{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 09/01/2010 08:15:20 Report 22 09/01/2010
{{#Wiki_filter:Page 1 of 2                                                                             Turkey Point 09/01/2010     08:15:20                                                         Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit         Planned Dates                                                                                                                                   No. of Staff Number        Start     End     Inspection Activity                                                             Title                                         on Site OL EXAM       - INITIAL EXAM PREP WEEK 1                                                                                               5 3     09/27/2010   10/01/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES PSB1-RP       - RP ACCESS CONTROLS                                                                                                     2 3, 4   09/27/2010   10/01/2010   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3, 4   09/27/2010   10/01/2010   IP 71151                Performance Indicator Verification PSB1-TI       - TI-179 NSTS VERIFICATION                                                                                               2 3, 4   09/27/2010  10/01/2010  IP 2515/179            Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS OL EXAM       - INITIAL EXAM PREP WEEK 2                                                                                               4 3     10/04/2010   10/07/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES EB3ISI       - UNIT 3 INSERVICE INSPECTION                                                                                           1 3     10/04/2010   10/08/2010   IP 7111108P            Inservice Inspection Activities - PWR EB3SGISI     - UNIT 3 SG INSERVICE INSPECTION                                                                                         1 3     10/11/2010   10/15/2010   IP 7111108P            Inservice Inspection Activities - PWR OL EXAM       - INITIAL EXAM WEEK 1                                                                                                   8 3     10/25/2010   10/29/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM WEEK 3                                                                                                   5 3     11/15/2010   11/19/2010     V23312              TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES DRP/BR3       - 95001 SUPPLEMENTAL INSPECTION                                                                                         3 3     11/29/2010  12/02/2010  IP 95001                Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area DRP/NR3       - 92702 FOLLOWUP CORRECTIVE ACTIONS                                                                                     2 3     11/29/2010   12/02/2010   IP 92702                Followup On Corrective Actions For Violations And Deviations TI-177       - TI-177 GAS INTRUSION                                                                                                   3 3, 4   01/10/2011  01/14/2011  IP 2515/177            Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1EP       - EMERGENCY PREPAREDNESS EXERCISE                                                                                       3 3, 4   02/07/2011   02/11/2011   IP 7111401              Exercise Evaluation 3, 4   02/07/2011   02/11/2011   IP 7111404              Emergency Action Level and Emergency Plan Changes 3, 4   02/07/2011   02/11/2011   IP 71151                Performance Indicator Verification EB3 ISI       - UNIT 4 IN-SERVICE INSPECTION                                                                                           1 4   03/28/2011   04/01/2011   IP 7111108P            Inservice Inspection Activities - PWR EB3SGISI     - UNIT 4 SG INSERVICE INSPECTION                                                                                         1 4   04/04/2011   04/08/2011   IP 7111108P            Inservice Inspection Activities - PWR PSB1-RP       - RP OCCUPATIONAL WEEK 1                                                                                                 4 3, 4   04/11/2011  04/15/2011  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3, 4  04/11/2011   04/15/2011   IP 71124.02            Occupational ALARA Planning and Controls 3, 4  04/11/2011   04/15/2011   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.
-12/31/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Turkey Point OL EXAM-INITIAL EXAM PREP WEEK 1 5   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 09/27/2010 10/01/2010 PSB1-RP-RP ACCESS CONTROLS 2   3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/27/2010 10/01/2010 3, 4 IP Performance Indicator Verification 71151 09/27/2010 10/01/2010 PSB1-TI-TI-179 NSTS VERIFICATION 2   3, 4 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 09/27/2010 10/01/2010 OL EXAM-INITIAL EXAM PREP WEEK 2 4   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/04/2010 10/07/2010 EB3ISI-UNIT 3 INSERVICE INSPECTION 1   3 IP Inservice Inspection Activities - PWR 7111108P 10/04/2010 10/08/2010 EB3SGISI-UNIT 3 SG INSERVICE INSPECTION 1   3 IP Inservice Inspection Activities - PWR 7111108P 10/11/2010 10/15/2010 OL EXAM-INITIAL EXAM WEEK 1 8   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/25/2010 10/29/2010 OL EXAM-INITIAL EXAM WEEK 3 5   3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 11/15/2010 11/19/2010 DRP/BR3-95001 SUPPLEMENTAL INSPECTION 3   3 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 11/29/2010 12/02/2010 DRP/NR3-92702 FOLLOWUP CORRECTIVE ACTIONS 2   3 IP Followup On Corrective Actions For Violations And Deviations 92702 11/29/2010 12/02/2010 TI-177-TI-177 GAS INTRUSION 3   3, 4 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 01/10/2011 01/14/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3   3, 4 IP Exercise Evaluation 7111401 02/07/2011 02/11/2011 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/07/2011 02/11/2011 3, 4 IP Performance Indicator Verification 71151 02/07/2011 02/11/2011 EB3 ISI-UNIT 4 IN-SERVICE INSPECTION 1     4 IP Inservice Inspection Activities - PWR 7111108P 03/28/2011 04/01/2011 EB3SGISI-UNIT 4 SG INSERVICE INSPECTION 1     4 IP Inservice Inspection Activities - PWR 7111108P 04/04/2011 04/08/2011 PSB1-RP-RP OCCUPATIONAL WEEK 1 4   3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2011 04/15/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/11/2011 04/15/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/11/2011 04/15/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                             Enclosure
This report shows only on-site and announced inspection procedures.
 
Inspection / Activity Plan Page 2 of 2 09/01/2010 08:15:20 Report 22 09/01/2010
Page 2 of 2                                                                           Turkey Point 09/01/2010     08:15:20                                                       Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit         Planned Dates                                                                                                                                 No. of Staff Number        Start     End     Inspection Activity                                                             Title                                       on Site PSB1-RP       - RP OCCUPATIONAL WEEK 1                                                                                               4 3, 4   04/11/2011  04/15/2011  IP 71124.04            Occupational Dose Assessment 3, 4  04/11/2011   04/15/2011   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4  04/11/2011   04/15/2011   IP 71151                Performance Indicator Verification PSB1-RP       - RP OCCUPATIONAL WEEK 2                                                                                               3 3, 4   04/18/2011  04/18/2011  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3, 4  04/18/2011   04/18/2011   IP 71124.02            Occupational ALARA Planning and Controls 3, 4  04/18/2011   04/18/2011   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 3, 4  04/18/2011   04/18/2011   IP 71124.04            Occupational Dose Assessment 3, 4  04/18/2011   04/18/2011   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4  04/18/2011   04/18/2011   IP 71151                Performance Indicator Verification ISFSI         - ISFSI DRY RUN                                                                                                         5 3, 4   05/16/2011  05/20/2011  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                     9 3, 4   06/27/2011   07/01/2011   IP 7111121              Component Design Bases Inspection 3, 4  07/11/2011   07/14/2011   IP 7111121              Component Design Bases Inspection 3, 4  07/25/2011   07/29/2011   IP 7111121              Component Design Bases Inspection 3, 4  08/08/2011   08/12/2011   IP 7111121              Component Design Bases Inspection ISFSI         - ISFSI FIRST CAMPAIGN                                                                                                 2 3, 4   07/18/2011  07/22/2011  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM       - INITIAL EXAM PREP                                                                                                     3 3     10/31/2011   11/04/2011     V23364              TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                                                                 3 3     12/05/2011   12/09/2011     V23364              TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 2                                                                                                 3 3     12/12/2011   12/16/2011     V23364              TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
-12/31/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Turkey Point PSB1-RP-RP OCCUPATIONAL WEEK 1 4   3, 4 IP Occupational Dose Assessment 71124.04 04/11/2011 04/15/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/11/2011 04/15/2011 3, 4 IP Performance Indicator Verification 71151 04/11/2011 04/15/2011 PSB1-RP-RP OCCUPATIONAL WEEK 2 3   3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/18/2011 04/18/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/18/2011 04/18/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/18/2011 04/18/2011 3, 4 IP Occupational Dose Assessment 71124.04 04/18/2011 04/18/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/18/2011 04/18/2011 3, 4 IP Performance Indicator Verification 71151 04/18/2011 04/18/2011 ISFSI-ISFSI DRY RUN 5   3, 4 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/16/2011 05/20/2011 CDBI-COMPONENT DESIGN BASES INSPECTION 9   3, 4 IP Component Design Bases Inspection 7111121 06/27/2011 07/01/2011 3, 4 IP Component Design Bases Inspection 7111121 07/11/2011 07/14/2011 3, 4 IP Component Design Bases Inspection 7111121 07/25/2011 07/29/2011 3, 4 IP Component Design Bases Inspection 7111121 08/08/2011 08/12/2011 ISFSI-ISFSI FIRST CAMPAIGN 2   3, 4 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/18/2011 07/22/2011 OL EXAM-INITIAL EXAM PREP 3   3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 10/31/2011 11/04/2011 OL EXAM-INITIAL EXAM - WEEK 1 3   3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/05/2011 12/09/2011 OL EXAM-INITIAL EXAM - WEEK 2 3   3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/12/2011 12/16/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                             Enclosure}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:51, 13 November 2019

Report 22 - 2010 Mid Cycle
ML102440876
Person / Time
Site: Saint Lucie, 07200061  NextEra Energy icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Shared Package
ML102440858 List:
References
Download: ML102440876 (2)


Text

Page 1 of 2 Turkey Point 09/01/2010 08:15:20 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM PREP WEEK 1 5 3 09/27/2010 10/01/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES PSB1-RP - RP ACCESS CONTROLS 2 3, 4 09/27/2010 10/01/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 09/27/2010 10/01/2010 IP 71151 Performance Indicator Verification PSB1-TI - TI-179 NSTS VERIFICATION 2 3, 4 09/27/2010 10/01/2010 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS OL EXAM - INITIAL EXAM PREP WEEK 2 4 3 10/04/2010 10/07/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES EB3ISI - UNIT 3 INSERVICE INSPECTION 1 3 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 3 SG INSERVICE INSPECTION 1 3 10/11/2010 10/15/2010 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM WEEK 1 8 3 10/25/2010 10/29/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 5 3 11/15/2010 11/19/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES DRP/BR3 - 95001 SUPPLEMENTAL INSPECTION 3 3 11/29/2010 12/02/2010 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area DRP/NR3 - 92702 FOLLOWUP CORRECTIVE ACTIONS 2 3 11/29/2010 12/02/2010 IP 92702 Followup On Corrective Actions For Violations And Deviations TI-177 - TI-177 GAS INTRUSION 3 3, 4 01/10/2011 01/14/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 3, 4 02/07/2011 02/11/2011 IP 7111401 Exercise Evaluation 3, 4 02/07/2011 02/11/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/07/2011 02/11/2011 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 4 IN-SERVICE INSPECTION 1 4 03/28/2011 04/01/2011 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 4 SG INSERVICE INSPECTION 1 4 04/04/2011 04/08/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL WEEK 1 4 3, 4 04/11/2011 04/15/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 04/11/2011 04/15/2011 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 04/11/2011 04/15/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Turkey Point 09/01/2010 08:15:20 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL WEEK 1 4 3, 4 04/11/2011 04/15/2011 IP 71124.04 Occupational Dose Assessment 3, 4 04/11/2011 04/15/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 04/11/2011 04/15/2011 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL WEEK 2 3 3, 4 04/18/2011 04/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 04/18/2011 04/18/2011 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 04/18/2011 04/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 04/18/2011 04/18/2011 IP 71124.04 Occupational Dose Assessment 3, 4 04/18/2011 04/18/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 04/18/2011 04/18/2011 IP 71151 Performance Indicator Verification ISFSI - ISFSI DRY RUN 5 3, 4 05/16/2011 05/20/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants CDBI - COMPONENT DESIGN BASES INSPECTION 9 3, 4 06/27/2011 07/01/2011 IP 7111121 Component Design Bases Inspection 3, 4 07/11/2011 07/14/2011 IP 7111121 Component Design Bases Inspection 3, 4 07/25/2011 07/29/2011 IP 7111121 Component Design Bases Inspection 3, 4 08/08/2011 08/12/2011 IP 7111121 Component Design Bases Inspection ISFSI - ISFSI FIRST CAMPAIGN 2 3, 4 07/18/2011 07/22/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - INITIAL EXAM PREP 3 3 10/31/2011 11/04/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 3 12/05/2011 12/09/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 3 12/12/2011 12/16/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure