MONTHYEARML20112F2122020-04-15015 April 2020 Acceptance of Requested Licensing Action Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices Project stage: Acceptance Review RA-20-0179, Supplemental Information for License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core.2020-06-22022 June 2020 Supplemental Information for License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core. Project stage: Supplement RA-20-0178, Supplement to License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices2020-06-22022 June 2020 Supplement to License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices Project stage: Supplement ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation Project stage: RAI RA-20-0287, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protectiv2020-10-0202 October 2020 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Project stage: Response to RAI ML21033B1062021-02-0202 February 2021 NRR E-mail Capture - (External_Sender) (External) State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Project stage: Other ML21033A8452021-02-0202 February 2021 NRR E-mail Capture - State Notification of Amendments to Shearon Harris Nuclear Power Plant, Unit 1 - Revision Minimum RCS Flow Rate and Update COLR References Project stage: Other ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation Project stage: Approval 2020-06-22
[Table View] |
|
---|
Category:Letter type:RA
MONTHYEARRA-24-0217, End of Cycle 25 (H1 R25) Inservice Inspection Program Owners Activity Report2024-09-0909 September 2024 End of Cycle 25 (H1 R25) Inservice Inspection Program Owners Activity Report RA-24-0172, Supplement to a Request for Additional Information Response Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2024-07-0808 July 2024 Supplement to a Request for Additional Information Response Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-24-0154, Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations2024-06-0707 June 2024 Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-24-0110, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical.2024-05-0909 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical. RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0117, Cycle 26 Core Operating Limits Report, Revision O2024-04-16016 April 2024 Cycle 26 Core Operating Limits Report, Revision O RA-24-0106, Annual Environmental (Non-Radiological) Operating Report2024-04-0909 April 2024 Annual Environmental (Non-Radiological) Operating Report RA-24-0097, Response to Request for Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations2024-04-0303 April 2024 Response to Request for Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024 Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-24-0062, 10 CFR 50 .54(q) Evaluation2024-03-0404 March 2024 10 CFR 50 .54(q) Evaluation RA-24-0033, Response to Request for Additional Information Regarding the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2024-02-24024 February 2024 Response to Request for Additional Information Regarding the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0008, Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations2024-02-0606 February 2024 Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0297, Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 502023-11-15015 November 2023 Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 50 RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0098, Annual Environmental (Nonradiological) Operating Report2023-04-19019 April 2023 Annual Environmental (Nonradiological) Operating Report RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-23-0011, End of Cycle 24 (H1R24) Inservice Inspection Program Owners Activity Report2023-01-26026 January 2023 End of Cycle 24 (H1R24) Inservice Inspection Program Owners Activity Report RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab 2024-09-09
[Table view] |
Text
Kim Maza Site Vice President Harris Nuclear Plant 5413 Shearon Harris Rd New Hill, NC 27562-9300 984-229-2512 10 CFR 50.90 June 22, 2020 Serial: RA-20-0179 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 / Renewed License No. NPF-63
Subject:
Supplemental Information for License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits Ladies and Gentlemen:
By letter dated March 6, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20066L112), as supplemented by letter dated April 23, 2020 (ADAMS Accession No. ML20114E131), Duke Energy Progress, LLC (Duke Energy), submitted a license amendment request for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). The proposed license amendment would modify Technical Specification (TS) 3/4.2.5, DNB Parameters, and TS 6.9.1.6, Core Operating Limits Report, in support of analysis development for HNP Cycle 24. HNP TS 3/4.2.5 would be revised to reflect a lower minimum Reactor Coolant System flow rate, whereas TS 6.9.1.6.2 would reflect the incorporation of the Framatome, Inc. topical report EMF-2103(P)(A), Revision 3, Realistic Large Break LOCA
[Loss-of-Coolant Accident] Methodology for Pressurized Water Reactors, and the removal of analytical methods no longer applicable for the determination of HNP core operating limits.
The attachment to this supplemental correspondence provides an updated markup of a TS page provided in Enclosure 2 of the submittal dated March 6, 2020. Specifically, Index page iii is being resubmitted due to a discrepancy between the markup copy provided in the original submittal and the docketed authority file of the HNP TS (ADAMS Accession No. ML052860283).
The markup should have reflected the Index page associated with Amendment No. 116 (ADAMS Accession No. ML042300450), as this was the last time the NRC issued an amendment to this page.
The content of this supplemental correspondence does not change the No Significant Hazards Consideration provided in the original submittal and does not contain any regulatory commitments.
Please refer any questions regarding this submittal to Art Zaremba, Manager - Nuclear Fleet Licensing, at (980) 373-2062.
U.S. Nuclear Regulatory Commission Serial RA-20-0179 Page2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 22, 2020.
Sincerely, Kim E. Maza Site Vice President Harris Nuclear Plant
Attachment:
Updated Markup of Technical Specification Index Page cc: L. Dudes, NRC Regional Administrator, Region 11 J. Zeiler, NRC Sr. Resident Inspector, HNP M. Mahoney, NRC Project Manager, HNP W. L. Cox, 111, Section Chief, N.C. DHSR
U.S. Nuclear Regulatory Commission Serial RA-20-0179 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 22, 2020.
Sincerely, Kim E. Maza Site Vice President Harris Nuclear Plant
Attachment:
Updated Markup of Technical Specification Index Page cc: L. Dudes, NRC Regional Administrator, Region II J. Zeiler, NRC Sr. Resident Inspector, HNP M. Mahoney, NRC Project Manager, HNP W. L. Cox, III, Section Chief, N.C. DHSR
U.S. Nuclear Regulatory Commission Serial RA-20-0179 Attachment ATTACHMENT UPDATED MARKUP OF TECHNICAL SPECIFICATION INDEX PAGE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 RENEWED LICENSE NUMBER NPF-63 2 PAGES (INCLUDING COVER)
2.0 SAFETY. LIMITS AND LIMITING SAFETY SYSTEM SETTINGS
- 2.1 SAFETY LIMITS 2.1.1 REACTOR CORE 2-1 2.1.2 REACTOR COOLANT SYSTEM PRESSURE. 2-1 FIGURE 2.1-1 REACTOR CORE SAFETY LIMITS - THREE LOOPS IN OPERATION. 2-2 WITH MEASURED RCS FLOW> [ 293 ,540 GPM x (1.0 + C1 )]
y..___
I 290,000 GPM 2.2 LIMITING SAFETY SYSTEM SETTINGS 2.2.1 REACTOR TRIP SYSTEM INSTRUMENTATION SETPOINTS . 2-1 TABLE 2.2-1 REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS 2-4 BASES SECTION 2.1 SAFETY LIMITS 2.1.1 REACTOR CORE B 2-1 2.1.2 REACTOR COOLANT SYSTEM PRESSURE. B 2-2 2.2 LIMITING SAFETY SYSTEM SETTINGS 2.2.1 REACTOR TRIP SYSTEM INSTRUMENTATIQN SETPOINTS . . . . . . . . . . B 2-2 V
SHEARON HARRIS - UNIT 1 iii Amendment No. m