IR 05000400/2013404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML13281A552
| number = ML13339A514
| issue date = 10/08/2013
| issue date = 12/05/2013
| title = IR 05000400-13-404, 8/29/2013, Shearon Harris Nuclear Plant, Cover Letter
| title = Errata Letter For Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
| author name = Desai B B
| author name = Guthrie E F
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS
| addressee name = Kapopoulos E J
| addressee name = Hamrick G T
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| docket = 05000400
| license number = NPF-63
| license number = NPF-063
| contact person = Linda K. Gruhler 404-997-4633
| contact person =  
| document report number = IR-13-404
| document report number = IR-13-404
| document type = Letter
| document type = Letter
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::October 8, 2013]]
[[Issue date::December 5, 2013]]


Ernest Jr.
Mr. George Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165


Vice President Carolina Power and Light Company Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404


SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000400/2013404
==Dear Mr. Hamrick:==
On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


==Dear Mr. Kapopoulos:==
Should you have any questions concerning this letter, please contact me at (404) 997-4662.
On August 29, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Shearon Harris Nuclear Plant, Unit 1. The inspectors discussed the results of this inspection with Mr. J. Dufner and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.


The NRC inspectors did not identify any findings or violations of more than minor significance.
Sincerely,/RA: Malcolm T. Widmann for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholdings," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security- Related Information - Withhold from public disclosure under 10 CFR 2.390," in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Docket No.: 50-400 License No.: NPF-63 cc: (See page 2)
December 5, 2013 Mr. George Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165


Sincerely,/RA/
SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-400 License No. NPF-63


===Enclosure:===
==Dear Mr. Hamrick:==
Inspection Report 05000400/2013404  
On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.


===w/Attachment:===
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Supplementary Information (OUO) cc: (See page 3)
 
Should you have any questions concerning this letter, please contact me at (404) 997-4662.
 
Sincerely,/RA: Malcolm T. Widmann for/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63
 
cc: (See page 2)
x PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE x NON-SENSITIVE ADAMS: x Yes ACCESSION NUMBER:_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\TI-186 INSPECTIONS\HARRIS\HARRIS ERRATTA LETTER TI-186 INSPECTION REPORT.DOCX cc: Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street Mail Code DEC45A Charlotte, NC 28202
 
Ernest J. Kapopoulos Jr. Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562
 
Progress Energy Carolinas, Inc.
 
ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127 New Hill, NC 27562-0165
 
Letter to George from Eugene F. Guthrie dated December 5, 2013.
 
SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404 Distribution: RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS
 
S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]
}}
}}

Revision as of 21:29, 18 February 2018

Errata Letter For Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
ML13339A514
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/05/2013
From: Guthrie E F
Division of Reactor Safety II
To: Hamrick G T
Carolina Power & Light Co
References
IR-13-404
Download: ML13339A514 (4)


Text

December 5, 2013

Mr. George Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404

Dear Mr. Hamrick:

On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,/RA: Malcolm T. Widmann for/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety

Docket No.: 50-400 License No.: NPF-63 cc: (See page 2)

December 5, 2013 Mr. George Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404

Dear Mr. Hamrick:

On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,/RA: Malcolm T. Widmann for/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63

cc: (See page 2)

x PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE x NON-SENSITIVE ADAMS: x Yes ACCESSION NUMBER:_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\TI-186 INSPECTIONS\HARRIS\HARRIS ERRATTA LETTER TI-186 INSPECTION REPORT.DOCX cc: Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street Mail Code DEC45A Charlotte, NC 28202

Ernest J. Kapopoulos Jr. Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562

Progress Energy Carolinas, Inc.

ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127 New Hill, NC 27562-0165

Letter to George from Eugene F. Guthrie dated December 5, 2013.

SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404 Distribution: RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS

S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]