ML15126A114: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[IR 05000250/2015201]]
{{Adams
| number = ML15126A114
| issue date = 05/28/2015
| title = IR 05000250/2015201 and 05000251/2015201, on 04,30,2015, Turkey Point Units 3 & 4 Security Baseline Inspection Report Cover Letter
| author name = Johnson R C
| author affiliation = NRC/NSIR/DSO
| addressee name = Kiley M
| addressee affiliation = Florida Power & Light Co
| docket = 05000250, 05000251
| license number = DPR-031, DPR-041
| contact person = Coughlin P L
| document report number = IR 2015201
| document type = Inspection Report, Letter
| page count = 3
}}
See also: [[followed by::IR 05000250/2015201]]
 
=Text=
{{#Wiki_filter:
[[Issue date::May 28, 2015]]
 
Mr. Michael Kiley, Site Vice President Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344 Street Florida City, FL 33035
 
SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC SECURITY INSPECTION REPORT 05000250/2015201 AND 05000251/2015201
 
==Dear Mr. Kiley:==
On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the results of this inspection with Mr. Mitch Guth and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
 
NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
 
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear Generating Station, Units 3 and 4.
 
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating Station, Units 3 and 4. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 "Protection of Safeguards Information; Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA/ Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41 Nonpublic
 
===Enclosure:===
Inspection Report 05000250/2015201 and 05000251/2015201
 
===w/Attachments:===
Supplemental Information cc w/encl: Timothy Eck, Security Manager
}}

Revision as of 21:18, 18 February 2018

IR 05000250/2015201 and 05000251/2015201, on 04,30,2015, Turkey Point Units 3 & 4 Security Baseline Inspection Report Cover Letter
ML15126A114
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/28/2015
From: Johnson R C
Division of Security Operations
To: Kiley M
Florida Power & Light Co
Coughlin P L
References
IR 2015201
Download: ML15126A114 (3)


See also: IR 05000250/2015201

Text

May 28, 2015

Mr. Michael Kiley, Site Vice President Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344 Street Florida City, FL 33035

SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC SECURITY INSPECTION REPORT 05000250/2015201 AND 05000251/2015201

Dear Mr. Kiley:

On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the results of this inspection with Mr. Mitch Guth and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear Generating Station, Units 3 and 4.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating Station, Units 3 and 4. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 "Protection of Safeguards Information; Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/ Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41 Nonpublic

Enclosure:

Inspection Report 05000250/2015201 and 05000251/2015201

w/Attachments:

Supplemental Information cc w/encl: Timothy Eck, Security Manager