ML063460495: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:© Dominion 2006 | {{#Wiki_filter:© Dominion 2006 Regulatory Meeting Internal Flooding Risk Reduction Activities November 30, 2006 | ||
© 2006 | |||
© | © Dominion 2006 Dominion | ||
© | |||
© Dominion 2006 | Introduction Leslie Hartz Site Vice President | ||
© | © Dominion 2006 | ||
© Dominion 2006 | © 2003 Dominion 3 | ||
© | |||
© | AGENDA Introduction Leslie Hartz - Site VP Background Lori Armstrong - Director Engineering PRA History Tom Hook - Supv. PRA Modifications Lori Armstrong - Director Engineering Conclusion Leslie Hartz - Site VP | ||
© Dominion 2006 | |||
© 2003 Dominion 4 | |||
Internal Flooding Background Lori Armstrong Director Engineering | |||
© Dominion 2006 | |||
© 2003 Dominion 5 | |||
===Background=== | ===Background=== | ||
Since 2004 numerous modifications installed reduce risk from Internal Flooding | Since 2004 numerous modifications installed reduce risk from Internal Flooding | ||
*Spring 2005 -Turbine Building Flooding Barrier installation | * Spring 2005 - Turbine Building Flooding Barrier installation | ||
*Fall 2005 -Safeguards Alley Level | * Fall 2005 - Safeguards Alley Level Alarms | ||
* 2006 - Procedure changes and outage maintenance | |||
© Dominion 2006 | |||
© 2003 Dominion 6 | |||
Additional Flood Barriers | |||
© Dominion 2006 | |||
© 2003 Dominion 7 | |||
© Dominion 2006 | |||
© 2003 Dominion Barrier to Safeguards Alley 8 | |||
Barrier between Turbine Building and | |||
© 2003 Dominion the far end of Safeguards Alley 9 | |||
© 2003 Dominion Level Switch Circulating Pump Trip 10 | |||
Safeguards Alley Flood Level Indication Level switches and alarms for: | |||
A AFW pump room B AFW pump room DG A room DG B room Bus 51/52 room Bus 61/62 room TD AFW pump room Cardox room | |||
© Dominion 2006 | |||
© 2003 Dominion 11 | |||
Pre-modification Circulating Water Outlet Expansion Joints | |||
© 2003 Dominion 12 | |||
Post-modification Circulating Water Outlet Expansion Joint | |||
© 2003 Dominion 13 | |||
Risk Profile and Safety Improvements Tom Hook Supervisor PRA | |||
© Dominion 2006 | |||
© 2003 Dominion 14 | |||
Flood Risk Contribution as of 12/2004 CDF = 7.2E-04/yr (internal events plus flooding) 95% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events | |||
© Dominion 2006 | |||
© 2003 Dominion 15 | |||
PRA Modifications Completed in 2005 Incorporated plant modifications | |||
* Installed flood barriers between Turbine Building and Safeguards Alley | |||
* Installed flood sensors and alarms in Safeguards Alley | |||
* Installed circulating water pump trip on high turbine building level | |||
* Reduced CDF by 4.1E-4/yr Model improvements | |||
* Upgraded flooding models for Auxiliary Bldg and Safeguards Alley to address WOG peer review comments | |||
© Dominion 2006 | |||
© 2003 Dominion 16 | |||
Flood Risk Contribution as of 12/2005 CDF = 3.1E-04/yr (internal events plus flooding) 92% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events | |||
© Dominion 2006 | |||
© 2003 Dominion 17 | |||
PRA Modifications Completed in 2006 Incorporated procedure changes | |||
* Included new operator actions to address loss of battery room, AFW pump room or safeguards bus ventilation during safeguards flooding | |||
* Included procedure changes enhancing service water isolation | |||
* Reduced CDF by 1.3E-4/yr | |||
© Dominion 2006 | |||
© 2003 Dominion 18 | |||
Flooding Risk Contribution - Current CDF = 1.8E-04/yr (internal events plus flooding) 82% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events | |||
© Dominion 2006 | |||
© 2003 Dominion 19 | |||
Current Dominant CDF Initiators 4.0E-05 3.0E-05 2.0E-05 1.0E-05 0.0E+00 SW A Fl ood SW B Spr ay RWST f l ood SW B Spr ay SW B Fl ood SW B Spr ay Tr ansi ent Loss of Steam Loss of i n Aux Bl dg on Tr ai n A i n Aux Bl dg i n Aux Bl dg i n Aux Bl dg on Tr ai n A wi th MFW Component Gener ator Of f si te 480V Swgr Basement EDG/ 4kV Avai l abl e Cool i ng Tube Power Swgr Ruptur e Note: SW pipe is seismically qualified. | |||
© Dominion 2006 | |||
© 2003 Dominion 20 | |||
Near Term Risk Reduction Actions z Install watertight door between Auxiliary Building and Safeguards Alley z Install flood level alarms in Auxiliary Building z Relocate risk significant bottom row breakers 15206 and 16206 on 480V buses to spare higher locations z Install spray shields around service water piping in Safeguards Alley to protect 480V and 4kV switchgear from spray | |||
© Dominion 2006 | |||
© 2003 Dominion 21 | |||
Plant Risk After Proposed Modifications CDF = 6.2E-05/yr 50% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events | |||
© Dominion 2006 | |||
© 2003 Dominion 22 | |||
Impact of Modifications on Dominant CDF Initiators 4.0E-05 Current Post-Modification 3.0E-05 2.0E-05 1.0E-05 0.0E+00 SW A Flood in SW B Spray RWST f lood SW B Spray SW B Flood in SW B Spray Transient Loss of St eam Loss of Aux Bldg on Train A in Aux Bldg in Aux Bldg Aux Bldg on Train A wit h MFW Component Generat or Of f sit e 480V Swgr Basement EDG/ 4kV Available Cooling Tube Power Swgr Rupt ure Note: SW pipe is seismically qualified. | |||
© Dominion 2006 | |||
© 2003 Dominion 23 | |||
Internal Events Risk Profile since 2004 Core Damage Frequency 1.0E-03 1.0E-04 1.0E-05 12/2004 12/2005 Current 5/2008 Date | |||
© Dominion 2006 | |||
© 2003 Dominion 24 | |||
Summary Dominion committed to reduce internal flooding risk at Kewaunee z With proposed modifications, CDF will be reduced by 91% to 6.2E-5/yr z Internal flood contribution after proposed modifications will be 50% of internal events CDF | |||
© Dominion 2006 | |||
© 2003 Dominion 25 | |||
Modifications Lori Armstrong Director Engineering | |||
© Dominion 2006 | |||
© 2003 Dominion 26 | |||
Installation of Watertight Door Scope: | |||
* Installation of a watertight door between Aux Building and Safeguards Alley Proposed Schedule: | |||
* Door installation during next refueling outage | |||
© Dominion 2006 | |||
© 2003 Dominion 27 | |||
Installation of Aux Building Water Level Alarms Scope: | |||
* Addition of Auxiliary Building water level alarms Proposed Schedule: | |||
* Installation of level indication 2Q07 | |||
© Dominion 2006 | |||
© 2003 Dominion 28 | |||
Raise breakers on 480V buses 52 and 62 Scope: | |||
* Relocate risk significant Class 1E breakers 15206, 16206 from bottom row to higher spare locations Proposed Schedule: | |||
* 4Q07 | |||
© Dominion 2006 | |||
© 2003 Dominion 29 | |||
© | |||
Install Spray Shields on SW piping Scope: | |||
* Install spray shields around service water piping in Safeguards Alley Proposed Schedule: | |||
© | * 1Q08 | ||
© Dominion 2006 | |||
© 2003 Dominion 30 | |||
Summary Dominion continues to reduce internal flooding risk at Kewaunee | |||
* With proposed modifications, CDF will be reduced by 91% since 2004 Dominion will continue to evaluate CDF reductions at Kewaunee | |||
© Dominion 2006 | |||
© 2003 Dominion 31 | |||
© | |||
Questions | |||
© Dominion 2006 | |||
© 2003 Dominion 32}} | |||
© | |||
Revision as of 12:23, 23 November 2019
ML063460495 | |
Person / Time | |
---|---|
Site: | Kewaunee ![]() |
Issue date: | 11/30/2006 |
From: | Dominion |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML063460495 (32) | |
Text
© Dominion 2006 Regulatory Meeting Internal Flooding Risk Reduction Activities November 30, 2006
© 2006
© Dominion 2006 Dominion
Introduction Leslie Hartz Site Vice President
© Dominion 2006
© 2003 Dominion 3
AGENDA Introduction Leslie Hartz - Site VP Background Lori Armstrong - Director Engineering PRA History Tom Hook - Supv. PRA Modifications Lori Armstrong - Director Engineering Conclusion Leslie Hartz - Site VP
© Dominion 2006
© 2003 Dominion 4
Internal Flooding Background Lori Armstrong Director Engineering
© Dominion 2006
© 2003 Dominion 5
Background
Since 2004 numerous modifications installed reduce risk from Internal Flooding
- Spring 2005 - Turbine Building Flooding Barrier installation
- Fall 2005 - Safeguards Alley Level Alarms
- 2006 - Procedure changes and outage maintenance
© Dominion 2006
© 2003 Dominion 6
Additional Flood Barriers
© Dominion 2006
© 2003 Dominion 7
© Dominion 2006
© 2003 Dominion Barrier to Safeguards Alley 8
Barrier between Turbine Building and
© 2003 Dominion the far end of Safeguards Alley 9
© 2003 Dominion Level Switch Circulating Pump Trip 10
Safeguards Alley Flood Level Indication Level switches and alarms for:
A AFW pump room B AFW pump room DG A room DG B room Bus 51/52 room Bus 61/62 room TD AFW pump room Cardox room
© Dominion 2006
© 2003 Dominion 11
Pre-modification Circulating Water Outlet Expansion Joints
© 2003 Dominion 12
Post-modification Circulating Water Outlet Expansion Joint
© 2003 Dominion 13
Risk Profile and Safety Improvements Tom Hook Supervisor PRA
© Dominion 2006
© 2003 Dominion 14
Flood Risk Contribution as of 12/2004 CDF = 7.2E-04/yr (internal events plus flooding) 95% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events
© Dominion 2006
© 2003 Dominion 15
PRA Modifications Completed in 2005 Incorporated plant modifications
- Installed flood barriers between Turbine Building and Safeguards Alley
- Installed flood sensors and alarms in Safeguards Alley
- Installed circulating water pump trip on high turbine building level
- Reduced CDF by 4.1E-4/yr Model improvements
- Upgraded flooding models for Auxiliary Bldg and Safeguards Alley to address WOG peer review comments
© Dominion 2006
© 2003 Dominion 16
Flood Risk Contribution as of 12/2005 CDF = 3.1E-04/yr (internal events plus flooding) 92% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events
© Dominion 2006
© 2003 Dominion 17
PRA Modifications Completed in 2006 Incorporated procedure changes
- Included new operator actions to address loss of battery room, AFW pump room or safeguards bus ventilation during safeguards flooding
- Included procedure changes enhancing service water isolation
- Reduced CDF by 1.3E-4/yr
© Dominion 2006
© 2003 Dominion 18
Flooding Risk Contribution - Current CDF = 1.8E-04/yr (internal events plus flooding) 82% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events
© Dominion 2006
© 2003 Dominion 19
Current Dominant CDF Initiators 4.0E-05 3.0E-05 2.0E-05 1.0E-05 0.0E+00 SW A Fl ood SW B Spr ay RWST f l ood SW B Spr ay SW B Fl ood SW B Spr ay Tr ansi ent Loss of Steam Loss of i n Aux Bl dg on Tr ai n A i n Aux Bl dg i n Aux Bl dg i n Aux Bl dg on Tr ai n A wi th MFW Component Gener ator Of f si te 480V Swgr Basement EDG/ 4kV Avai l abl e Cool i ng Tube Power Swgr Ruptur e Note: SW pipe is seismically qualified.
© Dominion 2006
© 2003 Dominion 20
Near Term Risk Reduction Actions z Install watertight door between Auxiliary Building and Safeguards Alley z Install flood level alarms in Auxiliary Building z Relocate risk significant bottom row breakers 15206 and 16206 on 480V buses to spare higher locations z Install spray shields around service water piping in Safeguards Alley to protect 480V and 4kV switchgear from spray
© Dominion 2006
© 2003 Dominion 21
Plant Risk After Proposed Modifications CDF = 6.2E-05/yr 50% of total CDF from flooding sequences Dominant CDF Contributors 4.0E-04 3.0E-04 2.0E-04 1.0E-04 0.0E+00 Auxiliary Turbine Safeguards Internal Building Building Alley Flooding Initiating Flooding Flooding Events
© Dominion 2006
© 2003 Dominion 22
Impact of Modifications on Dominant CDF Initiators 4.0E-05 Current Post-Modification 3.0E-05 2.0E-05 1.0E-05 0.0E+00 SW A Flood in SW B Spray RWST f lood SW B Spray SW B Flood in SW B Spray Transient Loss of St eam Loss of Aux Bldg on Train A in Aux Bldg in Aux Bldg Aux Bldg on Train A wit h MFW Component Generat or Of f sit e 480V Swgr Basement EDG/ 4kV Available Cooling Tube Power Swgr Rupt ure Note: SW pipe is seismically qualified.
© Dominion 2006
© 2003 Dominion 23
Internal Events Risk Profile since 2004 Core Damage Frequency 1.0E-03 1.0E-04 1.0E-05 12/2004 12/2005 Current 5/2008 Date
© Dominion 2006
© 2003 Dominion 24
Summary Dominion committed to reduce internal flooding risk at Kewaunee z With proposed modifications, CDF will be reduced by 91% to 6.2E-5/yr z Internal flood contribution after proposed modifications will be 50% of internal events CDF
© Dominion 2006
© 2003 Dominion 25
Modifications Lori Armstrong Director Engineering
© Dominion 2006
© 2003 Dominion 26
Installation of Watertight Door Scope:
- Installation of a watertight door between Aux Building and Safeguards Alley Proposed Schedule:
- Door installation during next refueling outage
© Dominion 2006
© 2003 Dominion 27
Installation of Aux Building Water Level Alarms Scope:
- Addition of Auxiliary Building water level alarms Proposed Schedule:
- Installation of level indication 2Q07
© Dominion 2006
© 2003 Dominion 28
Raise breakers on 480V buses 52 and 62 Scope:
- Relocate risk significant Class 1E breakers 15206, 16206 from bottom row to higher spare locations Proposed Schedule:
- 4Q07
© Dominion 2006
© 2003 Dominion 29
Install Spray Shields on SW piping Scope:
- Install spray shields around service water piping in Safeguards Alley Proposed Schedule:
- 1Q08
© Dominion 2006
© 2003 Dominion 30
Summary Dominion continues to reduce internal flooding risk at Kewaunee
- With proposed modifications, CDF will be reduced by 91% since 2004 Dominion will continue to evaluate CDF reductions at Kewaunee
© Dominion 2006
© 2003 Dominion 31
Questions
© Dominion 2006
© 2003 Dominion 32