ML17056B310: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS | ||
(315)349-2443 1.Unit Name: Nine Mile Poiat Unit//'I 2.Reporting Period: 9/1/89 through 9/30/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: | : 1. Unit Name: Nine Mile Poiat Unit //'I | ||
Forecast Achieved | : 2. Reporting Period: 9/1/89 through 9/30/89 Notes | ||
: 3. Licensed Thermal Power (MWt): 1850 | |||
: 4. Nameplate Rating (Gross MWe): 640 | |||
: 5. Design Electrical Rating (Net MWe): 620 | |||
: 6. Maximum Dependable Capacity (Gross MWe): 630 | |||
: 7. Maximum Dependable Capacity (Net MWe): 610 | |||
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons: | |||
Power Level To Which Restricted, IfAny (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Yr-to-Date Cumulative | |||
: 11. Hours in Reportiag Period 720.0 6,551.0 175,680.2 | |||
: 12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2 | |||
: 14. Hours Generator On-Line 0.0 0.0 1+,117.2 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4 | |||
: 16. Gross Thermal Eaergy Geaerated (MWH) 0.0 0.0 188~473~132 0 | |||
: 17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0 | |||
: 18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0 | |||
: 19. Unit Service Factor 0.0 0.0 63.8 | |||
: 20. Unit Availability Factor 0.0 0.0 63.8 | |||
: 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 56.5 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 55.5 | |||
: 23. Unit Forced Outage Rate 100.0 100.0 22.4 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): | |||
Refuel outa e started on anua 22 1 88. | |||
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION | |||
'102200122'10207. 05000220 1 | |||
PDR ADOCK R - - PDR}} | |||
Revision as of 06:41, 30 October 2019
| ML17056B310 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/30/1989 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200122 | |
| Download: ML17056B310 (2) | |
Text
OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
- 1. Unit Name: Nine Mile Poiat Unit //'I
- 2. Reporting Period: 9/1/89 through 9/30/89 Notes
- 3. Licensed Thermal Power (MWt): 1850
- 4. Nameplate Rating (Gross MWe): 640
- 5. Design Electrical Rating (Net MWe): 620
- 6. Maximum Dependable Capacity (Gross MWe): 630
- 7. Maximum Dependable Capacity (Net MWe): 610
- 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours in Reportiag Period 720.0 6,551.0 175,680.2
- 12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Generator On-Line 0.0 0.0 1+,117.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
- 16. Gross Thermal Eaergy Geaerated (MWH) 0.0 0.0 188~473~132 0
- 17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
- 18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
- 19. Unit Service Factor 0.0 0.0 63.8
- 20. Unit Availability Factor 0.0 0.0 63.8
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 56.5
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 55.5
- 23. Unit Forced Outage Rate 100.0 100.0 22.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuel outa e started on anua 22 1 88.
- 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION
'102200122'10207. 05000220 1