ML14154A403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713             June 3, 2014   MEETING  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 3, 2014 MEETING  


==SUMMARY==
==SUMMARY==
LICENSEE: EXELON GENERATION CO., LLC. FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
 
LICENSEE:       EXELON GENERATION CO., LLC.
FACILITY:       PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING   On May 29, 2014 at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2013. (public) Access and Management System (ADAMS) with Accession No. ML14071A589. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom Units 2 and 3 for the period of January 1 through December 31, 2013, as documented in our letter dated March, 4, 2013 (ADAMS Accession No. ML14058A409). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and a local township official attended the open-house and the role of the agency in ensuring safe plant operations.           /RA/   Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Enclosures   Attendee List (ML14153A535)  
OF PUBLIC MEETING On May 29, 2014 at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2013.
A notice of the open house was issued on March 12, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14071A589. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom Units 2 and 3 for the period of January 1 through December 31, 2013, as documented in our letter dated March, 4, 2013 (ADAMS Accession No. ML14058A409). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
A member of the public, a State official, and a local township official attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
                                                      /RA/
Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML14153A535)


ML14058A409. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and a local township official attended the open-house and the role of the agency in ensuring safe plant operations.
ML14058A409. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
A member of the public, a State official, and a local township official attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.


==Enclosures:==
==Enclosures:==
Attendee List (ML14153A535)       /RA/     Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Distribution: (via email) F. Bower, DRP S. Barber, DRP A. Turilin, DRP B. Lin, DRP S. Hansell, SRI B. Smith, RI S. Schmitt, ROAA RidsNRRPMResource DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2013 PB AAM\PB Annual Assessment Meeting Summary 2014.docx ADAMS Accession No.: ML14154A403   SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP   NAME MFannon/ MSF ATurilin/AT FBower/ FLB   DATE 06/03/14 06/03/14 06/03/14}}
 
Attendee List (ML14153A535)
                                                              /RA/
Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Distribution: (via email)
F. Bower, DRP           S. Barber, DRP         A. Turilin, DRP         B. Lin, DRP S. Hansell, SRI         B. Smith, RI           S. Schmitt, ROAA RidsNRRPMResource DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2013 PB AAM\PB Annual Assessment Meeting Summary 2014.docx ADAMS Accession No.: ML14154A403 Non-Sensitive                                   Publicly Available SUNSI Review Sensitive                                        Non-Publicly Available OFFICE   RI/DRP               RI/DRP                 RI/DRP NAME     MFannon/ MSF         ATurilin/AT           FBower/ FLB DATE     06/03/14             06/03/14               06/03/14}}

Latest revision as of 04:46, 4 November 2019

Summary of Public Meeting on May 29, 2014 to Discuss Assessment of the Safety Performance
ML14154A403
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/03/2014
From: Fred Bower
Reactor Projects Region 1 Branch 4
To:
BOWER, F
References
Download: ML14154A403 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 3, 2014 MEETING

SUMMARY

LICENSEE: EXELON GENERATION CO., LLC.

FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING On May 29, 2014 at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2013.

A notice of the open house was issued on March 12, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14071A589. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom Units 2 and 3 for the period of January 1 through December 31, 2013, as documented in our letter dated March, 4, 2013 (ADAMS Accession No. ML14058A409). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, a State official, and a local township official attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML14153A535)

ML14058A409. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, a State official, and a local township official attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

Enclosures:

Attendee List (ML14153A535)

/RA/

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects Distribution: (via email)

F. Bower, DRP S. Barber, DRP A. Turilin, DRP B. Lin, DRP S. Hansell, SRI B. Smith, RI S. Schmitt, ROAA RidsNRRPMResource DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2013 PB AAM\PB Annual Assessment Meeting Summary 2014.docx ADAMS Accession No.: ML14154A403 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME MFannon/ MSF ATurilin/AT FBower/ FLB DATE 06/03/14 06/03/14 06/03/14