ML20196A629: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:--                  _ _ _ _ _ _ _ _ _ .
A  .Q TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot SN 157B Lookout Place DEC 021988 TVA-SQN-TS-88-25                                                                                        10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Centlement In the Matter of                                                )                                  Docket Nos. 50-327 Tennessee Valley Authority                                      )                                              50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION CitANCE 88-25 In accordance with 10 CFR 50.90, we are enclosing a requested amendment to licenses DPR-77 and DPR-79 to change the technical specifications of SQN units 1 and 2.                The proposed change modifies the action statements for the pressurizer power-operated relief valves to ensure availability for pressure control.
The proposed technical specification change is identified in enclosure 1.                                              Tho justification for the proposed technical specification change is provided in enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in enclosure 3.
Enclosed is a check for tho $150 amendment application fee required by                                                              '
10 CFR 170.12.
Please direct questions you may have concerning this issue to M. J. Burzynski at (615) 843-6172.
Very truly yours, TENNESSEE VALLEY AUTilORITY l
H.)J.Nay,          Manage
                                                              #,                              site Licensing staff 9
Sworn t'                      d subsce    o efore me this                          ; day'of'      ;    1988 M
dotary Public My commission Expires _c e                          /[J                                                                    '
{/:y7 Enclosures cc: Seo page 2                                                                                                  h        p d
* b6o O SS12060055 GG1202                                                                                                    ni lg PDR            ADOCK 0500032~/
p                                      P DL.
An Equal Opportunity Employer
 
          -      -                                            U.S. Nuclear Regulatory Cornission                        }g
                                                                    }-
l            cc (Enclosures):
Ms. S. C. Black, Assistant Director for Projects TVA Projects Division l                U.S. Nuclear Regulatory Commlesion l                One White Flint, North 11555 Rockvillo Piko Rockville, Maryland 20852 Hr. F. R. McCoy, Assistant Director l
for Inspection Programs l                TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Harlotta Street, NW, Sulto 2900 Atlanta, Coorgia 30323 i
Hr. Michael 11. Hobley, Director (w/o enclosures) l                Division of Radiological llealth l                T.E.R.R.A. Building l                150 9th Avenue, H Hashvillo, Tennesseo 37203 l                Sequoyah Resident Inspector l                Sequoyah Nuclear Plant 2600 Igou Ferry Road l                Soddy Dalsy, Tennessee 37379 l
l                American Nuclear Insurors Attention: Librarian The Exchange, Sulto 245 270 Farmington Avenue Farmington, Connecticut 06032 L__}}

Latest revision as of 11:17, 13 November 2020

Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Tech Spec Change 88-25.Amend Modifies Action Statements for Pressurizer power-operated Relief Valves to Ensure Availability for Pressure Control.Fee Paid
ML20196A629
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/02/1988
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20196A632 List:
References
TAC-R00501, TAC-R00502, TAC-R501, TAC-R502, NUDOCS 8812060055
Download: ML20196A629 (2)


Text

-- _ _ _ _ _ _ _ _ _ .

A .Q TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot SN 157B Lookout Place DEC 021988 TVA-SQN-TS-88-25 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Centlement In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION CitANCE 88-25 In accordance with 10 CFR 50.90, we are enclosing a requested amendment to licenses DPR-77 and DPR-79 to change the technical specifications of SQN units 1 and 2. The proposed change modifies the action statements for the pressurizer power-operated relief valves to ensure availability for pressure control.

The proposed technical specification change is identified in enclosure 1. Tho justification for the proposed technical specification change is provided in enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in enclosure 3.

Enclosed is a check for tho $150 amendment application fee required by '

10 CFR 170.12.

Please direct questions you may have concerning this issue to M. J. Burzynski at (615) 843-6172.

Very truly yours, TENNESSEE VALLEY AUTilORITY l

H.)J.Nay, Manage

  1. , site Licensing staff 9

Sworn t' d subsce o efore me this  ; day'of'  ; 1988 M

dotary Public My commission Expires _c e /[J '

{/:y7 Enclosures cc: Seo page 2 h p d

  • b6o O SS12060055 GG1202 ni lg PDR ADOCK 0500032~/

p P DL.

An Equal Opportunity Employer

- - U.S. Nuclear Regulatory Cornission }g

}-

l cc (Enclosures):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division l U.S. Nuclear Regulatory Commlesion l One White Flint, North 11555 Rockvillo Piko Rockville, Maryland 20852 Hr. F. R. McCoy, Assistant Director l

for Inspection Programs l TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Harlotta Street, NW, Sulto 2900 Atlanta, Coorgia 30323 i

Hr. Michael 11. Hobley, Director (w/o enclosures) l Division of Radiological llealth l T.E.R.R.A. Building l 150 9th Avenue, H Hashvillo, Tennesseo 37203 l Sequoyah Resident Inspector l Sequoyah Nuclear Plant 2600 Igou Ferry Road l Soddy Dalsy, Tennessee 37379 l

l American Nuclear Insurors Attention: Librarian The Exchange, Sulto 245 270 Farmington Avenue Farmington, Connecticut 06032 L__