| ~8 o NUCLEAR REGULATORY COMMISSION g j WASHINGTON, D C.20555 | | ~8 o NUCLEAR REGULATORY COMMISSION g j WASHINGTON, D C.20555 |
| \...../ _ | | \...../ _ |
| SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT N0.116 TO FACILITY OPERATING LICENSE N0. DPR-53 BALTIM0RE GAS AND ELECTRIC COMPANY CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N0. 1 DOCKET N0. 50-317 Introduction By application for license amendment dated December 17, 1985, as supplemented by letter dated January 16, 1986, the Baltimore Gas and Electric Company (BG&E) requested changes to the Technical Specifications (TS) for Calvert Cliffs Unit 1. | | SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT N0.116 TO FACILITY OPERATING LICENSE N0. DPR-53 BALTIM0RE GAS AND ELECTRIC COMPANY CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N0. 1 DOCKET N0. 50-317 Introduction By application for license amendment dated December 17, 1985, as supplemented by {{letter dated|date=January 16, 1986|text=letter dated January 16, 1986}}, the Baltimore Gas and Electric Company (BG&E) requested changes to the Technical Specifications (TS) for Calvert Cliffs Unit 1. |
| The proposed amendment would change the Unit 1 TS 3.3.3.2, "Incore Detectors" for the remainder of fuel Cycle 8 operation, as follows: (1) TS 3.3.3.2a would be changed so that the incore detectors would be used to determine azimuthal power tilt at three axial elevations, (2) the number of incore detector segments required for recalibration of the excore neutron flux detection system, in TS 3.3.3.2b, would be decreased from at least 75% to at least 50% of all incore detector segments, and (3) the number of incore detector locations required for monitoring radial peaking factors or linear heat rate would be decreased from at least 75% to at least 50% of all incore detector locations. | | The proposed amendment would change the Unit 1 TS 3.3.3.2, "Incore Detectors" for the remainder of fuel Cycle 8 operation, as follows: (1) TS 3.3.3.2a would be changed so that the incore detectors would be used to determine azimuthal power tilt at three axial elevations, (2) the number of incore detector segments required for recalibration of the excore neutron flux detection system, in TS 3.3.3.2b, would be decreased from at least 75% to at least 50% of all incore detector segments, and (3) the number of incore detector locations required for monitoring radial peaking factors or linear heat rate would be decreased from at least 75% to at least 50% of all incore detector locations. |
| Discussion and Evaluation The monitoring of incore neutron flux is accomplished by the incore detectors which provide the detailed power distributions necessary for Technical Specification surveillance of power peaks and core data trends. The 45 in-core self-powered rhodium detector strings are placed in the center control element assembly (CEA) guide tube of selected assemblies. Each detector string has four, 40 cm long rhodium detectors located at 20, 40, 60, and 80 percent core height. Under ideal conditions, the power distribution within the core is symmetrical in that the power produced in one leometric | | Discussion and Evaluation The monitoring of incore neutron flux is accomplished by the incore detectors which provide the detailed power distributions necessary for Technical Specification surveillance of power peaks and core data trends. The 45 in-core self-powered rhodium detector strings are placed in the center control element assembly (CEA) guide tube of selected assemblies. Each detector string has four, 40 cm long rhodium detectors located at 20, 40, 60, and 80 percent core height. Under ideal conditions, the power distribution within the core is symmetrical in that the power produced in one leometric |
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20217Q7971998-05-0404 May 1998 Safety Evaluation Supporting Amends 227 & 201 to Licenses DPR-53 & DPR-69,respectively ML20217P7441998-04-0707 April 1998 SE Accepting Licensee Request for Second 10-yr Insp Interval to Use ASME Section IX Code Case N-416-1, Alternative Pressure Test Requirement for Replacement Items by Welding, Class 1,2 & 3,Div 1 at Plant Per 10CFR50.55a(a)(3)(i) ML20203E9741998-02-11011 February 1998 SER Accepting IST Program Requests for Relief Submitted for Third 10-yr Intervals for Pumps & Valves for Plant ML20198K3741998-01-0505 January 1998 Safety Evaluation Authorizing Second 10-yr ISI Interval for Plant,Units 1 & 2 Relief Request from ASME Boiler & Pressure Vessel Code Requirements to Use Performance Demonstration Initiative Program ML20197G1291997-12-15015 December 1997 Safety Evaluation Accepting Revised Withdrawal Schedules for Plant,Units 1 & 2 ML20134G5291997-02-0707 February 1997 Safety Evaluation Re Request Relief from ASME Code Requirement for Calvert Cliffs Nuclear Power Plant,Unit 1 ML20058G0561993-11-29029 November 1993 Safety Evaluation Granting Relief from Installation Requirements of Section Iii,Article 9 of 1968 Edition of ASME Boiler & Pressure Vessel Code for Plant ML20057C3831993-09-22022 September 1993 Sser Accepting Licensee 930707 Response to Station Blackout Rule,Per 10CFR50.63 ML20127C0571992-12-23023 December 1992 Safety Evaluation Accepting Clarification of Previous Reactor Vessel Surveillance Program Actions & Withdrawal Schedule Change for Reactor Matl Surveillance Capsule ML20128B9371992-11-20020 November 1992 Safety Evaluation Accepting Licensee Response to Suppl 1 to GL 87-02 IR 05000317/19900801990-11-21021 November 1990 SER Determining That Load Profile Used During Surveillance Test Procedure Meets Requirement of Tech Spec 4.8.2.3.2.e, Per Unresolved Item Noted in Insp Repts 50-317/90-80 & 50-318/90-80 ML20059N2251990-10-0101 October 1990 Safety Evaluation Accepting Proposed Actions Re Potential Design Deficiency,Per LER 89-023 ML20245E8561989-06-22022 June 1989 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28, Reactor Trip Sys Reliability for All Domestic Operating Reactors ML20247D0361989-03-24024 March 1989 Safety Evaluation Supporting Amend 119 to License DPR-69 ML20205P6491988-11-0202 November 1988 Safety Evaluation Re Compliance w/10CFR50.62 ATWS Rule. Auxiliary Feedwater Actuation Sys Designs in Conformance W/ Requirements of TMI Action Plan Item II.E.1.2,surveillance Testing,Complies W/Atws Rule ML20238A3141987-08-24024 August 1987 Safety Evaluation of Encl Technical Evaluation Repts EGG-NTA-7243,EGG-NTA-7720 & EGG-NTA-7463 & Licensee Submittals in Response to Generic Ltr 83-28,Items 2.1.1, 2.1.2 & 4.5.2.Responses Acceptable ML20213E8731987-05-11011 May 1987 Safety Evaluation Supporting Util 861002 Request for Relief from Inservice Insp Requirements of ASME Code Section XI Re Peripheral CRD Housings ML20205R7061987-03-26026 March 1987 Safety Evaluation Supporting Relief from Certain ASME Code Hoop Stress Requirements Until Next Refueling Outage to Repair Flaw in Base Metal of Steam Generator Main Steam Line 12 ML20210P0911987-02-0404 February 1987 Safety Evaluation Re Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against PTS Events.Util Must Submit Reevaluation of Resistance Temp PTS ML20207P0721987-01-0606 January 1987 Safety Evaluation Supporting Conformance to Reg Guide 1.97 W/Noted Exceptions ML20198G6971986-05-22022 May 1986 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Item 1.2 Re post-trip Review Data & Info Capability ML20210P2801986-05-0606 May 1986 Safety Evaluation Accepting Licensee Response to Items 3.1.3 & 3.2.3, Post-Maint Testing of...Safety-Related Components, of Generic Ltr 83-28 ML20202E0721986-03-31031 March 1986 Safety Evaluation Supporting Amend 116 to License DPR-53 ML20141N7691986-03-10010 March 1986 Safety Evaluation Granting Util 850913 & 860113 Requests for Relief from ASME Boiler & Pressure Vessel Code,Section XI Re Observation of Lubricant Level or Pressure During Pump Testing ML20136G7371985-11-14014 November 1985 Safety Evaluation Granting Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirement Re Pressure Testing of Class 2 Piping Associated W/Rcs ML20138E2821985-10-10010 October 1985 Safety Evaluation Re Extended Burnup of C-E PWR Fuel. Methodologies Acceptable for Extended Burnup Application ML20137W8811985-09-18018 September 1985 Safety Evaluation Granting Relief from Radiographic & Visual Insp of Reactor Coolant Pump Casings ML20126L8241985-07-18018 July 1985 Suppl to Safety Evaluation Supporting Response to IE Bulletin 80-11 Re Reevaluation of 22 Masonry Walls,Utilizing Methods Other than Energy Balance Technique ML20133E1101985-07-18018 July 1985 Corrected Suppl to Safety Evaluation Accepting Util 850612 Reevaluation of Masonry Wall Design Using Linear Elastic Methodology.Action Completed on IE Bulletin 80-11 ML20205B2591985-07-10010 July 1985 Safety Evaluation Accepting Licensee Position on Generic Ltr 83-28 Items 4.2.1 & 4.2.2 Re Reactor Trip Sys Reliability ML20127N2351985-05-0909 May 1985 SER Re NUREG/CR-3511, Interim Reliability Evaluation Program:Analysis of Calvert Cliffs Unit 1 Nuclear Power Plant. Use of PRA Results Out of PRA Context Clearly Inappropriate ML20132B8731984-03-21021 March 1984 SER on Multi-Plant Action C-14 Re Seismic Qualification of Auxiliary Feedwater Sys ML20148A9641978-01-0404 January 1978 Safety Evaluation Supporting Amends 27 & 12 to Licenses DPR-53 & DPR-69,respectively 1999-07-15
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
/ o
~g UNITED STATES
~8 o NUCLEAR REGULATORY COMMISSION g j WASHINGTON, D C.20555
\...../ _
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT N0.116 TO FACILITY OPERATING LICENSE N0. DPR-53 BALTIM0RE GAS AND ELECTRIC COMPANY CALVERT CLIFFS NUCLEAR POWER PLANT UNIT N0. 1 DOCKET N0. 50-317 Introduction By application for license amendment dated December 17, 1985, as supplemented by letter dated January 16, 1986, the Baltimore Gas and Electric Company (BG&E) requested changes to the Technical Specifications (TS) for Calvert Cliffs Unit 1.
The proposed amendment would change the Unit 1 TS 3.3.3.2, "Incore Detectors" for the remainder of fuel Cycle 8 operation, as follows: (1) TS 3.3.3.2a would be changed so that the incore detectors would be used to determine azimuthal power tilt at three axial elevations, (2) the number of incore detector segments required for recalibration of the excore neutron flux detection system, in TS 3.3.3.2b, would be decreased from at least 75% to at least 50% of all incore detector segments, and (3) the number of incore detector locations required for monitoring radial peaking factors or linear heat rate would be decreased from at least 75% to at least 50% of all incore detector locations.
Discussion and Evaluation The monitoring of incore neutron flux is accomplished by the incore detectors which provide the detailed power distributions necessary for Technical Specification surveillance of power peaks and core data trends. The 45 in-core self-powered rhodium detector strings are placed in the center control element assembly (CEA) guide tube of selected assemblies. Each detector string has four, 40 cm long rhodium detectors located at 20, 40, 60, and 80 percent core height. Under ideal conditions, the power distribution within the core is symmetrical in that the power produced in one leometric
^
part of the core is the same as other similar geometric core locations. This symmetry exists for both axial (core top to core bottom) and radial (horizontally across the core) locations. Groups of incore detector strings are used to detect asyurnetry with regard to power distribution. Since ;
persistent asymmetric power distributions can lead to a degradation of core thermal-hydraulic performance and result in more adverse post-accident behavior, detection and correction of power asymmetry (power tilt) is important. In addition, incore detectors are used to calibrate the excore detectors which are used for core power level monitoring.
8604110655 860331 l ADOCK 05000317 PDR P PDR
l l
l l
l Due to the nature of the incore detector strings, a number of these detectors normally become inoperable during the course of a fuel cycle. Wirth 45 operable l incore detector strings, an expected number of failures would still provide an adequate, remaining, detector string complement in both number and location to meet the monitoring requirements of TS 3.3.3.2. An unexpectedly large number of detectors were found failed at startup for Unit 1 Cycle 8 and the number of failed incore detector strings for Unit 1 is approaching the current limits of TS 3.3.3.2. The proposed TS changes provide increased flexibility for Unit 1 Cycle 8 with respect to the acceptable number of failed incere detector strings.
Standard Technical Specifications for Combustion Engineering plants have a Technical Specification (3.3.3.2) requiring an incore detector system with at least 75% of all incore detector locations operable. This operability requirement is applicable when the incore detector system is used for (1) recalibration of the excore neutron flux detector system, or (2) monitoring the azimuthal power tilt, or (3) monitoring the linear heat generation rate. In addition, a surveillance requirement calls for the determination of a core power map once per every 31 effective full power days.
The incore detector system should be maintained as close as possible to 100%
operability. This is necessary to be able to identify and evaluate any potential power distribution or reactivity anomaly which might occur during the operation of a power plant. An example of a power distribution anomaly is a corrosion, " crud", buildup problem that occurred at Calvert Cliffs, Unit 1 during a previous operating Cycle. Here, the incore detector system was an
. important tool in identifying and understanding the problem.
The 75% operability requirement for the incore detector locations, as specified in the Standard Technical Specifications for Combustion Engineering plants, was chosen so that (1) a reasonable number of incore detector failures could be accommodated, (2) overall core power distribution mapping capability could be retained, and (3) there would be incentive for incore detector system maintenance during the next refueling outage. Otherwise a decrease in the operability requirement could lead to a postponement in incore detector maintenance and replacement. Such a degraded incore detector system might not have the capability of identifying and resolving anomalous core conditions.
The NRC staff has reviewed and approved on a case-by-case basis other requests for TS changes for the duration of the affected operating cycle when incore detector failures in operating PWRs have approached or exceeded TS requirements.
These interim Technical Specifications have generally been allowed either with increased surveillance (e.g., increased frequency of core mapping), or in most cases because there is substantial margin (usually late in cycle) to TS power peaking factor limits.
TheproposedTSchangeisacceptableforCalvertCliffs, Unit 1fdrthe
~
remainder of Cycle 8 to allow a decrease from (at least) 75% operable detectors to (at least) 50% operable detectors. This proposed change is acceptable because the licensee has stated that it would administrative 1y change the core mapping frequency requirement to 15, from 31, accumulated Mode 1 (above 5% power) days. In addition, there have been no reported core power distribution anomalies and potentially increased margin to TS power peaking limits may be expected in the latter part of Cycle 8.
In addition, a proposed TS change would be acceptable for the remainder of Cycle 8 for monitoring the azimuthal power tilt. The number of-tilt determinations would remain the same. However, two azimuthal tilt estimates i would be made at three of the axial elevations containing incore detectors.
This is acceptable because core wide azimuthal tilts are generally observable at monitored as well as adjacent detector levels and there have been no reported azimuthal tilts during Cycle 8. Localized power distribution anomalies will, if significant, be observable by for example, the increased i core mapping and surveillance available for the duration of Cycle 8.
The staff has also reviewed " Analysis of CECOR Power Peaking Uncertair ties for Calvert Cliffs Unit 1 Cycle 8," Combustion Engineering Report No.
CEN-318(B)-P, November 1985, submitted in support of the proposed TS changes.
The statistical analysis discussed in the report supports the operation of Calvert Cliffs Unit 1 without requiring increases in the uncertainties presently approved for use with CECOR. The analysis was performed using the then-current detector failures present in Calvert Cliffs Unit 1 and assuming several extrapolated detector failure configurations. This analysis assumed, however, that expected normal core operation is maintained. No anomalous core conditions were examined.
Based upon the above, the staff concludes that the proposed changes to TS 3.3.3.2a, 3.3.3.2b, and 3.3.3.2c provide for an adequate complement of incore detectors for monitoring azimuthal power tilt, peaking factors or linear heat rate, and recalibration of the excore neutron flux detection system during
- the remainder of Unit 1, Cycle 8, in light of the increased use of core i mapping surveillance to detect anomalies in the observable parameters.
Accordingly, the proposed changes to the TS are acceptable.
Environmental Consideration This amendment involves a change in the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes in surveillance requirements. The staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously published a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR S51.22(c)(9).
Pursuant to 10 CFR S51.22(b), no environmental impact statement or environmental assessment need be prepared in c~onnection with the issuance of the amendment.
1 4
1 m.-. , .__.. , _.
. , s i l i
Conclusion We have concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by. operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations, and the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Date: March 31, 1986 Principal Contributors:
D. Jaffe D. Fieno d
no -
_ _ - _ _ _ _ _ _ . _ - _ ..-...__._-.m__ _ _ _ _ . _ _ . _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ - _ - _ _ - - . . . _ - _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _.-_.________m. ._ .-.__. __-_____ _ _ - - __ _ _ - _ _ _ _ - - - _ _ _ . _ _ _ . _ _ . _ _ - - _ . _ _ _ . _ _ _ _ _ _ . _ _