|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:April 2, 2013 | | {{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ril 2, 2013 |
|
| |
|
| Mr. Edward D. Halpin, Senior Vice President
| | ==SUBJECT:== |
| & Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Mail Code 104/6/601 Avila Beach, CA 93424
| | NRC INSPECTION REPORT 050-00133/13-007 |
| | |
| SUBJECT: NRC INSPECTION REPORT 050-00133/13-007 | |
|
| |
|
| ==Dear Mr. Halpin:== | | ==Dear Mr. Halpin:== |
| This refers to the inspection conducted on March 4-7, 2013, at the Humboldt Bay Power Plant, Unit 3 facility in Eureka, California. The enclosed report presents the results of this inspection. | | This refers to the inspection conducted on March 4-7, 2013, at the Humboldt Bay Power Plant, Unit 3 facility in Eureka, California. The enclosed report presents the results of this inspection. |
|
| |
|
| This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. In summary, the inspector determined that you were conducting decommissioning activities in accordance with license and regulatory requirements. The preliminary inspection results were presented to your staff at the conclusion of the onsite inspection. | | This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. In summary, the inspector determined that you were conducting decommissioning activities in accordance with license and regulatory requirements. The preliminary inspection results were presented to your staff at the conclusion of the onsite inspection. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC P ublic Document Room or from the NRC's documents system (ADAMS), accessible from the NRC's Web site at https://www.nrc.gov/ | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs documents system (ADAMS), accessible from the NRCs Web site at https://www.nrc.gov/ |
| reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist, at 817-200-1273 or the undersigned at 817-200-1191. | | reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist, at 817-200-1273 or the undersigned at 817-200-1191. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ | | /RA/ |
| D. Blair Spitzberg, PhD, Chief | | D. Blair Spitzberg, PhD, Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket: 050-00133 License: DPR-7 Enclosure: |
| | | NRC Inspection Report 050-00133/13-007 cc w/encl: See next page |
| Repository and Spent Fuel Safety Branch | |
| | |
| Division of Nuclear Materials Safety | |
| | |
| Docket: 050-00133 License: DPR-7 | |
| | |
| Enclosure: | |
| | |
| NRC Inspection Report 050-00133/13-007 cc w/encl: See next page cc list: | |
| James Becker, Site Vice President and Station Director Pacific Gas and Electric Company
| |
| | |
| Diablo Canyon Power Plant P.O. Box 56
| |
| | |
| Avila Beach, CA 93424
| |
| | |
| Jennifer L. Post, Esq. Pacific Gas and Electric Company P.O. Box 7442
| |
| | |
| San Francisco, CA 94120
| |
| | |
| Loren Sharp, Director and Plant Manager Humboldt Bay Power Plant, PG&E 1000 King Salmon Avenue
| |
| | |
| Eureka, CA 95505
| |
| | |
| Chairman Humboldt County Board of Supervisors County Courthouse
| |
| | |
| 825 Fifth Street
| |
| | |
| Eureka, CA 95501
| |
| | |
| Law Office of Linda J. Brown, Esq. 999 5th Avenue, Suite 430
| |
| | |
| San Rafael, CA 94901
| |
| | |
| Regional Radiation Representative U.S. Environmental Protection Agency Region IX Office
| |
| | |
| 75 Hawthorne Street
| |
| | |
| San Francisco, CA 94105
| |
| | |
| Dr. James F. Davis, State Geologist Department of Conservation Division of Mines and Geology 801 K Street MS 12-30
| |
| | |
| Sacramento, CA 95814-3531
| |
| | |
| Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
| |
| | |
| Sacramento, CA 95899-7474
| |
| | |
| Steven Hsu, M.S., Senior Health Physicist Radiological Assessment Unit Radioactive Material Licensing Section Radiologic Health Branch
| |
| | |
| Dept. of Health Services, MS-7610
| |
| | |
| Sacramento, CA 95899-7414
| |
| | |
| Gretchen Dumas, Esq. Public Utilities Commission of the State of California 5066 State Building
| |
| | |
| San Francisco, CA 94102 Director Energy Facilities Siting Division Energy Resources Conservation
| |
| & Development Commission 1516 9th Street Sacramento, CA 95814
| |
| | |
| Redwood Alliance P.O. Box 293
| |
| | |
| Arcata, CA 95521 Dr. Robert B. Weisenmiller, Chair California Energy Commission 1516 Ninth Street (MS 34)
| |
| | |
| Sacramento, CA 95814 California Public Utilities Commission
| |
| | |
| 505 Van Ness, Room 4102
| |
|
| |
|
| San Francisco, CA 94102
| | cc list: |
| | James Becker, Site Vice President Steven Hsu, M.S., Senior Health Physicist and Station Director Radiological Assessment Unit Pacific Gas and Electric Company Radioactive Material Licensing Section Diablo Canyon Power Plant Radiologic Health Branch P.O. Box 56 Dept. of Health Services, MS-7610 Avila Beach, CA 93424 Sacramento, CA 95899-7414 Jennifer L. Post, Esq. Gretchen Dumas, Esq. |
|
| |
|
| Deputy Attorney General State of California 110 West A Street, Suite 700
| | Pacific Gas and Electric Company Public Utilities Commission P.O. Box 7442 of the State of California San Francisco, CA 94120 5066 State Building San Francisco, CA 94102 Loren Sharp, Director and Plant Manager Humboldt Bay Power Plant, PG&E Director 1000 King Salmon Avenue Energy Facilities Siting Division Eureka, CA 95505 Energy Resources Conservation |
| | & Development Commission Chairman 1516 9th Street Humboldt County Board of Supervisors Sacramento, CA 95814 County Courthouse 825 Fifth Street Redwood Alliance Eureka, CA 95501 P.O. Box 293 Arcata, CA 95521 Law Office of Linda J. Brown, Esq. |
|
| |
|
| San Diego, CA 92101 | | 999 5th Avenue, Suite 430 Dr. Robert B. Weisenmiller, Chair San Rafael, CA 94901 California Energy Commission 1516 Ninth Street (MS 34) |
| | Regional Radiation Representative Sacramento, CA 95814 U.S. Environmental Protection Agency Region IX Office California Public Utilities Commission 75 Hawthorne Street 505 Van Ness, Room 4102 San Francisco, CA 94105 San Francisco, CA 94102 Dr. James F. Davis, State Geologist Deputy Attorney General Department of Conservation State of California Division of Mines and Geology 110 West A Street, Suite 700 801 K Street MS 12-30 San Diego, CA 92101 Sacramento, CA 95814-3531 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610) |
| | Sacramento, CA 95899-7474 |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 07200027/20214012021-10-21021 October 2021 Independent Spent Fuel Storage Installation - Independent Spent Fuel Storage Installation Security Inspection Report 07200027/2021401 IR 05000133/20200012020-12-0101 December 2020 NRC Inspection Report 05000133/2020-001 and 07200027/2020-001 ML20121A2192020-04-30030 April 2020 BWXT Nuclear Operations Group, Inc. - Nuclear Regulatory Commission Integrated Inspection Report 70-27/2020/001 and Notice of Violation IR 05000133/20190022019-09-27027 September 2019 Inspection Report 05000133/2019-002 IR 05000133/20190012019-05-21021 May 2019 Inspection Report 050-00133/2019-001 IR 05000133/20180032018-10-17017 October 2018 Pacific Gas and Electric Company; Humboldt Bay Power Plant Inspection Report 050-00133/2018-003 IR 05000133/20180022018-06-20020 June 2018 NRC Inspection Report 05000133/2018-002 and 07200027/2018-001 IR 07200027/20184012018-06-12012 June 2018 Independent Spent Fuel Storage Installation, Physical Security Requirements for Independent Spent Fuel Storage Installations Inspection Report 07200027/2018401 IR 05000133/20180012018-01-31031 January 2018 NRC Inspection Report 05000133/2018-001 IR 05000133/20170032017-10-19019 October 2017 Inspection Report 05000133/2017003 IR 05000133/20170022017-08-0202 August 2017 NRC Inspection Report 05000133/2017-002 IR 05000133/20170012017-03-28028 March 2017 NRC Inspection Report 05000133/2017001 IR 05000133/20160032016-08-31031 August 2016 NRC Inspection Report 050-00133/2016-003 IR 05000133/20160022016-06-0303 June 2016 NRC IR 050-00133/2016-002, and 072-00027/2016-001 IR 05000133/20160012016-03-0303 March 2016 IR 050-00133/16-001 IR 05000133/20150102015-12-17017 December 2015 NRC Inspection Report 050-00133/15-010 ML15351A4632015-12-17017 December 2015 NRC Inspection Report 050-00133/15-010 IR 05000133/20150092015-08-20020 August 2015 IR 05000133/2015009, on 07/21-23/2015, Humboldt Bay, NRC Inspection Report IR 05000133/20150082015-05-22022 May 2015 IR 05000133/2015008 on April 20-23, 2015, Humboldt Bay Power Plant, Unit 3 IR 05000133/20150072015-03-0303 March 2015 IR 05000133/2015-007; 02/10-12/2015; Humboldt Bay Power Plant, Unit 3 IR 05000133/20140092014-10-23023 October 2014 IR 05000133/2014009, on September 23-26, 2014, Humboldt Bay Power Plant, Unit 3, NRC Inspection Report IR 05000133/20140082014-07-18018 July 2014 NRC Inspection Report 05000133-14-008 IR 05000133/20140072014-04-17017 April 2014 IR 05000133-14-007; 03/17-20/2014; Humboldt Bay Power Plant, Unit 3 NRC Inspection Report IR 05000133/20130112013-12-12012 December 2013 IR 05000133-13-011 and 07200027-13-002, 10/30-31/2013 - 11/7-13/2013, Humboldt Bay Power Plant, Unit 3, and Independent Spent Fuel Storage Installation IR 05000133/20130102013-09-20020 September 2013 IR 05000133-13-010; 08/19-22/2013; Humboldt Bay Power Plant, Unit 3 NRC Inspection Report IR 05000133/20130092013-07-18018 July 2013 IR 05000133-13-009, 6/18-21/2013, Humboldt Bay Power Plant, Unit 3 IR 05000133/20130082013-05-31031 May 2013 Independent Spent Fuel Storage Installation (ISFSI) Inspection Report 05000133/2013008 and 07200027/2013001 IR 05000133/20130072013-04-0202 April 2013 IR 05000133-13-007; on 03/03/2013 - 03/07/2013; Humboldt Bay Power Plant, Unit 3; Inspection IR 05000133/20120122013-01-0303 January 2013 IR 05000133-12-012, 12/3-7/2012 for Humboldt Bay Power Plant IR 05000133/20120112012-10-11011 October 2012 IR 05000133-12-011, 9/11-14/2012, Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3 IR 05000133/20120102012-09-0404 September 2012 IR 05000133-12-010, 8/6-9/2012, Humboldt Bay Power Plant, Unit 3, Pacific Gas and Electric Company IR 05000133/20120092012-06-28028 June 2012 IR 05000133-12-009, June 11-14, 2012, Pacific Gas and Electric Company IR 05000133/20120082012-04-13013 April 2012 IR 05000133-12-008; Pacific Gas and Electric Company; 03/21-25-/2012; Humboldt Bay Power Plant, Unit 3, NRC Inspection Report IR 05000133/20120072012-03-13013 March 2012 IR 05000133-12-007, February 13-17, 2012, Pacific Gas and Electric Company IR 05000133/20110082012-02-0707 February 2012 IR 05000133-11-008, on December 5-9, 2011, Pacific Gas and Electric Company IR 05000133/20110072011-10-21021 October 2011 EA-11-211, IR 05000133-11-007, 07200027-11-001, on 8/1-4/2011, Humboldt Bay Power Plant, NRC Inspection Report IR 05000133/20110022011-07-14014 July 2011 IR 0500133-11-002, on June 13-16, 2011, Humboldt Bay Power Plant, Unit 3, Pacific Gas and Electric Company IR 05000133/20110012011-04-18018 April 2011 IR 05000133-11-001, on March 21-24, 2011, Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3, Inspection Report IR 05000133/20100042010-09-28028 September 2010 IR 05000133-10-004, on 08/30/2010 - 09/02/2010 for Pacific Gas and Electric Company, Humboldt Bay, Unit 3 IR 05000133/20100032010-05-12012 May 2010 IR 05000133-10-003, on 04/12-16/2010, Humboldt Bay Power Plant, Unit 3 IR 05000133/20100022010-04-13013 April 2010 IR 05000133-10-002, Pacific Gas and Electric Company, Humboldt Bay Power Plant, Dated 04/13/2010 IR 07200027/20100022010-02-10010 February 2010 IR 07200027-10-002, (Letter), on 01/12/2010 -01/13/2010, Humboldt Bay Power Plant, Independent Spent Fuel Storage Installation IR 05000133/20100012010-02-0909 February 2010 IR 05000133-10-001; 07200027-10-001, on January 11-14, 2010, Humboldt Bay Power Plant, Unit 3 IR 05000133/20090032009-11-30030 November 2009 IR 05000133-09-003, on 10/26-29/2009 for Humboldt Bay, Unit 3, Inspection Was a Routine, Announced Inspection of Decommissioning Activities IR 05000133/20090022009-08-24024 August 2009 IR 05000133-09-002, Pacific Gas and Electric Company Errata. Page 10 of This Report Was Inadvertently Omitted During Report Copying ML0922306142009-08-11011 August 2009 IR 05000133-09-002, on July 13-16, 2009, Humboldt Bay Power Plant Unit 3 Facility IR 05000133/20090012009-02-12012 February 2009 IR 05000133-09-001, on 01/12/09 Through 01/15/09, Humboldt Bay Power Plant, Unit 3 IR 05000133/20080042008-12-0505 December 2008 Cancelled NRC Inspection Report 05000133-08-004, No Inspection Will Be Issued for Report Number IR 05000133/20080032008-10-23023 October 2008 IR 05000133-08-003; Pacific Gas and Electric Company; 09/22-26/2008; Humboldt Bay Power Plant, NRC Inspection Report IR 05000133/20070042008-09-16016 September 2008 IR 05000133-07-004, IR 0720270-07-002, Pacific Gas and Electric Company Dated 09/16/2008 2021-10-21
[Table view] Category:Letter
MONTHYEARML24205A0842024-08-0606 August 2024 Exemption Title 10 of the Code of Federal Regulations Part 73 Safety Evaluation Report - Independent Spent Fuel Storage Installation L-24-006, Independent Spent Fuel Storage Installation, Supplement to the Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Supplement to the Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24121A2802024-05-23023 May 2024 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 1 (CAC No. 001028) L-23-009, Independent Spent Fuel Storage Installation, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Independent Spent Fuel Storage Installation, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program ML23109A3602023-04-19019 April 2023 Independent Spent Fuel Storage Installation, Annual Report of Occupational Radiation Exposure for 2022 L-23-002, Independent Spent Fuel Storage Installation Annual Radiological Environmental Monitoring Report for 20222023-03-16016 March 2023 Independent Spent Fuel Storage Installation Annual Radiological Environmental Monitoring Report for 2022 ML23047A3662023-02-16016 February 2023 Independent Spent Fuel Storage Installation - Response to NRC Request for Additional Information on Revision 1 to the Humboldt Bay ISFSI Quality Assurance Plan ML22340A5362022-12-19019 December 2022 Independent Spent Fuel Storage Installation (ISFSI) Revision 1 to Humbold Bay ISFSI Quality Assurance Plan L-22-005, Independent Spent Fuel Storage Installation - Material Status Report for the Period Ending July 31, 20222022-09-0808 September 2022 Independent Spent Fuel Storage Installation - Material Status Report for the Period Ending July 31, 2022 ML22200A2422022-07-19019 July 2022 Independent Spent Fuel Storage Installation (ISFSI) - Revision 1 to Humboldt Bay ISFSI Quality Assurance Plan L-22-002, Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 20212022-04-27027 April 2022 Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 2021 L-22-001, Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 20212022-03-0808 March 2022 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 2021 ML22027A4682022-02-0404 February 2022 Acceptance Letter, Humboldt Bay ISFSI License Amendment Request 21-02 L-21-007, License Amendment Request 21-02 - Proposed Revisions to Humboldt Bay Independent Spent Fuel Storage Installation - Special Nuclear Materials License Number 2514 and Technical Specifications2021-12-14014 December 2021 License Amendment Request 21-02 - Proposed Revisions to Humboldt Bay Independent Spent Fuel Storage Installation - Special Nuclear Materials License Number 2514 and Technical Specifications L-21-009, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan ML21285A0492021-11-29029 November 2021 U.S. Nuclear Regulatory Commission'S Analysis of Pacific Gas and Electric'S Decommissioning Funding Status Report for Humboldt Bay Power Plant Facility, Unit 3, Docket No. 50-133 ML21295A2502021-11-18018 November 2021 Cover Letter from J Marshall to J Welsch Regarding Humboldt Bay Unit 3 License Termination ML21299A2532021-11-17017 November 2021 Completion of Scheduled Decommissioning Activities at the Humboldt Bay Power Plant, Unit 3 Near Eureka, California (License No. DPR-7) L-21-006, Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 20212021-11-0404 November 2021 Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 2021 ML21313A3082021-11-0404 November 2021 Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11 and Changes to Technical Specification Bases and 10 CFR 72.48 Report of Changes, Tests, and Experiments for the Period of 10/2/2019 - 10/01/2021 ML21299A2352021-11-0202 November 2021 Approval of Final Status Survey Reports for Remaining Facility Survey Units HBL-21-017, Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant2021-10-28028 October 2021 Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant IR 07200027/20214012021-10-21021 October 2021 Independent Spent Fuel Storage Installation - Independent Spent Fuel Storage Installation Security Inspection Report 07200027/2021401 HBL-21-016, Request to Terminate the Humboldt Bay Power Plant 10 CFR Part 50 License2021-10-21021 October 2021 Request to Terminate the Humboldt Bay Power Plant 10 CFR Part 50 License DCL-21-056, Pacific Gas & Electric Co - Proposed Revision to the Pacific Gas and Electric Company Quality Assurance Program Approval Form for Radioactive Material Packages No. 02022021-08-31031 August 2021 Pacific Gas & Electric Co - Proposed Revision to the Pacific Gas and Electric Company Quality Assurance Program Approval Form for Radioactive Material Packages No. 0202 ML21225A7752021-08-25025 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC - Hbpp, Unit 3 - Approval of Final Status Survey Reports for Multiple Survey Units ML21225A7722021-08-24024 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC - Humboldt Bay Power Plant, Unit 3 - Approval of Final Status Survey Reports for Trailer City Survey Units (OOL09-01 Through OOL09-10) ML21214A1002021-08-0303 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC, Humboldt Bay Power Plant, Unit 3 - Approval of Final Status Survey Reports for Caisson Survey Units NOL01-09/NOL01-09-FSR HBL-21-012, Errata for Humboldt Bay Power Plant 2020 Annual Radioactive Effluent Release Report2021-07-28028 July 2021 Errata for Humboldt Bay Power Plant 2020 Annual Radioactive Effluent Release Report HBL-21-011, Final Status Survey Report for the Humboldt Bay Power Plant2021-07-13013 July 2021 Final Status Survey Report for the Humboldt Bay Power Plant ML21189A0752021-07-0808 July 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC, Correction to License Numbering Humboldt Bay Power Plant, Unit 3 - Issuance of License Termination Plan Amendment ML21158A1262021-06-24024 June 2021 Letter - Humboldt Bay Power Plant Unit 3 - Issuance of Amendment No. 46 Re License Termination Plan HBL-21-009, Supplemental Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan2021-05-20020 May 2021 Supplemental Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan HBL-21-007, Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan2021-04-29029 April 2021 Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan HBL-21-008, Annual Radiological Environmental Monitoring Report for 20202021-04-28028 April 2021 Annual Radiological Environmental Monitoring Report for 2020 HBL-21-006, Annual Report of Occupational Radiation Exposure for Year 20202021-04-15015 April 2021 Annual Report of Occupational Radiation Exposure for Year 2020 ML21099A1192021-04-0808 April 2021 Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 2020 ML21091A0472021-04-0101 April 2021 Request for Additional Information on License Amendment Request to Revise the License Termination Plan DCL-21-030, 2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant2021-04-0101 April 2021 2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant HBL-21-004, Annual Radioactive Effluent Release Report for 20202021-03-30030 March 2021 Annual Radioactive Effluent Release Report for 2020 HBL-21-003, Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 32021-03-29029 March 2021 Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 3 ML21055A8262021-03-0303 March 2021 Letter to Welsch, Change in NRC Staff Project Management for Humboldt Bay Power Plant Unit 3 L-21-001, Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 20202021-02-18018 February 2021 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 2020 HBL-21-001, License Amendment Request 21-01 Revise Methodology in License Termination Plan2021-02-0808 February 2021 License Amendment Request 21-01 Revise Methodology in License Termination Plan IR 05000133/20200012020-12-0101 December 2020 NRC Inspection Report 05000133/2020-001 and 07200027/2020-001 HBL-20-013, Final Status Survey Report for the Humboldt Bay Power Plant (Office Annex, Security Building, Intake Structure, Count Room Building, and Waste Management Facility)2020-09-24024 September 2020 Final Status Survey Report for the Humboldt Bay Power Plant (Office Annex, Security Building, Intake Structure, Count Room Building, and Waste Management Facility) HBL-20-012, Responses to NRC Requests for Additional Information on the Final Status Survey Reports for the Humboldt Bay Power Plant2020-09-0303 September 2020 Responses to NRC Requests for Additional Information on the Final Status Survey Reports for the Humboldt Bay Power Plant ML20281A4062020-09-0303 September 2020 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Revision 10 to the Updated Final Safety Analysis Report HBL-20-011, Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR2020-07-20020 July 2020 Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR 2024-08-06
[Table view] |
Text
UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ril 2, 2013
SUBJECT:
NRC INSPECTION REPORT 050-00133/13-007
Dear Mr. Halpin:
This refers to the inspection conducted on March 4-7, 2013, at the Humboldt Bay Power Plant, Unit 3 facility in Eureka, California. The enclosed report presents the results of this inspection.
This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. In summary, the inspector determined that you were conducting decommissioning activities in accordance with license and regulatory requirements. The preliminary inspection results were presented to your staff at the conclusion of the onsite inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs documents system (ADAMS), accessible from the NRCs Web site at https://www.nrc.gov/
reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist, at 817-200-1273 or the undersigned at 817-200-1191.
Sincerely,
/RA/
D. Blair Spitzberg, PhD, Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket: 050-00133 License: DPR-7 Enclosure:
NRC Inspection Report 050-00133/13-007 cc w/encl: See next page
cc list:
James Becker, Site Vice President Steven Hsu, M.S., Senior Health Physicist and Station Director Radiological Assessment Unit Pacific Gas and Electric Company Radioactive Material Licensing Section Diablo Canyon Power Plant Radiologic Health Branch P.O. Box 56 Dept. of Health Services, MS-7610 Avila Beach, CA 93424 Sacramento, CA 95899-7414 Jennifer L. Post, Esq. Gretchen Dumas, Esq.
Pacific Gas and Electric Company Public Utilities Commission P.O. Box 7442 of the State of California San Francisco, CA 94120 5066 State Building San Francisco, CA 94102 Loren Sharp, Director and Plant Manager Humboldt Bay Power Plant, PG&E Director 1000 King Salmon Avenue Energy Facilities Siting Division Eureka, CA 95505 Energy Resources Conservation
& Development Commission Chairman 1516 9th Street Humboldt County Board of Supervisors Sacramento, CA 95814 County Courthouse 825 Fifth Street Redwood Alliance Eureka, CA 95501 P.O. Box 293 Arcata, CA 95521 Law Office of Linda J. Brown, Esq.
999 5th Avenue, Suite 430 Dr. Robert B. Weisenmiller, Chair San Rafael, CA 94901 California Energy Commission 1516 Ninth Street (MS 34)
Regional Radiation Representative Sacramento, CA 95814 U.S. Environmental Protection Agency Region IX Office California Public Utilities Commission 75 Hawthorne Street 505 Van Ness, Room 4102 San Francisco, CA 94105 San Francisco, CA 94102 Dr. James F. Davis, State Geologist Deputy Attorney General Department of Conservation State of California Division of Mines and Geology 110 West A Street, Suite 700 801 K Street MS 12-30 San Diego, CA 92101 Sacramento, CA 95814-3531 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7474