{{#Wiki_filter:DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 1 ALL (Alternate Path)
TITLE WITHDRAW CONTROL RODS (ROD UNCOUPLES)
AUTHOR                MEDIA NUMBER        TIME Anthony Ball          2012-301 SIM-1    12 Minutes RECOMMENDED BY        APPROVED BY        DATE NA SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:    OPERATIONS TRAINING              Media Number:  2012-301 SIM-1 Rev. No. Date                    Reason for Revision              Authors      Supvs Initials    Initials 00              Revision for use on 20 12-301 NRC Exam. After NRC    ARB Exam, Media Number will be changed to LR-JP 01.10.
 
2012-301 SIM-1 Page 1 of9 UNIT 1 0 UNIT 2  (X)
TASK TITLE:        WITHDRAW CONTROL RODS (ROD UNCOUPLES)
JPM NUMBER:        2012-301 SIM-1 TASK STANDARD:
TASKNUMBER:        001.010 OBJECTIVE NUMBER: 001.010.A PLANT HATCH JTA IMPORTANCE RATING:
RO  2.8 SRO  2.8 K/A CATALOG NUMBER: 201003 A2.02, K/A CATALOG JTA IMPORTANCE RATING:
RO  3.7 SRO  3.8 OPERATOR APPLICABILITY:    Reactor Operator (RO)
GENERAL
 
==REFERENCES:==
Unit 2 34AR-603-248-2 34G0-OPS-065-0 34G0-OPS-00 1-2 REQUIRED MATERIALS:    Unit 2 34AR-603-248-2 34G0-OPS-065-0 APPROXIMATE COMPLETION TIME:        12 Minutes SIMULATOR SETUP:  REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 STM-l Page 2 of 9 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to IC #110 or  Snap 611 and leave in FREEZE.
: 2. INSERT the following MALFUNCTIONS:
MALF #                          TITLE                      FINAL    RAMP    ACT.
VALUE      RATE    TIME mfCl2_23        Control rod 10-47 uncoupled                                      0000
: 3. INSERT the following SIMULATOR VALUE OVERRIDES (SVO):
SVO #                      DESCRIPTION                    FINAL    RAMP    ACT.
VALUE      RATE  TIME none
: 4. INSERT the following REMOTE FUNCTIONS:
REM #                                DESCRIPTION                            STATUS none
: 5. INSERT the following ORS OVERRIDES:
TAG #        I P/L                DESCRIPTION                  I STATUS    ACT.
TIME none
: 6. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Give the student the marked up copy of 34G0-OPS-00l-2.
: 7. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
: 8. PLACE DANGER TAGS on the following equipment:
: 9. ESTIMATED Simulator SETUP TIME:
: 10. Once the operator begins inserting the control rod to re-couple, REMOVE the malfunction.
2
 
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. A Reactor Startup is in progress, 34G0-OPS-OOl-2 is in progress, and will be provided to you.
: 2. Control rods are being withdrawn to increase power per 34G0-OPS-065-O. The current control rod group is 12 with all rods in this group being at position 24.
: 3. The Control Rod Movement Pre-job Brief and associated checklist have been completed.
: 4. Continuous Rod Movement is desired for these rod movements
: 5. No one will be performing peer checks but proceed with the task.
INITIATING CUES:
Continue Control Rod withdrawal in Rod Group 12.
 
2012-301 SIM-1 Page 4 of 9 STEP            PERFORMANCE STEP                                      STDARD I  (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U  Human performance tools, safety, PPE met (1), AND            U  Mark the JPM as a PASS U  For initial trg all steps completed correctly OR PASS        U  For continuing trg, critical steps (if used) completed correctly FAIL      U  Above standards not met                                      U  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:_______
: 1. Operator identifies the procedure                  Operator has identified the correct needed to perform the task.                      procedure as 34G0-OPS-065-0.
: 2. Operator verifies the status of the              On 2H1 1-P603, the operator currently latched rod group.                    selects each control rod in the currently latched group, observing their position on the four rod display AND comparing to the pull sheet.
: 3. The operator selects the first rod to be        On 2H1 l-P603, the operator withdrawn 02-23.                                selects the first rod in the currently latched group.
NOTE: With regard to withdrawing the rod, IF the applicant notches the rod out one or two notches and then transitions to continuous withdrawal is acceptable.
(** Indicates critical step)
 
2012-301 SIM-l Page 5 of 9
: 9)              PERFORMANCE STEP                              STANDARD I (COMMENTS)
      **4* The operator withdraws the selected        The operator positions both the rod to position 48.                      Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.
NOTE: 34G0-OPS-065-0 instructions for performing a coupling check only addresses using the rod movement switch. It is acceptable if the student uses the RONOR switch along with the rod movement switch in withdrawing the rod for the coupling check.
      **5 The operator performs a coupling            The operator positions the Rod check on the selected control rod by      Movement Control switch to the providing a separate (second)            withdraw position observing for:
withdraw signal.
e    The red withdraw light illuminates
                                                        . Momentary loss of the 48 position indication
                                                        . The rod does NOT move beyond position 48.
                                                        . Annunciator rod overtravel does NOT illuminate.
                                                        . Documents the check on the movement form.
: 6. The operator selects the next rod to be    On 2Hl 1-P603, the operator withdrawn 10-47.                          depresses the pushbutton on the select panel for the next rod in the currently latched group.
      **7 The operator withdraws the selected        On 2Hl 1 -P603, the operator rod to position 48.                      positions both the Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.
(*
* Indicates critical step)
 
2012-301 SIM-1 Page 6 of 9 STEP            PERFORMANCE STEP                              STANDARD I  (COMMENTS)
      **8. The operator performs a coupling          The operator positions the Rod check on the selected control rod by      Movement Control switch to the providing a separate (second)            withdraw position observing for:
withdraw signal.
* The red withdraw light illuminates e  Momentary loss of the 48 position indication
                                                        . The rod MOVES beyond position 48.
                                                        . Annunciator rod overtravel DOES illuminate.
: 9. Operator identifies the procedure        The operator reviews ARP 34AR-needed to perform the task                603-248-2, Rod Over travel.
: 10. Notifies the Shift Supervisor.            The operator reports the status of the control rod which experienced over travel.
PROMPT:        Simulator operator remove the uncouple rod malfunction mfCl2_23 for rod 10-47.
Attempts to re-couple the rod by          On panel 2H1 1 -P603, the notching the rod in.                      operator inserts the rod from one to three notches, notching the rod in using the Rod Movement Switch.
NOTE: The operator may choose to use continuous withdrawal or notch withdrawal to return the control rod to position 48.
    **12. Withdraw the rod to position 48            On 2H1 l-P603, the operator positions both the Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.
NOTE: 34GO-OPS-065-0 instructions for performing a coupling check only addresses using the rod movement switch. It is acceptable if the student
(  Indicates critical step)
 
2012-301 SIM-l Page 7 of 9 STEP
 
PERFORMANCE STEP                                STANDARD I    (COMMENTS)      1 uses the RONOR switch along with the rod movement switch in withdrawing the rod for the coupling check.
      **13. The operator performs a coupling            The operator positions the Rod check on the selected control rod.        Movement Control switch to the withdraw position observing for:
e    The red withdraw light illuminates e    Momentary loss of the 48 position indication
                                                        . The rod does NOT move beyond position 48.
a    Annunciator rod overtravel does NOT illuminate.
                                                        . Documents the check on the movement form.
14  Informs supervision of the re-coupling    The operator reports to the SS attempt.                                  that the coupling check was successful.
PROMPT:        When the operator selects the third control rod inform the operator that another operator will assume control rod movement duties and the JPM will be stopped here.
END TIME:_______
NOTE:      The terminating cue shall be given to the operator when:
After 1PM step #14 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
* Indicates critical step)
 
Page 8 of 9 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. A Reactor Startup is in progress, 34G0-OPS-OOl-2 is in progress, and will be provided to you.
: 2. Control rods are being withdrawn to increase power per 34G0-OPS-065-O. The current control rod group is 12 with all rods in this group being at position 24.
: 3. The Control Rod Movement Pre-job Brief and associated checklist have been completed.
: 4. Continuous Rod Movement is desired for these rod movements
: 5. No one will be performing peer checks but proceed with the task.
INITIATING CUES:
Continue control rod withdrawal in rod group 12.
 
Page 9 of 9 p1ace this page with
: 1.      the marked up startup procedure, 34G0-OPS-OO 1-2,
: 2.      The marked up pull sheet for control rod withdrawal.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 2 ALL TITLE STARTUP A REACTOR FEED PUMP TURBINE (NORMAL METHOD)
AUTHOR                        MEDIA NUMBER        TIME Error! Reference source not  2012-301 SIM-2    20.0 Minutes found.
RECOMMENDED BY                APPROVED BY          DATE N/R SOUTHERN COMPANY
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:    OPERATIONS TRAINING              Media Number:    2012-301 SIM-2 Rev. No. Date                    Reason for Revision              Authors      Supvs Initials    Initials 00              Revision for use on 20123O1 NRC Exam. After NRC      ARB Exam, Media Number will be changed to LR-JP 02.04- 19.
 
2012-301 SIM-2 Page 1 of4 UNIT 1    (X)      UNIT 2  (X)
TASK TITLE:        STARTUP A REACTOR FEED PUMP TURBINE (NORMAL METHOD)
JPM NUMBER:        2012-301 SIM-2 TASK STANDARD:      The task shall be completed when the second Reactor Feed Pump is supplying water to the Reactor and is being controlled in automatic by the FW Lvi Control Turb, per 34S0-N21-007.
                                                      -
TASK NUMBER:        002.004 OBJECTIVE NUMBER:  002.004.C PLANT HATCH JTA IMPORTANCE RATING:
RO  2.79 SRO  3.15 K/A CATALOG NUMBER: 259001A4.02 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.90 SRO  3.70 OPERATOR APPLICABILITY:      Nuclear Plant Operator (NPO)
GENERAL
 
==REFERENCES:==
Unit 1                            Unit 2 34G0-OPS-00 1-1                  34GO-OPS-00 1-2 (current version)                (current version) 34S0-N21-007- i                  34S0-N21-007-2 (current version)                (current version)
_REQUIRED MATERIALS:      Unit 1                            Unit 2 34S0-N21-007- 1                  34SO-N21-007-2 (current version)                (current version)
APPROXIMATE COMPLETION TIME:            20.0 Minutes SIMULATOR SETUP:  REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 SIM-2 Page 2 of 4 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to IC #110 and leave in FREEZE.
: 2. ENSURE 2 Condensate and CBP are running.
: 3. ESTIMATED Simulator SETUP TIME:              10 Minutes
 
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. RFPT 2A is operating at 2100 rpms per step 7.1.11.9 of 34S0-N2 1-007-2.
: 2. RFPT 2B is in operation and the Feedwater Level Control System is in 3 Element Control.
: 3. 34G0-OPS-001-2 is in progress.
INITIATING CUES:
Place RFPT 2A in service per 34S0-N21-007-2 starting at step 7.1.11.9.
 
2012-301 SIM-2 Page 4 of 7 STEP I          PERFORMANCE STEP                                      STANDARD                        SAT/UNSAT
  ,    #    i                                                                                        I  (COENTS)            1 For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U  Human performance tools, safety, PPE met (1), AND          U  Mark the JPM as a PASS U  For initial trg all steps completed correctly OR PASS      U  For continuing trg, critical steps (if used) completed correctly FAIL      U  Above standards not met                                    U  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:
: 1. Operator reviews the procedures                    Operator has reviewed the precautions and limitations,                      precautions and limitations.
: 2. Confirm the M/A Station Permissive                At panel 2H1 1-P650, the operator 2A white light is illuminated.                    CONFIRMS the MJA STATION PERMISSIVE 2A white light is illuminated.
: 3. Confirm that the MIA Station output                At panel 2H1 1-P603, the operator signal is tracking 2A RFPT speed.                CONFIRMS the WA STATION, output signal is tracking actual RFPT 2A speed.
      **4 Place the RFPT 2A TMR Mode                            At panel 2H1 1 -P650, the operator switch to WA.                                    PLACES the RFPT 2A TMR MODE switch to M/A, the M/A STATION green light illuminates.
: 5. Slowly increase RFPT 2A speed until                At panel 2Hl 1-P603, RFPT 2A incoming and running RFPT flows                  M/A STATION has been match.                                            ADJUSTED until the RFP being started and the running RFP flow MATCH
(**  Indicates critical step)
 
2012-301 SIM-2 Page 5 of 7 STEP          PERFORMANCE STEP                              STANDARD I  (COMMENTS)
NOTE: For the purpose of this JPM, accept feed flows within +/-10% of meter scale as being matched on feed flows.
: 6. Adjust the manual output lever on          At panel 2H1 1-P603, RFPT 2A RFPT 2A MIA Station until the              M/A STATION manual output INPUT and OUTPUT signals are              lever is ADJUSTED until the matched.                                  INPUT signal (PF lamp extinguished) and OUTPUT signal (PF lamp illuminated) are MATCHED.
NOTE: To match the INPUT and OUTPUT signals, the PF key must be toggled (PF key depressed to switch off, PF lamp extinguished, then depressing the PF key again to switch on, PF lamp illuminated) to compare the signals. For the purpose of this JPM, consider the signals matched if within +/-2%.
      **7 Place RFPT 2A M/A Station in                At panel 2H1 1-P603, RFPT 2A automatic.                                M/A STATION is placed in AUTOMATIC, the (A) AUTO green light is illuminated.
(** Indicates critical step)
 
2012-301 SIM-2 Page 6 of 7 STEP
    #    I PERFORMANCE STEP i          STANDARD                I  SAT/UNSAT (COMMENTS)
: 8. Adjust RFPT 2A Speed Control Bias          At panel 2H1 1-P603, if required:
setting to maintain RFPT 2A and The Speed Control Bias for M/A RFPT 2B speeds within 100 rpm.
STATION R6O1A or R6O1B has been ADJUSTED using the INCREASE/DECREASE set pushbuttons.
RFPT 2A and RFPT 2B speeds are within 100 rpm of each other on panel 2H1 1-P650.
END TIME:_______
NOTE:      The terminating cue shall be given to the operator when:
After JPM step #8 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR          PICK UP the Initiating Cue sheet.
( Indicates critical step)
 
2012-301 SIM-2 Page 7 of 7 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. RFPT 2A is operating at 2100 rpms per step 7.1.11.9 of 34S0-N2 1-007-2.
: 2. RFPT 2B is in operation and the Feedwater Level Control System is in 3 Element Control.
: 3. 34G0-OPS-00l-2 is in progress.
INITIATING CUES:
Place RFPT 2A in service per 34S0-N2 1-007-2 starting at step 7.1.11.9.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CRISIM 3 ALL TITLE OVERRIDE THE MSIVS IN AN EMERGENCY AUTHOR                  MEDIA NUMBER        TIME ANTHONY BALL            2012-301 SIM-3    18.0 Minutes RECOMMENDED BY          APPROVED BY          DATE N/R SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                    Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:      OPERATIONS TRAINING                  Media Number:  2012-301 SIM-3 Rev. No. I  Date                      Reason for Revision                Authors Initials Supvs Initials 01      08/24/92  General revision and format change                      WMM          SCB 02      08/16/93  General revision, word processor change                  RAB        RSG 03      08/19/94 Modify simulator setup, adjust format                    RAB        SMC 04      03/28/96 Format_change                                            RAB        DHG 05      04/10/97 Revised based on feedback from the 1996 Requal            SCB        RSG annual exam.
06      02/07/00  Format  modification, change time allowance based on    RAB        DHG running average, upgrade to the new simulator operating_system 07      11/02/00  Include objective number                                RAB        DHG 08      03/1 1/02 Include initial operator statement                      RAB        RAB 09      03/17/05  Deleted S from procedure numbers, changed              ARB        DHG Revision and Rev, numbers to Current Version.
Changed to Nuclear Plant Operator. Updated Simulator_IC#_and_MSIV_position.
10    06/13/05  Revised Initial License statement for successful        RAB        RAB completion 11    04/18/06  Remove Response_Cues                                    RAB        RAB 12    11/06/06  Correct MPLs and Switch labels on Unit 1                BKW        RAB 13              Revision for use on 2012-301 CR-S1M 3 and updated        ARB procedure changes. After NRC Exam, Media Number will_be_changed_to_LR-JP-14.14-13.
 
2012-301 SIM-3 Page 1 of 10 UNIT 1    (X)    UNIT 2  (X)
TASK TITLE:        OVERRIDE THE MSIVS IN AN EMERGENCY JPM NUMBER:        2012-301 SIM-3 TASK STANDARD:      The task shall be completed when the MSIVs have been opened per 31E0-EOP-1 11-1/2.
TASK NUMBER:        014.014 OBJECTIVE NUMBER: 014.014.A PLANT HATCH JTA IMPORTANCE RATING:
RO  3.85 SRO  3.16 K/A CATALOG NUMBER: 239001A401 K/A CATALOG JTA IMPORTANCE RATING:
RO  4.20 SRO  4.00 OPERATOR APPLICABILITY:      Nuclear Plant Operator (NPO)
GENERAL
 
==REFERENCES:==
Unit 1                          Unit 2 31E0-EOP-111-1                  31E0-EOP-111-2 3 1EO-EOP-01 1-1                3 1EO-EOP-0 11-2 (current versions)              (current versions)
REQUIRED MATERIALS:      Unit 1                          Unit 2 31E0-EOP-1 11-1                31E0-EOP-1 11-2 (current version)              (current version)
APPROXTMATE COMPLETION TIME:            18.0 Minutes SIMULATOR SETUP:  REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 SIM-3 Page 2 of 10 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to IC #127 or Snap 613 and leave in FREEZE.
: 2. INSERT the following MALFUNCTIONS:
MALF #                          TITLE                      FINAL      RAMP      ACT.
VALUE      RATE    TIME mfCl l_211      Scram Discharge Volume ATWS (Var)                60        100    00000 mfE4l_235A      HPCI Fails to Auto Start on Low Level                              00000 mfE4l_235B      HPCI Fails to Auto Start on Hi Drywell Press                      00000 mf60321383      Spur Ann LOW CONDENSER VACUUM
                            --
00000 A BYPASS mf60321384      Spur Ann LOW CONDENSER VACUUM B
                            --
00000 BYPASS
: 3. INSERT the following SIMULATOR VALUE OVERRIDES (SVO):
SVO #                      DESCRIPTION                    FINAL      RAMP      ACT.
VALUE      RATE    TIvW svoB2lOO5        LT-NO81A Group I/lI Isolation                  -110        100    00000 svoB2lOO6        LT-NO81B Group 1111 Isolation                  -110        100    00000
: 4. INSERT the following REMOTE FUNCTIONS:
REM #                                DESCRIPTION                            STATUS rfNl 1045      SJAE A Steam                                                      CLOSE rfB2l 148      Grp 1 Low Rx Water Level Bypass                                  ORIDE rfC7 1279      Group 1 Isolation Oride Jumpers                                  ORIDE
: 5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Take simulator out of FREEZE and perform RC- I and RC-2.
B. Place the MSIV control switches in CLOSED.
C. Enter Remote Functions when Torus temperature reaches 109°F or greater.
D. Inhibit ADS and inject SBLC.
E. Acknowledge annunciators.
: 6. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
: 7. ESTIMATED Simulator SETUP TIME:                15 Minutes
 
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The Condenser Low Vacuum and Low RWL isolations have been bypassed.
: 2. Main Condenser is in operation with Circ Water and Condensate Systems in operation.
: 3. An ATWS condition exists and 31E0-EOP-O11-2 (RCA) is in progress.
: 4. EHC is in operation.
INITIATING CUES:
Open the MSIVs to re-establish Main Condenser as the heat sink using 31E0-EOP-1 1 1-2.
 
2012-301 SIM-3 Page 4 of 10 STEP
      #    I        PERFORMANCE STEP                                    STANDARD I    SATfUNSAT1 (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U  Human performance tools, safety, PPE met (1), AND          U  Mark the JPM as a PASS U  For initial trg all steps completed correctly OR PASS      LI  For continuing trg, critical steps (if used) completed correctly FAIL      LI  Above standards not met                                    LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:_______
: 1. Place MSIV Control Switches to                      At panel 2H11-P601, the CLOSED.                                          following OUTBOARD MSIV switches are in CLOSED:
MSIV  2B21-F028A MS1V  2B21-F028B MSIV  2B21-F028C MSIV  2B21-F028D At panel 2H1 1-P602, the following INBOARD MSIV switches are in CLOSED:
MSIV  2B21-F022A MSIV  2B21-F022B MSIV  2B21-F022C MSIV  2B21-F022D
(**  Indicates critical step)
 
2012-301 SIM-3 Page5 of 10 STEP
 
PERFORMANCE STEP                              STANDARD I  (COMMENTS)    1
: 2. Confirm A & B RFPTs are tripped.            At panel 2H1 1-P650, Operator has determined BOTH RFPTs are TRIPPED by:
Checking annunciators(650-325
                                                      & 326) are ILLUMINATED OR Checking INBD INLET ISOL 2P70-F004 and F005 red lights illuminated on panel 2H1 l-P700 PROMPT:        IF the operator addresses isolation bypasses, as the Shift Supervisor, INFORM the operator that the Condenser Low Vacuum and Low Water Level isolations are bypassed.
      **3  Reset Group I Isolation.                  The GR ISOL RESET switch has been taken to GR I RESET position at panels 2H1 l-P601 and 2H1 1-P602.
: 4. Bypass the High Flow isolation on          Operator has determined it is 2P70-F004 and F005, if necessary.          NOT necessary to bypass the High Flow Isolation by:
Checking annunciators OR Checking INBD INLET ISOL 2P70-F004 and P005 red lights illuminated on panel 2H1 1-P700.
NOTE: It is acceptable for operator to have the High Flow Isolation bypassed. IF operator decides to bypass the High Flow Isolation, as the Shift Support Supervisor, INFORM the operator that it has been bypassed.
PROMPT:        IF the operator addresses 2P70-F004 and P005, INDICATE that NO annunciators associated with Drywell Pneumatics are illuminated and/or that valves 2P70-F004 and F005 red lights are illuminated.
(** Indicates critical step)
 
2012-301 SIM-3 Page 6 of 10 STEP
 
PERFORMANCE STEP                            STANDARD I (COMMENTS)
: 5. Confirm closed Inboard MSIVs.          At panel 2H1 l-P602, the following INBOARD MSIVs are CLOSED, green light illuminated:
MSIV    2B21-F022A MSIV    2B21-F022B MSIV    2B21-F022C MSIV    2B21-F022D.
      **6. Open Outboard MS1Vs.                    At panel 2H1 1 -P601, the following switches are in OPEN SLO TEST, red light illuminated:
MSIV    2B21-F028A MSIV    2B21-F028B MS1V    2B21-F028C MSIV    2B21-F028D.
: 7. Check differential pressure across      Operator has determined Inboard MSIVs.                        differential pressure is greater than 200 psid using:
REACTOR PRESSURE indicator A(B,C) 2C32-R605A(B,C) on panel 2H1 l-P603 AND MAIN STEAM PRESS A(B) 2N32-R654A(B) indicator on Turbine EHC Panel or recorder PRESS TO STOP VLVS 1 & 4 2N1 l-R601 OR
                                                    *Monitor*        steam pressure*
2N32-K4001A OR 2N32-K4001B.
NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 7.
PROMPT:        WHEN the operator addresses differential pressure across Inboard MSIVs, INDICATE for the operator that it is greater than 200 psid.
(**  Indicates critical step)
 
2012-301 SIM-3 Page 7 of 10 STEP            PERFORMANCE STEP                          STANDARD I  (COMMENTS)      1
: 8. Confirm/Close valves                  The operator has ADDRESSED 2N1 1-FOOIA & B.                      contacting a SO to verify/close SJAE 2A(2B) MAIN STEAM ISOL VALVE at panel 2H2 1 -P216.
PROMPT:        WHEN the operator addresses valves 2N11-FOO1A and B, as the SO, INFORM the operator that the valves 2N11-FOO1A & B are closed.
: 9. Confirm the following valves are      At panel 2H1 1-P650, the closed:                                following valves are CLOSED, 2N1 1-FOO4A                            green light illuminated:
2N1 1 FOO4B                            2ND STG A & B MSR RHTR STM SPLY VLV 2N1 1-FOO4A 2N33-F003 2ND STG C & D MSR RHTR STM SPLY VLV 2Nl 1-FOO4B MAIN STM FEED VLV 2N33-F003.
  .i *10. Open the following valves:            The following valves are OPEN, 2B2 1 -FO 16                          red lights illuminated:
2B21-F019                              MSL DRAIN VLV, 2B21-F016, at panel 2H11-P602 2B21-F020 MSL DRAIN VLV, 2B21-F019, at panel 2H1 1-P601 DRAIN VLV, 2B21-F020, at panel 2H11-P602
( Indicates critical step)
 
2012-301 SIM-3 Page 8 of 10 L I            PERFORMANCE STEP                              STANDARD I    (COMMENTS)
: 11. Verify differential pressure across      Operator has determined MSIVs is less than 200 psid.              differential pressure is greater than 200 psid using:
REACTOR PRESSURE indicator A(B,C) 2C32-R605A(B,C) on panel 2H 11 -P603 AND MAIN STEAM PRESS A(B) 2N32-R654A(B) indicator on Turbine EHC Panel or recorder PRESS TO STOP VLVS 1 & 4 2N1 1-R601 OR
                                                      *Monjtor*j      steam pressure*
2N32-K4001A OR 2N32-1(400 1 B.
NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 11.
PROMPT:        WHEN the operator addresses differential pressure across Inboard MSIVs.
INDICATE for the operator that it is less than 200 psid.
            )pen Inboard MSIVs.                      At panel 2H1 1-P602, the following switches are in OPEN SLO TEST, red light illuminated:
MSIV    2B21-F022A MSIV    2B21-F022B MSTV    2B21-F022C MSIV    2B21-F022D.
NOTE: It is acceptable if the operator uses the Open Fast Test switch position.
PROMPT:        WHEN the operator addresses EHC operation, as the Shift Supervisor, INFORM the operator that the EHC is in service.
PROMPT:        IF the operator addresses the Circ Water or Condensate Systems, as the Shift Supervisor, INFORM the operator that those systems are in operation.
(** Indicates critical step)
 
2012-301 SIM-3 Page 9 of 10 STEP I 1  #
PERFORMANCE STEP                              STANDARD I    SAT/UNSAT (COMMENTS)    1 PROMPT:      WHEN the operator addresses the Main Condenser Vacuum System, as the Shift Supervisor, INFORM the operator that another operator will place it in service and monitor vacuum.
PROMPT:      IF the operator addresses system restoration, as the Shift Supervisor, INFORM the operator that restoration is not required at this time.
END TIME:________
NOTE:      The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #12 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
( Indicates critical step)
 
Page lOof 10 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The Condenser Low Vacuum and Low RWL isolations have been bypassed.
: 2. Main Condenser is in operation with Circ Water and Condensate Systems in operation.
: 3. An ATWS condition exists and 31E0-EOP-011-2 (RCA) is in progress.
: 4. EHC is in operation.
INITIATING CUES:
Open the MSIVs to re-establish Main Condenser as the heat sink using 31E0-EOP-1 1 1-2.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 4 ALL (Alternate Path)
TITLE REACTOR PRESSURE CONTROL WITHIN BAND WITH BPVs & HPCI AUTHOR                MEDIA NUMBER                TIME Anthony Ball          2012-301 SIM-4            20 Minutes RECOMMENDED BY        APPROVED BY                DATE N/R SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                  Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:      OPERATIONS TRAINING                Media Number:    2012-301 SIM-4 Rev. No. Date                  Reason for Revision                [ Authors Initials Supvs Initials 00              Initial development for use on 2012-301 NRC Exam.      ARB
 
2012-301 SIM-4 Page 1 of 10 UNIT 1      ()      UNIT 2  (X)
TASK TITLE:        REACTOR PRESSURE CONTROL WITHIN BAND WITH BPVs & HPCI JPM NUMBER:        2012-301 SIM-4 TASK STANDARD:      The task will be completed when the operator is controlling Reactor pressure in a band using HPCI per 34S0-E41-001-2.
TASK NUMBER:        200.034 OBJECTIVE NUMBER:  200.034.C PLANT HATCH JTA IMPORTANCE RATING:
RO SRO K/A CATALOG NUMBER: 206000A4.01 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.80 SRO  3.70 OPERATOR APPLICABILITY:    Nuclear Plant Operator (NPO)
GENERAL
 
==REFERENCES:==
Unit 2 34S0-N30-001-2 (current version) 34S0-E41-001-2 (current version)
REQUIRED MATERIALS:    Unit 2 34S0-N30-001-2 (current version) 34S0-E41-001-2 (current version)
APPROXIMATE COMPLETION TIME:          20 Minutes SIMULATOR SETUP:  REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 SIM-4 Page 2 of 10 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to IC #113 or Snap 614 and leave in FREEZE.
: 2. INSERT the following MALFUNCTIONS and EVENT TRIGGERS:
KEY      MALF #                    DESCRIPTION                FINAL  RAMP    DELAY ST-O  mfB2l_129A      SRV A Fails Stuck                                        0000 ST-O  mfB2l_129B      SRV B Fails Stuck                                        0000 ST-O  mfB2l_129C      SRV C Fails Stuck                                        0000 ST-O  mfB2l_129D      SRV D Fails Stuck                                        0000 ST-O  mfB2ll29E        SRV B Fails Stuck                                        0000 ST-O  mfB2 1_I 29F    SRV F Fails Stuck                                        0000 ST-O  mfB2l_129G      SRV G Fails Stuck                                        0000 ST-O  mfB2 1_I 29H    SRV H Fails Stuck                                        0000 ST-O  mfB2L129K        SRV K Fails Stuck                                        0000 ST-O  mfB2l_l29L      SRV L Fails Stuck                                        0000 ST-O  mfB2l_129M      SRV M Fails Stuck                                        0000 ST-O  mfE5 1_i 10      RCIC Turbine Trip                                        0000 ST-O  mfN2l_87A        Feedwater Pump A Trip                                    0000 ST-O  mfB2l_226A      Low-Low Set A Fails mop                                  0000 ST-O  mfB2l_226B      Low-Low Set B Fails mop                                  0000 ST-O  svoB2 1053      PT-N127A SRV Electrical open              1000  1000      0000 ST-O  svoB2 1054      PT-N 127B SRV Electrical open            1000  1000      0000 ST-O  svoB2lO55        PT-N127C SRV Electrical open              1000  1000      0000 ST-O  svoB2lO56        PT-N127D SRV Electrical open              1000  1000      0000 ST-O  mf6013l129      Leak Det Diff Temp Hi                                    0000 ST-O  mf60131 135      Leak Ambient Temp Hi                                      0000 2
 
2012-301 SJM-4 Page 3 of 10 RB-i    mfN37_134        ALL Bypass Valves Fail CLOSED                                      9999 RB-2    diN32-C001 A      EHC Pump 2A Switch                            Trip                9999 RB-2    diN32-COO1B      EHC Pump 2B Switch                            Trip                9999 ACTIVATE THE FOLLOWING EVENT TRIGGERS:
Trigger #                      DESCRIPTION                            CONDITIONS        Expert Command
: 3. Take the Simulator OUT OF FREEZE and PERFORM the followina MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPiv1 CR-SIM 4 2012-301:
A. Perform RC-1 and RC-2 actions such that the 2N2 1-Fl 10 is closed and the SULCV is in auto and set at +20.
B. Perform TC- 1; ensuring 2N 11 -FOO4A and B are closed.
C. Lower Pressure Set to 825 psig.
D. Ensure Reactor pressure stabilizes at 825 psig.
E. Ensure Bypass Valve screen and Speed screen is called up.
F. Place Pressure in the P603 plasma display.
: 4. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
: 5. ESTIMATED Simulator SETUP TIME:                15 minutes 3
 
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 Reactor has been scrammed.
: 2. Other operators are performing scram actions.
: 3. A Reactor pressure reduction is required due to an unisolable steam leak in the Reactor Building.
: 4. You are assigned Reactor Pressure control.
INITIATING CUES:
LOWER AND THEN MAINTAIN Reactor pressure between 700 and 800 psig using the Bypass Valves.
 
2012-301 SIM-4 Page 5 of 10 i  STEP            PERFORMANCE STEP                                    STANDARD I  (COMMENTS)
For INITIAL Operator Programs:
For OJT/OLE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN LI  Human performance tools, safety, PPE met (1), AND          Li Mark the JPM as a PASS LI  For initial trg all steps completed correctly OR PASS      LI  For continuing trg, critical steps (if used) completed correctly FAIL      LI  Above standards not met                                    Li  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:_______
: 1. Operator identifies the procedure                  Operator has obtained procedure needed to perform the task.                      34G0-OPS-013-2, step 7.5.5 or uses Placard at Turbine Panel.
NOTE: For Steps 2 through 8 all indication will be on panel 2H1 1 -P650 using HMI Screens 2N32-K4001A or B.
: 2. Selects *Control* I        psi-1oad              The operator has SELECTED the screen                                            Control* screen and also has SELECTED the *psj..Ioad*
button on 2N32-K4001A or B.
: 3. Selects *Ramp      Rate*I button                The operator has SELECTED the
                                                                *Ramp Rate* button on 2N32-K4001A or B.
(*.*  Indicates critical step)
 
2012-301 SIM-4 Page 6 of 10 STEP            PERFORMANCE STEP                                STANDARD I  (COMMENTS)        1 NOTE: An acceptable Ramp Rate results in a cooldown rate NOT exceeding 1 00°F/hr OR RWL exceeding 100 inches.
      **4 Enters a ramp rate                            The operator has ENTERED a ramp rate >0 and <100 displayed on 2N32-K4001A or B.
      * *5  Selects *h.essure*I button                  The operator has SELECTED the
                                                        *Pressure*I button on 2N32-K4001A or B.
      * *6  Enters desired target pressure              The operator has ENTERED a target pressure between 700 and 800 psig on 2N32-K4001A or B.
      **7* Adjusts *Ramp Rate*I AND/OR the              The operator has VARIED the I*Pressure* setpoints to maintain          ramp rate/pressure to maintain a pressure/cooldown rate.                    cooldown rate 100&deg; F/Hr OR RWL exceeding 100 inches change on 2N32-K4001A or B.
NOTE: ALTERNATE PATH starts here.
NOTE: SIMULATOR OPERATOR, WHEN the operator has successfully opened Bypass Valves (BPVs) and reactor pressure is being reduced AND with the Chief Examiners approval, ENTER RB-i malfunction which FULLY CLOSES ALL Bypass Valves.
The failure of ALL BPVs is                  Operator identifies all BPVs closed on 2N32-K400IA or B.
PROMPT:        IF the operator reports the failure of the BPVs, INFORM the operator that you will get Maintenance to investigate, and to continue control Reactor pressure in the band using HPCI in the Pressure Control Mode.
(*
* Indicates critical step)
 
2012-301 SIM-4 Page 7 of 10 STEP f        PERFORMANCE STEP                              STANDARD I  (COMMENTS)
NOTE: SIMULATOR OPERATOR, AFTER 3 minutes ONLY IF the operator is still at the P650 panel AND with the Chief Examiners approval, ENTER RB-2 malfunction which TRIPS BOTH EHC Pumps.
PROMPT:        IF the operator addresses the failure of EHC Pumps, INFORM the operator that you will get Maintenance to investigate, and to continue control Reactor pressure in the band.
PROMPT:        IF alarm 650-124, Max Combined Flow Limit Limiting, is received, INFORM the operator that another operator will address the ARP.
PROMPT:        IF the operator addresses using other systems to control Reactor pressure, INFORM the operator to use HPCI in the Pressure Control Mode.
: 1. Resets the High Water Level Reset          Confirms a HPCI High Water Pushbutton, IF the HPCI High Water        Level light is NOT Level condition exists.                  ILLUMINATED on 2H1 l-P60l.
: 2. Resets the HPCI initiation signal, IF      Confirm a HPCI initiation signal the HPCI initiation cannot be reset,      does NOT exist by verifying the THEN do NOT perform this section.        HPCI auto initiation light is not illuminated on 2H1 l-P601.
: 3. Open 2E41-F059, Lube Oil Cig Wtr          On 2H1 1-P601, the operator has Valve.                                    PLACED the switch for 2E41-F059 into the OPEN position, red light ILLUMINATED.
: 4. Start 2E41-C002-2, Barom Cndsr            On 2H1 1-P601, the operator has Vacuum Pump.                              PLACED the switch for the HPCI vacuum pump to the START position, red light ILLUMINATED.
      **5 Confirm open OR open 2E41-F008,              On 2111 1-P60l, the operator has Test To CST Valve.                        VERIFIED that 2E41-F008 is OPEN, red light ILLUMINATED.
(** Indicates critical step)
 
2012-301 S1M-4 Page 8 of 10 STEP I
    #    I      PERFORMANCE STEP                        STANDARD I  SAT/UNSAT (COMMENTS)
    **6. OPEN 2E41-F01 1, Test to CST          On 2H1 1-P601, the operator has Valve.                            PLACED the switch for 2E41-FOl 1 into the OPEN position, red light ILLUMINATED.
: 7. NOTIFY Shift Supervisor to declare  The operator has NOTIFIED the HPCI INOP AND place under an      Shift Supervisor to declare HPCI LCO.                              INOP AND place under an LCO.
    **$    Place 2E41-F00l. Turb Steam Supply On 2H11-P602, the operator has Valve control switch to the OPEN  PLACED the switch for 2E41-position.                          FOOl into the OPEN position, red light ILLUMINATED.
    **9    Start 2E41-C002-3, the Aux Oil    On 2H1 1-P601, the operator has Pump.                              PLACED the Aux Oil Pump switch into the START position, red light ILLUMINATED.
: 10. WHEN 2E41-C002-3, Aux Oil Pump,      On 2H1 1-P601, the operator has STARTS, the operator will observe: VERIFIED the following:
Turbine Stop Valve OPENS, red Turbine Stop Valve OPENS          light ILLUMINATED.
Turbine Control Valve OPENS        Turbine Control Valve OPENS, HPCI comes up to speed            red light ILLUMINATED.
HPCI speed is increasing on 2E41-R610.
: 11. Confirm CLOSE:                    The operator has VERIFIED the 2E41-F028, Steam Line Drain Valve  green light is ILLUMINATED 2E41-F029, Steam Line Drain Valve  for the following valves; 2E4l-F025, Barom Cndsr Disch To    2E41-F028, panel 2H1 1-P602 CRW Valve                          2E41F029, panel 2H1 1-P601 2E4l-F026, Barom Cndsr Disch To    2E4l-F025, panel 2H1 1 -P602 CRW Valve                          2E41-F026, panel 2Hl 1-P60l
( Indicates critical step)
 
2012-301 SIM-4 Page 9 of 10 f STEP          PERFORMANCE STEP                              STANDARD I  (COMMENTS)      1
: 12. Confirm 2E4 I -FO 12, Mm Flow Valve,      On 2H 11 -P601, the operator has cycles CLOSED, IF OPEN.                  VERIFIED 2E41-F012, Mm Flow Valve, cycles CLOSED, green light ILLUMINATED.
: 13. Confirms 2E41-C002-l, Barom Cndsr          On 2H11-P601, the operator has Cond Pump, operates automatically to      VERIFIED 2E41-C002-1, Barom maintain the condenser water level.        Cndsr Cond Pump, operates automatically, cycles between red then green light ILLUMINATED.
: 14. Confirms 2E41-C002-3, Aux Oil              On 2111 l-P601, the operator has Pump, automatically STOPS at greater VERIFIED 2E4l-C002-3 stops, than 2000 rpm on the turbine,              green light ILLUMINATED.
    **15  Control HPCI turbine speed/system          On 2H1 1 -P601, the operator has flow, and IF necessary throttle            ADJUSTED the HPCI flow 2E41-F008, Test to CST Vlv, to            controller 2E41-R612 and/or has control Reactor pressure.                  THROTTLED 2E41-F008 to CONTROL reactor pressure between 700 psig and 800 psig.
    **16. Reactor pressure in band:                  The operator CONTROLS 700 to 800 psig                            pressure in band:
700 to 800 psig (+/-50 psig).
NOTE: AFTER the operator has demonstrated proper control of Reactor pressure, INFORM the operator that another operator will continue maintaining Reactor pressure in band.
END TIME:_______
NOTE:      The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #16 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
(** Indicates critical step)
 
Page 10 of 10 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 Reactor has been scrammed.
: 2. Other operators are performing scram actions.
: 3. A Reactor pressure reduction is required due to an unisolable steam leak in the Reactor Building.
: 4. You are assigned Reactor Pressure control.
INITIATING CUES:
LOWER AND THEN MAINTAIN Reactor pressure between 700 and 800 psig using the Bypass Valves.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 5 ALL (Alternate Path)
TITLE PERFORM A MANUAL INITIATION OF DRYWELL SPRAY (VALVE FAILURE)
AUTHOR                  MEDIA NUMBER              TIME Anthony Ball            201 2-301 SIM-5          5 Minutes RECOMMENDED BY          APPROVED BY                DATE N/R SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                      Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:        OPERATIONS TRAINING                  Media Number:    2012-301 SIM-5 Rev. No. Date                      Reason for Revision                  [ Authors I Initials Supvs Initials 00      11/15/99  Initial development                                      RAB          DHG 01      05/i 9/00 Correct simulator setup to incorporate instructor        RAB          DHG comments 02      11/06/00  Include objective number                                  RAB          DHG 03      03/25/02  Include initial operator statement                        RAB          RAB 04      02/04/03  Reference 5000gpm limit as referenced in SAG/EOP.        DNM          DHG Add placing RHR in SP cooling as initial condition.
05      05/27/05  Revised Initial License statement for successful          RAB          RAB completion 06      06/30/06  Remove Response Cues                                      RAB          RAB 07      05/19/07  Correct the value for maximum drywell spray flow,        DHG          RAB 12500 gpm.
08      06/01/07  Revised to have both loops of torus cooling in service    DHG          BKW 09                Update KA information                                    DHG 10              Revision for use on 2012-301 CR-STM 5 and updated        ARB procedure changes. After NRC Exam, Media Number will be changed to LR-JP-25033--i0.
 
2012-301 SIM-5 Page 1 of 8 UNIT 1    ( )    UNIT2    (X)
TASK TITLE:        PERFORM A MANUAL INITIATION OF DRYWELL SPRAY (VALVE FAILURE)
JPM NUMBER:        2012-301 SIM-5 TASK STANDARD:      The task shall be completed when the RHR System has been initiated in the Drywell Spray Mode, per 34S0-El 1-010-2.
TASK NUMBER:        007.00 1 OBJECTIVE NUMBER: 007.001 .0 Type                ALTERNATE PATH PLANT HATCH JTA IMPORTANCE RATING:
RO  4.71 SRO  4.05 K/A CATALOG NUMBER: 226001A4.03, 226001A2.l 1 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.50,3.0 SRO  3.40,3.0 OPERATOR APPLICABILITY:      Nuclear Plant Operator (NPO)
GENERAL
 
==REFERENCES:==
Unit 2 34S0-El 1-010-2 (current version) 31EO-EOP-012-2 (current version REQUIRED MATERIALS:      Unit 2 34S0-E1 1-010-2 (current version)
Key for 2E1 1-F016 A(B)
APPROXIMATE COMPLETION TIME:            10 SIMULATOR SETUP:  REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 SIM-5 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to IC #113 or Snap      615 and leave in FREEZE.
: 2. INSERT the following MALFUNCTIONS:
MALF #                            TITLE                        FINAL    RAMP        ACT.
VALUE      RATE      TIME mfE5 1_i 10      RCIC Turbine Trip                                                      00000 mfB2l_229B        FW Line B Break Inside Containment (Var)          50      1000      00000 mfB2l48A          Steam Line A Break (After Restrictor) (Var)        2      1000      99999
: 3. INSERT the following REMOTE FUNCTIONS:
REM #                                DESCRIPTION                                STATUS mfEll_167      2E11-FO17A & B Override 5 Mm Timer                                    ORIDE
: 4. INSERT the following ORS OVERRIDES:
TAG #          PIL                  DESCRIPTION                    STATUS diEl 1-FOl 6A        P    Contmt Spray Outboard Drywell                  CLOSE        00000 diEl 1-FO16B          P    Contmt Spray Outboard Drywell                  CLOSE        0000 ACTIVATE THE FOLLOWING EVENT TRIGGERS:
Trigger #                        DESCRIPTION                          CONDITIONS          Expert Command E11-4      Deletes diEl 1-FO16B & CET El 1-5 when 2E1 l-FO16A open Eli-S      Deletes diEl 1-FO16A & CET El 1-4 when 2E1 1-FO16B open
: 5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Take the simulator out of FREEZE.
B. Close 2N21-FOO6B. Allow the valve to go FULL CLOSE.
C. Place the A and B Loops of RHR in torus spray.
D. When the operator starts Drywell spray, activate Malfunction mfB2l48A.
E. Place Recirc pumps switches in the TRIP position and all Drywell Cooling Fans to off.
: 6. PLACE the Simulator in FREEZE until the crew assumes the shift.
: 7. ESTIMATED Simulator SETUP TIME:                20 Minutes
 
Page 3 of 8 INSTRUCTOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Torus pressure is greater than 11 psig.
: 2. Drywell pressure and temperature are within the SAFE region of the Drywell Spray Initiation Limit Curve. (GRAPH 8)
: 3. Both Recirc pumps are tripped.
: 4. Both loops of RHR have been placed in torus sprays.
: 5. All Drywell Cooling fans are tripped.
: 6. Torus level is <215 inches.
: 7. 31E0-EOP-012-2, PC-i Primary Containment Control is in progress.
: 8. The links to override the 5 minute LOCA OPEN interlock for RHR OUTBD INJ VLVs has been OPENED.
INITIATING CUES:
Initiate one loop of RHR in Drywell sprays per 34S0-E11-0i0-2, Residual Heat Removal System to lower drywell pressure to 1.0 psig.
 
2012-301    SIM-5 Page 4 of 8 STEP I            PERFORMANCE STEP                                                                      SAT/UNSAT STANDARD
      #    I                                                                                        I  (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN Li  Human performance tools, safety, PPE met (1), AND          Li  Mark the JPM as a PASS Li  For initial trg all steps completed correctly OR PASS      Li  For continuing trg, critical steps (if used) completed correctly FAIL      Li  Above standards not met                                    LI  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)
START TIME:________
NOTE: If the operator starts with the A Loop of RHR, then ONLY the B Loop steps designated are CRITICAL (Steps 9, 11, 12, & 14).
If the operator starts with the B Loop of RHR, then ONLY the A Loop steps designated are CRITICAL (Steps 3, 6, 7, & 14).
: 1. Identifies the procedure for the task.              Operator EITHER utilizes 34SO-El 1-010-2 Attachment 5 OR section 7.4.6.
NOTE: It is acceptable for the operator to place the 2/3 core height switch to override even though not required.
: 2. IF reactor water level is < 2/3 core                Operator observes current RPV height, (-193 inches indicated on                water level is above 193 inches 2B21-R623A or B, Rx Level, at                    indicated on 2B21-R623A or B, 2H1 1-P60l). PLACE 2E1 1-S18A(B),                Rx Level, at 2H1 1-P601 and that Cnmt Spray Vlv Cntl 2/3 Core Ht                  overriding the 2/3 interlock is not Permis switch, in the MANUAL                      required.
OVERRD position.
 
2012-301 SIM-5 Page 5 of 8 STEP          PERFORMANCE STEP                              STANDARD I  (COMMENTS)
  **3 Place the Containment Spray Valve          At panel 2H1 1-P601, the operator control switch 2E1 1-SI7A to the          PLACES the CONTAINMENT Manual position.                          SPRAY VALVE CONTROL switch to MANUAL, white light illuminated. This switch will already be in manual due to having torus sprays in service.
NOTE: The operator may throttle or close 2E1 1-FO17A/B even though the RHR System is NOT injecting into the Reactor.
NOTE: The first 2E1 1-F016 A or B switch selected is failed.
Event Triggers E11-4 OR Eli-S will remove the other 2E1 1-F016 A or B switch failure.
: 4. Confirm or start RHR pumps in            At panel 2H11-P601, the operator selected Loop.                            CONFIRMS the RHR pumps are running in the selected ioop, red lights illuminated.
: 5. Addresses Torus sprays                    The operator recognizes Torus sprays have already been placed in service.
  **6. Open Containment Spray Valve              At panel 2H1 1-P601, the operator 2Ell-FO21A.                              PLACES the CNMT SPRAY INBD VLV, 2Ell-FO21AJB to OPEN, red light illuminated.
  **7 If this is the second ioop attempted,      At panel 2H1 l-P601, the slowly opens the Containment Spray        Operator has THROTTLED Outboard Vlv. 2E1 l-FO16A to start        2E1 l-FO16A OPEN, red light flow.                                    ILLUMINATED.
: 8. If this is the first loop attempted,      At panel 2H11-P601, the attempts to throttle open the            Operator has RECOGNIZED that Containment Spray Outboard Vlv.          2E1 l-FO16A failed to OPEN, 2El 1-FO16A.                              green light ILLUMINATED.
NOTE: Do not order B loop to be placed in Torus spray since this is an Alternate Path JPM, the operators must determine this is the correct action on their own.
 
2012-301 SIM-5 Page 6 of 8 STEP f        PERFORMANCE STEP                              STANDARD I (COMMENTS)
PROMPT:          WHEN the Operator reports that 2E1 1-FO16A will NOT open ACKNOWLEDGE the failure and INFORM the operator that conditions are still met to spray the Drywell, ORDER the Operator to Spray the Drywell.
  **9* Place the Containment Spray Valve            At panel 2H1 1-P601, the operator control switch 2E1 1-S17B to the            PLACES the CONTAINMENT Manual position.                            SPRAY VALVE CONTROL to MANUAL, white light illuminated.
NOTE: The operator may throttle or close 2E1 1-FO17B even though the RHR System is NOT injecting into the Reactor. The operator may close 2E1 1-F027B, Torus Spray valve, but this is NOT required because only one ioop will be in drywell sprays.
: 10. Confirm or start RHR pumps in              At panel 2H1 1-P601, the operator selected loop.                              CONFIRMS the RFIR pumps are RUNNING, red lights illuminated.
**l1. Open Containment Spray Valve                  At panel 2H11-P601, the operator 2E11-FO21B.                                PLACES the CNMT SPRAY INBD VLV, 2E11-FO21B, to OPEN, red light illuminated.
* *12. If this is the second loop attempted,      At panel 2H1 1-P601, the operator slowly opens the Containment Spray          THROTTLES the CNMT Outboard Vlv. 2E11-FO16B to start          SPRAY OUTBD VLV, flow.                                      2E1 1-FO16B, to OPEN, red light illuminated.
: 13. If this is the first loop attempted,          At panel 2H1 1-P601, the attempts to throttle open the              Operator has RECOGNIZED that Containment Spray Outboard VIv.            2E11-FO16B failed to OPEN, 2El l-FO16B.                                green light ILLUMINATED.
NOTE: Drywell Spray flow rate must be at least 5000 GPM to ensure an effective drywell pressure reduction (reference EOP/SAG Appendix C calculations).
 
2012-301 SIM-5 Page 7 of 8 STEP I          PERFORMANCE STEP                            STANDARD              I  SAT/UNSAT
    #    I                                                                              (COMMENTS)
  **14. RHR flow rate established within        At panel 2H1 1-P601, the operator limits.                                  VERIFIES that RHR Flow is less than or equal to 17,000 gpm, but greater than 5,000 gpm, on RHR FLOW 2E11.-R6O3AIB.
NOTE: This JPM may be stopped once drywell pressure is decreasing.
END TIME:________
NOTE:    The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #14 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
 
Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Torus pressure is greater than 1 1 psig.
: 2. Drywell pressure and temperature are within the SAFE region of the Drywell Spray Initiation Limit Curve. (GRAPH 8)
: 3. Both Recirc pumps are tripped.
: 4. Both loops of RHR have been placed in torus sprays.
: 5. All Drywell Cooling fans are tripped.
: 6. Torus level is <215 inches.
: 7. 31E0-EOP-012-2, PC Primary Containment Control, is in progress.
: 8. The links to override the 5 minute LOCA OPEN interlock for RHR OUTBD INJ VLVs has been OPENED.
INITIATING CUES:
Initiate one loop of RHR in Drywell sprays per 34S0-El 1-010-2, Residual Heat Removal System to lower drywell pressure to 1.0 psig.
 
ES-401                                      Written Examination Review Worksheet                            -- Hatch June 2012 Exam                                  Form ES-401-9
: 1.      2.        3. Psychometric Flaws              4. Job Content Flaws          5. Other      6.      7.                                    8.
Q#  LOK    LOD (F/H)    (1-5)  Stem Cues TIF          Cred. Partial Job- Minutia #1 Back-            Q= SRO B/M/N UIE/S                                        Explanation Focus                    Dist.          Link          units ward        K/A Only Instructions
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
: 1.      Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
: 2.      Enter the level of difficulty (LOD) of each question using a 1  5 (easy    difficult) rating scale (questions in the 2 4 range are acceptable).
: 3.      Check the appropriate box if a psychometric flaw is identified:
* The stem lacks sufficient focus to elicit the correct answer (e.g. unclear intent, more information is needed, or too much needless information).
* The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
* The answer choices are a collection of unrelated true/false statements.
* The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
* One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
: 4.      Check the appropriate box if a job content error is identified:
* The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
* The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
* The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
* The question requires reverse logic or application compared to the job requirements.
: 5.      Check questions that are samqled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
: 6.      Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
: 7.      Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
: 8.      At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
: 1.      2.        3. Psychometric Flaws                4. Job Content Flaws          5. Other      6.      7.                                    8.
Q#  LOK      LOD (F/H)    (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back-                          Q    SRO B/M/N U/E/S                                  Explanation Focus                    Dist.          Link            units ward      K/A    Only EEEEEEEEE_
zz=zzz=_
4    F                                                                                      X              N      U    K/A mismatch. Need better understanding of what task is to be performed and where it is performed.(chanped to E licensee will revise question.
 
a)            a)
C              a)
                      .
a)I                                                  a) xj co                          aix j
0.
                      <                a)                          >0)                      CO           
                            .                                                              C 0                        o              >
ai&deg; C                                          C                                      a)
                                                                                                          .cI)
C a.
0)0            CO
                                                                  .
 
0              Cia)                                            .0                  0 (1)                                              CO CO o              Z.0
                      .!0)            .)                                                D O            U)                                              0.
0.
x                                                              .c                .2              .2o UI                                                          .oCci                Ci 0
CO                                                                                  0)0
                      .0 D5                                                                  .
U)>                a)                      0. C              co  0 E.                                          0. CO                                Ca)
U)                          CO  .C                  .                O
                      ;CO            LL                                                  LL a
0
                                        *.C                      -0>0)                .9    .
                      .&deg;                                                                                    0)0
                                                                                      -o coE            c                                                                  .00 0C o
(1)-C
                                      .H                          o
: 0)              CO      0; E...
CCl)          <.                                                C      a)
CQCO                0 Z.2                                        ).J.0              Ci (I,
p-.. Lii    Cl) Cl)        U)  Cl) D      C/) Cl) C/) Cl) C/) D        Cl) C/) Cl)  UI D      C/) C/) C D
z
  &#xf3;          Z      Z      Z      2      0  Z                        Z  Z  2        Z      2 O
a)
.C    C/)Q o
C                                                                                          x
      .-0 0.
UI  CO CO U-
-
g  .
C)
.0    .9
.g t
0.
      -)
CO t
CO ci C/)                                                                                               
  !
L:;  c 0  I
-C C.)                                                                                               
  >.  (I)
CO  U.)
ci c-U)
E
      .2                                                                                X HH_HE_EHEHE_EHEE_EEL LL      I      CL. U-  CL. Z  IL  CL  I  IL  I      CL  I  CL  I  U.. CL  U[
u)cor.          c0Q)
: 1. 2.        3. Psychometric Flaws          4. Job Content Flaws  5. Other  6. 7.                                        8.
Q#  LOK  LOD (F/H) (1-5) Stem Cues    T/F    Cred. Partial Job- Minutia #1 Back-    Q    SRO B/M/N U/E/S                                Explanation Focus                Dist.        Link          units ward K/A Only ZZI__________          The placement of the phrase lAW 34SO-N30-001 -2 implies that 26  F                                                                                M    E both responses are to be answered in accordance with the procedure, but from reading the supplied references the applicant isnt expected to apply any specific direction from the procedure to answer the second fill-in the-blank, which could cause some confusion. Move the phrase out of the question portion of the stem and place it at the front of the first fill-in-the-blank since its not the expectation that the applicant close the stop valves lAW the procedure.
Is it the expectation that the applicant know from memory which instrument is required by procedure to be used to measure eccentricity?
27  H                                                                                M    S/E  Distractors A & C Since this is an individual RFPT controller might
                                                                                                                    -
be more plausible that some preset amount of speed bias is generated rather than a preset drop in the level setpoint might make the second part more plausible. Should discuss.
--------------_
30  H                                                                                B    5  Grammar      remove apostrophe from the word its in the stem 31  F                                                                                M    E  Consider: Choices A & B The stem is asking for the initial backup
 
power to the Vital AC Bus. 1 St part of these choices includes Vital AC in the response. If an applicant didnt know; a good guess would be the responses containing the same terminology. Add via Vital AC Battery Charger to the end of choices C & D. This is accurate because the power can be supplied from the 600V AC D Bus via the battery chargers and the terminology is consistent with what appears in the Vital AC Electrical Lineup (34S0-R25-002-2).
This removes any obviouse clue provided by the use of Vital AC in only choices A & B.
32  F                                                                                B    S?  Is it an expectation that the operators are should know the actions on pg. 4 of a six page abnormal operations procedure?
: 1. 2.        3. Psychometric Flaws    4. Job Content Flaws  5. Other  6. 7.                                      8.
Q# LOK  LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back-    Q    SRO B/M/N U/E/S                                Explanation Focus                Dist. Link          units ward K/A Only 33  F                                                                          B    U  Choices B & D Given the background of all the applicants (AUO
 
qualified) the use of SYN INDICATOR AND SYNCHRONIZER are implausible. The exam item distractors have to be credible for the position (RO) being sought. Anyone with previous AUO qualification would know that the synchronizer would not be used to control the fuel supply to the EDG.
34  F                                                                          B    S  Consider removing the word normally out of the stem. Is there any other integrator they would ever use for determining Unidentified Leakage?
35  H                                                                          N    S 36  H                                                                          N    U  Distractors B and D a flow (2.OMlbm/hr) that corresponds to some
 
unspecified lower power/speed doesnt seem a credible choice.
Choices A and C None of the supporting documentation supports
 
that a final core flow value of 6.0 Mlbm/hr would occur at the stated power level (73%) and RR pump speed (70%).
37  H                                                              x          N    U    K/A match is weak. The KJA is to test the operational implications of
              .
undervoltage/degraded voltage. The conditions provided in the stem of the question are not specific to an undervoltage/degraded voltage situation. The stem of the question doesnt have the applicant either recognize an undervoltage/degraded voltage condtion or make some determination how the system will respond to a given undervoltage/degraded voltage condition. The conditions that caused the response provided in the stem would also occur on a loss of power and is not specific to an undervoltage/degraded voltage condition. So no decision can be made about the applicants understanding of the operational implications of an undervoltage/degraded voltage condition.
: 1. 2.        3. Psychometric Flaws          4. Job Content Flaws    5. Other 6. 7.                                      8.
Q# LOK  LOD                        r                        r#1 Back-
 
(F/H) (1-5) Stem Cues    T/F    Cred. Partial Job- Minutia              Q SRO B/M/N U/E/S                                Explanation Focus                Dist. j      Link          unitsj ward K/A Only 40  F                                                                                M  E    Distractor D The stem states a failure occurred I dont find it
                                                                                                                                                      -
plausible that nothing happens. Since the intent of the question is to determine if the applicant knows the effect of removing the shorting links, consider reworking the stem of the question with an SRM with rising counts (above the trip point) and subsequently another SRM experiences an upscale failure. The choices can the revolve around whether a scram or half-scram occurred as a result of the first SRM reaching its trip point or once the second SRM failed.
EIEZ_                                                                  Z11__________
i__J_i___
44  F                                                                                N  SI?  Distractors C and D Dont understand why
                                                                                                                                                . . . a guage on the 87 elevation is plausible. Are there other instruments at this location that are used during Control Rm Abandonment? If not then the 2 half of these choices are not plausible 45  F                                                                                N  E  The second bullet in the stem the use of LOWER and ABOVE
 
together is confusing. Is the dP being changed to 2 psid OR 12 psid? Unless there some evaluation value that I am not seeing recommend telling them specifically the desired psid.
i[_ _L___L_____________
IL___                                                                                Need to discuss K/A to make sure that question matches K/A. I 48  H                                                                                M  E dont see how the question relates to loss of SDC. The question is asking for the requirements for having SDC in service; it doesnt test anything associated with a loss of SDC. I think it can be reworded to lose an RHR subsystem and then ask whether or not the LCO is met or NOT met.
: 1. 2.        3. Psychometric Flaws        4. Job Content Flaws    5. Other  6. 7.                                      8.
Q#    LOK  LOD (F/H) (1-5) Stem Cues TIE Cred. Partial Job- Minutia #1 Back-          Q SRO BIMIN UIE/S                                  Explanation Focus                Dist.      Link          units ward  K/A Only 49      H                                                                                M
* K/A match is weak. Nothing states or implies that refueling is in progress. A lowering fuel pool level is not the same as a refueling accident. From looking at the distractor analysis and the original question, it appears some portion of the stem conditions got inadvertently omitted. Need to revisit the conditions provided in the original question and incorporate them into the question stem.
* The ARMs automatically reset, but the RED trip lights must be manually reset. Are we testing minutia? I can see the need for knowing whether the ARMs automatically reset or not, but is the condition of the lights something the applicants should know?
50      F I                                I      B  UI? Not sure why distractors A and D are plausible 51 f    H                                                                    X          N  UI? Please explain why you think this question meets the K/A. Do not
  ]                          ]                                                        ]        see where purpose or function is identified.
    ..L.                        L.. . . . .                    I N  fs  Why is a reference needed?
53      H                                                                                M    S 54      H                                X                                  X          B  U/? Explain how the question matches K/A.. Identify why the distractors based on using the graft. Some of the numbers used in the distractors should be based on using the incorrect graft.
55      H          X                                                                    M    E  Need to reword stem and distractors. The correct answer is the only one that doesnt have ONLY in the choices given. Rewrite the question and make sure there is not a subset issue.
---
:z=zzz=_:rz::z__________
60      H    1                                                            f            M  5?  LOD. Need to make sure that there is not a subset issue. May
                                                                          ]                    need to reword the stem E[izzEE::::z_LZE[i____________
[iZZEEZZ_ZZE[i[___________
: 1. 2.          3. Psychometric Flaws          4. Job Content Flaws    5. Other  6. 7.                                    8.
Q#    LOK  LCD (F/H) (1-5)  Stem Cues    T/F    Cred. Partial Job- f Minutia #1 Back-    Q ISRO B/M/N U/E/S                              Explanation Focus                Dist.          Linki          units ward K/AjOnly 64    F                          X                                                        N    U  [Distractors C & D are not plausible. Why would anyone think that only a manual actions would start a fire suppression?
65 J  H I I                                I                M  SI?  Take another look to make sure that KIA match.
66    H    1 I                                    f B  U/S  There could be several correct answers (C & D). LOD fZLZZZ_:L:1ii__________
68    H f                                                            M    5Il0D 69    H 1                                N    ?  JIs this an RO question 70    H f                                                  I                      N f 115
                                                                                                ?      this an RO question 71    H f_J f f                                                f      B  UI? fueing in the stem 72  HH?    1 f                N    S  LOD There could be two correct answers. A and B. Need to discuss 73    H                                X                                                  B  U/S
                                    .                                                                at expected normal full power radiation levels L
75    F                                                                                    N  SI?  Need to talk about K/A match.
76    H                                                                                    N    S 77    H    1                                                                        X    N    U  RO question. LOD 1 Do you expect candidate to have surveillance frequencies 78    H                                                                                    N    E  Memorized?
79    H                                                                                    N    U  RO question 55.41
 
Appears to be basic GFES Knowledge. K/A mismatch and. No 80    H                                                                              X    N    U  procedure selection required.
81    H                                                                                    N    S RO question 82    H                                                                              X    M    E 83    H                                                                                    M    S
 
AT,NS part is basic RO knowledge 84    H                                      X                                            N    E
: 1. 2.        3. Psychometric Flaws    4. Job Content Flaws  5. Other  6. 7.                                    8.
Q# LOK  LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back-    Q    SRO B/M/N U/E/S                              Explanation Focus                Dist. Link          units ward K/A Only 85  H                                                                          B    E/U  Not sure this is a RO question. It appears as if the first part of the question can be answered with system knowledge. The procedures identified have different numbers but the same titles.
86  H                                                                          N    S 87  H                                                                          N    U  RO question 88  H                                                                          M    U  RO question. I do not see where SRO knowledge is required to answer this question.
89  H                                                                          N    S 90  H                                                                          M    S 91  H                                                                          B    S 92  H                                                                          M    S 93  H                                                              X          M    U  K/A mismatch. The first part of the question appears to be RO knowledge. Do you expect the applicant to know from memory the action statement?
94  H                                                                          N    S 95  H                                                                          M    E  Do we expect them to know surveillance requirements form memory?
96  H                                                                          N    S 97  H                                                                    X    N    U  RO questions. Question appears to test on specific operator actions.
98  F                                                                          M    S 99  H                                                              X          B    U  K/A mismatch. Does not test basis. Explain why you consider B plausible.
100  H                                                                          M    S
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 6 RO ONLY TITLE TRANSFER AN EMERGENCY 4160 VAC BUS FROM NORMAL TO ALTERNATE SUPPLY AUTHOR                MEDIA NUMBER                TIME Anthony Ball          2012-301 SIM-6          5.0 Minutes RECOMMENDED BY        APPROVED BY                DATE N/R SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                            Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SKEET Program/Course Code:          OPERATIONS TRAINING                          Media Number:  2012-301 SIM-6 Rev.                                                                                    Authors Supvs Date                              Reason for Revision No.                                                                                    Inifials Initials 01  06/09/89  General revision and format change                                      JEM      RSG 02  08/09/89  Procedure revision & add LR lesson plans                                JEM      DHG 03  05/11/90  Procedure, format, and question revision                                JEM      DHG 04  08/18/92  General revision and format change                                      WMM        SCB 05  09/23/93  General revision, word processor change                                  RAB      RSG 06  07/05/96  Format change                                                            RAB      SMC 07    02/11/00  Format modification, update K/As, change time allowance based on        RAB      DHG running average 08    11/02/00 Include objective number                                                RAB      DHG 09  03/11/02  Include initial operator statement                                      RAB      RAB 10  03/08/05  Documentum revision                                                      DNM      RAB 11  06/13/05  Revised Initial License statement for successful completion              RAB      RAB 12  04/18/06  Remove Response Cues                                                    RAB      RAB 13  10/19/09  Added HU steps.                                                      CLN/ADY      ALD 1 3. 1 10/17/11  Reviewed JPM against current procedure. Added                          MMG        ALS Fundamental question to Attachment 1. Changed step 1 from identify correct procedure to obtain correct procedure.
13.2            Revision for use on 2012-301 CR-SIM 6. Removed prompt                    ARB for DIG. After NRC Exam, Media Number will be changed to LR-JP-27.10.
 
2012-301 SIM-6 Page 1 of4 UNIT1      ()      UNIT2    (X)
TASK TITLE:        TRANSFER AN EMERGENCY 4160 VAC BUS FROM NORMAL TO ALTERNATE SUPPLY JPM NUMBER:        2012-301 SIM-6 TASK STANDARD:      The task shall be completed when the operator has transferred one of the Emergency 4160 VAC Buses power supply from the D Startup Transformer to the C Startup Transformer per 34S0-R22-001.
TASK NUMBER:        027.010 OBJECTIVE NUMBER: 027.0 10.0 PLANT HATCH JTA IMPORTANCE RATING:
RO  3.00 SRO  3.11 K/A CATALOG NUMBER: 262001A4.01 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.4 SRO  3.7 OPERATOR APPLICABILITY:      Nuclear Plant Operator (NPO)
GENERAL
 
==REFERENCES:==
Unit 1                          Unit 2 N/A                              34S O-R22-00 1-2 (current version)
REQUIRED MATERIALS:    Unit 1                          Unit 2 N/A                              34S0-R22-001 -2 (current version)
APPROXIMATE COMPLETION TIME:          5.0 Minutes SIMULATOR SETUP:  REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 SIM-6 Page 2 of 4 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to 100% Power and leave in FREEZE.
: 2. ESTIMATED Simulator SETUP TIME:          5 Minutes
 
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The plant is at 100% power. All plant systems are in their normal power lineup.
: 2. All offsite power sources are available.
INITIATING CUES:
Transfer the 4160 VAC Bus 2F to the Alternate Supply per 34S0R22-001 -2.
 
2012-301 SIM-6 Page 4 of 7 STEP            PERFORMANCE STEP                                      STANDARD I
(COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U  Human performance tools, safety, PPE met (1), AND          U  Mark the JPM as a PASS U  For initial trg all steps completed correctly OR PASS        U  For continuing trg, critical steps (if used) completed correctly FAIL      U  Above standards not met                                    U  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:________
NOTE: This JPM was written for 4160 VAC Bus 2F. Other Emergency Buses may be chosen. The performance step sequence will be identical, but the switch names will be different.
: 1. Operator identifies the procedure                Operator has obtained the correct needed to perform the task.                      procedure as 34S0-R22-001-2.
: 2. Operator reviews the procedures                  Operator has reviewed the precautions and limitations,                      precautions and limitations.
: 3. Confirm power is available from                  At panel 2H1 1-P651, the operator SAT 2C.                                          has VERIFIED that VOLT SELECT STARTUP AUX XFMR 2C, 211-S004, potential lights are illuminated.
(**  Indicates critical step)
 
2012-301 SIM-6 Page 5 of 7 STEP
 
PERFORMANCE STEP                          STANDARD I (COMMENTS)
: 4. Confirm 4160 VAC Buses 2A and 2B      At panel 2H1 1-P651, the operator are powered from UAT 2B.              has VERiFIED that:
NORMAL SUPPLY ACB 135434 is CLOSED, red light illuminated.
ALTERNATE SUPPLY ACB 135454 is OPEN. green light illuminated.
NORMAL SUPPLY ACB 135444 is CLOSED, red light illuminated.
ALTERNATE SUPPLY ACB 135464 is OPEN, green light illuminated.
      **5 Place Sync Switch in ON position for    At panel 2H1 1-P652, SSW ACB 135564.                          ACB 135564 Switch is in ON.
      **6. Close Alternate supply breaker,        At panel 2H1 1-P652, ACB 135564.                          ALTERNATE SUPPLY ACB 135564 is CLOSED, red light illuminated.
: 7. Verify the Normal supply breaker,      At panel 2H1 1-P652, verifies ACB 135574, trips.                    NORMAL SUPPLY ACB 135574 TRIPS, green and amber lights illuminated.
: 8. Take Normal Supply Breaker control    At panel 2H1 1-P652, NORMAL switch to TRIP.                      SUPPLY ACB 135574 control switch has been taken to TRIP, green light illuminated and amber light extinguished.
: 9. Place Sync Switch in OFF position for At panel 2H1 1-P652, SSW ACB ACB 135564.                            135544 Switch is in OFF.
(** Indicates critical step)
 
2012-301 SIM-6 Page 6 of 7 STEP          PERFORMANCE STEP                              STANDARD I  (COMMENTS)
: 10. Notify SS the Emergency bus is on          Notifies SS the Emergency bus is Alternate Supply AND should                on Alternate Supply AND should consider placing 4160V Buses 2C            consider placing 4160V Buses 2C AND 2D on alternate supply.                AND 2D on alternate supply.
END TIME:_______
NOTE:      The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #10 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
(** Indicates critical step)
 
Page 7 of 7 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The plant is at 100% power. All plant systems are in their normal power lineup.
: 2. All offsite power sources are available.
INITIATING CUES:
Transfer the 4160 VAC Bus 2F to the Alternate Supply per 34S0-R22-001-2.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 7 ALL TITLE CROSSTIE RHR SERVICE WATER AUTHOR                MEDIA NUMBER          TIME Anthony Ball            2012-301 SIM-7    15.0 Minutes RECOMMENDED BY        APPROVED BY          DATE N/R SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                                  Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET ProgramlCourse Code:            OPERATIONS TRAINING                          Media Number:    2012-301 SIM-7 Rev.
No.
Date
[                          Reason for Revision Format modification, change time allowance based on running average, Authors Initials Supvs Initials 07    02/25/00                                                                              RAB        DHG correct simulator setup TLB comment, procedure change on Unit 2 that reorder Step 2-5 08    03/22/00                                                                              RAB        DHG 09    11/02/00  Include objective number, correct simulator setup                          RAB        DHG 10    12/27/01  Incorporate procedure changes                                            DNM        DHG 11    03/12/02  Include initial Operator statement                                        RAB        RAB Revised Initial License statement for successful completion 12    06/14/05                                                                              RAB        RAB 13    04/21/06  Remove Response Cues                                                      RAB        RAB Changed the Initial Conditions for Unit 2 to include a lead from PC 14    09/18/08                                                                                          RAB Primary Containment Control to allow 2 pump operations.
15    10/17/08  Added prompt before step 2 to address concern about flume level            JWP        RAB control, Added another prompt before step 2 to address the need to sample before using B Heat Exchanger. Added Red Light and annunciator to Standard on step 6 to reflect procedure.
16              Revision for use on 20 12-301 CR-SIM 7 and updated                        ARB procedure changes. Removed Ui info for NRC Exam.
After NRC Exam, Media Number will be changed to LR-JP 34.08-16.
 
2012-301 SIM-7 Page 1 of 8 UNIT 1      ()      UNIT 2  (X)
TASK TITLE:          CROSSTIE RHR SERVICE WATER JPM NUMBER:          20 12-301 SIM-7 TASK STANDARD:        The task will be completed when RHRSW Loop A has been cross-tied to RHRSW Loop B per 34S0-E1 1-0 10.
TASK NUMBER:          034.008 OBJECTIVE NUMBER: 034.008.O PLANT HATCH JTA IMPORTANCE RATING:
RO  3.29 SRO  Not Available K/A CATALOG NUMBER: 219000A2.15 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.30 SRO  3.40 OPERATOR APPLICABILITY:        Nuclear Plant Operator (NPO)
GENERAL
 
==REFERENCES:==
Unit 1                          Unit 2
.                            N/A                            34S0-E11-010-2 (current version)
REQUIRED MATERIALS:        Unit 1                          Unit 2 N/A                            34SO-El 1-010-2 (current version)
APPROXIMATE COMPLETION TIME:            15.0 Minutes SIMULATOR SETUP:    REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 SIM-7 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to IC #111 or Snap    617 and leave in FREEZE.
: 2. INSERT the following MALFUNCTIONS:
MALF #                          TITLE                        FINAL    RAMP      ACT.
VALUE    RATE      TIME mtEl 1_120B      RHRSW 2B Pump Trip                                                00000 mfEl 1j 20D      RHRSW 2D Pump Trip                                                00000
: 3. INSERT the following ORS OVERRIDES:
TAG #        PIL                DESCRIPTION                    STATUS El 1-COOIB_A              RHR Service Water Pmp lB                      OFF        00000 El l-COO1B_B              RHR Service Water Pmp lB                      OFF        00000 El 1-COOl D_A            RHR Service Water Pmp ID                      OFF        00000 El 1-COO iD_B            RHR Service Water Pmp ID                      OFF        00000 El 1-FO28ADI        P    RHR A Torus Spray/Test Vlv                    CLOSE      00000 El l-FO28A_A        L    RHR A Torus Spray/Test Vlv                    OFF        00000 Eli F028A_B        L    RHR A Torus Spray/Test Vlv                    OFF        00000
: 4. PLACE DANGER TAGS on the following equipment:
MPL #                            COMPONENT                            TAGGED POSITION 2E1 l-FO28A        Torus Spray Or Test Vlv 2E1 l-F028A                        CLOSE 2E1 l-COO1B        Service Water Pump 2E1 lCOO1B                                OFF 2E11-COO1D        Service Water Pump 2ElI-COOID                                OFF
: 5. OPEN SRV(s) and allow Torus temperature to exceed 102&deg;F, THEN close and reset amber light/alarms.
: 6. ESTIMATED Simulator SETUP TIME:              10 Minutes
 
INSTRUCTOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is at 75% power and Torus Cooling is desired.
: 2. RHR Service Water Pumps 2B and 2D have been removed from service.
: 3. 2E1 I -F028A is tagged closed for corrective maintenance.
: 4. Torus Water Temperature is 102&deg;F.
INITIATING CUES:
Crosstie the A loop of RHR Service Water to the B loop of RHR Service Water.
 
2012-301 SIM-7 Page 4 of 8 STEP            PERFORMANCE STEP                                                                      SAT!UNSAT STANDARD
      #    I                                                                                        I (COMMENTS)        1 For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U  Human performance tools, safety, PPE met (1), AND          U  Mark the JPM as a PASS U  For initial trg all steps completed correctly OR PASS      U  For continuing trg, critical steps (if used) completed correctly FAIL      U  Above standards not met                                    U  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actua or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:________
NOTE: The remaining steps were written using 34S0-E1 1-010-2 Attachment 10.
: 1. Operator identifies the procedure                  Operator EITHER utilizes 34SO-needed to perform the task.                      El 1-010-2 Attachment 10 OR section 7.2.6.
PROMPT:          IF the Operator addresses the Caution concerning Flume level control, INFORM the Operator that Flume level control will be monitored and maintained by another Operator NOTE: It will NOT be necessary to override the RHRSW pump LOCA signal in this condition, but to do so will NOT prevent system operation.
: 2. Depress the RHR Service Water Lube                  At panel 2H1 l-P601, Operator Valves push-button on 2H1 1-P601.                has depressed the RHR SERVICE WATER LUBE VALVES push button.
PROMPT:          IF the Operator addresses waiting for one minute, INFORM the Operator that one minute has elapsed.
( Indicates critical step)
 
2012-301 SIM-7 Page 5 of 8
  !
STEP          PERFORMANCE STEP                              STANDARD I  (COMMENTS)      1 PROMPT:        IF the Operator addresses obtaining Shift Supervisors permission to crosstie RHRSW loops, INFORM the Operator that the Shift Supervisor has given permission to crosstie RHRSW loops.
      **3* Open 2E11-F119A.                          At panel 2H11-P601, Operator opens SERV WTR CROSSTIE VLV 2E1 1-Fl 19A, red light illuminated.
      **4 Open 2E1 1-Fl 19B.                          At panel 2H1 l-P60l, Operator opens SERV WTR CROSSTIE VLV 2E11-F119B, red light illuminated.
      **5* Operator places the Interlock Override    At panel 2H 1 1 -P601, Operator valve 2E1 l-F068B Keylock Switch in      PLACES the Interlock Override the Override position.                    Valve 2El l-F068B Keylock Switch in the OVERRIDE position.
NOTE: Using the Override Switch for 2E1 I -F068A is not required, but if performed, should be noted. Overriding 2E1 l-F068A will not affect the performance of the JPM.
: 6. Set the Heat Exchanger B Differential    At panel 2H11-P601, Operator Pressure Control Valve Controller,        sets HX B DIFF PRESS 2E1 l-R600B to 45% OPEN.                  CONTROL VLV F068B controller, 2E1 1-R600B to 45%
OPEN.
The Operator confirms 2Ell-F068B, red light illuminated.
The Operator confirms RHR HX A (B) DIFF PRESS LOW annunciator illuminates.
NOTE: RHRSW Pump A or C may be started first. Therefore Steps 7 and 11 may be interchanged.
      **7 Start RHRSW Pump 2A.                        At panel 2H1 l-P601, Operator starts SERVICE WATER PUMP 2El 1-COO1A, red light illuminated.
(** Indicates critical step)
 
2012-301 SIM-7 Page 6 of 8 STEP
 
PERFORMANCE STEP                            STANDARD I 1 (COMMENT      S)
: 8. Operator places the Interlock Override  At panel 2H1 1-P601, Operator valve 2E1 l-F068B Keylock Switch in    PLACES the INTERLOCK the Normal position.                    OVERRIDE VLV 2E1 1-F068B Keylock Switch in the NORMAL position.
: 9. THROTTLE 2E1 l-F068B, Hx B              At panel 2H1 1-P601, Operator Disch Vlv to obtain the desired        has adjusted HX B DIFF PRESS 2E1 1-R602B RHR Service Water          CONTROL VLV F068B flow (4400 GPM maximum), WHILE          controller, 2E1 1-R600B, to obtain maintaining RI-IRSW System pressure    desired flow rate of about less than 450 PSIG                      4400gpm.
Pressure limit for RHR Service Water is less than 450 psi.
PROMPT:        WhEN the Operator addresses starting the second RHRSW pump, INFORM the Operator that it is desired to start the second RHRSW pump.
: 10. Adjust Diff Press Control Vlv          At panel 2H1 1-P601, Operator 2E1 1-F068B to obtain desired          has adjusted HX B DIFF PRESS RHRSW flow rate, THEN open              CONTROL VLV F068B 2E1 1-F068B an additional 5%.          controller, 2E1 1-R600B, to obtain desired flow rate, and THEN an additional 5% is added.
Flow rate limit, PRIOR to adding 5%, is 4400 gpm (+0, -200 gpm).
Pressure limit for RHR Service Water is less than 450 psi.
NOTE: Flow rate will be monitored on PUMP TEST FLOW indicator SERV WATER FLOW indicator 2E1 1-R602A. Pump discharge pressure will be monitored on DIV I PRESSURE indicator 2E1 l-R650A or R650B.
NOTE: If step 7 is performed successfully, Step 1 1 is NOT critical.
      **11. Start RHRSW Pump 2C.                    At panel 2H1 1-P601, Operator starts SERVICE WATER PUMP 2E11-COOIC, red light illuminated.
(*
* Indicates critical step)
 
2012-301 SIM-7 Page 7 of 8 STEP          PERFORMANCE STEP                                STANDARD I  (COMMENTS)
    **12. Adjust Diff Press Control Vlv                At panel 2H1 1-P601, Operator 2E11-F068B to obtain desired              has adjusted HX B DIFF PRESS RHRSW flow rate.                            CONTROL VLV F068B controller, 2E1 l-R600B, to obtain desired flow rate.
Flow rate limit is 4400 gpm for one pump or 8800 gpm for two pumps.
Pressure limit for RHR Service Water is less than 450 psi.
PROMPT:        WHEN the Operator addresses starting RHR, INFORM the Operator that another Operator will start that system.
PROMPT:        IF the Operator addresses the in-service RHR Service Water strainer differential pressure, INFORM the Operator that another Operator is monitoring this differential pressure and it is below 6 psid.
END TIME:________
NOTE:      The terminating cue shall be given to the Operator when:
After JPM step #12 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
( Indicates critical step)
 
Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is at 75% power and Torus Cooling is desired.
: 2. RHR Service Water Pumps 2B and 2D have been removed from service.
: 3. 2E1 1FO28A is tagged closed for corrective maintenance.
: 4. Torus Water Temperature is 102&deg;F.
INITIATING CUES:
Crosstie the A loop of RHR Service Water to the B loop of RHR Service Water.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CRISIM 8 ALL (Alternate Path)
TITLE USING THE OVERRIDE SWITCHES, VENT THE DRYWELL WITH THE CAD SYSTEM WITH VALVE FAILURE AUTHOR                  MEDIA NUMBER                TIME Anthony Ball            2012-301 SIM-8          7.0 Minutes RECOMMENDED BY          APPROVED BY                DATE N/R SOUTHERN COMPANY
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:      OPERATIONS TRAINING              Media Number:  2012-301 SIM-8 Rev. No. Date                  Reason for Revision                Authors      Supvs Initials    Initials 00              Initial development for NRC Exam 20 12-301 SIM 8      ARB from JPM 01364-8.1.
 
2012-301 SIM-8 Page 1 of 5 UNIT 1      ()      UNIT 2  (X)
TASK TITLE:        USING THE OVERRIDE SWITCHES, VENT THE DRYWELL WITH THE CAD SYSTEM WITH VALVE FAILURE 3PM NUMBER:        2012-301 SIM-8 TASK STANDARD:      The task shall be completed when the Drywell is being vented via the CAD System, per 31E0-EOP-101.
TASK NUMBER:        013.064 OBJECTIVE NUMBER: 013.064.A PLANT HATCH JTA IMPORTANCE RATING:
RO  3.43 SRO  3.16 K/A CATALOG NUMBER: 223001A2.07 K/A CATALOG JTA IMPORTANCE RATING:
RO  4.20 SRO  4.30 OPERATOR APPLICABILITY:    Nuclear Plant Operator (NPO)
GENERAL
 
==REFERENCES:==
Unit 1                          Unit 2 N/A                            31E0-EOP-101-2 (current version)
REQUIRED MATERIALS:      Unit 1                          Unit 2 N/A                            31E0-EOP-101-2 (current version)
APPROXIMATE COMPLETION TIME:          7.0 Minutes SIMULATOR SETUP:  REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
 
2012-301 SIM-8 Page 2 of 5 SIMULATOR SETUP Simulator Initial Conditions:
: 1. RESET the Simulator to 100% RTP or Snap 618 and leave in FREEZE.
: 2. INSERT the following MALFUNCTIONS:
MALF #                          TITLE                        FINAL      RAMP    ACT.
VALUE      RATE  TIME mfP64_193A      Drywell Chiller Compressor A Failure                                00000 mfP64_193B      Drywell Chiller Compressor B Failure                                00000 mfB2l_123A      Steam Line A Break (Before Restrictor) (Var)      7.5        100  00000 diT48-F334A      Drywell Vent Exh 2 Inch Isolation Valve          CLOSE        100    0000
: 3. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. RC-1,2,&3 B. Start SBGT System 2A with suction from the Reactor Building.
C. Allow the simulator to run until the plant is in the UNSAFE Region of the DWSIL Curve.
D. Maintain RWL around 0 inches with Condensate.
E. Turn OFF ALL ECCS Pumps.
: 4. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
: 5. ESTIMATED Simulator SETUP TIME:                  15 Minutes
 
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. A steam line broke in the Drywell.
: 2. All attempts to control Drywell pressure have been unsuccessful.
: 3. Standby Gas Treatment is in operation.
: 4. Primary Containment Hydrogen concentration is less than 1 %.
: 5. Offsite radioactivity release rate is <0.057 mR/hr and is expected to remain at its present level.
: 6. Normal AC Power is available.
: 7. A Group II isolation has occurred.
INITIATING CUES:
Defeating isolation interlocks, vent the Drywell with the 2A loop of CAD valves, per 31E0-EOP-l0l-2.
 
2012-301 SIM-8 Page 4 of 8 STEP I
 
PERFORMANCE STEP                                    STANDARD (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U  Human performance tools, safety, PPE met (1), AND          U  Mark the JPM as a PASS U  For initial trg all steps completed correctly OR PASS        U  For continuing trg, critical steps (if used) completed correctly FAIL      U  Above standards not met                                    U  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)
START TIME:
: 1. Operator identifies the materials that              Operator identifies the required are required.                                      materials and where to obtain them.
: 2. Defeat the High Drywell Pressure                    At panel 2H1 1-P657, the operator Isolation signal.                                  PLACES the keylock PCIS Override Switches to OVERRIDE for:
High Drywell Press, 2T48-F334A High Drywell Press, 2T48-F335A
: 3. Defeat the Low RPV Level Isolation                  At panel 2H1 1-P657, the operator signal.                                            PLACES the keylock PCIS Override Switches to OVERRIDE for:
Low RPV Level, 2T48-F334A Low RPV Level, 2T48-F335A
(*
* Indicates critical step)
 
2012-301 SIM-8 Page 5 of 8 STEP
 
PERFORMANCE STEP                              STANDARD f  (1:rS)
: 4. Defeat the Reactor Building High          At panel 2H1 1-P657, the operator Radiation Isolation signal.                PLACES the keylock PCIS Override Switches to OVERRIDE for:
Rx Bldg High Radn, 2T48-F334A Rx Bldg High Radn, 2T48-F335A
: 5. Defeat the Refuel Floor High                At panel 2H1 1-P657, the operator Radiation Isolation signal.                PLACES the keylock PCIS Override Switches to OVERRIDE for:
Refuel Fir High Radn, 2T48-F334A Refuel Flr High Radn, 2T48-F335 A
: 6. Open Drywell 2 Vent valve,                At panel 2H1 1-P657, the 2T48-F334A.                                Operator has RECOGNIZED that 2T48-F334A failed to OPEN, green light ILLUMINATED.
NOTE: Do NOT order B CAD loop for Drywell Venting since this is an Alternate Path JPM, the operator must determine this is the correct action on their own.
PROMPT:        WHEN the Operator reports that 2T48-F334A will NOT open ACKNOWLEDGE the failure and INFORM the operator that conditions are still met to vent the Drywell, ORDER the Operator to Vent the Drywell using the CAD Loops.
      **7 Defeat the High Drywell Pressure            At panel 2H1 1-P654, the operator Isolation signal.                          PLACES the keylock PCIS Override Switches to OVERRIDE for:
High Drywell Press, 2T48-F334B High Drywell Press, 2T48-F335B
      **8. Defeat the Low RPV Level Isolation          At panel 2H1 1-P654, the operator signal.                                    PLACES the keylock PCIS Override Switches to OVERRIDE for:
Low RPV Level, 2T48-F334B Low RPV Level, 2T48-F335B
(** Indicates critical step)
 
2012-301 SJM-8 Page 6 of 8 STEP
 
PERFORMANCE STEP                              STANDARD I  (COMMENTS)
      **9* Defeat the Reactor Building High          At panel 2H1 1-P654, the operator Radiation Isolation signal.              PLACES the keylock PCIS Override Switches to OVERRIDE for:
Rx Bldg High Radn, 2T48-F334B Rx Bldg High Radn, 2T48-F335B
      **1O. Defeat the Refuel Floor High              At panel 2H1 1-P654, the operator Radiation Isolation signal.              PLACES the keylock PCIS Override Switches to OVERRIDE for:
Refuel Fir High Radn, 2T48-F334B Refuel Fir High Radn, 2T48-F335B
      **11. Open Drywell 2 Vent valve,                At panel 2H1 1-P654, DRYWELL 2T48-F334B.                              VENT ISOL VLV, 2T48-F334B is OPEN, red light illuminated.
      **12. Open Drywell 2 Vent valve,                At panel 2H1 l-P654, DRYWELL 2T48-F335B.                              VENT ISOL VLV, 2T48-F335B is OPEN, red light illuminated.
      **13. Using Drywell Flow Controller,            At panei 2H1 1-P654, the operator 2T48-R615B, Open Torus Vent Flow          Operates 2T48-R615B, Drywell Control Valve, 2T48-F336B.                Vent Flow Cntl Vlv 2T48-F336B, as required to maintain Suppression Chamber pressure below 56 psig.
: 14. Monitor Drywell pressure indication        At panel 2H1 l-P654, Dryweli pressure is monitored by the operator.
PROMPT:        WHEN the operator addresses Drywell pressure, INDICATE for the operator that Drywell pressure is less than 56 psig and slowly decreasing.
(*
* Indicates critical step)
 
2012-301 SIM-8 Page 7 of 8 STEP I
      #    i      PERFORMANCE STEP                            STANDARD I    SAT/UNSAT (COJ{[4ENTS)  1 PROMPT:        INFORM the operator, as Shift Supervisor, that Drywell venting is to continue and another operator will complete the process.
END TIME:________
NOTE:      The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #14 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
(*
* Indicates critical step)
 
Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. A steam line broke in the Drywell.
: 2. All attempts to control Drywell pressure have been unsuccessful.
: 3. Standby Gas Treatment is in operation.
: 4. Primary Containment Hydrogen concentration is less than 1%.
: 5. Offsite radioactivity release rate is <0.057 mRlhr and is expected to remain at its present level.
: 6. Normal AC Power is available.
: 7. A Group II isolation has occurred.
INITIATING CUES:
Defeating isolation interlocks, vent the Drywell with the 2A loop of CAD valves, per 3lEOEOP-l01-2.
 
DRAFT Southern Nuclear E, I. Hatch Nuclear Plant Operations Training JPM PLANT 1 ALL (Alternate Path)
TITLE From Outside the MCR, Inject Boron using the SBLC System with 1st Pump Failure AUTHOR                        MEDIA NUMBER                        TIME ANTHONY BALL                  2012-301 PLANT-i                21.0 Minutes RECOMMENDED BY                APPROVED BY                        DATE N/R SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:      OPERATIONS TRAINING              Media Number: 2012-301 PLANT-i Rev. No. Date                    Reason for Revision                Authors Initials
[  Supvs Initials 00              Modified JPM 11.12-16.1 (From Outside MCR Inject      ARB SBLC) to make a NEW Alternate Path JPM where the A SBLC pump fails to run but B SBLC will start.
After NRC Exam, Media Number will be changed to LR-JP-1 1,12-01.
 
2012-301 PLANT-i Page 1 of 3 UNIT 1    (X)      UNIT 2  (X)
TASK TITLE:        From Outside the MCR, Inject Boron using the SBLC System with 1st Pump Failure JPM NUMBER:        2012-301 PLANT-i TASK STANDARD:      The task shall be completed when one Standby Liquid Control Squib Valve has been fired and one System pump has been started locally and the Standby Liquid Control System is injecting to the Reactor, per 34S0-C41-003.
TASK NUMBER:        011.012 OBJECTIVE NUMBER: 01 i.012.B PLANT HATCH JTA IMPORTANCE RATING:
RO  4.20 SRO  4.20 K/A CATALOG NUMBER: 2110002130 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.90 SRO  3.40 OPERATOR APPLICABILITY:      System Operator (SO)
GENERAL
 
==REFERENCES:==
Unit 1                            Unit 2 31E0-EOP-011--1                  31E0-EOP-01 1-2 34S0-C41 -003-1                  34S0-C41 -003-2 (Current Versions)              (Current Versions)
REQUIRED MATERIALS:      Unit 1                            Unit 2 34S0-C41-003-1                  34S0-C4 1-003-2 (current version)                (current version)
Four (4) SBLC Squib Valve        Four (4) SBLC Squib Valve jumper wires, from EOP file      jumper wires, from EOP file next to Remote Shutdown          next to Remote Shutdown Panel 1H21-P173                  Panel 2C82-P001 Flathead screwdriver              Flathead screwdriver APPROXIMATE COMPLETION TIME:            21.0 Minutes SIMULATOR SETUP:  N/A 1
 
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The Reactor has failed to Scram either manually or automatically, and the Torus temperature is approaching the BITT curve.
: 2. 31E0-EOP-O1 1-1 (RCA) is in progress.
: 3. SBLC has failed to initiate from the Control Room.
: 4. RWCU is isolated.
INITIATING CUES:
Manually initiate SBLC locally per 34S0-C4 1-003-I.
 
2012-301 PLANT-i Page 3 of 6 STEP            PERFORMANCE STEP                                      STANDARD For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U  Human performance tools, safety, PPE met (1), AND          Ii  Mark the JPM as a PASS U  For initial trg all steps completed correctly OR PASS        U  For continuing trg, critical steps (if used) completed correctly FAIL      U  Above standards not met                                    U  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:_______
: 1. Operator identifies the materials that            Operator has identified the are required.                                    required materials and where to obtain them.
: 2. Operator reviews the procedures                    Operator has reviewed the precautions and limitations,                      precautions and limitations.
(**  Indicates critical step)
 
2012-301 PLANT-I Page 4 of 6 STEP            PERFORMANCE STEP                                STANDARD I (COMMENTS)
      *k3  Detonate Squib Valve 1C41-FOO4A.          At Squib Valve Junction Box and AND                                        Panel 1H21-P01 1, the following jumpers are INSTALLED to fire Detonate Squib Valve 1C41-FOO4B.          1C41-FOO4A:
Junction Box terminal Cl (white wire) and terminal C (green wire) to Terminal point BB-I.
Junction Box terminal C2 (black wire) and terminal C3 (red wire) to Terminal point BB-4.
At Squib Valve Junction Box and Panel 1H21-P01 1, the following jumpers are INSTALLED to fire 1C41-FOO4B:
Junction Box terminal Cl (white wire) and terminal C (green wire) to Terminal point BB-8.
Junction Box terminal C2 (black wire) and terminal C3 (red wire) to Terminal point BB-l 1.
PROMPT:        WHEN all terminals for a Squib Valve are correctly installed (Squib Valve will fire when the last connection is made, preferably at 1H21-PO1l panel), INDICATE an explosive noise from the vicinity of that Squib Valve.
NOTE: Detonation of one Squib Valve will satisfactorily meet the standard.
NOTE: The jumpers used to fire the Squib Valves are a jumper with 3 connections to connect all three terminal points.
PROMPT:        IF the operator addresses isolation of RWCU, as the Control Room operator REPORT that RWCU is isolated.
: 4. Start SBLC Pump 1C41-COO1A.                At panel 1H21-P0l 1, SBLC PUMP, 1C41-COO1A, control switch is in RUN.
PROMPT:        WHEN the operator addresses indications for pump start, INDICATE there is NO noise from the pump and the green light is ILLUMINATED and the red light is EXTINGUISHED.
(** Indicates critical step)
 
2012-301 PLANT-i Page 5 of 6 STEP
 
PERFORMANCE STEP                                STANDARD I  (COMMENTS)
: 5. RETURN the control switch to the            At panel 1H21-P01 1, SBLC STOP position.                              STOP position PUMP, 1C41-COO1A, control switch is in STOP.
      **6. Start SBLC 1C41-.COO1B                      At panel 1H21-P011, SBLC PUMP, 1C41-COOIB, control switch is in RUN.
PROMPT:        WHEN the operator addresses indications for pump start, INDICATE there is noise from the pump and the green light is EXTINGUISHED and the red light is ILLUMINATED.
: 7. Verify the SBLC solution is being            The operator has VERIFIED injected into the Reactor.                  SBLC Tank level is DECREASING as indicated by SBLC STORAGE TANK LEVEL INDICATOR, 1C41-R001.
PROMPT:        WHEN the operator addresses SBLC tank level, INDICATE for the operator that level is decreasing slowly, but is greater than 1300 gallons.
NOTE: It will take between 30 and 70 minutes to completely empty the SBLC Storage Tank.
END TIME:_______
NOTE:      The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #7 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
(** Indicates critical step)
 
Page 6 of 6 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The Reactor has failed to Scram either manually or automatically, and the Torus temperature is approaching the BuT curve.
: 2. 31E0-EOP-Ol 1-1 (RCA) is in progress.
: 3. SBLC has failed to initiate from the Control Room.
: 4. RWCU is isolated.
INITIATING CUES:
Manually initiate SBLC locally per 34S0-C41-003-1.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 2 ALL (Alternate Path)
TITLE FROM OUTSIDE THE CONTROL ROOM, ENERGIZE AN EMERGENCY BUS AUTHOR                MEDIA NUMBER              TIME ANTHONY BALL          2012-301 PLANT-2        19.0 Minutes RECOMMENDED BY        APPROVED BY                DATE N/R SOUTHERN                  4 COMPANT
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                  Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:      OPERATIONS TRAINING                Media Number: 2012-301 PLANT-2 Rev. No. Date                                  ..
Reason for Revision                  Authors
                                                                              ..
Supvs Initials    Initials 00              Initial development of new Alternate path JPM.          ARB
 
2012-301 PLANT-2 Page 1 of 7 UNIT 1    (X)      UNIT 2  (X)
TASK TITLE:          FROM OUTSIDE THE CONTROL ROOM, ENERGIZE AN EMERGENCY BUS JPM NUMBER:          2012-30 1 PLANT-2 TASK STANDARD:        The task shall be completed when the operator has successfully tied Emergency Diesel Generator 1C (1A) per 34AB-R43-00l.
TASK NUMBER:          028.026 OBJECTIVE NUMBER:    028.026.O PLANT HATCH JTA IMPORTANCE RATING:
RO  3.64 SRO  Not Available K/A CATALOG NUMBER: 2640002130 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.90 SRO  3.40 OPERATOR APPLICABILITY:        Systems Operator (SO)
GENERAL
 
==REFERENCES:==
Unit 1                          Unit 2 34A8-R43-001-1                  34AB-R43-001-2 31 RS-OPS-002- 1                31 RS-OPS-002-2 (current versions)              (current versions)
REQUIRED MATERIALS:        Unit 1                          Unit 2 34AB-R43-001 -1                34AB-R43-001-2 (current version)              (current version)
APPROXIMATE COMPLETION TIME:              19.0 Minutes SIMULATOR SETUP:    N/A
 
EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The Main Control Room has been evacuated.
: 2. The 1G 416OVAC Emergency Bus is DE-ENERGIZED.
: 3. ALL 1G 4160 VAC Bus Supply Breakers are OPEN.
: 4. Another operator has manually started the 1C Diesel Generator (DG).
: 5. 1 C DG is operating at 900 RPM.
: 6. The 1C DG Output Breaker is OPEN.
: 7. The I C DG Control Switch is in the AT ENGINE position
: 8. lD PSW Pump is operating.
: 9. All station DC power is available.
: 10. A fire was NOT the cause of the Control Room evacuation.
INITIATING CUES:
JAW step 4.6 of 34AB-R43-00l-l, ENERGIZE the IG 4160VAC Emergency Bus.
 
2012-301 PLANT-2 Page 3 of 7 I STEP PERFORMANCE STEP                                      STANDARD I
(COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN U    Human performance tools, safety, PPE met (1), AND        U  Mark the JPM as a PASS U    For initial trg all steps completed correctly OR PASS      U    For continuing trg, critical steps (if used) completed correctly FAIL      U    Above standards not met                                  LI  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (Reference NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation)
NOTE: IF any Diesel Generator (DG) surveillance is in progress, DOUBLE hearing protection will be REQUIRED to be worn while performing this JPM.
NOTE: If it is desired to have the candidate open local panel 1R43-POO1C to demonstrate knowledge of the location of the speed control switch, then a key (Key 1 R43- 1) is required to perform this JPM. If the candidate will not be required to open the panel, a picture of the switch may be used to simulate this part of the task and the key will NOT be required.
NOTE: This JPM is written to be performed on the IC DG. If 1C DG is out of service for plant maintenance, then substitute the letter A for the letter C throughout this JPM and complete on the 1 A DG.
START TIME:
: 1. Operator reviews the procedure.                  Operator has reviewed step 4.6 of 34AB-R43-001-1.
PROMPT:          IF the operator addresses operation of other 4160VAC Buses, as the Shift Supervisor, INFORM the operator that another operator will energize any remaining Buses.
(*
* Indicates critical step)
 
2012-301 PLANT-2 Page 4 of 7 I STEP PERFORMANCE STEP                              STANDARD I
(COMMENTS)
NOTE: The status of the 1 D PSW pump is OPERATiNG (provided to the candidate on the Initial Conditions sheet of this JPM). The power supply to 1B PSW Pump is 1G 4KV bus, which is currently de-energized.
PROMPT:        IF the operator checks voltage before flashing the field, INDICATE for the operator that voltage is 0 Volts on voltage meter.
      **2. Flash the generator field by placing        At panel 1R43-POO3C, the Diesel the Diesel Generator 1 C control            Generator 1 C CONTROL switch:
switch in REMOTE.                          Has been taken to REMOTE.
PROMPT:        WHEN the operator addresses voltage, INDICATE for the operator that voltage is increasing after the Control switch has been taken to REMOTE.
      **3 Places the Diesel Generator 1C                At panel lR43-POO3C, the Diesel control switch in AT ENGINE.                Generator lC CONTROL switch:
Has been taken back to AT ENGINE after voltage develops.
PROMPT:        WHEN the operator addresses generator voltage, INDICATE for the operator that voltage is 4160 volts.
: 4. Confirm DIG voltage is at 4160 VAC          At panel lR43-POO1C, operator at Diesel Generator lC Control            has read lR43-R769C, GEN KV Panel, 1R43-POO1C.                          VOLTMETER indication of 4160 volts.
: 5. Confirm D/G frequency is at 60 Hz at        At panel lR43-POOIC, operator Diesel Generator 1C Control Panel          READS 1R43-R766C, GEN 1R43-POO1C.                                FREQ METER indication of 60 Hz (+/-1 Hz).
PROMPT:        WHEN the operator identifies 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 60 Hz.
PROMPT:        WHEN the operator identifies the 1C DG Output breaker, INFORM the operator that the Green indicating light is ILLUMINATED.
NOTE: At this point the operator will go to section 4.7 to force the output breaker to close by lowering and then raising 1C DG speedlfrequency.
(** Indicates critical step)
 
2012-301 PLANT-2 Page 5 of 7 STEP            PERFORMANCE STEP                            STANDARD I  (COMMENTS)
NOTE: The operator can adjust the Diesel Generator 1C speed from EITHER 1R43-POO1C, using the SPEED CONTROL switch OR from Diesel Generator 1C Governor Speed Setting knob (Top Right Knob on the Governor). Note: The knob below this one is labeled Speed Setting Indicator NOTE: If the Operator uses the Speed Setting Switch then steps 6 & 7 are CRITICAL, and 8& 9 become N/A; if the Operator uses the Speed Setting Switch then steps 8 & 9 will be CRITICAL and 6 & 7 become N/A.
: 6. Adjust Diesel Generator lC Speed          At panel 1R43-POO1C (Inside Setting Switch to LOWER frequency        lower-left panel door, on the 57 Hz.                                  backside of the door), operator has ADJUSTED Speed Setting Switch in the LOWER direction.
At panel 1 R43-P00 1 C, operator READS 1R43-R766C, GEN FREQ METER indication of 57 Hz (+/-1 Hz).
PROMPT:        WHEN the operator identifies the 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 57 Hz.
      **7 Adjust Diesel Generator 1C Speed          At panel 1R43-POO3C, operator Setting Switch to RAISE frequency 60 has ADJUSTED Speed Setting Hz.                                      Switch in the RAISE direction.
At panel 1R43-POOIC, operator READS 1R43-R766C, GEN FREQ METER indication of 60 Hz (+/-1 Hz).
PROMPT:        WHEN the operator identifies the 1 R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 60 Hz.
(** Indicates critical step)
 
2012-301 PLANT-2 Page 6 of 7 I STEP I                                                                                                      I
      #    I      PERFORMANCE STEP                              STANDARD I    SAT/UNSAT (COMMENTS)          I
      **8. Adjust Diesel Generator 1C governor      At panel 1R43-POO3C, operator Speed Setting knob to LOWER              has ADJUSTED governor frequency 57 Hz.                          SPEED SETTING knob in the LOWER (CCW) direction.
At panel 1R43-POOIC, operator READS 1R43-R766C, GEN FREQ METER indication of 57 Hz (+/-1 Hz).
PROMPT:        WHEN the operator identifies the 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 57 Hz.
      **9 Adjust Diesel Generator 1C governor          At panel 1R43-POO3C, operator Speed Setting knob to RAISE              has ADJUSTED governor frequency 60 Hz.                          SPEED SETTING knob in the RAISE (CW) direction.
At panel 1R43-POO1C, operator READS 1R43-R766C, GEN FREQ METER indication of 60 Hz (+/-1 Hz).
PROMPT:        WHEN the operator identifies the 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 60 Hz.
PROMPT:        WHEN the operator addresses the I C DG Output breaker, INFOR1\I the operator that the Red indicating light is ILLUMINATED.
PROMPT:        IF the operator addresses restoration of 4160 VAC Emergency Bus loads, as the Shift Supervisor, INFORM the operator that this will be performed by another operator.
END TIME:
NOTE:    The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #9 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet and the picture of the Speed Control switch (if used).
(** Indicates critical step)
 
Page 7 of 7 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The Main Control Room has been evacuated.
: 2. The 1G 416OVAC Emergency Bus is DE-ENERGIZED.
: 3. ALL 1G 4160 VAC Bus Supply Breakers are OPEN.
: 4. Another operator has manually started the 1C Diesel Generator (DG).
: 5. 1C DG is operating at 900 RPM.
: 6. The iC DG Output Breaker is OPEN.
: 7. The 1C DG Control Switch is in the AT ENGINE position
: 8. 1D PSW Pump is operating.
: 9. All station DC power is available.
: 10. A fire was NOT the cause of the Control Room evacuation.
INITIATING CUES:
JAW step 4.6 of 34AB-R43-001-1, ENERGIZE the 1G 4160VAC Emergency Bus.
 
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 3 ALL TITLE DURING A LOSS OF AIR, ISOLATE THE FIRE PROTECTION SPRINKLERS AUTHOR                    MEDIA NUMBER                TIME Anthony Ball              2012-301 PLANT-3          13.0 Minutes RECOMMENDED BY            APPROVED BY                  DATE N/R SOUTHERN COMPANY A
 
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                    Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:      OPERATIONS TRAINING                  Media Number: 2012-301 PLANT-3 Rev. No. Date                    Reason for Revision                  Authors Initials
[  Supvs Initials 01      09/04/92 General revision and format change                      WMM          SMC 02      07/22/93 General revision, word processor change                  RAB          RSG 03      08/19/94 Procedure change, adjust format, change initiating cue  RAB          SMC to a direct command 04      08/01/96 Format change, modify time allowance                    RAB          DFIG 05      02/25/00 Format modification, change time allowance based on      RAB          DHG running average, update K/As 06      11/02/00 Include objective number, change operator                RAB          DHG applicability to Systems Operator 07      03/12/02 Include initial operator statement                      RAB          RAB 08      06/16/05 Revised Initial License statement for successful        RAB          RAB completion 09      04/21/06 Remove Response Cues                                    RAB          RAB 10              General revision for use on HLT-7 NRC Exam. After        ARB NRC Exam, Media Number will be changed to LR JP-36. 13-10.
 
2012-301 PLANT-3 Page 1 of 5 UNIT 1      (X)      UNIT 2  (X)
TASK TITLE:        DURING A LOSS OF AIR, ISOLATE THE FIRE PROTECTION SPRINKLERS JPM NUMBER:        2012-301 PLANT-3 TASK STANDARD:      The task shall be completed when the Fire Protection Sprinklers have been isolated during a loss of air per 34AB-P51-001.
TASK NUMBER:        036.013 OBJECTIVE NUMBER: 036.013.O PLANT HATCH JTA IMPORTANCE RATING:
RO  3.57 SRO  3.70 K/A CATALOG NUMBER: 2860002130 K/A CATALOG JTA IMPORTANCE RATING:
RO  3.90 SRO  3.40 OPERATOR APPLICABILITY:    Systems Operator (SO)
GENERAL
 
==REFERENCES:==
Unit 1                              Unit 2 N/A                                34AB-P5l-001-2 (current version)
REQUIRED MATERIALS:    Unit 1                              Unit 2 N/A                                34AB-P5 1-001-2 (current version)
APPROXIMATE COMPLETION TIME:          13.0 Minutes SIMULATOR SETUP:  N/A
 
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. A scram has occurred on Unit 2.
: 2. Unit 2 has had a loss of control air pressure and header pressure is below 45 psig and NOT increasing.
: 3. No fires exist in the plant.
: 4. Another operator is isolating Fire Protection Sprinklers to the Startup Transformers.
: 5. 34AB-P51-OOl-2, Loss of Instrument and Service Air System, is in progress.
INITIATING CUES:
Isolate the Fire Protection Sprinklers inside the Power Block per Attachment I of 34AB-P5 1-001-2.
 
2012-301 PLANT-3 Page 3 of 5 STEP                                                                                                    SAT/UNSAT
      #    I        PERFORMANCE STEP                                    STANDARD I
(COMMENTS)        1 For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                THEN Human performance tools, safety, PPE met (1), AND          Li Mark the JPM as a PASS Li  For initial trg all steps completed correctly OR PASS      Li  For continuing trg, critical steps (if used) completed correctly FAIL      Li  Above standards not met                                    Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)
START TIME:
NOTE: The steps of this JPM may be performed in any order.
Close valve 2U43-F093.                            At location 11 2TAT19, valve 2U43-F093 is CLOSED.
NOTE: This valve isolates the Reactor Feed Pump and Oil Conditioner area.
      **2. Close valve 2U43-F214.                            At location 136ThT20, valve 2U43-F214 is CLOSED.
NOTE: This valve isolates the Hydrogen Seal Oil System, W End Cond A & B (Below 130) and W End Cond A & B (Above 130) areas.
      **3 Close valve 2Z43-F101.                                At location 1 12THT13, valve 2Z43-Fl01 is CLOSED.
NOTE: This valve isolates the Main Turbine Lube Oil Reservoir area.
PROMPT:          IF the operator addresses stationing a fire watch, as the Shift Supervisor, INFORM the operator that a fire watch is being posted with back-up suppression equipment.
(**  Imlicates critical step)
 
2012-301 PLANT-3 Page 4 of 5 STEP I
 
      #    I      PERFORMANCE STEP I          STANDARD I  SAT!UNSAT (COMMENTS)          I I
L*4.
Close valve 2U43-F090.                    At location 13OTAT19, valve 2U43-F090 is CLOSED.
I                    1 RESPONSE CUE:        N/A NOTE: This valve isolates the RFP Oil Conditioner area.
END TIME:_______
NOTE:      The terminating cue shall be given to the operator when any one of the following is met:
After JPM step #4 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
EVALUATOR        PICK UP the Initiating Cue sheet.
(** Indicates critical step)
 
Page 5 of 5 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. A scram has occurred on Unit 2.
: 2. Unit 2 has had a loss of control air pressure and header pressure is below 45 psig and NOT increasing.
: 3. No fires exist in the plant.
: 4. Another operator is isolating Fire Protection Sprinklers to the Startup Transformers.
: 5. 34AB-P51-OO1-2, Loss of Instrument and Service Air System, is in progress.
INITIATING CUES:
Isolate the Fire Protection Sprinklers inside the Power Block per Attachment 1 of 34AB-P51-OO1-2.}}

Revision as of 19:07, 11 November 2019

Initial Exam 2012-301 Draft Sim_IN-Plant JPMs
ML12342A083
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/06/2012
From:
NRC/RGN-II
To:
Southern Co
References
Download: ML12342A083 (115)


Text

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 1 ALL (Alternate Path)

TITLE WITHDRAW CONTROL RODS (ROD UNCOUPLES)

AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-1 12 Minutes RECOMMENDED BY APPROVED BY DATE NA SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-1 Rev. No. Date Reason for Revision Authors Supvs Initials Initials 00 Revision for use on 20 12-301 NRC Exam. After NRC ARB Exam, Media Number will be changed to LR-JP 01.10.

2012-301 SIM-1 Page 1 of9 UNIT 1 0 UNIT 2 (X)

TASK TITLE: WITHDRAW CONTROL RODS (ROD UNCOUPLES)

JPM NUMBER: 2012-301 SIM-1 TASK STANDARD:

TASKNUMBER: 001.010 OBJECTIVE NUMBER: 001.010.A PLANT HATCH JTA IMPORTANCE RATING:

RO 2.8 SRO 2.8 K/A CATALOG NUMBER: 201003 A2.02, K/A CATALOG JTA IMPORTANCE RATING:

RO 3.7 SRO 3.8 OPERATOR APPLICABILITY: Reactor Operator (RO)

GENERAL

REFERENCES:

Unit 2 34AR-603-248-2 34G0-OPS-065-0 34G0-OPS-00 1-2 REQUIRED MATERIALS: Unit 2 34AR-603-248-2 34G0-OPS-065-0 APPROXIMATE COMPLETION TIME: 12 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 STM-l Page 2 of 9 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #110 or Snap 611 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfCl2_23 Control rod 10-47 uncoupled 0000

3. INSERT the following SIMULATOR VALUE OVERRIDES (SVO):

SVO # DESCRIPTION FINAL RAMP ACT.

VALUE RATE TIME none

4. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS none

5. INSERT the following ORS OVERRIDES:

TAG # I P/L DESCRIPTION I STATUS ACT.

TIME none

6. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Give the student the marked up copy of 34G0-OPS-00l-2.

7. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
8. PLACE DANGER TAGS on the following equipment:
9. ESTIMATED Simulator SETUP TIME:
10. Once the operator begins inserting the control rod to re-couple, REMOVE the malfunction.

2

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A Reactor Startup is in progress, 34G0-OPS-OOl-2 is in progress, and will be provided to you.
2. Control rods are being withdrawn to increase power per 34G0-OPS-065-O. The current control rod group is 12 with all rods in this group being at position 24.
3. The Control Rod Movement Pre-job Brief and associated checklist have been completed.
4. Continuous Rod Movement is desired for these rod movements
5. No one will be performing peer checks but proceed with the task.

INITIATING CUES:

Continue Control Rod withdrawal in Rod Group 12.

2012-301 SIM-1 Page 4 of 9 STEP PERFORMANCE STEP STDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the procedure Operator has identified the correct needed to perform the task. procedure as 34G0-OPS-065-0.
2. Operator verifies the status of the On 2H1 1-P603, the operator currently latched rod group. selects each control rod in the currently latched group, observing their position on the four rod display AND comparing to the pull sheet.
3. The operator selects the first rod to be On 2H1 l-P603, the operator withdrawn 02-23. selects the first rod in the currently latched group.

NOTE: With regard to withdrawing the rod, IF the applicant notches the rod out one or two notches and then transitions to continuous withdrawal is acceptable.

(** Indicates critical step)

2012-301 SIM-l Page 5 of 9

9) PERFORMANCE STEP STANDARD I (COMMENTS)
    • 4* The operator withdraws the selected The operator positions both the rod to position 48. Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.

NOTE: 34G0-OPS-065-0 instructions for performing a coupling check only addresses using the rod movement switch. It is acceptable if the student uses the RONOR switch along with the rod movement switch in withdrawing the rod for the coupling check.

    • 5 The operator performs a coupling The operator positions the Rod check on the selected control rod by Movement Control switch to the providing a separate (second) withdraw position observing for:

withdraw signal.

e The red withdraw light illuminates

. Momentary loss of the 48 position indication

. The rod does NOT move beyond position 48.

. Annunciator rod overtravel does NOT illuminate.

. Documents the check on the movement form.

6. The operator selects the next rod to be On 2Hl 1-P603, the operator withdrawn 10-47. depresses the pushbutton on the select panel for the next rod in the currently latched group.
    • 7 The operator withdraws the selected On 2Hl 1 -P603, the operator rod to position 48. positions both the Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.

(*

  • Indicates critical step)

2012-301 SIM-1 Page 6 of 9 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

    • 8. The operator performs a coupling The operator positions the Rod check on the selected control rod by Movement Control switch to the providing a separate (second) withdraw position observing for:

withdraw signal.

  • The red withdraw light illuminates e Momentary loss of the 48 position indication

. The rod MOVES beyond position 48.

. Annunciator rod overtravel DOES illuminate.

9. Operator identifies the procedure The operator reviews ARP 34AR-needed to perform the task 603-248-2, Rod Over travel.
10. Notifies the Shift Supervisor. The operator reports the status of the control rod which experienced over travel.

PROMPT: Simulator operator remove the uncouple rod malfunction mfCl2_23 for rod 10-47.

Attempts to re-couple the rod by On panel 2H1 1 -P603, the notching the rod in. operator inserts the rod from one to three notches, notching the rod in using the Rod Movement Switch.

NOTE: The operator may choose to use continuous withdrawal or notch withdrawal to return the control rod to position 48.

    • 12. Withdraw the rod to position 48 On 2H1 l-P603, the operator positions both the Rod Movement Control switch and the RONOR switch to the withdraw position and holds them until the rod moves to position 48.

NOTE: 34GO-OPS-065-0 instructions for performing a coupling check only addresses using the rod movement switch. It is acceptable if the student

( Indicates critical step)

2012-301 SIM-l Page 7 of 9 STEP

PERFORMANCE STEP STANDARD I (COMMENTS) 1 uses the RONOR switch along with the rod movement switch in withdrawing the rod for the coupling check.

    • 13. The operator performs a coupling The operator positions the Rod check on the selected control rod. Movement Control switch to the withdraw position observing for:

e The red withdraw light illuminates e Momentary loss of the 48 position indication

. The rod does NOT move beyond position 48.

a Annunciator rod overtravel does NOT illuminate.

. Documents the check on the movement form.

14 Informs supervision of the re-coupling The operator reports to the SS attempt. that the coupling check was successful.

PROMPT: When the operator selects the third control rod inform the operator that another operator will assume control rod movement duties and the JPM will be stopped here.

END TIME:_______

NOTE: The terminating cue shall be given to the operator when:

After 1PM step #14 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

  • Indicates critical step)

Page 8 of 9 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A Reactor Startup is in progress, 34G0-OPS-OOl-2 is in progress, and will be provided to you.
2. Control rods are being withdrawn to increase power per 34G0-OPS-065-O. The current control rod group is 12 with all rods in this group being at position 24.
3. The Control Rod Movement Pre-job Brief and associated checklist have been completed.
4. Continuous Rod Movement is desired for these rod movements
5. No one will be performing peer checks but proceed with the task.

INITIATING CUES:

Continue control rod withdrawal in rod group 12.

Page 9 of 9 p1ace this page with

1. the marked up startup procedure, 34G0-OPS-OO 1-2,
2. The marked up pull sheet for control rod withdrawal.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM 2 ALL TITLE STARTUP A REACTOR FEED PUMP TURBINE (NORMAL METHOD)

AUTHOR MEDIA NUMBER TIME Error! Reference source not 2012-301 SIM-2 20.0 Minutes found.

RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-2 Rev. No. Date Reason for Revision Authors Supvs Initials Initials 00 Revision for use on 20123O1 NRC Exam. After NRC ARB Exam, Media Number will be changed to LR-JP 02.04- 19.

2012-301 SIM-2 Page 1 of4 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: STARTUP A REACTOR FEED PUMP TURBINE (NORMAL METHOD)

JPM NUMBER: 2012-301 SIM-2 TASK STANDARD: The task shall be completed when the second Reactor Feed Pump is supplying water to the Reactor and is being controlled in automatic by the FW Lvi Control Turb, per 34S0-N21-007.

-

TASK NUMBER: 002.004 OBJECTIVE NUMBER: 002.004.C PLANT HATCH JTA IMPORTANCE RATING:

RO 2.79 SRO 3.15 K/A CATALOG NUMBER: 259001A4.02 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.70 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 34G0-OPS-00 1-1 34GO-OPS-00 1-2 (current version) (current version) 34S0-N21-007- i 34S0-N21-007-2 (current version) (current version)

_REQUIRED MATERIALS: Unit 1 Unit 2 34S0-N21-007- 1 34SO-N21-007-2 (current version) (current version)

APPROXIMATE COMPLETION TIME: 20.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-2 Page 2 of 4 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #110 and leave in FREEZE.
2. ENSURE 2 Condensate and CBP are running.
3. ESTIMATED Simulator SETUP TIME: 10 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. RFPT 2A is operating at 2100 rpms per step 7.1.11.9 of 34S0-N2 1-007-2.
2. RFPT 2B is in operation and the Feedwater Level Control System is in 3 Element Control.
3. 34G0-OPS-001-2 is in progress.

INITIATING CUES:

Place RFPT 2A in service per 34S0-N21-007-2 starting at step 7.1.11.9.

2012-301 SIM-2 Page 4 of 7 STEP I PERFORMANCE STEP STANDARD SAT/UNSAT

, # i I (COENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:

1. Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.
2. Confirm the M/A Station Permissive At panel 2H1 1-P650, the operator 2A white light is illuminated. CONFIRMS the MJA STATION PERMISSIVE 2A white light is illuminated.
3. Confirm that the MIA Station output At panel 2H1 1-P603, the operator signal is tracking 2A RFPT speed. CONFIRMS the WA STATION, output signal is tracking actual RFPT 2A speed.
    • 4 Place the RFPT 2A TMR Mode At panel 2H1 1 -P650, the operator switch to WA. PLACES the RFPT 2A TMR MODE switch to M/A, the M/A STATION green light illuminates.
5. Slowly increase RFPT 2A speed until At panel 2Hl 1-P603, RFPT 2A incoming and running RFPT flows M/A STATION has been match. ADJUSTED until the RFP being started and the running RFP flow MATCH

(** Indicates critical step)

2012-301 SIM-2 Page 5 of 7 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

NOTE: For the purpose of this JPM, accept feed flows within +/-10% of meter scale as being matched on feed flows.

6. Adjust the manual output lever on At panel 2H1 1-P603, RFPT 2A RFPT 2A MIA Station until the M/A STATION manual output INPUT and OUTPUT signals are lever is ADJUSTED until the matched. INPUT signal (PF lamp extinguished) and OUTPUT signal (PF lamp illuminated) are MATCHED.

NOTE: To match the INPUT and OUTPUT signals, the PF key must be toggled (PF key depressed to switch off, PF lamp extinguished, then depressing the PF key again to switch on, PF lamp illuminated) to compare the signals. For the purpose of this JPM, consider the signals matched if within +/-2%.

    • 7 Place RFPT 2A M/A Station in At panel 2H1 1-P603, RFPT 2A automatic. M/A STATION is placed in AUTOMATIC, the (A) AUTO green light is illuminated.

(** Indicates critical step)

2012-301 SIM-2 Page 6 of 7 STEP

  1. I PERFORMANCE STEP i STANDARD I SAT/UNSAT (COMMENTS)
8. Adjust RFPT 2A Speed Control Bias At panel 2H1 1-P603, if required:

setting to maintain RFPT 2A and The Speed Control Bias for M/A RFPT 2B speeds within 100 rpm.

STATION R6O1A or R6O1B has been ADJUSTED using the INCREASE/DECREASE set pushbuttons.

RFPT 2A and RFPT 2B speeds are within 100 rpm of each other on panel 2H1 1-P650.

END TIME:_______

NOTE: The terminating cue shall be given to the operator when:

After JPM step #8 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

( Indicates critical step)

2012-301 SIM-2 Page 7 of 7 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. RFPT 2A is operating at 2100 rpms per step 7.1.11.9 of 34S0-N2 1-007-2.
2. RFPT 2B is in operation and the Feedwater Level Control System is in 3 Element Control.
3. 34G0-OPS-00l-2 is in progress.

INITIATING CUES:

Place RFPT 2A in service per 34S0-N2 1-007-2 starting at step 7.1.11.9.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CRISIM 3 ALL TITLE OVERRIDE THE MSIVS IN AN EMERGENCY AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2012-301 SIM-3 18.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-3 Rev. No. I Date Reason for Revision Authors Initials Supvs Initials 01 08/24/92 General revision and format change WMM SCB 02 08/16/93 General revision, word processor change RAB RSG 03 08/19/94 Modify simulator setup, adjust format RAB SMC 04 03/28/96 Format_change RAB DHG 05 04/10/97 Revised based on feedback from the 1996 Requal SCB RSG annual exam.

06 02/07/00 Format modification, change time allowance based on RAB DHG running average, upgrade to the new simulator operating_system 07 11/02/00 Include objective number RAB DHG 08 03/1 1/02 Include initial operator statement RAB RAB 09 03/17/05 Deleted S from procedure numbers, changed ARB DHG Revision and Rev, numbers to Current Version.

Changed to Nuclear Plant Operator. Updated Simulator_IC#_and_MSIV_position.

10 06/13/05 Revised Initial License statement for successful RAB RAB completion 11 04/18/06 Remove Response_Cues RAB RAB 12 11/06/06 Correct MPLs and Switch labels on Unit 1 BKW RAB 13 Revision for use on 2012-301 CR-S1M 3 and updated ARB procedure changes. After NRC Exam, Media Number will_be_changed_to_LR-JP-14.14-13.

2012-301 SIM-3 Page 1 of 10 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: OVERRIDE THE MSIVS IN AN EMERGENCY JPM NUMBER: 2012-301 SIM-3 TASK STANDARD: The task shall be completed when the MSIVs have been opened per 31E0-EOP-1 11-1/2.

TASK NUMBER: 014.014 OBJECTIVE NUMBER: 014.014.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.85 SRO 3.16 K/A CATALOG NUMBER: 239001A401 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.20 SRO 4.00 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 31E0-EOP-111-1 31E0-EOP-111-2 3 1EO-EOP-01 1-1 3 1EO-EOP-0 11-2 (current versions) (current versions)

REQUIRED MATERIALS: Unit 1 Unit 2 31E0-EOP-1 11-1 31E0-EOP-1 11-2 (current version) (current version)

APPROXTMATE COMPLETION TIME: 18.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-3 Page 2 of 10 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #127 or Snap 613 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfCl l_211 Scram Discharge Volume ATWS (Var) 60 100 00000 mfE4l_235A HPCI Fails to Auto Start on Low Level 00000 mfE4l_235B HPCI Fails to Auto Start on Hi Drywell Press 00000 mf60321383 Spur Ann LOW CONDENSER VACUUM

--

00000 A BYPASS mf60321384 Spur Ann LOW CONDENSER VACUUM B

--

00000 BYPASS

3. INSERT the following SIMULATOR VALUE OVERRIDES (SVO):

SVO # DESCRIPTION FINAL RAMP ACT.

VALUE RATE TIvW svoB2lOO5 LT-NO81A Group I/lI Isolation -110 100 00000 svoB2lOO6 LT-NO81B Group 1111 Isolation -110 100 00000

4. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS rfNl 1045 SJAE A Steam CLOSE rfB2l 148 Grp 1 Low Rx Water Level Bypass ORIDE rfC7 1279 Group 1 Isolation Oride Jumpers ORIDE

5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Take simulator out of FREEZE and perform RC- I and RC-2.

B. Place the MSIV control switches in CLOSED.

C. Enter Remote Functions when Torus temperature reaches 109°F or greater.

D. Inhibit ADS and inject SBLC.

E. Acknowledge annunciators.

6. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
7. ESTIMATED Simulator SETUP TIME: 15 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Condenser Low Vacuum and Low RWL isolations have been bypassed.
2. Main Condenser is in operation with Circ Water and Condensate Systems in operation.
3. An ATWS condition exists and 31E0-EOP-O11-2 (RCA) is in progress.
4. EHC is in operation.

INITIATING CUES:

Open the MSIVs to re-establish Main Condenser as the heat sink using 31E0-EOP-1 1 1-2.

2012-301 SIM-3 Page 4 of 10 STEP

  1. I PERFORMANCE STEP STANDARD I SATfUNSAT1 (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1. Place MSIV Control Switches to At panel 2H11-P601, the CLOSED. following OUTBOARD MSIV switches are in CLOSED:

MSIV 2B21-F028A MS1V 2B21-F028B MSIV 2B21-F028C MSIV 2B21-F028D At panel 2H1 1-P602, the following INBOARD MSIV switches are in CLOSED:

MSIV 2B21-F022A MSIV 2B21-F022B MSIV 2B21-F022C MSIV 2B21-F022D

(** Indicates critical step)

2012-301 SIM-3 Page5 of 10 STEP

PERFORMANCE STEP STANDARD I (COMMENTS) 1

2. Confirm A & B RFPTs are tripped. At panel 2H1 1-P650, Operator has determined BOTH RFPTs are TRIPPED by:

Checking annunciators(650-325

& 326) are ILLUMINATED OR Checking INBD INLET ISOL 2P70-F004 and F005 red lights illuminated on panel 2H1 l-P700 PROMPT: IF the operator addresses isolation bypasses, as the Shift Supervisor, INFORM the operator that the Condenser Low Vacuum and Low Water Level isolations are bypassed.

    • 3 Reset Group I Isolation. The GR ISOL RESET switch has been taken to GR I RESET position at panels 2H1 l-P601 and 2H1 1-P602.
4. Bypass the High Flow isolation on Operator has determined it is 2P70-F004 and F005, if necessary. NOT necessary to bypass the High Flow Isolation by:

Checking annunciators OR Checking INBD INLET ISOL 2P70-F004 and P005 red lights illuminated on panel 2H1 1-P700.

NOTE: It is acceptable for operator to have the High Flow Isolation bypassed. IF operator decides to bypass the High Flow Isolation, as the Shift Support Supervisor, INFORM the operator that it has been bypassed.

PROMPT: IF the operator addresses 2P70-F004 and P005, INDICATE that NO annunciators associated with Drywell Pneumatics are illuminated and/or that valves 2P70-F004 and F005 red lights are illuminated.

(** Indicates critical step)

2012-301 SIM-3 Page 6 of 10 STEP

PERFORMANCE STEP STANDARD I (COMMENTS)

5. Confirm closed Inboard MSIVs. At panel 2H1 l-P602, the following INBOARD MSIVs are CLOSED, green light illuminated:

MSIV 2B21-F022A MSIV 2B21-F022B MSIV 2B21-F022C MSIV 2B21-F022D.

    • 6. Open Outboard MS1Vs. At panel 2H1 1 -P601, the following switches are in OPEN SLO TEST, red light illuminated:

MSIV 2B21-F028A MSIV 2B21-F028B MS1V 2B21-F028C MSIV 2B21-F028D.

7. Check differential pressure across Operator has determined Inboard MSIVs. differential pressure is greater than 200 psid using:

REACTOR PRESSURE indicator A(B,C) 2C32-R605A(B,C) on panel 2H1 l-P603 AND MAIN STEAM PRESS A(B) 2N32-R654A(B) indicator on Turbine EHC Panel or recorder PRESS TO STOP VLVS 1 & 4 2N1 l-R601 OR

  • Monitor* steam pressure*

2N32-K4001A OR 2N32-K4001B.

NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 7.

PROMPT: WHEN the operator addresses differential pressure across Inboard MSIVs, INDICATE for the operator that it is greater than 200 psid.

(** Indicates critical step)

2012-301 SIM-3 Page 7 of 10 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

8. Confirm/Close valves The operator has ADDRESSED 2N1 1-FOOIA & B. contacting a SO to verify/close SJAE 2A(2B) MAIN STEAM ISOL VALVE at panel 2H2 1 -P216.

PROMPT: WHEN the operator addresses valves 2N11-FOO1A and B, as the SO, INFORM the operator that the valves 2N11-FOO1A & B are closed.

9. Confirm the following valves are At panel 2H1 1-P650, the closed: following valves are CLOSED, 2N1 1-FOO4A green light illuminated:

2N1 1 FOO4B 2ND STG A & B MSR RHTR STM SPLY VLV 2N1 1-FOO4A 2N33-F003 2ND STG C & D MSR RHTR STM SPLY VLV 2Nl 1-FOO4B MAIN STM FEED VLV 2N33-F003.

.i *10. Open the following valves: The following valves are OPEN, 2B2 1 -FO 16 red lights illuminated:

2B21-F019 MSL DRAIN VLV, 2B21-F016, at panel 2H11-P602 2B21-F020 MSL DRAIN VLV, 2B21-F019, at panel 2H1 1-P601 DRAIN VLV, 2B21-F020, at panel 2H11-P602

( Indicates critical step)

2012-301 SIM-3 Page 8 of 10 L I PERFORMANCE STEP STANDARD I (COMMENTS)

11. Verify differential pressure across Operator has determined MSIVs is less than 200 psid. differential pressure is greater than 200 psid using:

REACTOR PRESSURE indicator A(B,C) 2C32-R605A(B,C) on panel 2H 11 -P603 AND MAIN STEAM PRESS A(B) 2N32-R654A(B) indicator on Turbine EHC Panel or recorder PRESS TO STOP VLVS 1 & 4 2N1 1-R601 OR

  • Monjtor*j steam pressure*

2N32-K4001A OR 2N32-1(400 1 B.

NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 11.

PROMPT: WHEN the operator addresses differential pressure across Inboard MSIVs.

INDICATE for the operator that it is less than 200 psid.

)pen Inboard MSIVs. At panel 2H1 1-P602, the following switches are in OPEN SLO TEST, red light illuminated:

MSIV 2B21-F022A MSIV 2B21-F022B MSTV 2B21-F022C MSIV 2B21-F022D.

NOTE: It is acceptable if the operator uses the Open Fast Test switch position.

PROMPT: WHEN the operator addresses EHC operation, as the Shift Supervisor, INFORM the operator that the EHC is in service.

PROMPT: IF the operator addresses the Circ Water or Condensate Systems, as the Shift Supervisor, INFORM the operator that those systems are in operation.

(** Indicates critical step)

2012-301 SIM-3 Page 9 of 10 STEP I 1 #

PERFORMANCE STEP STANDARD I SAT/UNSAT (COMMENTS) 1 PROMPT: WHEN the operator addresses the Main Condenser Vacuum System, as the Shift Supervisor, INFORM the operator that another operator will place it in service and monitor vacuum.

PROMPT: IF the operator addresses system restoration, as the Shift Supervisor, INFORM the operator that restoration is not required at this time.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #12 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

( Indicates critical step)

Page lOof 10 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Condenser Low Vacuum and Low RWL isolations have been bypassed.
2. Main Condenser is in operation with Circ Water and Condensate Systems in operation.
3. An ATWS condition exists and 31E0-EOP-011-2 (RCA) is in progress.
4. EHC is in operation.

INITIATING CUES:

Open the MSIVs to re-establish Main Condenser as the heat sink using 31E0-EOP-1 1 1-2.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 4 ALL (Alternate Path)

TITLE REACTOR PRESSURE CONTROL WITHIN BAND WITH BPVs & HPCI AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-4 20 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-4 Rev. No. Date Reason for Revision [ Authors Initials Supvs Initials 00 Initial development for use on 2012-301 NRC Exam. ARB

2012-301 SIM-4 Page 1 of 10 UNIT 1 () UNIT 2 (X)

TASK TITLE: REACTOR PRESSURE CONTROL WITHIN BAND WITH BPVs & HPCI JPM NUMBER: 2012-301 SIM-4 TASK STANDARD: The task will be completed when the operator is controlling Reactor pressure in a band using HPCI per 34S0-E41-001-2.

TASK NUMBER: 200.034 OBJECTIVE NUMBER: 200.034.C PLANT HATCH JTA IMPORTANCE RATING:

RO SRO K/A CATALOG NUMBER: 206000A4.01 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.80 SRO 3.70 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 34S0-N30-001-2 (current version) 34S0-E41-001-2 (current version)

REQUIRED MATERIALS: Unit 2 34S0-N30-001-2 (current version) 34S0-E41-001-2 (current version)

APPROXIMATE COMPLETION TIME: 20 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-4 Page 2 of 10 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #113 or Snap 614 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS and EVENT TRIGGERS:

KEY MALF # DESCRIPTION FINAL RAMP DELAY ST-O mfB2l_129A SRV A Fails Stuck 0000 ST-O mfB2l_129B SRV B Fails Stuck 0000 ST-O mfB2l_129C SRV C Fails Stuck 0000 ST-O mfB2l_129D SRV D Fails Stuck 0000 ST-O mfB2ll29E SRV B Fails Stuck 0000 ST-O mfB2 1_I 29F SRV F Fails Stuck 0000 ST-O mfB2l_129G SRV G Fails Stuck 0000 ST-O mfB2 1_I 29H SRV H Fails Stuck 0000 ST-O mfB2L129K SRV K Fails Stuck 0000 ST-O mfB2l_l29L SRV L Fails Stuck 0000 ST-O mfB2l_129M SRV M Fails Stuck 0000 ST-O mfE5 1_i 10 RCIC Turbine Trip 0000 ST-O mfN2l_87A Feedwater Pump A Trip 0000 ST-O mfB2l_226A Low-Low Set A Fails mop 0000 ST-O mfB2l_226B Low-Low Set B Fails mop 0000 ST-O svoB2 1053 PT-N127A SRV Electrical open 1000 1000 0000 ST-O svoB2 1054 PT-N 127B SRV Electrical open 1000 1000 0000 ST-O svoB2lO55 PT-N127C SRV Electrical open 1000 1000 0000 ST-O svoB2lO56 PT-N127D SRV Electrical open 1000 1000 0000 ST-O mf6013l129 Leak Det Diff Temp Hi 0000 ST-O mf60131 135 Leak Ambient Temp Hi 0000 2

2012-301 SJM-4 Page 3 of 10 RB-i mfN37_134 ALL Bypass Valves Fail CLOSED 9999 RB-2 diN32-C001 A EHC Pump 2A Switch Trip 9999 RB-2 diN32-COO1B EHC Pump 2B Switch Trip 9999 ACTIVATE THE FOLLOWING EVENT TRIGGERS:

Trigger # DESCRIPTION CONDITIONS Expert Command

3. Take the Simulator OUT OF FREEZE and PERFORM the followina MANIPULATIONS OR RUN SCENARIO FILE and EVENT TRIGGER (current rev) JPiv1 CR-SIM 4 2012-301:

A. Perform RC-1 and RC-2 actions such that the 2N2 1-Fl 10 is closed and the SULCV is in auto and set at +20.

B. Perform TC- 1; ensuring 2N 11 -FOO4A and B are closed.

C. Lower Pressure Set to 825 psig.

D. Ensure Reactor pressure stabilizes at 825 psig.

E. Ensure Bypass Valve screen and Speed screen is called up.

F. Place Pressure in the P603 plasma display.

4. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
5. ESTIMATED Simulator SETUP TIME: 15 minutes 3

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 Reactor has been scrammed.
2. Other operators are performing scram actions.
3. A Reactor pressure reduction is required due to an unisolable steam leak in the Reactor Building.
4. You are assigned Reactor Pressure control.

INITIATING CUES:

LOWER AND THEN MAINTAIN Reactor pressure between 700 and 800 psig using the Bypass Valves.

2012-301 SIM-4 Page 5 of 10 i STEP PERFORMANCE STEP STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OLE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN LI Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the procedure Operator has obtained procedure needed to perform the task. 34G0-OPS-013-2, step 7.5.5 or uses Placard at Turbine Panel.

NOTE: For Steps 2 through 8 all indication will be on panel 2H1 1 -P650 using HMI Screens 2N32-K4001A or B.

2. Selects *Control* I psi-1oad The operator has SELECTED the screen Control* screen and also has SELECTED the *psj..Ioad*

button on 2N32-K4001A or B.

3. Selects *Ramp Rate*I button The operator has SELECTED the

(*.* Indicates critical step)

2012-301 SIM-4 Page 6 of 10 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 NOTE: An acceptable Ramp Rate results in a cooldown rate NOT exceeding 1 00°F/hr OR RWL exceeding 100 inches.

    • 4 Enters a ramp rate The operator has ENTERED a ramp rate >0 and <100 displayed on 2N32-K4001A or B.
  • *5 Selects *h.essure*I button The operator has SELECTED the
  • *6 Enters desired target pressure The operator has ENTERED a target pressure between 700 and 800 psig on 2N32-K4001A or B.
    • 7* Adjusts *Ramp Rate*I AND/OR the The operator has VARIED the I*Pressure* setpoints to maintain ramp rate/pressure to maintain a pressure/cooldown rate. cooldown rate 100° F/Hr OR RWL exceeding 100 inches change on 2N32-K4001A or B.

NOTE: ALTERNATE PATH starts here.

NOTE: SIMULATOR OPERATOR, WHEN the operator has successfully opened Bypass Valves (BPVs) and reactor pressure is being reduced AND with the Chief Examiners approval, ENTER RB-i malfunction which FULLY CLOSES ALL Bypass Valves.

The failure of ALL BPVs is Operator identifies all BPVs closed on 2N32-K400IA or B.

PROMPT: IF the operator reports the failure of the BPVs, INFORM the operator that you will get Maintenance to investigate, and to continue control Reactor pressure in the band using HPCI in the Pressure Control Mode.

(*

  • Indicates critical step)

2012-301 SIM-4 Page 7 of 10 STEP f PERFORMANCE STEP STANDARD I (COMMENTS)

NOTE: SIMULATOR OPERATOR, AFTER 3 minutes ONLY IF the operator is still at the P650 panel AND with the Chief Examiners approval, ENTER RB-2 malfunction which TRIPS BOTH EHC Pumps.

PROMPT: IF the operator addresses the failure of EHC Pumps, INFORM the operator that you will get Maintenance to investigate, and to continue control Reactor pressure in the band.

PROMPT: IF alarm 650-124, Max Combined Flow Limit Limiting, is received, INFORM the operator that another operator will address the ARP.

PROMPT: IF the operator addresses using other systems to control Reactor pressure, INFORM the operator to use HPCI in the Pressure Control Mode.

1. Resets the High Water Level Reset Confirms a HPCI High Water Pushbutton, IF the HPCI High Water Level light is NOT Level condition exists. ILLUMINATED on 2H1 l-P60l.
2. Resets the HPCI initiation signal, IF Confirm a HPCI initiation signal the HPCI initiation cannot be reset, does NOT exist by verifying the THEN do NOT perform this section. HPCI auto initiation light is not illuminated on 2H1 l-P601.
3. Open 2E41-F059, Lube Oil Cig Wtr On 2H1 1-P601, the operator has Valve. PLACED the switch for 2E41-F059 into the OPEN position, red light ILLUMINATED.
4. Start 2E41-C002-2, Barom Cndsr On 2H1 1-P601, the operator has Vacuum Pump. PLACED the switch for the HPCI vacuum pump to the START position, red light ILLUMINATED.
    • 5 Confirm open OR open 2E41-F008, On 2111 1-P60l, the operator has Test To CST Valve. VERIFIED that 2E41-F008 is OPEN, red light ILLUMINATED.

(** Indicates critical step)

2012-301 S1M-4 Page 8 of 10 STEP I

  1. I PERFORMANCE STEP STANDARD I SAT/UNSAT (COMMENTS)
    • 6. OPEN 2E41-F01 1, Test to CST On 2H1 1-P601, the operator has Valve. PLACED the switch for 2E41-FOl 1 into the OPEN position, red light ILLUMINATED.
7. NOTIFY Shift Supervisor to declare The operator has NOTIFIED the HPCI INOP AND place under an Shift Supervisor to declare HPCI LCO. INOP AND place under an LCO.
    • $ Place 2E41-F00l. Turb Steam Supply On 2H11-P602, the operator has Valve control switch to the OPEN PLACED the switch for 2E41-position. FOOl into the OPEN position, red light ILLUMINATED.
    • 9 Start 2E41-C002-3, the Aux Oil On 2H1 1-P601, the operator has Pump. PLACED the Aux Oil Pump switch into the START position, red light ILLUMINATED.
10. WHEN 2E41-C002-3, Aux Oil Pump, On 2H1 1-P601, the operator has STARTS, the operator will observe: VERIFIED the following:

Turbine Stop Valve OPENS, red Turbine Stop Valve OPENS light ILLUMINATED.

Turbine Control Valve OPENS Turbine Control Valve OPENS, HPCI comes up to speed red light ILLUMINATED.

HPCI speed is increasing on 2E41-R610.

11. Confirm CLOSE: The operator has VERIFIED the 2E41-F028, Steam Line Drain Valve green light is ILLUMINATED 2E41-F029, Steam Line Drain Valve for the following valves; 2E4l-F025, Barom Cndsr Disch To 2E41-F028, panel 2H1 1-P602 CRW Valve 2E41F029, panel 2H1 1-P601 2E4l-F026, Barom Cndsr Disch To 2E4l-F025, panel 2H1 1 -P602 CRW Valve 2E41-F026, panel 2Hl 1-P60l

( Indicates critical step)

2012-301 SIM-4 Page 9 of 10 f STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

12. Confirm 2E4 I -FO 12, Mm Flow Valve, On 2H 11 -P601, the operator has cycles CLOSED, IF OPEN. VERIFIED 2E41-F012, Mm Flow Valve, cycles CLOSED, green light ILLUMINATED.
13. Confirms 2E41-C002-l, Barom Cndsr On 2H11-P601, the operator has Cond Pump, operates automatically to VERIFIED 2E41-C002-1, Barom maintain the condenser water level. Cndsr Cond Pump, operates automatically, cycles between red then green light ILLUMINATED.
14. Confirms 2E41-C002-3, Aux Oil On 2111 l-P601, the operator has Pump, automatically STOPS at greater VERIFIED 2E4l-C002-3 stops, than 2000 rpm on the turbine, green light ILLUMINATED.
    • 15 Control HPCI turbine speed/system On 2H1 1 -P601, the operator has flow, and IF necessary throttle ADJUSTED the HPCI flow 2E41-F008, Test to CST Vlv, to controller 2E41-R612 and/or has control Reactor pressure. THROTTLED 2E41-F008 to CONTROL reactor pressure between 700 psig and 800 psig.
    • 16. Reactor pressure in band: The operator CONTROLS 700 to 800 psig pressure in band:

700 to 800 psig (+/-50 psig).

NOTE: AFTER the operator has demonstrated proper control of Reactor pressure, INFORM the operator that another operator will continue maintaining Reactor pressure in band.

END TIME:_______

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #16 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 10 of 10 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 Reactor has been scrammed.
2. Other operators are performing scram actions.
3. A Reactor pressure reduction is required due to an unisolable steam leak in the Reactor Building.
4. You are assigned Reactor Pressure control.

INITIATING CUES:

LOWER AND THEN MAINTAIN Reactor pressure between 700 and 800 psig using the Bypass Valves.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 5 ALL (Alternate Path)

TITLE PERFORM A MANUAL INITIATION OF DRYWELL SPRAY (VALVE FAILURE)

AUTHOR MEDIA NUMBER TIME Anthony Ball 201 2-301 SIM-5 5 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-5 Rev. No. Date Reason for Revision [ Authors I Initials Supvs Initials 00 11/15/99 Initial development RAB DHG 01 05/i 9/00 Correct simulator setup to incorporate instructor RAB DHG comments 02 11/06/00 Include objective number RAB DHG 03 03/25/02 Include initial operator statement RAB RAB 04 02/04/03 Reference 5000gpm limit as referenced in SAG/EOP. DNM DHG Add placing RHR in SP cooling as initial condition.

05 05/27/05 Revised Initial License statement for successful RAB RAB completion 06 06/30/06 Remove Response Cues RAB RAB 07 05/19/07 Correct the value for maximum drywell spray flow, DHG RAB 12500 gpm.

08 06/01/07 Revised to have both loops of torus cooling in service DHG BKW 09 Update KA information DHG 10 Revision for use on 2012-301 CR-STM 5 and updated ARB procedure changes. After NRC Exam, Media Number will be changed to LR-JP-25033--i0.

2012-301 SIM-5 Page 1 of 8 UNIT 1 ( ) UNIT2 (X)

TASK TITLE: PERFORM A MANUAL INITIATION OF DRYWELL SPRAY (VALVE FAILURE)

JPM NUMBER: 2012-301 SIM-5 TASK STANDARD: The task shall be completed when the RHR System has been initiated in the Drywell Spray Mode, per 34S0-El 1-010-2.

TASK NUMBER: 007.00 1 OBJECTIVE NUMBER: 007.001 .0 Type ALTERNATE PATH PLANT HATCH JTA IMPORTANCE RATING:

RO 4.71 SRO 4.05 K/A CATALOG NUMBER: 226001A4.03, 226001A2.l 1 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.50,3.0 SRO 3.40,3.0 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 34S0-El 1-010-2 (current version) 31EO-EOP-012-2 (current version REQUIRED MATERIALS: Unit 2 34S0-E1 1-010-2 (current version)

Key for 2E1 1-F016 A(B)

APPROXIMATE COMPLETION TIME: 10 SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-5 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #113 or Snap 615 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfE5 1_i 10 RCIC Turbine Trip 00000 mfB2l_229B FW Line B Break Inside Containment (Var) 50 1000 00000 mfB2l48A Steam Line A Break (After Restrictor) (Var) 2 1000 99999

3. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS mfEll_167 2E11-FO17A & B Override 5 Mm Timer ORIDE

4. INSERT the following ORS OVERRIDES:

TAG # PIL DESCRIPTION STATUS diEl 1-FOl 6A P Contmt Spray Outboard Drywell CLOSE 00000 diEl 1-FO16B P Contmt Spray Outboard Drywell CLOSE 0000 ACTIVATE THE FOLLOWING EVENT TRIGGERS:

Trigger # DESCRIPTION CONDITIONS Expert Command E11-4 Deletes diEl 1-FO16B & CET El 1-5 when 2E1 l-FO16A open Eli-S Deletes diEl 1-FO16A & CET El 1-4 when 2E1 1-FO16B open

5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Take the simulator out of FREEZE.

B. Close 2N21-FOO6B. Allow the valve to go FULL CLOSE.

C. Place the A and B Loops of RHR in torus spray.

D. When the operator starts Drywell spray, activate Malfunction mfB2l48A.

E. Place Recirc pumps switches in the TRIP position and all Drywell Cooling Fans to off.

6. PLACE the Simulator in FREEZE until the crew assumes the shift.
7. ESTIMATED Simulator SETUP TIME: 20 Minutes

Page 3 of 8 INSTRUCTOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Torus pressure is greater than 11 psig.
2. Drywell pressure and temperature are within the SAFE region of the Drywell Spray Initiation Limit Curve. (GRAPH 8)
3. Both Recirc pumps are tripped.
4. Both loops of RHR have been placed in torus sprays.
5. All Drywell Cooling fans are tripped.
6. Torus level is <215 inches.
7. 31E0-EOP-012-2, PC-i Primary Containment Control is in progress.
8. The links to override the 5 minute LOCA OPEN interlock for RHR OUTBD INJ VLVs has been OPENED.

INITIATING CUES:

Initiate one loop of RHR in Drywell sprays per 34S0-E11-0i0-2, Residual Heat Removal System to lower drywell pressure to 1.0 psig.

2012-301 SIM-5 Page 4 of 8 STEP I PERFORMANCE STEP SAT/UNSAT STANDARD

  1. I I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Li Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS Li For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:________

NOTE: If the operator starts with the A Loop of RHR, then ONLY the B Loop steps designated are CRITICAL (Steps 9, 11, 12, & 14).

If the operator starts with the B Loop of RHR, then ONLY the A Loop steps designated are CRITICAL (Steps 3, 6, 7, & 14).

1. Identifies the procedure for the task. Operator EITHER utilizes 34SO-El 1-010-2 Attachment 5 OR section 7.4.6.

NOTE: It is acceptable for the operator to place the 2/3 core height switch to override even though not required.

2. IF reactor water level is < 2/3 core Operator observes current RPV height, (-193 inches indicated on water level is above 193 inches 2B21-R623A or B, Rx Level, at indicated on 2B21-R623A or B, 2H1 1-P60l). PLACE 2E1 1-S18A(B), Rx Level, at 2H1 1-P601 and that Cnmt Spray Vlv Cntl 2/3 Core Ht overriding the 2/3 interlock is not Permis switch, in the MANUAL required.

OVERRD position.

2012-301 SIM-5 Page 5 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

    • 3 Place the Containment Spray Valve At panel 2H1 1-P601, the operator control switch 2E1 1-SI7A to the PLACES the CONTAINMENT Manual position. SPRAY VALVE CONTROL switch to MANUAL, white light illuminated. This switch will already be in manual due to having torus sprays in service.

NOTE: The operator may throttle or close 2E1 1-FO17A/B even though the RHR System is NOT injecting into the Reactor.

NOTE: The first 2E1 1-F016 A or B switch selected is failed.

Event Triggers E11-4 OR Eli-S will remove the other 2E1 1-F016 A or B switch failure.

4. Confirm or start RHR pumps in At panel 2H11-P601, the operator selected Loop. CONFIRMS the RHR pumps are running in the selected ioop, red lights illuminated.
5. Addresses Torus sprays The operator recognizes Torus sprays have already been placed in service.
    • 7 If this is the second ioop attempted, At panel 2H1 l-P601, the slowly opens the Containment Spray Operator has THROTTLED Outboard Vlv. 2E1 l-FO16A to start 2E1 l-FO16A OPEN, red light flow. ILLUMINATED.
8. If this is the first loop attempted, At panel 2H11-P601, the attempts to throttle open the Operator has RECOGNIZED that Containment Spray Outboard Vlv. 2E1 l-FO16A failed to OPEN, 2El 1-FO16A. green light ILLUMINATED.

NOTE: Do not order B loop to be placed in Torus spray since this is an Alternate Path JPM, the operators must determine this is the correct action on their own.

2012-301 SIM-5 Page 6 of 8 STEP f PERFORMANCE STEP STANDARD I (COMMENTS)

PROMPT: WHEN the Operator reports that 2E1 1-FO16A will NOT open ACKNOWLEDGE the failure and INFORM the operator that conditions are still met to spray the Drywell, ORDER the Operator to Spray the Drywell.

    • 9* Place the Containment Spray Valve At panel 2H1 1-P601, the operator control switch 2E1 1-S17B to the PLACES the CONTAINMENT Manual position. SPRAY VALVE CONTROL to MANUAL, white light illuminated.

NOTE: The operator may throttle or close 2E1 1-FO17B even though the RHR System is NOT injecting into the Reactor. The operator may close 2E1 1-F027B, Torus Spray valve, but this is NOT required because only one ioop will be in drywell sprays.

10. Confirm or start RHR pumps in At panel 2H1 1-P601, the operator selected loop. CONFIRMS the RFIR pumps are RUNNING, red lights illuminated.
  • *12. If this is the second loop attempted, At panel 2H1 1-P601, the operator slowly opens the Containment Spray THROTTLES the CNMT Outboard Vlv. 2E11-FO16B to start SPRAY OUTBD VLV, flow. 2E1 1-FO16B, to OPEN, red light illuminated.
13. If this is the first loop attempted, At panel 2H1 1-P601, the attempts to throttle open the Operator has RECOGNIZED that Containment Spray Outboard VIv. 2E11-FO16B failed to OPEN, 2El l-FO16B. green light ILLUMINATED.

NOTE: Drywell Spray flow rate must be at least 5000 GPM to ensure an effective drywell pressure reduction (reference EOP/SAG Appendix C calculations).

2012-301 SIM-5 Page 7 of 8 STEP I PERFORMANCE STEP STANDARD I SAT/UNSAT

  1. I (COMMENTS)
    • 14. RHR flow rate established within At panel 2H1 1-P601, the operator limits. VERIFIES that RHR Flow is less than or equal to 17,000 gpm, but greater than 5,000 gpm, on RHR FLOW 2E11.-R6O3AIB.

NOTE: This JPM may be stopped once drywell pressure is decreasing.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #14 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Torus pressure is greater than 1 1 psig.
2. Drywell pressure and temperature are within the SAFE region of the Drywell Spray Initiation Limit Curve. (GRAPH 8)
3. Both Recirc pumps are tripped.
4. Both loops of RHR have been placed in torus sprays.
5. All Drywell Cooling fans are tripped.
6. Torus level is <215 inches.
7. 31E0-EOP-012-2, PC Primary Containment Control, is in progress.
8. The links to override the 5 minute LOCA OPEN interlock for RHR OUTBD INJ VLVs has been OPENED.

INITIATING CUES:

Initiate one loop of RHR in Drywell sprays per 34S0-El 1-010-2, Residual Heat Removal System to lower drywell pressure to 1.0 psig.

ES-401 Written Examination Review Worksheet -- Hatch June 2012 Exam Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q= SRO B/M/N UIE/S Explanation Focus Dist. Link units ward K/A Only Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 5 (easy difficult) rating scale (questions in the 2 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:
  • The stem lacks sufficient focus to elicit the correct answer (e.g. unclear intent, more information is needed, or too much needless information).
  • The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
  • The answer choices are a collection of unrelated true/false statements.
  • The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
  • One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4. Check the appropriate box if a job content error is identified:
  • The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
  • The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
  • The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
  • The question requires reverse logic or application compared to the job requirements.
5. Check questions that are samqled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only EEEEEEEEE_

zz=zzz=_

4 F X N U K/A mismatch. Need better understanding of what task is to be performed and where it is performed.(chanped to E licensee will revise question.

a) a)

C a)

.

a)I a) xj co aix j

0.

< a) >0) CO

. C 0 o >

ai° C C a)

.cI)

C a.

0)0 CO

.

0 Cia) .0 0 (1) CO CO o Z.0

.!0) .) D O U) 0.

0.

x .c .2 .2o UI .oCci Ci 0

CO 0)0

.0 D5 .

U)> a) 0. C co 0 E. 0. CO Ca)

U) CO .C . O

CO LL LL a

0

  • .C -0>0) .9 .

.° 0)0

-o coE c .00 0C o

(1)-C

.H o

0) CO 0; E...

CCl) <. C a)

CQCO 0 Z.2 ).J.0 Ci (I,

p-.. Lii Cl) Cl) U) Cl) D C/) Cl) C/) Cl) C/) D Cl) C/) Cl) UI D C/) C/) C D

z

ó Z Z Z 2 0 Z Z Z 2 Z 2 O

a)

.C C/)Q o

C x

.-0 0.

UI CO CO U-

-

g .

C)

.0 .9

.g t

0.

-)

CO t

CO ci C/)

!

L:; c 0 I

-C C.)

>. (I)

CO U.)

ci c-U)

E

.2 X HH_HE_EHEHE_EHEE_EEL LL I CL. U- CL. Z IL CL I IL I CL I CL I U.. CL U[

u)cor. c0Q)

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only ZZI__________ The placement of the phrase lAW 34SO-N30-001 -2 implies that 26 F M E both responses are to be answered in accordance with the procedure, but from reading the supplied references the applicant isnt expected to apply any specific direction from the procedure to answer the second fill-in the-blank, which could cause some confusion. Move the phrase out of the question portion of the stem and place it at the front of the first fill-in-the-blank since its not the expectation that the applicant close the stop valves lAW the procedure.

Is it the expectation that the applicant know from memory which instrument is required by procedure to be used to measure eccentricity?

27 H M S/E Distractors A & C Since this is an individual RFPT controller might

-

be more plausible that some preset amount of speed bias is generated rather than a preset drop in the level setpoint might make the second part more plausible. Should discuss.


_

30 H B 5 Grammar remove apostrophe from the word its in the stem 31 F M E Consider: Choices A & B The stem is asking for the initial backup

power to the Vital AC Bus. 1 St part of these choices includes Vital AC in the response. If an applicant didnt know; a good guess would be the responses containing the same terminology. Add via Vital AC Battery Charger to the end of choices C & D. This is accurate because the power can be supplied from the 600V AC D Bus via the battery chargers and the terminology is consistent with what appears in the Vital AC Electrical Lineup (34S0-R25-002-2).

This removes any obviouse clue provided by the use of Vital AC in only choices A & B.

32 F B S? Is it an expectation that the operators are should know the actions on pg. 4 of a six page abnormal operations procedure?

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 33 F B U Choices B & D Given the background of all the applicants (AUO

qualified) the use of SYN INDICATOR AND SYNCHRONIZER are implausible. The exam item distractors have to be credible for the position (RO) being sought. Anyone with previous AUO qualification would know that the synchronizer would not be used to control the fuel supply to the EDG.

34 F B S Consider removing the word normally out of the stem. Is there any other integrator they would ever use for determining Unidentified Leakage?

35 H N S 36 H N U Distractors B and D a flow (2.OMlbm/hr) that corresponds to some

unspecified lower power/speed doesnt seem a credible choice.

Choices A and C None of the supporting documentation supports

that a final core flow value of 6.0 Mlbm/hr would occur at the stated power level (73%) and RR pump speed (70%).

37 H x N U K/A match is weak. The KJA is to test the operational implications of

.

undervoltage/degraded voltage. The conditions provided in the stem of the question are not specific to an undervoltage/degraded voltage situation. The stem of the question doesnt have the applicant either recognize an undervoltage/degraded voltage condtion or make some determination how the system will respond to a given undervoltage/degraded voltage condition. The conditions that caused the response provided in the stem would also occur on a loss of power and is not specific to an undervoltage/degraded voltage condition. So no decision can be made about the applicants understanding of the operational implications of an undervoltage/degraded voltage condition.

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD r r#1 Back-

(F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia Q SRO B/M/N U/E/S Explanation Focus Dist. j Link unitsj ward K/A Only 40 F M E Distractor D The stem states a failure occurred I dont find it

-

plausible that nothing happens. Since the intent of the question is to determine if the applicant knows the effect of removing the shorting links, consider reworking the stem of the question with an SRM with rising counts (above the trip point) and subsequently another SRM experiences an upscale failure. The choices can the revolve around whether a scram or half-scram occurred as a result of the first SRM reaching its trip point or once the second SRM failed.

EIEZ_ Z11__________

i__J_i___

44 F N SI? Distractors C and D Dont understand why

. . . a guage on the 87 elevation is plausible. Are there other instruments at this location that are used during Control Rm Abandonment? If not then the 2 half of these choices are not plausible 45 F N E The second bullet in the stem the use of LOWER and ABOVE

together is confusing. Is the dP being changed to 2 psid OR 12 psid? Unless there some evaluation value that I am not seeing recommend telling them specifically the desired psid.

i[_ _L___L_____________

IL___ Need to discuss K/A to make sure that question matches K/A. I 48 H M E dont see how the question relates to loss of SDC. The question is asking for the requirements for having SDC in service; it doesnt test anything associated with a loss of SDC. I think it can be reworded to lose an RHR subsystem and then ask whether or not the LCO is met or NOT met.

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues TIE Cred. Partial Job- Minutia #1 Back- Q SRO BIMIN UIE/S Explanation Focus Dist. Link units ward K/A Only 49 H M

  • K/A match is weak. Nothing states or implies that refueling is in progress. A lowering fuel pool level is not the same as a refueling accident. From looking at the distractor analysis and the original question, it appears some portion of the stem conditions got inadvertently omitted. Need to revisit the conditions provided in the original question and incorporate them into the question stem.
  • The ARMs automatically reset, but the RED trip lights must be manually reset. Are we testing minutia? I can see the need for knowing whether the ARMs automatically reset or not, but is the condition of the lights something the applicants should know?

50 F I I B UI? Not sure why distractors A and D are plausible 51 f H X N UI? Please explain why you think this question meets the K/A. Do not

] ] ] see where purpose or function is identified.

..L. L.. . . . . I N fs Why is a reference needed?

53 H M S 54 H X X B U/? Explain how the question matches K/A.. Identify why the distractors based on using the graft. Some of the numbers used in the distractors should be based on using the incorrect graft.

55 H X M E Need to reword stem and distractors. The correct answer is the only one that doesnt have ONLY in the choices given. Rewrite the question and make sure there is not a subset issue.

---

z=zzz=_:rz::z__________

60 H 1 f M 5? LOD. Need to make sure that there is not a subset issue. May

] need to reword the stem E[izzEE::::z_LZE[i____________

[iZZEEZZ_ZZE[i[___________

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LCD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- f Minutia #1 Back- Q ISRO B/M/N U/E/S Explanation Focus Dist. Linki units ward K/AjOnly 64 F X N U [Distractors C & D are not plausible. Why would anyone think that only a manual actions would start a fire suppression?

65 J H I I I M SI? Take another look to make sure that KIA match.

66 H 1 I f B U/S There could be several correct answers (C & D). LOD fZLZZZ_:L:1ii__________

68 H f M 5Il0D 69 H 1 N  ? JIs this an RO question 70 H f I N f 115

? this an RO question 71 H f_J f f f B UI? fueing in the stem 72 HH? 1 f N S LOD There could be two correct answers. A and B. Need to discuss 73 H X B U/S

. at expected normal full power radiation levels L

75 F N SI? Need to talk about K/A match.

76 H N S 77 H 1 X N U RO question. LOD 1 Do you expect candidate to have surveillance frequencies 78 H N E Memorized?

79 H N U RO question 55.41

Appears to be basic GFES Knowledge. K/A mismatch and. No 80 H X N U procedure selection required.

81 H N S RO question 82 H X M E 83 H M S

AT,NS part is basic RO knowledge 84 H X N E

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 85 H B E/U Not sure this is a RO question. It appears as if the first part of the question can be answered with system knowledge. The procedures identified have different numbers but the same titles.

86 H N S 87 H N U RO question 88 H M U RO question. I do not see where SRO knowledge is required to answer this question.

89 H N S 90 H M S 91 H B S 92 H M S 93 H X M U K/A mismatch. The first part of the question appears to be RO knowledge. Do you expect the applicant to know from memory the action statement?

94 H N S 95 H M E Do we expect them to know surveillance requirements form memory?

96 H N S 97 H X N U RO questions. Question appears to test on specific operator actions.

98 F M S 99 H X B U K/A mismatch. Does not test basis. Explain why you consider B plausible.

100 H M S

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 6 RO ONLY TITLE TRANSFER AN EMERGENCY 4160 VAC BUS FROM NORMAL TO ALTERNATE SUPPLY AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-6 5.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SKEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-6 Rev. Authors Supvs Date Reason for Revision No. Inifials Initials 01 06/09/89 General revision and format change JEM RSG 02 08/09/89 Procedure revision & add LR lesson plans JEM DHG 03 05/11/90 Procedure, format, and question revision JEM DHG 04 08/18/92 General revision and format change WMM SCB 05 09/23/93 General revision, word processor change RAB RSG 06 07/05/96 Format change RAB SMC 07 02/11/00 Format modification, update K/As, change time allowance based on RAB DHG running average 08 11/02/00 Include objective number RAB DHG 09 03/11/02 Include initial operator statement RAB RAB 10 03/08/05 Documentum revision DNM RAB 11 06/13/05 Revised Initial License statement for successful completion RAB RAB 12 04/18/06 Remove Response Cues RAB RAB 13 10/19/09 Added HU steps. CLN/ADY ALD 1 3. 1 10/17/11 Reviewed JPM against current procedure. Added MMG ALS Fundamental question to Attachment 1. Changed step 1 from identify correct procedure to obtain correct procedure.

13.2 Revision for use on 2012-301 CR-SIM 6. Removed prompt ARB for DIG. After NRC Exam, Media Number will be changed to LR-JP-27.10.

2012-301 SIM-6 Page 1 of4 UNIT1 () UNIT2 (X)

TASK TITLE: TRANSFER AN EMERGENCY 4160 VAC BUS FROM NORMAL TO ALTERNATE SUPPLY JPM NUMBER: 2012-301 SIM-6 TASK STANDARD: The task shall be completed when the operator has transferred one of the Emergency 4160 VAC Buses power supply from the D Startup Transformer to the C Startup Transformer per 34S0-R22-001.

TASK NUMBER: 027.010 OBJECTIVE NUMBER: 027.0 10.0 PLANT HATCH JTA IMPORTANCE RATING:

RO 3.00 SRO 3.11 K/A CATALOG NUMBER: 262001A4.01 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.4 SRO 3.7 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 N/A 34S O-R22-00 1-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 34S0-R22-001 -2 (current version)

APPROXIMATE COMPLETION TIME: 5.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-6 Page 2 of 4 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to 100% Power and leave in FREEZE.
2. ESTIMATED Simulator SETUP TIME: 5 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The plant is at 100% power. All plant systems are in their normal power lineup.
2. All offsite power sources are available.

INITIATING CUES:

Transfer the 4160 VAC Bus 2F to the Alternate Supply per 34S0R22-001 -2.

2012-301 SIM-6 Page 4 of 7 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

NOTE: This JPM was written for 4160 VAC Bus 2F. Other Emergency Buses may be chosen. The performance step sequence will be identical, but the switch names will be different.

1. Operator identifies the procedure Operator has obtained the correct needed to perform the task. procedure as 34S0-R22-001-2.
2. Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.
3. Confirm power is available from At panel 2H1 1-P651, the operator SAT 2C. has VERIFIED that VOLT SELECT STARTUP AUX XFMR 2C, 211-S004, potential lights are illuminated.

(** Indicates critical step)

2012-301 SIM-6 Page 5 of 7 STEP

PERFORMANCE STEP STANDARD I (COMMENTS)

4. Confirm 4160 VAC Buses 2A and 2B At panel 2H1 1-P651, the operator are powered from UAT 2B. has VERiFIED that:

NORMAL SUPPLY ACB 135434 is CLOSED, red light illuminated.

ALTERNATE SUPPLY ACB 135454 is OPEN. green light illuminated.

NORMAL SUPPLY ACB 135444 is CLOSED, red light illuminated.

ALTERNATE SUPPLY ACB 135464 is OPEN, green light illuminated.

    • 5 Place Sync Switch in ON position for At panel 2H1 1-P652, SSW ACB 135564. ACB 135564 Switch is in ON.
    • 6. Close Alternate supply breaker, At panel 2H1 1-P652, ACB 135564. ALTERNATE SUPPLY ACB 135564 is CLOSED, red light illuminated.
7. Verify the Normal supply breaker, At panel 2H1 1-P652, verifies ACB 135574, trips. NORMAL SUPPLY ACB 135574 TRIPS, green and amber lights illuminated.
8. Take Normal Supply Breaker control At panel 2H1 1-P652, NORMAL switch to TRIP. SUPPLY ACB 135574 control switch has been taken to TRIP, green light illuminated and amber light extinguished.
9. Place Sync Switch in OFF position for At panel 2H1 1-P652, SSW ACB ACB 135564. 135544 Switch is in OFF.

(** Indicates critical step)

2012-301 SIM-6 Page 6 of 7 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

10. Notify SS the Emergency bus is on Notifies SS the Emergency bus is Alternate Supply AND should on Alternate Supply AND should consider placing 4160V Buses 2C consider placing 4160V Buses 2C AND 2D on alternate supply. AND 2D on alternate supply.

END TIME:_______

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #10 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 7 of 7 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The plant is at 100% power. All plant systems are in their normal power lineup.
2. All offsite power sources are available.

INITIATING CUES:

Transfer the 4160 VAC Bus 2F to the Alternate Supply per 34S0-R22-001-2.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CR/SIM 7 ALL TITLE CROSSTIE RHR SERVICE WATER AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-7 15.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET ProgramlCourse Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-7 Rev.

No.

Date

[ Reason for Revision Format modification, change time allowance based on running average, Authors Initials Supvs Initials 07 02/25/00 RAB DHG correct simulator setup TLB comment, procedure change on Unit 2 that reorder Step 2-5 08 03/22/00 RAB DHG 09 11/02/00 Include objective number, correct simulator setup RAB DHG 10 12/27/01 Incorporate procedure changes DNM DHG 11 03/12/02 Include initial Operator statement RAB RAB Revised Initial License statement for successful completion 12 06/14/05 RAB RAB 13 04/21/06 Remove Response Cues RAB RAB Changed the Initial Conditions for Unit 2 to include a lead from PC 14 09/18/08 RAB Primary Containment Control to allow 2 pump operations.

15 10/17/08 Added prompt before step 2 to address concern about flume level JWP RAB control, Added another prompt before step 2 to address the need to sample before using B Heat Exchanger. Added Red Light and annunciator to Standard on step 6 to reflect procedure.

16 Revision for use on 20 12-301 CR-SIM 7 and updated ARB procedure changes. Removed Ui info for NRC Exam.

After NRC Exam, Media Number will be changed to LR-JP 34.08-16.

2012-301 SIM-7 Page 1 of 8 UNIT 1 () UNIT 2 (X)

TASK TITLE: CROSSTIE RHR SERVICE WATER JPM NUMBER: 20 12-301 SIM-7 TASK STANDARD: The task will be completed when RHRSW Loop A has been cross-tied to RHRSW Loop B per 34S0-E1 1-0 10.

TASK NUMBER: 034.008 OBJECTIVE NUMBER: 034.008.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.29 SRO Not Available K/A CATALOG NUMBER: 219000A2.15 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.30 SRO 3.40 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2

. N/A 34S0-E11-010-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 34SO-El 1-010-2 (current version)

APPROXIMATE COMPLETION TIME: 15.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-7 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to IC #111 or Snap 617 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mtEl 1_120B RHRSW 2B Pump Trip 00000 mfEl 1j 20D RHRSW 2D Pump Trip 00000

3. INSERT the following ORS OVERRIDES:

TAG # PIL DESCRIPTION STATUS El 1-COOIB_A RHR Service Water Pmp lB OFF 00000 El l-COO1B_B RHR Service Water Pmp lB OFF 00000 El 1-COOl D_A RHR Service Water Pmp ID OFF 00000 El 1-COO iD_B RHR Service Water Pmp ID OFF 00000 El 1-FO28ADI P RHR A Torus Spray/Test Vlv CLOSE 00000 El l-FO28A_A L RHR A Torus Spray/Test Vlv OFF 00000 Eli F028A_B L RHR A Torus Spray/Test Vlv OFF 00000

4. PLACE DANGER TAGS on the following equipment:

MPL # COMPONENT TAGGED POSITION 2E1 l-FO28A Torus Spray Or Test Vlv 2E1 l-F028A CLOSE 2E1 l-COO1B Service Water Pump 2E1 lCOO1B OFF 2E11-COO1D Service Water Pump 2ElI-COOID OFF

5. OPEN SRV(s) and allow Torus temperature to exceed 102°F, THEN close and reset amber light/alarms.
6. ESTIMATED Simulator SETUP TIME: 10 Minutes

INSTRUCTOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 is at 75% power and Torus Cooling is desired.
2. RHR Service Water Pumps 2B and 2D have been removed from service.
3. 2E1 I -F028A is tagged closed for corrective maintenance.
4. Torus Water Temperature is 102°F.

INITIATING CUES:

Crosstie the A loop of RHR Service Water to the B loop of RHR Service Water.

2012-301 SIM-7 Page 4 of 8 STEP PERFORMANCE STEP SAT!UNSAT STANDARD

  1. I I (COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actua or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

NOTE: The remaining steps were written using 34S0-E1 1-010-2 Attachment 10.

1. Operator identifies the procedure Operator EITHER utilizes 34SO-needed to perform the task. El 1-010-2 Attachment 10 OR section 7.2.6.

PROMPT: IF the Operator addresses the Caution concerning Flume level control, INFORM the Operator that Flume level control will be monitored and maintained by another Operator NOTE: It will NOT be necessary to override the RHRSW pump LOCA signal in this condition, but to do so will NOT prevent system operation.

2. Depress the RHR Service Water Lube At panel 2H1 l-P601, Operator Valves push-button on 2H1 1-P601. has depressed the RHR SERVICE WATER LUBE VALVES push button.

PROMPT: IF the Operator addresses waiting for one minute, INFORM the Operator that one minute has elapsed.

( Indicates critical step)

2012-301 SIM-7 Page 5 of 8

!

STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 PROMPT: IF the Operator addresses obtaining Shift Supervisors permission to crosstie RHRSW loops, INFORM the Operator that the Shift Supervisor has given permission to crosstie RHRSW loops.

    • 3* Open 2E11-F119A. At panel 2H11-P601, Operator opens SERV WTR CROSSTIE VLV 2E1 1-Fl 19A, red light illuminated.
    • 4 Open 2E1 1-Fl 19B. At panel 2H1 l-P60l, Operator opens SERV WTR CROSSTIE VLV 2E11-F119B, red light illuminated.
    • 5* Operator places the Interlock Override At panel 2H 1 1 -P601, Operator valve 2E1 l-F068B Keylock Switch in PLACES the Interlock Override the Override position. Valve 2El l-F068B Keylock Switch in the OVERRIDE position.

NOTE: Using the Override Switch for 2E1 I -F068A is not required, but if performed, should be noted. Overriding 2E1 l-F068A will not affect the performance of the JPM.

6. Set the Heat Exchanger B Differential At panel 2H11-P601, Operator Pressure Control Valve Controller, sets HX B DIFF PRESS 2E1 l-R600B to 45% OPEN. CONTROL VLV F068B controller, 2E1 1-R600B to 45%

OPEN.

The Operator confirms 2Ell-F068B, red light illuminated.

The Operator confirms RHR HX A (B) DIFF PRESS LOW annunciator illuminates.

NOTE: RHRSW Pump A or C may be started first. Therefore Steps 7 and 11 may be interchanged.

    • 7 Start RHRSW Pump 2A. At panel 2H1 l-P601, Operator starts SERVICE WATER PUMP 2El 1-COO1A, red light illuminated.

(** Indicates critical step)

2012-301 SIM-7 Page 6 of 8 STEP

PERFORMANCE STEP STANDARD I 1 (COMMENT S)

8. Operator places the Interlock Override At panel 2H1 1-P601, Operator valve 2E1 l-F068B Keylock Switch in PLACES the INTERLOCK the Normal position. OVERRIDE VLV 2E1 1-F068B Keylock Switch in the NORMAL position.
9. THROTTLE 2E1 l-F068B, Hx B At panel 2H1 1-P601, Operator Disch Vlv to obtain the desired has adjusted HX B DIFF PRESS 2E1 1-R602B RHR Service Water CONTROL VLV F068B flow (4400 GPM maximum), WHILE controller, 2E1 1-R600B, to obtain maintaining RI-IRSW System pressure desired flow rate of about less than 450 PSIG 4400gpm.

Pressure limit for RHR Service Water is less than 450 psi.

PROMPT: WhEN the Operator addresses starting the second RHRSW pump, INFORM the Operator that it is desired to start the second RHRSW pump.

10. Adjust Diff Press Control Vlv At panel 2H1 1-P601, Operator 2E1 1-F068B to obtain desired has adjusted HX B DIFF PRESS RHRSW flow rate, THEN open CONTROL VLV F068B 2E1 1-F068B an additional 5%. controller, 2E1 1-R600B, to obtain desired flow rate, and THEN an additional 5% is added.

Flow rate limit, PRIOR to adding 5%, is 4400 gpm (+0, -200 gpm).

Pressure limit for RHR Service Water is less than 450 psi.

NOTE: Flow rate will be monitored on PUMP TEST FLOW indicator SERV WATER FLOW indicator 2E1 1-R602A. Pump discharge pressure will be monitored on DIV I PRESSURE indicator 2E1 l-R650A or R650B.

NOTE: If step 7 is performed successfully, Step 1 1 is NOT critical.

(*

  • Indicates critical step)

2012-301 SIM-7 Page 7 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

    • 12. Adjust Diff Press Control Vlv At panel 2H1 1-P601, Operator 2E11-F068B to obtain desired has adjusted HX B DIFF PRESS RHRSW flow rate. CONTROL VLV F068B controller, 2E1 l-R600B, to obtain desired flow rate.

Flow rate limit is 4400 gpm for one pump or 8800 gpm for two pumps.

Pressure limit for RHR Service Water is less than 450 psi.

PROMPT: WHEN the Operator addresses starting RHR, INFORM the Operator that another Operator will start that system.

PROMPT: IF the Operator addresses the in-service RHR Service Water strainer differential pressure, INFORM the Operator that another Operator is monitoring this differential pressure and it is below 6 psid.

END TIME:________

NOTE: The terminating cue shall be given to the Operator when:

After JPM step #12 is complete.

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

( Indicates critical step)

Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 is at 75% power and Torus Cooling is desired.
2. RHR Service Water Pumps 2B and 2D have been removed from service.
3. 2E1 1FO28A is tagged closed for corrective maintenance.
4. Torus Water Temperature is 102°F.

INITIATING CUES:

Crosstie the A loop of RHR Service Water to the B loop of RHR Service Water.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM CRISIM 8 ALL (Alternate Path)

TITLE USING THE OVERRIDE SWITCHES, VENT THE DRYWELL WITH THE CAD SYSTEM WITH VALVE FAILURE AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 SIM-8 7.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 SIM-8 Rev. No. Date Reason for Revision Authors Supvs Initials Initials 00 Initial development for NRC Exam 20 12-301 SIM 8 ARB from JPM 01364-8.1.

2012-301 SIM-8 Page 1 of 5 UNIT 1 () UNIT 2 (X)

TASK TITLE: USING THE OVERRIDE SWITCHES, VENT THE DRYWELL WITH THE CAD SYSTEM WITH VALVE FAILURE 3PM NUMBER: 2012-301 SIM-8 TASK STANDARD: The task shall be completed when the Drywell is being vented via the CAD System, per 31E0-EOP-101.

TASK NUMBER: 013.064 OBJECTIVE NUMBER: 013.064.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.43 SRO 3.16 K/A CATALOG NUMBER: 223001A2.07 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.20 SRO 4.30 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 N/A 31E0-EOP-101-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 31E0-EOP-101-2 (current version)

APPROXIMATE COMPLETION TIME: 7.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2012-301 SIM-8 Page 2 of 5 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to 100% RTP or Snap 618 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfP64_193A Drywell Chiller Compressor A Failure 00000 mfP64_193B Drywell Chiller Compressor B Failure 00000 mfB2l_123A Steam Line A Break (Before Restrictor) (Var) 7.5 100 00000 diT48-F334A Drywell Vent Exh 2 Inch Isolation Valve CLOSE 100 0000

3. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. RC-1,2,&3 B. Start SBGT System 2A with suction from the Reactor Building.

C. Allow the simulator to run until the plant is in the UNSAFE Region of the DWSIL Curve.

D. Maintain RWL around 0 inches with Condensate.

E. Turn OFF ALL ECCS Pumps.

4. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
5. ESTIMATED Simulator SETUP TIME: 15 Minutes

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A steam line broke in the Drywell.
2. All attempts to control Drywell pressure have been unsuccessful.
3. Standby Gas Treatment is in operation.
4. Primary Containment Hydrogen concentration is less than 1 %.
5. Offsite radioactivity release rate is <0.057 mR/hr and is expected to remain at its present level.
6. Normal AC Power is available.
7. A Group II isolation has occurred.

INITIATING CUES:

Defeating isolation interlocks, vent the Drywell with the 2A loop of CAD valves, per 31E0-EOP-l0l-2.

2012-301 SIM-8 Page 4 of 8 STEP I

PERFORMANCE STEP STANDARD (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:

1. Operator identifies the materials that Operator identifies the required are required. materials and where to obtain them.
2. Defeat the High Drywell Pressure At panel 2H1 1-P657, the operator Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

High Drywell Press, 2T48-F334A High Drywell Press, 2T48-F335A

3. Defeat the Low RPV Level Isolation At panel 2H1 1-P657, the operator signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Low RPV Level, 2T48-F334A Low RPV Level, 2T48-F335A

(*

  • Indicates critical step)

2012-301 SIM-8 Page 5 of 8 STEP

PERFORMANCE STEP STANDARD f (1:rS)

4. Defeat the Reactor Building High At panel 2H1 1-P657, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Rx Bldg High Radn, 2T48-F334A Rx Bldg High Radn, 2T48-F335A

5. Defeat the Refuel Floor High At panel 2H1 1-P657, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Refuel Fir High Radn, 2T48-F334A Refuel Flr High Radn, 2T48-F335 A

6. Open Drywell 2 Vent valve, At panel 2H1 1-P657, the 2T48-F334A. Operator has RECOGNIZED that 2T48-F334A failed to OPEN, green light ILLUMINATED.

NOTE: Do NOT order B CAD loop for Drywell Venting since this is an Alternate Path JPM, the operator must determine this is the correct action on their own.

PROMPT: WHEN the Operator reports that 2T48-F334A will NOT open ACKNOWLEDGE the failure and INFORM the operator that conditions are still met to vent the Drywell, ORDER the Operator to Vent the Drywell using the CAD Loops.

    • 7 Defeat the High Drywell Pressure At panel 2H1 1-P654, the operator Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

High Drywell Press, 2T48-F334B High Drywell Press, 2T48-F335B

    • 8. Defeat the Low RPV Level Isolation At panel 2H1 1-P654, the operator signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Low RPV Level, 2T48-F334B Low RPV Level, 2T48-F335B

(** Indicates critical step)

2012-301 SJM-8 Page 6 of 8 STEP

PERFORMANCE STEP STANDARD I (COMMENTS)

    • 9* Defeat the Reactor Building High At panel 2H1 1-P654, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Rx Bldg High Radn, 2T48-F334B Rx Bldg High Radn, 2T48-F335B

    • 1O. Defeat the Refuel Floor High At panel 2H1 1-P654, the operator Radiation Isolation signal. PLACES the keylock PCIS Override Switches to OVERRIDE for:

Refuel Fir High Radn, 2T48-F334B Refuel Fir High Radn, 2T48-F335B

    • 11. Open Drywell 2 Vent valve, At panel 2H1 1-P654, DRYWELL 2T48-F334B. VENT ISOL VLV, 2T48-F334B is OPEN, red light illuminated.
    • 12. Open Drywell 2 Vent valve, At panel 2H1 l-P654, DRYWELL 2T48-F335B. VENT ISOL VLV, 2T48-F335B is OPEN, red light illuminated.
    • 13. Using Drywell Flow Controller, At panei 2H1 1-P654, the operator 2T48-R615B, Open Torus Vent Flow Operates 2T48-R615B, Drywell Control Valve, 2T48-F336B. Vent Flow Cntl Vlv 2T48-F336B, as required to maintain Suppression Chamber pressure below 56 psig.
14. Monitor Drywell pressure indication At panel 2H1 l-P654, Dryweli pressure is monitored by the operator.

PROMPT: WHEN the operator addresses Drywell pressure, INDICATE for the operator that Drywell pressure is less than 56 psig and slowly decreasing.

(*

  • Indicates critical step)

2012-301 SIM-8 Page 7 of 8 STEP I

  1. i PERFORMANCE STEP STANDARD I SAT/UNSAT (COJ{[4ENTS) 1 PROMPT: INFORM the operator, as Shift Supervisor, that Drywell venting is to continue and another operator will complete the process.

END TIME:________

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #14 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(*

  • Indicates critical step)

Page 8 of 8 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A steam line broke in the Drywell.
2. All attempts to control Drywell pressure have been unsuccessful.
3. Standby Gas Treatment is in operation.
4. Primary Containment Hydrogen concentration is less than 1%.
5. Offsite radioactivity release rate is <0.057 mRlhr and is expected to remain at its present level.
6. Normal AC Power is available.
7. A Group II isolation has occurred.

INITIATING CUES:

Defeating isolation interlocks, vent the Drywell with the 2A loop of CAD valves, per 3lEOEOP-l01-2.

DRAFT Southern Nuclear E, I. Hatch Nuclear Plant Operations Training JPM PLANT 1 ALL (Alternate Path)

TITLE From Outside the MCR, Inject Boron using the SBLC System with 1st Pump Failure AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2012-301 PLANT-i 21.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 PLANT-i Rev. No. Date Reason for Revision Authors Initials

[ Supvs Initials 00 Modified JPM 11.12-16.1 (From Outside MCR Inject ARB SBLC) to make a NEW Alternate Path JPM where the A SBLC pump fails to run but B SBLC will start.

After NRC Exam, Media Number will be changed to LR-JP-1 1,12-01.

2012-301 PLANT-i Page 1 of 3 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: From Outside the MCR, Inject Boron using the SBLC System with 1st Pump Failure JPM NUMBER: 2012-301 PLANT-i TASK STANDARD: The task shall be completed when one Standby Liquid Control Squib Valve has been fired and one System pump has been started locally and the Standby Liquid Control System is injecting to the Reactor, per 34S0-C41-003.

TASK NUMBER: 011.012 OBJECTIVE NUMBER: 01 i.012.B PLANT HATCH JTA IMPORTANCE RATING:

RO 4.20 SRO 4.20 K/A CATALOG NUMBER: 2110002130 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.40 OPERATOR APPLICABILITY: System Operator (SO)

GENERAL

REFERENCES:

Unit 1 Unit 2 31E0-EOP-011--1 31E0-EOP-01 1-2 34S0-C41 -003-1 34S0-C41 -003-2 (Current Versions) (Current Versions)

REQUIRED MATERIALS: Unit 1 Unit 2 34S0-C41-003-1 34S0-C4 1-003-2 (current version) (current version)

Four (4) SBLC Squib Valve Four (4) SBLC Squib Valve jumper wires, from EOP file jumper wires, from EOP file next to Remote Shutdown next to Remote Shutdown Panel 1H21-P173 Panel 2C82-P001 Flathead screwdriver Flathead screwdriver APPROXIMATE COMPLETION TIME: 21.0 Minutes SIMULATOR SETUP: N/A 1

UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Reactor has failed to Scram either manually or automatically, and the Torus temperature is approaching the BITT curve.
2. 31E0-EOP-O1 1-1 (RCA) is in progress.
3. SBLC has failed to initiate from the Control Room.
4. RWCU is isolated.

INITIATING CUES:

Manually initiate SBLC locally per 34S0-C4 1-003-I.

2012-301 PLANT-i Page 3 of 6 STEP PERFORMANCE STEP STANDARD For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND Ii Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the materials that Operator has identified the are required. required materials and where to obtain them.
2. Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.

(** Indicates critical step)

2012-301 PLANT-I Page 4 of 6 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

Junction Box terminal Cl (white wire) and terminal C (green wire) to Terminal point BB-I.

Junction Box terminal C2 (black wire) and terminal C3 (red wire) to Terminal point BB-4.

At Squib Valve Junction Box and Panel 1H21-P01 1, the following jumpers are INSTALLED to fire 1C41-FOO4B:

Junction Box terminal Cl (white wire) and terminal C (green wire) to Terminal point BB-8.

Junction Box terminal C2 (black wire) and terminal C3 (red wire) to Terminal point BB-l 1.

PROMPT: WHEN all terminals for a Squib Valve are correctly installed (Squib Valve will fire when the last connection is made, preferably at 1H21-PO1l panel), INDICATE an explosive noise from the vicinity of that Squib Valve.

NOTE: Detonation of one Squib Valve will satisfactorily meet the standard.

NOTE: The jumpers used to fire the Squib Valves are a jumper with 3 connections to connect all three terminal points.

PROMPT: IF the operator addresses isolation of RWCU, as the Control Room operator REPORT that RWCU is isolated.

4. Start SBLC Pump 1C41-COO1A. At panel 1H21-P0l 1, SBLC PUMP, 1C41-COO1A, control switch is in RUN.

PROMPT: WHEN the operator addresses indications for pump start, INDICATE there is NO noise from the pump and the green light is ILLUMINATED and the red light is EXTINGUISHED.

(** Indicates critical step)

2012-301 PLANT-i Page 5 of 6 STEP

PERFORMANCE STEP STANDARD I (COMMENTS)

5. RETURN the control switch to the At panel 1H21-P01 1, SBLC STOP position. STOP position PUMP, 1C41-COO1A, control switch is in STOP.

PROMPT: WHEN the operator addresses indications for pump start, INDICATE there is noise from the pump and the green light is EXTINGUISHED and the red light is ILLUMINATED.

7. Verify the SBLC solution is being The operator has VERIFIED injected into the Reactor. SBLC Tank level is DECREASING as indicated by SBLC STORAGE TANK LEVEL INDICATOR, 1C41-R001.

PROMPT: WHEN the operator addresses SBLC tank level, INDICATE for the operator that level is decreasing slowly, but is greater than 1300 gallons.

NOTE: It will take between 30 and 70 minutes to completely empty the SBLC Storage Tank.

END TIME:_______

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #7 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 6 of 6 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Reactor has failed to Scram either manually or automatically, and the Torus temperature is approaching the BuT curve.
2. 31E0-EOP-Ol 1-1 (RCA) is in progress.
3. SBLC has failed to initiate from the Control Room.
4. RWCU is isolated.

INITIATING CUES:

Manually initiate SBLC locally per 34S0-C41-003-1.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 2 ALL (Alternate Path)

TITLE FROM OUTSIDE THE CONTROL ROOM, ENERGIZE AN EMERGENCY BUS AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2012-301 PLANT-2 19.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN 4 COMPANT

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 PLANT-2 Rev. No. Date ..

Reason for Revision Authors

..

Supvs Initials Initials 00 Initial development of new Alternate path JPM. ARB

2012-301 PLANT-2 Page 1 of 7 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: FROM OUTSIDE THE CONTROL ROOM, ENERGIZE AN EMERGENCY BUS JPM NUMBER: 2012-30 1 PLANT-2 TASK STANDARD: The task shall be completed when the operator has successfully tied Emergency Diesel Generator 1C (1A) per 34AB-R43-00l.

TASK NUMBER: 028.026 OBJECTIVE NUMBER: 028.026.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.64 SRO Not Available K/A CATALOG NUMBER: 2640002130 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.40 OPERATOR APPLICABILITY: Systems Operator (SO)

GENERAL

REFERENCES:

Unit 1 Unit 2 34A8-R43-001-1 34AB-R43-001-2 31 RS-OPS-002- 1 31 RS-OPS-002-2 (current versions) (current versions)

REQUIRED MATERIALS: Unit 1 Unit 2 34AB-R43-001 -1 34AB-R43-001-2 (current version) (current version)

APPROXIMATE COMPLETION TIME: 19.0 Minutes SIMULATOR SETUP: N/A

EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Main Control Room has been evacuated.
2. The 1G 416OVAC Emergency Bus is DE-ENERGIZED.
3. ALL 1G 4160 VAC Bus Supply Breakers are OPEN.
4. Another operator has manually started the 1C Diesel Generator (DG).
5. 1 C DG is operating at 900 RPM.
6. The 1C DG Output Breaker is OPEN.
7. The I C DG Control Switch is in the AT ENGINE position
8. lD PSW Pump is operating.
9. All station DC power is available.
10. A fire was NOT the cause of the Control Room evacuation.

INITIATING CUES:

JAW step 4.6 of 34AB-R43-00l-l, ENERGIZE the IG 4160VAC Emergency Bus.

2012-301 PLANT-2 Page 3 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (Reference NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation)

NOTE: IF any Diesel Generator (DG) surveillance is in progress, DOUBLE hearing protection will be REQUIRED to be worn while performing this JPM.

NOTE: If it is desired to have the candidate open local panel 1R43-POO1C to demonstrate knowledge of the location of the speed control switch, then a key (Key 1 R43- 1) is required to perform this JPM. If the candidate will not be required to open the panel, a picture of the switch may be used to simulate this part of the task and the key will NOT be required.

NOTE: This JPM is written to be performed on the IC DG. If 1C DG is out of service for plant maintenance, then substitute the letter A for the letter C throughout this JPM and complete on the 1 A DG.

START TIME:

1. Operator reviews the procedure. Operator has reviewed step 4.6 of 34AB-R43-001-1.

PROMPT: IF the operator addresses operation of other 4160VAC Buses, as the Shift Supervisor, INFORM the operator that another operator will energize any remaining Buses.

(*

  • Indicates critical step)

2012-301 PLANT-2 Page 4 of 7 I STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

NOTE: The status of the 1 D PSW pump is OPERATiNG (provided to the candidate on the Initial Conditions sheet of this JPM). The power supply to 1B PSW Pump is 1G 4KV bus, which is currently de-energized.

PROMPT: IF the operator checks voltage before flashing the field, INDICATE for the operator that voltage is 0 Volts on voltage meter.

    • 2. Flash the generator field by placing At panel 1R43-POO3C, the Diesel the Diesel Generator 1 C control Generator 1 C CONTROL switch:

switch in REMOTE. Has been taken to REMOTE.

PROMPT: WHEN the operator addresses voltage, INDICATE for the operator that voltage is increasing after the Control switch has been taken to REMOTE.

    • 3 Places the Diesel Generator 1C At panel lR43-POO3C, the Diesel control switch in AT ENGINE. Generator lC CONTROL switch:

Has been taken back to AT ENGINE after voltage develops.

PROMPT: WHEN the operator addresses generator voltage, INDICATE for the operator that voltage is 4160 volts.

4. Confirm DIG voltage is at 4160 VAC At panel lR43-POO1C, operator at Diesel Generator lC Control has read lR43-R769C, GEN KV Panel, 1R43-POO1C. VOLTMETER indication of 4160 volts.
5. Confirm D/G frequency is at 60 Hz at At panel lR43-POOIC, operator Diesel Generator 1C Control Panel READS 1R43-R766C, GEN 1R43-POO1C. FREQ METER indication of 60 Hz (+/-1 Hz).

PROMPT: WHEN the operator identifies 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 60 Hz.

PROMPT: WHEN the operator identifies the 1C DG Output breaker, INFORM the operator that the Green indicating light is ILLUMINATED.

NOTE: At this point the operator will go to section 4.7 to force the output breaker to close by lowering and then raising 1C DG speedlfrequency.

(** Indicates critical step)

2012-301 PLANT-2 Page 5 of 7 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

NOTE: The operator can adjust the Diesel Generator 1C speed from EITHER 1R43-POO1C, using the SPEED CONTROL switch OR from Diesel Generator 1C Governor Speed Setting knob (Top Right Knob on the Governor). Note: The knob below this one is labeled Speed Setting Indicator NOTE: If the Operator uses the Speed Setting Switch then steps 6 & 7 are CRITICAL, and 8& 9 become N/A; if the Operator uses the Speed Setting Switch then steps 8 & 9 will be CRITICAL and 6 & 7 become N/A.

6. Adjust Diesel Generator lC Speed At panel 1R43-POO1C (Inside Setting Switch to LOWER frequency lower-left panel door, on the 57 Hz. backside of the door), operator has ADJUSTED Speed Setting Switch in the LOWER direction.

At panel 1 R43-P00 1 C, operator READS 1R43-R766C, GEN FREQ METER indication of 57 Hz (+/-1 Hz).

PROMPT: WHEN the operator identifies the 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 57 Hz.

    • 7 Adjust Diesel Generator 1C Speed At panel 1R43-POO3C, operator Setting Switch to RAISE frequency 60 has ADJUSTED Speed Setting Hz. Switch in the RAISE direction.

At panel 1R43-POOIC, operator READS 1R43-R766C, GEN FREQ METER indication of 60 Hz (+/-1 Hz).

PROMPT: WHEN the operator identifies the 1 R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 60 Hz.

(** Indicates critical step)

2012-301 PLANT-2 Page 6 of 7 I STEP I I

  1. I PERFORMANCE STEP STANDARD I SAT/UNSAT (COMMENTS) I
    • 8. Adjust Diesel Generator 1C governor At panel 1R43-POO3C, operator Speed Setting knob to LOWER has ADJUSTED governor frequency 57 Hz. SPEED SETTING knob in the LOWER (CCW) direction.

At panel 1R43-POOIC, operator READS 1R43-R766C, GEN FREQ METER indication of 57 Hz (+/-1 Hz).

PROMPT: WHEN the operator identifies the 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 57 Hz.

    • 9 Adjust Diesel Generator 1C governor At panel 1R43-POO3C, operator Speed Setting knob to RAISE has ADJUSTED governor frequency 60 Hz. SPEED SETTING knob in the RAISE (CW) direction.

At panel 1R43-POO1C, operator READS 1R43-R766C, GEN FREQ METER indication of 60 Hz (+/-1 Hz).

PROMPT: WHEN the operator identifies the 1R43-R766C, GEN FREQ METER indication meter, INDICATE for the operator a frequency of 60 Hz.

PROMPT: WHEN the operator addresses the I C DG Output breaker, INFOR1\I the operator that the Red indicating light is ILLUMINATED.

PROMPT: IF the operator addresses restoration of 4160 VAC Emergency Bus loads, as the Shift Supervisor, INFORM the operator that this will be performed by another operator.

END TIME:

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #9 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet and the picture of the Speed Control switch (if used).

(** Indicates critical step)

Page 7 of 7 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Main Control Room has been evacuated.
2. The 1G 416OVAC Emergency Bus is DE-ENERGIZED.
3. ALL 1G 4160 VAC Bus Supply Breakers are OPEN.
4. Another operator has manually started the 1C Diesel Generator (DG).
5. 1C DG is operating at 900 RPM.
6. The iC DG Output Breaker is OPEN.
7. The 1C DG Control Switch is in the AT ENGINE position
8. 1D PSW Pump is operating.
9. All station DC power is available.
10. A fire was NOT the cause of the Control Room evacuation.

INITIATING CUES:

JAW step 4.6 of 34AB-R43-001-1, ENERGIZE the 1G 4160VAC Emergency Bus.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM PLANT 3 ALL TITLE DURING A LOSS OF AIR, ISOLATE THE FIRE PROTECTION SPRINKLERS AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 PLANT-3 13.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2012-301 PLANT-3 Rev. No. Date Reason for Revision Authors Initials

[ Supvs Initials 01 09/04/92 General revision and format change WMM SMC 02 07/22/93 General revision, word processor change RAB RSG 03 08/19/94 Procedure change, adjust format, change initiating cue RAB SMC to a direct command 04 08/01/96 Format change, modify time allowance RAB DFIG 05 02/25/00 Format modification, change time allowance based on RAB DHG running average, update K/As 06 11/02/00 Include objective number, change operator RAB DHG applicability to Systems Operator 07 03/12/02 Include initial operator statement RAB RAB 08 06/16/05 Revised Initial License statement for successful RAB RAB completion 09 04/21/06 Remove Response Cues RAB RAB 10 General revision for use on HLT-7 NRC Exam. After ARB NRC Exam, Media Number will be changed to LR JP-36. 13-10.

2012-301 PLANT-3 Page 1 of 5 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: DURING A LOSS OF AIR, ISOLATE THE FIRE PROTECTION SPRINKLERS JPM NUMBER: 2012-301 PLANT-3 TASK STANDARD: The task shall be completed when the Fire Protection Sprinklers have been isolated during a loss of air per 34AB-P51-001.

TASK NUMBER: 036.013 OBJECTIVE NUMBER: 036.013.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.57 SRO 3.70 K/A CATALOG NUMBER: 2860002130 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 3.40 OPERATOR APPLICABILITY: Systems Operator (SO)

GENERAL

REFERENCES:

Unit 1 Unit 2 N/A 34AB-P5l-001-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 N/A 34AB-P5 1-001-2 (current version)

APPROXIMATE COMPLETION TIME: 13.0 Minutes SIMULATOR SETUP: N/A

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A scram has occurred on Unit 2.
2. Unit 2 has had a loss of control air pressure and header pressure is below 45 psig and NOT increasing.
3. No fires exist in the plant.
4. Another operator is isolating Fire Protection Sprinklers to the Startup Transformers.
5. 34AB-P51-OOl-2, Loss of Instrument and Service Air System, is in progress.

INITIATING CUES:

Isolate the Fire Protection Sprinklers inside the Power Block per Attachment I of 34AB-P5 1-001-2.

2012-301 PLANT-3 Page 3 of 5 STEP SAT/UNSAT

  1. I PERFORMANCE STEP STANDARD I

(COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS Li For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:

NOTE: The steps of this JPM may be performed in any order.

Close valve 2U43-F093. At location 11 2TAT19, valve 2U43-F093 is CLOSED.

NOTE: This valve isolates the Reactor Feed Pump and Oil Conditioner area.

NOTE: This valve isolates the Hydrogen Seal Oil System, W End Cond A & B (Below 130) and W End Cond A & B (Above 130) areas.

NOTE: This valve isolates the Main Turbine Lube Oil Reservoir area.

PROMPT: IF the operator addresses stationing a fire watch, as the Shift Supervisor, INFORM the operator that a fire watch is being posted with back-up suppression equipment.

(** Imlicates critical step)

2012-301 PLANT-3 Page 4 of 5 STEP I

  1. I PERFORMANCE STEP I STANDARD I SAT!UNSAT (COMMENTS) I I

L*4.

Close valve 2U43-F090. At location 13OTAT19, valve 2U43-F090 is CLOSED.

I 1 RESPONSE CUE: N/A NOTE: This valve isolates the RFP Oil Conditioner area.

END TIME:_______

NOTE: The terminating cue shall be given to the operator when any one of the following is met:

After JPM step #4 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

(** Indicates critical step)

Page 5 of 5 UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A scram has occurred on Unit 2.
2. Unit 2 has had a loss of control air pressure and header pressure is below 45 psig and NOT increasing.
3. No fires exist in the plant.
4. Another operator is isolating Fire Protection Sprinklers to the Startup Transformers.
5. 34AB-P51-OO1-2, Loss of Instrument and Service Air System, is in progress.

INITIATING CUES:

Isolate the Fire Protection Sprinklers inside the Power Block per Attachment 1 of 34AB-P51-OO1-2.