ML17056B310: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
{{#Wiki_filter:OPERATING DATA REPORT                             DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS
(315)349-2443 1.Unit Name: Nine Mile Poiat Unit//'I 2.Reporting Period: 9/1/89 through 9/30/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reportiag Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Eaergy Geaerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anua 22 1 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each): 88.6,551.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 175,680.2 115,234.3 1,204.2 1+,117.2 20.4 188~473~132 0 62,473,070.0 60,524,382.0 63.8 63.8 56.5 55.5 22.4 26.Unit is Test Status (Prior to Commercial Operation):
: 1. Unit Name: Nine Mile Poiat Unit //'I
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRIClTY COMMERCIAL OPERATION'102200122'10207.
: 2. Reporting Period: 9/1/89 through 9/30/89                                     Notes
1 PDR ADOCK 05000220 R--PDR}}
: 3. Licensed Thermal Power (MWt):                       1850
: 4. Nameplate Rating (Gross MWe):                         640
: 5. Design Electrical Rating (Net MWe):                   620
: 6. Maximum Dependable Capacity (Gross MWe):             630
: 7. Maximum Dependable Capacity (Net MWe):               610
: 8. If Changes Occur in Capacity Ratings (items Number   3 through 7) Since Last Report, Give Reasons:
Power Level To Which Restricted,   IfAny (Net MWe):
: 10. Reasons For Restrictions,   If Any:
This Month           Yr-to-Date       Cumulative
: 11. Hours in Reportiag Period                                 720.0              6,551.0        175,680.2
: 12. Number   of Hours Reactor   Was Critical                       0.0                  0.0        115,234.3
: 13. Reactor Reserve Shutdown Hours                                 0.0                  0.0          1,204.2
: 14. Hours Generator On-Line                                       0.0                  0.0        1+,117.2
: 15. Unit Reserve Shutdown Hours                                   0.0                  0.0              20.4
: 16. Gross Thermal Eaergy Geaerated (MWH)                           0.0                  0.0    188~473~132 0
: 17. Gross Electrical Energy Generated (MWH)                       0.0                  0.0      62,473,070.0
: 18. Net Electrical Energy Generated (MWH)                         0.0                  0.0      60,524,382.0
: 19. Unit Service Factor                                           0.0                  0.0              63.8
: 20. Unit Availability Factor                                       0.0                  0.0              63.8
: 21. Unit Capacity Factor (Using MDC Net)                           0.0                  0.0              56.5
: 22. Unit Capacity Factor (Using DER Net)                           0.0                  0.0              55.5
: 23. Unit Forced Outage Rate                                     100.0                100.0              22.4
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration     of Each):
Refuel outa e started on anua 22 1 88.
: 26. Unit is Test Status (Prior to Commercial Operation): Forecast         Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION
            '102200122'10207.     05000220 1
PDR       ADOCK R     - -                 PDR}}

Revision as of 06:41, 30 October 2019

Revised Monthly Operating Rept for Sept 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B310
Person / Time
Site: Nine Mile Point 
Issue date: 09/30/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200122
Download: ML17056B310 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: (315) 349-2443 OPERATING STATUS

1. Unit Name: Nine Mile Poiat Unit //'I
2. Reporting Period: 9/1/89 through 9/30/89 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 640
5. Design Electrical Rating (Net MWe): 620
6. Maximum Dependable Capacity (Gross MWe): 630
7. Maximum Dependable Capacity (Net MWe): 610
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:

Power Level To Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, If Any:

This Month Yr-to-Date Cumulative

11. Hours in Reportiag Period 720.0 6,551.0 175,680.2
12. Number of Hours Reactor Was Critical 0.0 0.0 115,234.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
14. Hours Generator On-Line 0.0 0.0 1+,117.2
15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
16. Gross Thermal Eaergy Geaerated (MWH) 0.0 0.0 188~473~132 0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 62,473,070.0
18. Net Electrical Energy Generated (MWH) 0.0 0.0 60,524,382.0
19. Unit Service Factor 0.0 0.0 63.8
20. Unit Availability Factor 0.0 0.0 63.8
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 56.5
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 55.5
23. Unit Forced Outage Rate 100.0 100.0 22.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuel outa e started on anua 22 1 88.

26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRIClTY COMMERCIAL OPERATION

'102200122'10207. 05000220 1

PDR ADOCK R - - PDR