ML060950290: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:XI.M5 BWR Feedwater Nozzle 1 AUDIT W ORKSHEET  GALL R EPORT AMP PLANT: ______________________________
{{#Wiki_filter:AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________
LRA AMP: __________________________
LRA AMP: __________________________                                                       REVIEWER: ______________________
R EVIEWER: ______________________
GALL AMP: XI.M5, BWR Feedwater Nozzle                                                     DATE: __________________________
GALL AMP: XI.M5, BWR Feedwater Nozzle DATE: __________________________
Program             Auditable GALL Criteria                                               Documentation of Audit Finding Element Program             A. This program includes (a) enhanced inservice inspection (ISI)     Consistent with GALL AMP:      Yes  No Description        in accordance with the requirements of the American Society of       Document(s) used to confirm Criteria:
Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. This program includes (a) enhanced inservice inspection (ISI) in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Code, Section XI, Subsection IWB, Table IWB 2500-1 (2001 edition including the 2002 and 2003 Addenda) and the recommendation of General Electric (GE) NE-523-A71-0594, and Consistent with GALL AMP:
Mechanical Engineers (ASME) Code, Section XI, Subsection IWB, Table IWB 2500-1 (2001 edition including the 2002 and 2003 Addenda) and the recommendation of General Electric (GE) NE-523-A71-0594, and                                             Comment:
Yes  No Document(s) used to confirm Criteria:
B. (b) system modifications to mitigate cracking. The program         Consistent with GALL AMP:      Yes  No specifies periodic ultrasonic inspection of critical regions of the   Document(s) used to confirm Criteria:
Comment: " B. (b) system modifications to mitigate cracking. The program specifies periodic ultrasonic inspection of critical regions of the boiling water reactor (BWR) feedwater nozzle. Consistent with GALL AMP:
boiling water reactor (BWR) feedwater nozzle.
Yes  No Document(s) used to confirm Criteria:


Comment: 1. Scope of Program A. The program includes enhanced ISI to monitor the effects of cracking on the intended function of the component, and Consistent with GALL AMP:
Comment:
Yes No Document(s) used to confirm Criteria:  
: 1. Scope of         A. The program includes enhanced ISI to monitor the effects of       Consistent with GALL AMP:      Yes  No Program            cracking on the intended function of the component, and               Document(s) used to confirm Criteria:
Comment:
B. systems modifications to mitigate cracking.                        Consistent with GALL AMP:       Yes   No Document(s) used to confirm Criteria:


Comment: " B. systems modifications to mitigate cracking. Consistent with GALL AMP:
Yes  No Document(s) used to confirm Criteria:
Comment:
Comment:
XI.M5 BWR Feedwater Nozzle 2 Program Element Auditable GALL Criteria Documentation of Audit Finding  2. Preventive Actions A. Mitigation occurs by systems modifications, such as removal of stainless steel cladding and installation of improved spargers. Consistent with GALL AMP:
XI.M5 BWR Feedwater Nozzle                                                             1
Yes  No Document(s) used to confirm Criteria:
Comment: " B. Mitigation is also accomplished by changes to plant-operating procedures, such as improved feedwater control and rerouting of the reactor water cleanup system, to decrease the magnitude and frequency of temperature fluctuations. Consistent with GALL AMP:
Yes  No Document(s) used to confirm Criteria:


Comment: 3. Parameters Monitored/ Inspected A. The aging management program (AMP) monitors the effects of cracking on the intended function of the component by detection and sizing of cracks by ISI in accordance with ASME Section XI, Subsection IWB and the recommendation of GE NE-523-A71-0594. Consistent with GALL AMP:
Program            Auditable GALL Criteria                                            Documentation of Audit Finding Element
Yes No Document(s) used to confirm Criteria:  
: 2. Preventive      A. Mitigation occurs by systems modifications, such as removal      Consistent with GALL AMP:      Yes  No Actions            of stainless steel cladding and installation of improved spargers. Document(s) used to confirm Criteria:
Comment:
B. Mitigation is also accomplished by changes to plant-operating Consistent with GALL AMP:         Yes   No procedures, such as improved feedwater control and rerouting        Document(s) used to confirm Criteria:
of the reactor water cleanup system, to decrease the magnitude


Comment: 4. Detection of Aging Effects A. The extent and schedule of the inspection prescribed by the program are designed to ensure that aging effects will be discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking. GE NE-523-A71-0594 specifies ultrasonic testing (UT) of specific regions of the blend radius and bore. The UT examination techniques and personnel qualifications are in accordance with the guidelines of GE NE-523-A71-0594. Based on the inspection method and techniques and plant-specific fracture mechanics assessments, the inspection schedule is in accordance with Table 6-1 of GE NE-523-A71-0594. Leakage monitoring may be used to modify the inspection interval. Consistent with GALL AMP:
and frequency of temperature fluctuations.
Yes No Document(s) used to confirm Criteria:  
Comment:
: 3. Parameters      A. The aging management program (AMP) monitors the effects          Consistent with GALL AMP:      Yes  No Monitored/          of cracking on the intended function of the component by            Document(s) used to confirm Criteria:
Inspected          detection and sizing of cracks by ISI in accordance with ASME Section XI, Subsection IWB and the recommendation of GE NE-523-A71-0594.
Comment:
: 4. Detection of     A. The extent and schedule of the inspection prescribed by the     Consistent with GALL AMP:      Yes  No Aging Effects      program are designed to ensure that aging effects will be           Document(s) used to confirm Criteria:
discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking. GE NE-523-A71-0594 specifies ultrasonic testing (UT) of specific regions of the blend radius and bore. The UT examination techniques and       Comment:
personnel qualifications are in accordance with the guidelines of GE NE-523-A71-0594. Based on the inspection method and techniques and plant-specific fracture mechanics assessments, the inspection schedule is in accordance with Table 6-1 of GE NE-523-A71-0594. Leakage monitoring may be used to modify the inspection interval.
: 5. Monitoring      A. Inspections scheduled in accordance with GE NE-523-A71-          Consistent with GALL AMP:       Yes   No and Trending        0594 provide timely detection of cracks.                            Document(s) used to confirm Criteria:
XI.M5 BWR Feedwater Nozzle                                                            2


Comment: 5. Monitoring and Trending A. Inspections scheduled in accordance with GE NE-523-A71-0594 provide timely detection of cracks. Consistent with GALL AMP:
Program            Auditable GALL Criteria                                          Documentation of Audit Finding Element Comment:
Yes No Document(s) used to confirm Criteria:  
: 6. Acceptance      A. Any cracking is evaluated in accordance with IWB-3100 by      Consistent with GALL AMP:      Yes  No Criteria            comparing inspection results with the acceptance standards of    Document(s) used to confirm Criteria:
IWB-3400 and IWB-3500.
Comment:
: 7. Corrective      A. Repair is performed in conformance with IWB-4000 and          Consistent with GALL AMP:      Yes  No Actions            replacement in accordance with IWB-7000. As discussed in the      Document(s) used to confirm Criteria:
appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.
Comment:
: 8.                  A. Site quality assurance (QA) procedures, review and approval    Consistent with GALL AMP:      Yes  No Confirmation        processes, and administrative controls are implemented in        Document(s) used to confirm Criteria:
Process            accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and                Comment:
administrative controls.
: 9.                  A. See Item 8, above.                                            Consistent with GALL AMP:      Yes  No Administrative                                                                        Document(s) used to confirm Criteria:
Controls Comment:
: 10. Operating      A. Cracking has occurred in several BWR plants (NUREG-0619,      Consistent with GALL AMP:      Yes   No Experience          NRC Generic Letter 81-11). This AMP has been implemented          Document(s) used to confirm Criteria:
for nearly 25 years and has been found to be effective in managing the effect of cracking on the intended function of feedwater nozzles.
Comment:
XI.M5 BWR Feedwater Nozzle                                                          3


XI.M5 BWR Feedwater Nozzle 3 Program Element Auditable GALL Criteria Documentation of Audit Finding Comment: 6. Acceptance Criteria A. Any cracking is evaluated in accordance with IWB-3100 by comparing inspection results with the acceptance standards of IWB-3400 and IWB-3500. Consistent with GALL AMP:
EXCEPTIONS Item        Program Elements      LRA Exception Description  Basis for Accepting Exception  Documents Reviewed Number                                                                                          (Identifier, Para.# and/or Page #)
Yes  No Document(s) used to confirm Criteria:
1.
Comment: 7. Corrective Actions A. Repair is performed in conformance with IWB-4000 and replacement in accordance with IWB-7000. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions. Consistent with GALL AMP:
2.
Yes  No Document(s) used to confirm Criteria:


Comment: 8.
ENHANCEMENTS Item        Program Elements      LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number                                                                                          (Identifier, Para.# and/or Page #)
Confirmation Process A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls. Consistent with GALL AMP:
1.
Yes  No Document(s) used to confirm Criteria:
2.


Comment: 9. Administrative Controls A. See Item 8, above. Consistent with GALL AMP:
DOCUMENT REVIEWED DURING AUDIT Document Number           Identifier (number)       Title                                                 Revision and/or Date 1.
Yes  No Document(s) used to confirm Criteria:
2.
 
3.
Comment: 10. Operating Experience A. Cracking has occurred in several BWR plants (NUREG-0619, NRC Generic Letter 81-11). This AMP has been implemented for nearly 25 years and has been found to be effective in managing the effect of cracking on the intended function of feedwater nozzles. Consistent with GALL AMP:
4.
Yes  No Document(s) used to confirm Criteria:
.
 
XI.M5 BWR Feedwater Nozzle                                                4}}
Comment:
XI.M5 BWR Feedwater Nozzle 4 EXCEPTIONS  Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed  (Identifier, Para.# and/or Page #) 1. 2.    -
ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed  (Identifier, Para.# and/or Page #) 1. 2.    -
DOCUMENT REVIEWED D URING A UDIT  Document Number Identifier (number) Title Revision and/or Date 1. 2. 3. 4.   -.}}

Revision as of 21:21, 23 November 2019

2006/03/22-GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP)
ML060950290
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/22/2006
From: Morgan M
NRC/NRR/ADRO/DLR/RLRC
To:
Office of Nuclear Reactor Regulation
morgan M NRR/NRC/DLR/RLRC, 415-2232
Shared Package
ML060950189 List: ... further results
References
%dam200611, TAC MC9668
Download: ML060950290 (6)


Text

AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________

LRA AMP: __________________________ REVIEWER: ______________________

GALL AMP: XI.M5, BWR Feedwater Nozzle DATE: __________________________

Program Auditable GALL Criteria Documentation of Audit Finding Element Program A. This program includes (a) enhanced inservice inspection (ISI) Consistent with GALL AMP: Yes No Description in accordance with the requirements of the American Society of Document(s) used to confirm Criteria:

Mechanical Engineers (ASME) Code,Section XI, Subsection IWB, Table IWB 2500-1 (2001 edition including the 2002 and 2003 Addenda) and the recommendation of General Electric (GE) NE-523-A71-0594, and Comment:

B. (b) system modifications to mitigate cracking. The program Consistent with GALL AMP: Yes No specifies periodic ultrasonic inspection of critical regions of the Document(s) used to confirm Criteria:

boiling water reactor (BWR) feedwater nozzle.

Comment:

1. Scope of A. The program includes enhanced ISI to monitor the effects of Consistent with GALL AMP: Yes No Program cracking on the intended function of the component, and Document(s) used to confirm Criteria:

Comment:

B. systems modifications to mitigate cracking. Consistent with GALL AMP: Yes No Document(s) used to confirm Criteria:

Comment:

XI.M5 BWR Feedwater Nozzle 1

Program Auditable GALL Criteria Documentation of Audit Finding Element

2. Preventive A. Mitigation occurs by systems modifications, such as removal Consistent with GALL AMP: Yes No Actions of stainless steel cladding and installation of improved spargers. Document(s) used to confirm Criteria:

Comment:

B. Mitigation is also accomplished by changes to plant-operating Consistent with GALL AMP: Yes No procedures, such as improved feedwater control and rerouting Document(s) used to confirm Criteria:

of the reactor water cleanup system, to decrease the magnitude

and frequency of temperature fluctuations.

Comment:

3. Parameters A. The aging management program (AMP) monitors the effects Consistent with GALL AMP: Yes No Monitored/ of cracking on the intended function of the component by Document(s) used to confirm Criteria:

Inspected detection and sizing of cracks by ISI in accordance with ASME Section XI, Subsection IWB and the recommendation of GE NE-523-A71-0594.

Comment:

4. Detection of A. The extent and schedule of the inspection prescribed by the Consistent with GALL AMP: Yes No Aging Effects program are designed to ensure that aging effects will be Document(s) used to confirm Criteria:

discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking. GE NE-523-A71-0594 specifies ultrasonic testing (UT) of specific regions of the blend radius and bore. The UT examination techniques and Comment:

personnel qualifications are in accordance with the guidelines of GE NE-523-A71-0594. Based on the inspection method and techniques and plant-specific fracture mechanics assessments, the inspection schedule is in accordance with Table 6-1 of GE NE-523-A71-0594. Leakage monitoring may be used to modify the inspection interval.

5. Monitoring A. Inspections scheduled in accordance with GE NE-523-A71- Consistent with GALL AMP: Yes No and Trending 0594 provide timely detection of cracks. Document(s) used to confirm Criteria:

XI.M5 BWR Feedwater Nozzle 2

Program Auditable GALL Criteria Documentation of Audit Finding Element Comment:

6. Acceptance A. Any cracking is evaluated in accordance with IWB-3100 by Consistent with GALL AMP: Yes No Criteria comparing inspection results with the acceptance standards of Document(s) used to confirm Criteria:

IWB-3400 and IWB-3500.

Comment:

7. Corrective A. Repair is performed in conformance with IWB-4000 and Consistent with GALL AMP: Yes No Actions replacement in accordance with IWB-7000. As discussed in the Document(s) used to confirm Criteria:

appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.

Comment:

8. A. Site quality assurance (QA) procedures, review and approval Consistent with GALL AMP: Yes No Confirmation processes, and administrative controls are implemented in Document(s) used to confirm Criteria:

Process accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and Comment:

administrative controls.

9. A. See Item 8, above. Consistent with GALL AMP: Yes No Administrative Document(s) used to confirm Criteria:

Controls Comment:

10. Operating A. Cracking has occurred in several BWR plants (NUREG-0619, Consistent with GALL AMP: Yes No Experience NRC Generic Letter 81-11). This AMP has been implemented Document(s) used to confirm Criteria:

for nearly 25 years and has been found to be effective in managing the effect of cracking on the intended function of feedwater nozzles.

Comment:

XI.M5 BWR Feedwater Nozzle 3

EXCEPTIONS Item Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed Number (Identifier, Para.# and/or Page #)

1.

2.

ENHANCEMENTS Item Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed Number (Identifier, Para.# and/or Page #)

1.

2.

DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number) Title Revision and/or Date 1.

2.

3.

4.

.

XI.M5 BWR Feedwater Nozzle 4