| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:54443
| stage = Approval
}}
}}


Line 69: Line 71:
ENCLOSURE WNP-2 SAFETY EVALUATION OF TECHNICAL SPECIFICATION CHANGES
ENCLOSURE WNP-2 SAFETY EVALUATION OF TECHNICAL SPECIFICATION CHANGES
: 1. Section 3/4 8.1. (page 3/4 8-3)
: 1. Section 3/4 8.1. (page 3/4 8-3)
AC Sources The note referred to in paragraphs 4.8.1.1.2.a,4 and 5 requires performance of a prelube function prior to DG testing.                  Conduct of the prelube function would then increase the number of emergency power supplies in an inoperable condition.                  The licensee proposed to change the note from "shall be preceded" to "may be preceded" in order to provide flexibility.                The proposed change is in accordance with approved changes to standard technical specification recommended by DSI/PSB in its letter dated June 5,1984 to DL. Therefore, the proposed change is acceptable.
AC Sources The note referred to in paragraphs 4.8.1.1.2.a,4 and 5 requires performance of a prelube function prior to DG testing.                  Conduct of the prelube function would then increase the number of emergency power supplies in an inoperable condition.                  The licensee proposed to change the note from "shall be preceded" to "may be preceded" in order to provide flexibility.                The proposed change is in accordance with approved changes to standard technical specification recommended by DSI/PSB in its {{letter dated|date=June 5, 1984|text=letter dated June 5,1984}} to DL. Therefore, the proposed change is acceptable.
: 2. Section 3.8.3.2.b.1 (page 3/4 8-18)
: 2. Section 3.8.3.2.b.1 (page 3/4 8-18)
Electrical Power Systems, Distribution-Shutdown The proposed changes provide clarification that distribution panel DP-SI-lF is the Division 1 125-VDC critical switch gear distribution panel and DP-Sl-10 is the Division 1 remote shutdown distribution panel.
Electrical Power Systems, Distribution-Shutdown The proposed changes provide clarification that distribution panel DP-SI-lF is the Division 1 125-VDC critical switch gear distribution panel and DP-Sl-10 is the Division 1 remote shutdown distribution panel.

Latest revision as of 20:02, 8 December 2021

Forwards Power Sys Branch Safety Evaluation of Proposed Changes to Tech Specs 3.4.8.1 Re Ac Sources & 3.8.3.2.b.1 Re Electrical Power Sys Distribution & Shutdown Panels. Changes Acceptable.Tac 54443 Complete
ML20197H836
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/03/1984
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0758, CON-WNP-75, CON-WNP-758 TAC-54443, NUDOCS 8407260467
Download: ML20197H836 (2)


Text

.

C10 -N JUL 3 1984 f4Efl0RANDUti FOR: Thomas fi. Novak, Assistant Director for Licensing, DL FR0fi: L. S. Rubenstein, Assistant Director for Core & Plant Systems, DSI

SUBJECT:

WNP TECHNICAL SPECIFICATION CHANGES (TAC #54443)

The Washington Public Power Supply System proposed to change the Technical Specifications for WNP-2 by letters dated January 20 and February 8,1984 The licensee provided the technical justification and discussion to support the requested changes. The Power Systems Branch, DSI, has reviewed the proposed changes in its area of responsibility. The results of PSB's evaluction of these proposed changes to the Technical Specifications are enclosed.

This completes TAC No. 54443.

. Original signed by L. S. Rubenstein L. S. Rubenstein, Assistant Director for Core & Plant Systems Division of Systems Integra tion

Enclosure:

As stated DISTRIBUTION:

, cc: f!. Srinivasan l

A. Schwencer PSB R/F J. E. Knight LSRubenstein R. Auluck S. Rhow I

Contact:

S. Rhow, DSI:PSB M 60467 4 703 X

)

Q DOCK 05000397 4}

, i 1

omcc) ....D.S.I.3 P,S,B,, . ,,D S I,;,P S B,. ,, , < > , D,S,Ii!PSB AP,5 . . . .

sun ~~o ..SRhow/..jl ' . JEKnight f1Srinivasan

. . . . . . . . . . . . . . . . . . . . . .. L S.R..U..,s t e i a .. . . . . ..

om> 7/.. /84 7/... ......../ 8 4 7L .L..L84

.ZL. . 3.B. . . . .

fR'C FORM 318 (10-60) NROM C24a OFFICI AL RiECORD COPY usm m -as:w t

cjo- 39'7 JUL 3 1984 ME!!0RANDU!i FOR: Thomas fi. Novak, Assistant Director for Licensing, DL FR0fi: L. S. Rubenstein, Assistant Director for Core & Plant Systems, DSI

SUBJECT:

WNP TECHflICAL SPECIFICATI0*l CHANGES (TAC #54443)

The Washington Public Power Supply System proposed to change the Technical Specifications for WNP-2 by letters dated January 20 and February 8,1984 The licensee provided the technical justification and discussion to support the requested changes. The Power Systems Dranch, DSI, has reviewed the proposed changes in its area of responsibility. The results of PSB's evaluation of these proposed changes to the Technical Specifications are enclosed.

This completes TAC No. 54443.

Original signed by L. s. Ruizenstein L. S. Rubenstein, Assistant Director for Core & Plant Systems l Division of Systems Integra tion

Enclosure:

As stated DISTRIBUTION:

I cc: f!. Srinivasan M A. Schwencer PSB R/F J. E. Knight LSRubenstein R. Auluck S. Rhow l ,

i

Contact:

S. Rhow, DSI:PSB X=23696 M60467 840703 X/l

!  % DOCK 05000397 1 l v' ,

i _s omce > ..D S,I,;, P,SB,. ,, .,, D S Ig,S,B, ,, - ( , DS JgiFSB DS PS sua c > ..SRhow/.jl ~ JEKnight ' f1Srinivasan

. . . . . . . . . . . . . . . . . . . . . . L SR..U.g tei. l1 . .

I l om> . l.84 7f........ .!84 7L.. .L..L84 .. ,.1L ..~$Rh . .

ec rosu sie tic-6a3 sneu c24a OFFICIAL RECORO COPY usac.mi-m.m

~

ENCLOSURE WNP-2 SAFETY EVALUATION OF TECHNICAL SPECIFICATION CHANGES

1. Section 3/4 8.1. (page 3/4 8-3)

AC Sources The note referred to in paragraphs 4.8.1.1.2.a,4 and 5 requires performance of a prelube function prior to DG testing. Conduct of the prelube function would then increase the number of emergency power supplies in an inoperable condition. The licensee proposed to change the note from "shall be preceded" to "may be preceded" in order to provide flexibility. The proposed change is in accordance with approved changes to standard technical specification recommended by DSI/PSB in its letter dated June 5,1984 to DL. Therefore, the proposed change is acceptable.

2. Section 3.8.3.2.b.1 (page 3/4 8-18)

Electrical Power Systems, Distribution-Shutdown The proposed changes provide clarification that distribution panel DP-SI-lF is the Division 1 125-VDC critical switch gear distribution panel and DP-Sl-10 is the Division 1 remote shutdown distribution panel.

The technical specification change is acceptable.