.1.6.2 is also revised to reflect the removal of analytical methods no longer applicable for the determination of HNP core operating limits. In addition, as part of the submitted license amendment request, the licensee provided an updated small break LOCA, reflecting the proposed lower minimum RCS flow rate and the use of GAIA fuel assemblies. |
| | The application is dated March 6, 2020 as supplemented by letters date April 23, June 22 and November 24, 2020, (ADAMS Accession Nos. ML20066L108, ML20114E131, ML20174A640, and ML20329A386, respectively). |
| | The no significant hazards consideration determination was noticed in the Federal Register on November 3, 2020 (85 FR 69660), attached. |
| | Please respond if you have any or no comments. |
| | Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Desk: (301)-415-3867 Mobile: (301)-250-0450 Email: Michael.Mahoney@nrc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized State official. Unauthorized disclosure of juvenile, health, legally privileged, or otherwise confidential information, including confidential information relating to an ongoing State procurement effort, is prohibited by law. If you have received this email in error, please notify the sender immediately and delete all records of this email. |
| | |
| | Hearing Identifier: NRR_DRMA Email Number: 998 Mail Envelope Properties (MN2PR09MB5243C1E6B67C21ED862E8D8BA8B59) |
| | |
| | ==Subject:== |
| | [External_Sender] RE: [External] State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Sent Date: 2/2/2021 9:14:43 AM Received Date: 2/2/2021 9:16:40 AM From: Cox, Lee Created By: lee.cox@dhhs.nc.gov Recipients: |
| | "Mahoney, Michael" <Michael.Mahoney@nrc.gov> |
| | Tracking Status: None Post Office: MN2PR09MB5243.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4198 2/2/2021 9:16:40 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML20112F2122020-04-15015 April 2020 Acceptance of Requested Licensing Action Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices Project stage: Acceptance Review RA-20-0179, Supplemental Information for License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core.2020-06-22022 June 2020 Supplemental Information for License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core. Project stage: Supplement RA-20-0178, Supplement to License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices2020-06-22022 June 2020 Supplement to License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices Project stage: Supplement ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation Project stage: RAI RA-20-0287, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protectiv2020-10-0202 October 2020 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Project stage: Response to RAI ML21033B1062021-02-0202 February 2021 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Project stage: Other ML21033A8452021-02-0202 February 2021 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Project stage: Other ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation Project stage: Approval 2020-06-22
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24303A3142024-10-25025 October 2024 Notification of Shearon Harris Nuclear Power Plant FEI and Information Request ML24227A9572024-08-14014 August 2024 LRA - Requests for Additional Information - Set 1 (Email to Applicant) ML24187A0262024-07-0303 July 2024 NRR E-mail Capture - Change in Review Schedule - Harris Risk-Informed Process for Evaluations Exemption (L-2024-LLE-0004) ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24113A2522024-04-22022 April 2024 NRR E-mail Capture - Audit Plan - Shearon Harris Nuclear Power Plant, Unit 1 - RIPE Exemption 10 CFR 50.55a(h)(2) (L-2024-LLE-0004) ML24101A0542024-04-10010 April 2024 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0244 - Extend CT for Accumulators - CLIIP (L-2024-LLA-0032) ML24101A0522024-04-10010 April 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - ITS Alignments LAR (L-2023-LLA-0078) ML24145A1732024-02-26026 February 2024 002 Radiation Safety Baseline Inspection Information Request ML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23177A1992023-06-26026 June 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23065A0942023-03-0606 March 2023 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020) ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22237A1632022-08-25025 August 2022 004 Radiation Safety Baseline Inspection Information Request ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22108A0182022-04-15015 April 2022 NRR E-mail Capture - Accepted for Review - Duke Energy Relief Request for Harris Nuclear Plant Inservice Testing Program Plan - Fourth Ten-Year Interval to Extend Type C Test to 75 Months ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22083A0282022-03-23023 March 2022 Email Snsb Safety Evaluation for Harris LAR to Revise Reactor Protection System TS ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21288A0802021-10-15015 October 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0213 - Remove Limitations to Perform Certain SRs During Shutdown (L-2021-LLA-0167) ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0112021-08-30030 August 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1- RA-21-0191 - Revised TS Related to Reactor Trip System Instrumentation (L-2021-LLA-0149) ML21189A0282021-07-0101 July 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0112 - Revise TS to Reflect Development of TRM (L-2021-LLA-0108) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21106A0112021-04-15015 April 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-21-0052 - Revise Containment Spray Nozzle Surveillance Frequency (L-2021-LLA-0058) ML21084A2492021-03-24024 March 2021 Notification of Inspection and Request for Information ML21084A2512021-03-22022 March 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-20-0252 - LAR to Remove Extraneous Content and Requirements from the OL and TS (L-2021-LLA-0027) ML21039A6382021-02-0808 February 2021 NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1-RA-20-0311 - 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach (L-2021-LLA-0003) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21033B1062021-02-0202 February 2021 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21033A8452021-02-0202 February 2021 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML21025A2922021-01-25025 January 2021 NRR E-mail Capture - (External_Sender) State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4042021-01-0606 January 2021 NRR E-mail Capture - State Notification of Amendment to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20345A3052020-12-10010 December 2020 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 ML20344A4192020-12-0909 December 2020 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS 3.3.3.6 and TS 3.9.2 2024-08-14
[Table view] |
Text
From: Cox, Lee <lee.cox@dhhs.nc.gov>
Sent: Tuesday, February 2, 2021 9:15 AM To: Mahoney, Michael
Subject:
[External_Sender] RE: [External] State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Thanks Mike. I have reviewed and have no comments.
W. Lee Cox, III Chief Division of Health Service Regulation, Radiation Protection Section NC Department of Health and Human Services Help protect your family and neighbors from COVID-19.
Know the 3 Ws. Wear. Wait. Wash.
- StayStrongNC and get the latest at nc.gov/covid19.
Office: 919-814-2252 Mobile: 919-413-2506 lee.cox@dhhs.nc.gov 5505 Creedmoor Rd., Suite 100, Raleigh, NC 27612 1645 Mail Service Center 27699-1645 Twitter l Facebook l Instagram l YouTube l LinkedIn Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized State official. Unauthorized disclosure of juvenile, health, legally privileged, or otherwise confidential information, including confidential information relating to an ongoing State procurement effort, is prohibited by law. If you have received this email in error, please notify the sender immediately and delete all records of this email.
From: Mahoney, Michael <Michael.Mahoney@nrc.gov>
Sent: Tuesday, February 2, 2021 8:29 AM To: Cox, Lee <lee.cox@dhhs.nc.gov>
Subject:
[External] State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 -
Revision Minimum RCS Flow Rate and Update COLR References CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.
Good Morning Mr. Cox, We are near completion of an amendment for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), to revise Technical Specification 3/4.2.5, DNB [Departure from Nucleate Boiling]
Parameters, and TS 6.9.1.6, Core Operating Limits Report in support of analysis development for HNP Cycle 24 and the introduction of reload batches of Framatome, Inc. (Framatome) GAIA (GAIA) fuel assemblies. TS 3/4.2.5 is revised to reflect a lower minimum Reactor Coolant System (RCS) flow rate, whereas TS 6.9.1.6.2 is revised to reflect the incorporation of the
Framatome topical report EMF-2103(P)(A), Revision 3, Realistic Large Break LOCA [Loss-of-Coolant Accident] Methodology for Pressurized Water Reactors. TS 6.9.1.6.2 is also revised to reflect the removal of analytical methods no longer applicable for the determination of HNP core operating limits. In addition, as part of the submitted license amendment request, the licensee provided an updated small break LOCA, reflecting the proposed lower minimum RCS flow rate and the use of GAIA fuel assemblies.
The application is dated March 6, 2020 as supplemented by letters date April 23, June 22 and November 24, 2020, (ADAMS Accession Nos. ML20066L108, ML20114E131, ML20174A640, and ML20329A386, respectively).
The no significant hazards consideration determination was noticed in the Federal Register on November 3, 2020 (85 FR 69660), attached.
Please respond if you have any or no comments.
Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Desk: (301)-415-3867 Mobile: (301)-250-0450 Email: Michael.Mahoney@nrc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized State official. Unauthorized disclosure of juvenile, health, legally privileged, or otherwise confidential information, including confidential information relating to an ongoing State procurement effort, is prohibited by law. If you have received this email in error, please notify the sender immediately and delete all records of this email.
Hearing Identifier: NRR_DRMA Email Number: 998 Mail Envelope Properties (MN2PR09MB5243C1E6B67C21ED862E8D8BA8B59)
Subject:
[External_Sender] RE: [External] State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Sent Date: 2/2/2021 9:14:43 AM Received Date: 2/2/2021 9:16:40 AM From: Cox, Lee Created By: lee.cox@dhhs.nc.gov Recipients:
"Mahoney, Michael" <Michael.Mahoney@nrc.gov>
Tracking Status: None Post Office: MN2PR09MB5243.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4198 2/2/2021 9:16:40 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: