{{#Wiki_filter:ATTACHMENT 2 AEP:NRC'0372
{{#Wiki_filter:ATTACHMENT 2 AEP:NRC'0372
~~8X.O 5 29 0 Pgq CHANGE NO......'I'EP'NRC:0372 ELECTRICAL POWER SYSTEMS D.C.DISTRIBUTION
                              ~~
-OPERATING LIMITING CONDITION fOR OPERATION TRAIN AB consisting of 250-volt D.C.bus AB, 250-volt D.C.battery bank AB, and a full capacity charger.TRAIN CD consisting of 250-volt D.C.bus CD, 250-volt D.C.battery a d pacity charger.b nk CD, an a full ca APPLICABILITY:
8X.O 5 29 0 Pgq
-MODES 1, 2, 3 and 4.ACT't ON: 3.8.2.3 The following D.C.bus trains shall be energized and OPERABLE with tie breakers between bus trains open: a.With 250-volt D.C.bus inoperable, restore the inoperable bus to OPERABLE status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within tne, following 30 hours..With one 250-volt D.C.battery and/or its charger inoperable, restore the inoperable battery and/or charger to OPERABLE status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE RE UIREMENTS 4.8.2.3.1 Each O.C'.bus train shall be determined OPERABLE and energized with tie breakers open at least once per 7 days by verifying correct breaker alignment and indicated power availability.
4.8.2.3.2 Each.250-volt battery bank and charger shall be demonstrated OPERABLE'.
a.At least once per 7'ays by verifying that: 1.The electrolyte level of each pilot cell is between the minimum and, maximum level indication marks, 0.C.COOK-UNIT 1 3/4 8-8 CHANGE NO....,.2 AEP:NRC:0372 ELECTRICAL POMER SYSTEMS SURVEILLANCE REQUIRBIENTS (Continued) b.2.The pilot cell specific gravity, corrected to 77'F and full electrolyte level, is>1.200, 3.The pilot cell voltage is>2.10 volts, and 4.The overall battery voltage is>250 volts.At least once per 92 days by verifying that:.r 1.The voltage of each connected cell is>2.10 volts under float charge and has not decreased more than 0 F 05 volts from the value observed during the original acceptance test, 2.The specific gra'vity, corrected to 70'F and full electro-lyte level, of each connected cell is>1;200 and has not decreased more than 0.03 from the value observed during the previous test, and 3.The electrolyte level of each connected cell is between the minimum and maximum level indication marks.co d;At least once per 18 months by verifying that: 1.The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration.
2.The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material.3.The battery-charger will supply at least 140 amperes at>250 volts for at least 4 hours.At least, once per 18 months, during shutdown, by verifying that the battery capaci ty is adequate to supply and main'tain in OPERABLE status the emergency loads for the specified times of Table 4.8-1Awith the battery charger disconnected.
The battery terminal voltage shall be maintained
>210 volts throughout the entire test.e.At least once per SO months, during shutdown, by verifying that the battery capacity is at least 805 of the manufacturer's rating when subjected to a performance discharge test.This performance discharge test shall be performed subsequent to the satisfactory completion of the required battery service test..C.COOK-UNIT 2 3/4 8-9 TABLE 4.8-1A BATTERY EMERGENCY LOAOS AB Batter Loads.Minimum Time 1.Channel I II static inverter*2.Channel I V static i nverter*3.Computer s ta ti c inverter*4.BOP static inverter" 5.Feed pump turbine 2E oil pump 6.Control room emergency lighting 7.Hain turbine oil pump"E" 8.Isolation valve control 9.All contrnl circuits 3 hrs 3 hrs 3 hrs'hrs 1 hr 8 hrs 3 hrs 8 hrs 8 hrs 1: Channel I static inverter*2.Channel II static inverter*3.Feed, pump turbine 2M oil pump 4.Generator seal oil pump 5.Hain turbine oil pump"M" 6.Isolation valves 3 hrs 3 hrs 1 hr 5 hrs 3 hrs'8 hrs 7.Annunciators 8.All control circuits 8 hrs*AC power sources to the inverters shall be turned.off at the start of the test and may be turned on at the end of the specified time interval.Inverters may be left in this operating mode for the duration of the discharge test.0.C.COOK-UNIT 2 3/4 8-10 CHANGE NO....., AEP:NRC:0372 I~~~l~I~w~r TABLE 1.2 FREQUENCY NOTATION NOTATION S SA S/U N.A.FREQUENCY At least once per 12 hours.At least once per 24 hours.At least once per 7 days.At least once per 31 days At least once per 92 days.At least once per 184 days..At least once per 549 days.Prior to each reactor startup.Not applicable.
D.C.COOK-UNIT 1 1-7


TABLE 1.2 FRE UENCY NOTATION NOTATION S W Q SA S/U: N.A.~FRE UENCY At least once per 12 hours.At least once per 24 hours.At least once per 7 days.At least once per 31 days At least once per 92 days.At least once per 184 days.At least once per 549 days.Prior to each reactor startup.Not applicable.
CHANGE
D.C.COOK-UNIT 2 1-8 h~eC CHANGE NO....., AEP:NRC'0372
          'I NO......
~~
'EP'NRC:0372


I POWER DISTRIBUTION LI S ACTION: (Continued)
ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION        - OPERATING LIMITING CONDITION fOR OPERATION 3.8.2.3 The following D.C. bus trains shall            be energized and  OPERABLE with tie breakers between bus trains open:
I c)Surveillance testing of the APDMS may be per formed pursuant to Specification 4.3.3.7.1 provided the indicated AFD is mai ntained within the limits of Figure 3.2-1.A total of 6 hours of operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation.
TRAIN AB  consisting of 250-volt D.C. bus AB, 250-volt D.C. battery bank AB, and a full capacity charger.
b., ERMAL POWER shall not be increased above 90%or 0.9 X APL whichever is less)of RATED THERHAL POllER unless the indicated AFD is within the 5Ãtarget band and ACTION.2.a) 1), above'has been satisfied.
TRAIN  CD consisting of 250-volt      D. C. bus CD,  250-volt D. C. battery b a nk CD, an d a  full ca pacity  charger.
c.THERMAL POWER shall not be increased above 50K of RATED THERMAL POWER unless the indicated AFD has not been outside of the~+5%target band for more than 1 hour penalty deviation cumulative during the previous 24 hours.d.During power reductions using control gods, the reporting require-ments of Specification 6.9.1.9 shall not apply provided the action items above are satisifed..
APPLICABILITY:      - MODES  1, 2, 3 and 4.
SURYEILLANCE RE UIREMENTS J 4.2.1.1 The indicated AXIAL FLUX DIFFERENCE shall be determined to be within its limits during POWER OPERATION above 15K of RATED THERMAL POWER by: a..Monitoring the indicated AFD for each OPERABLE excore.channel: At least once per 7 days when the AFD Monitor Alarm is'PERABLE, and 2., At least once per hour for the first 24 hours after restoring the AFD Monitor Alarm to OPERABLE status.b.Monitoring and logging the indicated AXIAL FLUX DIFFERENCE for each OPERABLE excore channel at least once per hour for the first 24 hours and at least once per 30 minutes thereafter,-
ACT't ON:
: a. With 250-volt D.C. bus inoperable, restore the inoperable bus to OPERABLE status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within tne, following 30 hours.
          . With one 250-volt D.C. battery and/or its charger inoperable, restore the inoperable battery and/or charger to OPERABLE status within 2 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE RE UIREMENTS 4.8.2.3.1 Each O.C'. bus train shall be determined OPERABLE and energized with tie breakers open at least once per 7 days by verifying correct breaker alignment and indicated power availability.
4.8.2.3.2    Each. 250-volt battery bank    and  charger shall  be demonstrated OPERABLE'.
: a. At least once per 7'ays by verifying that:
: 1. The electrolyte level of each pilot cell is between the minimum and, maximum level indication marks,
: 0. C. COOK  -  UNIT  1              3/4 8-8
 
CHANGE  .2 NO....,
AEP:NRC:0372
 
ELECTRICAL POMER SYSTEMS SURVEILLANCE REQUIRBIENTS    (Continued)
: 2. The  pilot cell specific gravity, corrected to      77'F and full electrolyte level, is > 1.200,
: 3. The pilot cell voltage is > 2.10 volts, and
: 4. The  overall battery voltage is    > 250 volts.
: b. At least once per  92 days by  verifying that:.
r
: 1. The  voltage of each connected cell is > 2.10 volts under float charge and has not decreased more than 0 05 volts F
from the value observed during the original acceptance test,
: 2. The  specific gra'vity, corrected to 70'F    and  full electro-lyte level, of each connected cell is >      1;200 and has not decreased  more than 0.03 from the value observed during the previous  test, and
: 3. The  electrolyte level of each connected cell is between the minimum and maximum level indication marks.
co  At least once per    18 months by  verifying that:
: 1. The  cells, cell plates  and battery racks show no visual indication of physical  damage or abnormal deterioration.
: 2. The  cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material.
: 3. The battery- charger will supply at least 140 amperes at
                > 250  volts for at least  4  hours.
d;  At least, once per 18 months, during shutdown, by verifying that the battery capaci ty is adequate to supply and main'tain in OPERABLE status the emergency loads for the specified times of Table 4.8-1Awith the battery charger disconnected. The battery terminal voltage shall be maintained > 210 volts throughout the entire test.
: e. At least once per SO months, during shutdown, by verifying that the battery capacity is at least 805 of the manufacturer's rating when subjected to a performance discharge test. This performance discharge test shall be performed subsequent to the satisfactory completion of the required battery service test.
. C. COOK  - UNIT 2                  3/4 8-9
 
TABLE  4.8-1A BATTERY EMERGENCY LOAOS AB  Batter    Loads.                                            Minimum Time
: 1. Channel  I II  static inverter*                                3 hrs
: 2. Channel  IV  static i nverter*                                3 hrs
: 3. Computer s ta  ti c  inverter*                                3  hrs
                                                                    '
: 4. BOP  static inverter"                                              hrs
: 5. Feed pump    turbine    2E  oil  pump                          1  hr
: 6. Control room emergency        lighting                          8  hrs
: 7. Hain turbine    oil  pump  "E"                                3  hrs
: 8. Isolation valve control                                        8  hrs
: 9. All contrnl circuits                                            8  hrs 1:    Channel  I  static inverter*                                  3  hrs
: 2. Channel  II static inverter*                                  3  hrs
: 3. Feed, pump  turbine    2M  oil  pump                          1  hr
: 4. Generator seal      oil pump                                  5  hrs
: 5. Hain  turbine oil pump "M"                                      3  hrs
: 6. Isolation valves                                              '8 hrs
: 7. Annunciators
: 8. All control circuits                                            8  hrs
*AC power    sources    to the inverters shall be turned.off at the start of the  test  and may be turned on        at the end of the specified time interval.
Inverters  may be    left  in this  operating mode for the duration of the discharge test.
: 0. C. COOK  - UNIT    2              3/4 8-10
 
CHANGE NO.....,
AEP:NRC:0372 I ~~ ~ l                    ~ w ~ r
        ~ I
 
TABLE  1.2 FREQUENCY NOTATION NOTATION                          FREQUENCY S                  At least once per  12  hours.
At least once per  24  hours.
At least once per  7  days.
At least once per  31 days At least once per  92 days.
SA                  At least once per 184 days..
At least once per  549 days.
S/U                Prior to  each reactor startup.
N.A.                Not applicable.
D. C. COOK  - UNIT 1          1-7
 
TABLE 1.2 FRE UENCY NOTATION NOTATION                          ~FRE  UENCY S                    At least once per  12  hours.
At least once per  24  hours.
W                    At least once per  7  days.
At least once per  31  days Q                    At least once per  92  days.
SA                  At least once per 184 days.
At least once per 549 days.
S/U:                Prior to each  reactor startup.
N.A.                Not applicable.
D. C. COOK  -  UNIT 2          1-8 h      ~ eC
 
CHANGE NO.....,
AEP:NRC'0372
~ ~
 
I POWER     DISTRIBUTION   LI   S ACTION:       (Continued)
I c)   Surveillance testing of the APDMS may be per formed pursuant to Specification 4.3.3.7.1 provided the indicated AFD is mai ntained within the limits of Figure 3.2-1. A total of 6 hours of operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation.
b .,       ERMAL POWER shall not be increased above 90% or 0.9 X APL whichever is less) of RATED THERHAL POllER unless the indicated AFD is within the       5Ã target band and ACTION.2.a) 1), above 'has been   satisfied.
: c.     THERMAL POWER     shall not be increased above 50K of RATED THERMAL POWER   unless the indicated AFD has not been outside of the
      ~         +5% target band for more than 1 hour penalty deviation cumulative during the previous 24 hours.
: d.     During power reductions using control gods, the reporting require-ments   of Specification 6.9.1.9 shall not apply provided the action items above are satisifed..
SURYEILLANCE RE UIREMENTS J
4.2.1.1         The indicated   AXIAL FLUX DIFFERENCE shall be determined to be within its limits during           POWER OPERATION above 15K of RATED THERMAL POWER by:
a.. Monitoring       the indicated   AFD for each OPERABLE excore .channel:
At least   once per 7 days when the AFD Monitor Alarm   is and                                              'PERABLE, 2.,   At least once per hour for the first 24 hours after restoring the AFD Monitor Alarm to OPERABLE status .
: b.     Monitoring and logging the indicated AXIAL FLUX DIFFERENCE for each OPERABLE excore channel at least once per hour for the first 24 hours and at least once per 30 minutes thereafter,-
when the AXIAL FLUX DIFFERENCE Monitor Alarm is INOPERABLE.
when the AXIAL FLUX DIFFERENCE Monitor Alarm is INOPERABLE.
The 1ogged values of the indicated AXIAL FLUX DIFFERENCE shall be.assumed to exist during the interval preceding each logging.~t 0.C.'.COOK UNIT 1 3/4 2-2 POWER DISTRIBUTION LI TS ACTION: (Continued) c)Surveillance testing of the APDMS may be performed pursuant to Specification 4.3.3.7.1 provided the indicated AFD is maintained within the limits of Figure 3.2-1.A total of 6 hours of operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation.
The 1ogged values of the indicated AXIAL FLUX DIFFERENCE shall be. assumed to exist during the interval preceding each logging.
b.THERMAL POWER shall not be increased above 814 of RATED THERMAL POWER unless the indicated AFD is within the+5%target band and ACTION 2.a)1), above has been satisfied.
                                                                        ~ t
C.THERMAL POWER shall not be increased above 50%of RATED THERMAL POWER unless the indicated AFD has not been outside of the+5%target band for more than 1 hour penalty deviation cumulative during the previous 24 hours.d.During power reductions using control, rods, the reporting require-ments of Specification 6.9.1.9 shall riot apply provided the action items above are satisifed.
: 0. C.'. COOK UNIT     1                     3/4 2-2
SURVEILLANCE RE UIREMENTS 4.2.1.1 The indicated AXIAL FLUX DIFFERENCE shall be determined to be within its limits during POWER OPERATION above 15%of RATED THERMAL POWER by: a.Monitoring the indi cated AFD for each OPERABLE excore channel: l.At, least once per 7 days when the AFD Monitor Alarm is OPERABLE, and 2.At least once per hour for the first 24 hours after restoring the AFD Monitor Alarm to OPERABLE status.b.Monitoring and logging the indicated AXIAL FLUX DIFFERENCE for each OPERABLE excore channel at least once per hour for the first 24 hours and at least once per 30 minutes thereafter, when the AXIAL FLUX DIFFERENCE Monitor Alarm is INOPERABLE.
 
The logged values of the indicated AXIAL FLUX DIFFERENCE shall be assumed to exist during the interval preceding each logging.D.C.COOK UNIT 2 3/4 2-2 CHANGE NO.,-.AEP:NRC:0372 REACTIVITY CONTROL SYSTEMS CHARGING PUMP-SHUTDOMN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an-OPERABLE emergency bus.APPLICABILITY:
POWER   DISTRIBUTION LI     TS ACTION:     (Continued) c)   Surveillance testing of the APDMS may be performed pursuant to Specification 4.3.3.7.1 provided the indicated AFD is maintained within the limits of Figure 3.2-1. A total of 6 hours of operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation.
MODES 5 and, 6.ACTION: With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive re~ctivity changes unti 1 one charging pump is restored to OPERABLE status.SURVEILLANCE REQUIREMENTS 4.1.2.3 At least the above required charging pump shall be demonstrated OPERABLE by verifying, that on recirculation flow, the pump develops a discharge pressure of>2390 psig when tested pursuant to Specification 4.0.5.D.C.'COOK-UNIT 2 3/4 1-11~~w s s~~/
: b. THERMAL POWER   shall not be increased above 814 of RATED THERMAL POWER unless the indicated AFD is within the +5% target band and ACTION   2.a) 1), above has been satisfied.
CHANGE NO....., AEP:NRC:0372 CONTAIHMENT SYSTEMS CONTAIHMEHT AIR RECIRCULATION SYSTEMS LIMITIHG CONDITION FOR OPERATION 3.6.5.6 Two independent containment air recirculation systems shall be OPERABLE.APPLICABILITY:
C. THERMAL POWER   shall not be increased above 50% of RATED THERMAL POWER unless the indicated AFD has not been outside of the
MODES 1, 2, 3 and 4.ACTION: With one containment air recirculation system inoperable, restore the inoperable system to OPERABLE status within 72 hours or be in at least HOT STANDBY wi.thin the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE REOUIREIMEHTS 4.6.5.6 Each containment air recirculation system shall be demonstrated OPERABLE at least once per 3 months on a STAGGERED TEST BASIS by: a.b.C.Verifying that the return air fan starts on an auto-start signal after a 10+1 minute delay and operates"or at least 15 minutes, Verifying that with the return air fan dampers closed, the fan , motor current is 56+10 amps when the fan speed is 880+20'PH, Verifying that with the fan off, the return air fan damoer opens when a force.of<ll lbs is applied to the counter-weight, and Verifying that the motor operated valve in the suction line co the containment's lower compartment opens after a 10+1 minute delay.0.C.COOK-UNIT 1 3/4 6-35 CONTAINMENT SYSTEMS CONTAINMENT AIR RECIRCULATION SYSTEMS LIMITING CONDITION FOR OPERATION 3.6.5.6 Two independent containment air recirculation systems shall be OP ERABLE.APPLICABILITY:
          +5% target band for more than 1 hour penalty deviation cumulative during the previous 24 hours.
MODES 1, 2, 3 and 4.'I ACTION: With one containment air recirculation system in'operable,.restore.
: d. During power reductions using control, rods, the reporting require-ments of Specification 6.9.1.9 shall riot apply provided the action items above are satisifed.
the inoperable system to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.SURVEILLANCE REOUIREMENTS 4.6.5.6 E'ach containment air recirculation system shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by: Verifying that the return air fan starts on an auto-start signal after a 10+0/-1 minute delay and operates for at least 15 minutes.b.Ci d.Verifying that with the return air fan dampers closed, the fan motor current is 56+10 amps when the fan speed is 880+20 RPM.Verifying that with the fan off, the return air fan damper opens when a force of<ll lbs is applied to the counterweight.
SURVEILLANCE RE UIREMENTS 4.2.1.1     The indicated AXIAL FLUX DIFFERENCE shall be determined to be within its limits during POWER OPERATION above 15% of RATED THERMAL POWER by:
Yerifyino that the motor operated valve in the, suction line to the containment's lower compartment opens after a 10+0/-1 minute delay..C.COOK'-UNIT 2.,',.3/4 6 44~Amendment Ho.1'C~
: a. Monitoring the indi cated   AFD for each OPERABLE excore channel:
CHANGE N0..7...AEP:NRC:0372
: l. At, least once per 7 days when the AFD Monitor Alarm is OPERABLE, and
~~  
: 2. At least once per hour for the first 24 hours after restoring the AFD Monitor Alarm to OPERABLE status .
: b. Monitoring and logging the indicated AXIAL FLUX DIFFERENCE for each OPERABLE excore channel at least once per hour for the first 24 hours and at least once per 30 minutes thereafter, when the AXIAL FLUX DIFFERENCE Monitor Alarm is INOPERABLE.
The logged values of the indicated AXIAL FLUX DIFFERENCE shall be assumed to exist during the interval preceding each logging.
D. C. COOK UNIT 2                       3/4 2-2
 
CHANGE NO.,-.
AEP:NRC:0372
 
REACTIVITY CONTROL SYSTEMS CHARGING PUMP   - SHUTDOMN LIMITING CONDITION     FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3. 1.2.1 shall be OPERABLE and capable of being powered from     an- OPERABLE emergency bus.
APPLICABILITY:     MODES 5   and, 6.
ACTION:
With no charging   pump OPERABLE, suspend all operations involving CORE ALTERATIONS   or positive re~ctivity changes unti 1 one charging pump is restored to OPERABLE status.
SURVEILLANCE REQUIREMENTS 4.1.2.3   At least the above required charging       pump     shall be demonstrated OPERABLE by   verifying, that on recirculation flow, the pump develops a discharge pressure of > 2390 psig when tested pursuant to Specification 4.0.5.
D. C. 'COOK - UNIT 2                 3/4 1-11
                                                  ~ ~ w s s ~ ~
                                                            /
 
CHANGE NO.....,
AEP:NRC:0372
 
CONTAIHMENT SYSTEMS CONTAIHMEHT   AIR RECIRCULATION     SYSTEMS LIMITIHG CONDITION     FOR OPERATION 3.6.5.6   Two independent containment air       recirculation   systems shall be OPERABLE.
APPLICABILITY:     MODES 1, 2, 3 and 4.
ACTION:
With one containment     air recirculation     system inoperable, restore the inoperable system to     OPERABLE   status within 72 hours or be in at least HOT STANDBY   wi.thin the next 6   hours and in COLD SHUTDOWN within the following   30 hours.
SURVEILLANCE REOUIREIMEHTS 4.6.5.6   Each containment     air recirculation     system shall be demonstrated OPERABLE at least   once per 3 months on a     STAGGERED TEST BASIS     by:
: a. Verifying that the return air fan starts         on an auto-start signal after   a 10 +   1 minute delay and operates       "or at least 15 minutes,
: b. Verifying that with the return air fan         dampers closed, the fan
          , motor current   is 56 +10 amps when the fan speed is 880 + 20
          'PH, C. Verifying that with the fan       off, the return air fan damoer opens when a force. of < ll lbs is applied to the counter-weight, and Verifying that the motor operated valve in the suction line             co the containment's     lower compartment opens after       a 10 +   1 minute delay.
: 0. C. COOK-UNIT   1                 3/4 6-35
 
CONTAINMENT SYSTEMS CONTAINMENT   AIR RECIRCULATION SYSTEMS LIMITING CONDITION     FOR OPERATION 3.6.5.6   Two independent containment       air recirculation   systems   shall   be OP ERABLE.
APPLICABILITY:     MODES   1, 2, 3 and   4.
                        'I ACTION:
With one containment air recirculation system in'operable,.restore. the inoperable system to OPERABLE status within 48 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REOUIREMENTS 4.6.5.6   E'ach containment air recirculation system shall be demonstrated OPERABLE at least   once per 92 days on a STAGGERED TEST BASIS by:
Verifying that the return air fan starts         on an auto-start signal after     a 10 + 0/-1 minute delay and operates for at least 15 minutes.
: b. Verifying that with the return air fan dampers closed, the fan motor current is 56 + 10 amps when the fan speed is 880 + 20 RPM.
Ci  Verifying that with the fan off, the return air fan damper opens when a force of < ll lbs is applied to the counterweight.
: d. Yerifyino that the motor operated valve in the, suction line to the containment's     lower compartment opens     after a 10 +     0/-1 minute delay.
  . C. COOK'- UNIT 2                 .,', .3/4 6 44 ~
Amendment Ho.       1
                                                                          'C ~
 
CHANGE N0..7...
AEP:NRC:0372
          ~ ~
 
F
~ ~
REACTIVITY CONTROL SYSTEI~)S BORATED WATER SOURCES        -  SHUTOOWN LIHITING CONOITION        FOR OPERATION 3.1.2.7. As a minimum, one        of the following borated water sources shall
      . be OPERABLE:,
: a. A bor  ic acid storage      system and associated  heat tracing with:
: 1. A minimum    conta.ined volume  of 835  gallons,
                    .Z.      Between 20,000 and 22,500 ppm      of boron,  and
: 3. A'inimum solution temperature of 145'F.
: b. The  refueling water storage .tank with:
: 1. A minimum    contained, volume of 9690 gallons,
: 2.  ~
A minimum    boron concentration  of  1950 ppm, and
: 3. A.minimum    solution temperature of 35'F.
C APPLICABILITY!        NOOES  5  and 6.
ACTION:                      I With no borated water source OPERABLE, suspend            all operations involving CORE  ALTERATIONS    or positive reactivity changes until at least'ne borated water source is restored to OPERABLE status.
SURVEILLANCE RE UIREMENTS 4.1.2.7'he        above required borated water source        shall  be  demonstrated OPERABLE:  .
: a. At least once per      7  days by:
: l. Verifying the boron concentration of the water,
: 2. Verifying the water level of the tank,        and
: 3. Verifying the boric acid 'storage tank solution temperature when  it  is the source of borated water.
: b. At least once per 24 hours by verifying the RWST temperature wh'en  it is the sou'rce of borated water and the outside air temperature is < 35'F.
0.. C. COOK  -  UNIT  1                  3/4 1-15


~~F REACTIVITY CONTROL SYSTEI~)S BORATED WATER SOURCES-SHUTOOWN LIHITING CONOITION FOR OPERATION 3.1.2.7.As a minimum, one of the following borated water sources shall.be OPERABLE:, a.A bor ic acid storage system and associated heat tracing with: 1.A minimum conta.ined volume of 835 gallons,.Z.Between 20,000 and 22,500 ppm of boron, and b.3.A'inimum solution temperature of 145'F.The refueling water storage.tank with: 1.A minimum contained, volume of 9690 gallons, 2.~A minimum boron concentration of 1950 ppm, and 3.A.minimum solution temperature of 35'F.C APPLICABILITY!
REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES     -   SHUTDOWN LIMITING CONDITION     FOR OPERATION 3.1.2.7   As a. minimum, one     of the following borated water   sources   shall be OPERABLE:
NOOES 5 and 6.ACTION: I With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until at least'ne borated water source is restored to OPERABLE status.SURVEILLANCE RE UIREMENTS 4.1.2.7'he above required borated water source shall be demonstrated OPERABLE:.a.At least once per 7 days by: l.Verifying the boron concentration of the water, 2.Verifying the water level of the tank, and 3.Verifying the boric acid'storage tank solution temperature when it is the source of borated water.b.At least once per 24 hours by verifying the RWST temperature wh'en it is the sou'rce of borated water and the outside air temperature is<35'F.0..C.COOK-UNIT 1 3/4 1-15 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a.minimum, one of the following borated water sources shall be OPERABLE: a.A boric acid storage system and associated heat tracing with: l.A minimum contained borated water volume 835 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F.b.The refueling water storage tank with: l.A minimum contained borated water volume of 9690 gallons, 2.A minimum boron concentration of'000 ppm, and''3.A minimum solution temperature of 35'F.APPLICABILITY:
: a. A   boric acid storage system     and associated heat tracing with:
MODES 5 and 6.ACTION: With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until at least one borated water source is restored to..OPERABLE status.SURVEILLANCE RE UIREMEHTS 4.1.2.7 The above required borated water source shall be demonstrated OPERABLE: a.At least once per 7 days by: l.Verifying the boron'oncentration of the water, 2.Verifying the contained borated water volume, and 3.Verifying the boric acid storage tank solution temperature when it is the source of borated water.b.At least once per 24 hours by verifying the RWST temperature when it is the source of borated water and the outside air temperature is<35'F.D.C.COOK-UNIT 2 3/4'>>15}}
: l. A minimum contained borated water volume 835 gallons,
: 2. Between 20,000 and 22,500 ppm of boron, and
: 3. A minimum solution temperature of 145'F.
: b. The   refueling water storage tank with:
: l. A minimum     contained borated water volume of 9690 gallons,
: 2. A minimum boron concentration of'000 ppm, and''
: 3. A minimum solution temperature of 35'F.
APPLICABILITY:     MODES 5   and 6.
ACTION:
With no borated water source       OPERABLE, suspend   all operations involving CORE ALTERATIONS   or positive reactivity changes until at least       one borated water source is restored to..OPERABLE status.
SURVEILLANCE RE UIREMEHTS 4.1.2.7   The above   required borated water source shall     be demonstrated OPERABLE:
: a. At least once per 7 days by:
: l. Verifying the boron'oncentration of the water,
: 2. Verifying the contained borated water volume, and
: 3. Verifying the boric acid storage tank solution temperature when it   is the source of borated water.
: b. At least once per       24 hours by verifying the RWST temperature when   it is the source     of borated water and the outside air temperature is       < 35'F.
D. C. COOK   - UNIT 2                     3/4'>>15}}

Revision as of 14:41, 22 October 2019

Tech Specs 3.8.2.3,4.2.1.1,4.1.2.3,4.6.5.6,3.1.2.7 & 4.1.2.7 Re Surveillance
ML17331A729
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/26/1981
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331A728 List:
References
NUDOCS 8105290364
Download: ML17331A729 (23)


Text

ATTACHMENT 2 AEP:NRC'0372

~~

8X.O 5 29 0 Pgq

CHANGE

'I NO......

'EP'NRC:0372

ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - OPERATING LIMITING CONDITION fOR OPERATION 3.8.2.3 The following D.C. bus trains shall be energized and OPERABLE with tie breakers between bus trains open:

TRAIN AB consisting of 250-volt D.C. bus AB, 250-volt D.C. battery bank AB, and a full capacity charger.

TRAIN CD consisting of 250-volt D. C. bus CD, 250-volt D. C. battery b a nk CD, an d a full ca pacity charger.

APPLICABILITY: - MODES 1, 2, 3 and 4.

ACT't ON:

a. With 250-volt D.C. bus inoperable, restore the inoperable bus to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within tne, following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

. With one 250-volt D.C. battery and/or its charger inoperable, restore the inoperable battery and/or charger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.8.2.3.1 Each O.C'. bus train shall be determined OPERABLE and energized with tie breakers open at least once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.3.2 Each. 250-volt battery bank and charger shall be demonstrated OPERABLE'.

a. At least once per 7'ays by verifying that:
1. The electrolyte level of each pilot cell is between the minimum and, maximum level indication marks,
0. C. COOK - UNIT 1 3/4 8-8

CHANGE .2 NO....,

AEP:NRC:0372

ELECTRICAL POMER SYSTEMS SURVEILLANCE REQUIRBIENTS (Continued)

2. The pilot cell specific gravity, corrected to 77'F and full electrolyte level, is > 1.200,
3. The pilot cell voltage is > 2.10 volts, and
4. The overall battery voltage is > 250 volts.
b. At least once per 92 days by verifying that:.

r

1. The voltage of each connected cell is > 2.10 volts under float charge and has not decreased more than 0 05 volts F

from the value observed during the original acceptance test,

2. The specific gra'vity, corrected to 70'F and full electro-lyte level, of each connected cell is > 1;200 and has not decreased more than 0.03 from the value observed during the previous test, and
3. The electrolyte level of each connected cell is between the minimum and maximum level indication marks.

co At least once per 18 months by verifying that:

1. The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration.
2. The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material.
3. The battery- charger will supply at least 140 amperes at

> 250 volts for at least 4 hours.

d; At least, once per 18 months, during shutdown, by verifying that the battery capaci ty is adequate to supply and main'tain in OPERABLE status the emergency loads for the specified times of Table 4.8-1Awith the battery charger disconnected. The battery terminal voltage shall be maintained > 210 volts throughout the entire test.

e. At least once per SO months, during shutdown, by verifying that the battery capacity is at least 805 of the manufacturer's rating when subjected to a performance discharge test. This performance discharge test shall be performed subsequent to the satisfactory completion of the required battery service test.

. C. COOK - UNIT 2 3/4 8-9

TABLE 4.8-1A BATTERY EMERGENCY LOAOS AB Batter Loads. Minimum Time

1. Channel I II static inverter* 3 hrs
2. Channel IV static i nverter* 3 hrs
3. Computer s ta ti c inverter* 3 hrs

'

4. BOP static inverter" hrs
5. Feed pump turbine 2E oil pump 1 hr
6. Control room emergency lighting 8 hrs
7. Hain turbine oil pump "E" 3 hrs
8. Isolation valve control 8 hrs
9. All contrnl circuits 8 hrs 1: Channel I static inverter* 3 hrs
2. Channel II static inverter* 3 hrs
3. Feed, pump turbine 2M oil pump 1 hr
4. Generator seal oil pump 5 hrs
5. Hain turbine oil pump "M" 3 hrs
6. Isolation valves '8 hrs
7. Annunciators
8. All control circuits 8 hrs
  • AC power sources to the inverters shall be turned.off at the start of the test and may be turned on at the end of the specified time interval.

Inverters may be left in this operating mode for the duration of the discharge test.

0. C. COOK - UNIT 2 3/4 8-10

CHANGE NO.....,

AEP:NRC:0372 I ~~ ~ l ~ w ~ r

~ I

TABLE 1.2 FREQUENCY NOTATION NOTATION FREQUENCY S At least once per 12 hours.

At least once per 24 hours.

At least once per 7 days.

At least once per 31 days At least once per 92 days.

SA At least once per 184 days..

At least once per 549 days.

S/U Prior to each reactor startup.

N.A. Not applicable.

D. C. COOK - UNIT 1 1-7

TABLE 1.2 FRE UENCY NOTATION NOTATION ~FRE UENCY S At least once per 12 hours.

At least once per 24 hours.

W At least once per 7 days.

At least once per 31 days Q At least once per 92 days.

SA At least once per 184 days.

At least once per 549 days.

S/U: Prior to each reactor startup.

N.A. Not applicable.

D. C. COOK - UNIT 2 1-8 h ~ eC

CHANGE NO.....,

AEP:NRC'0372

~ ~

I POWER DISTRIBUTION LI S ACTION: (Continued)

I c) Surveillance testing of the APDMS may be per formed pursuant to Specification 4.3.3.7.1 provided the indicated AFD is mai ntained within the limits of Figure 3.2-1. A total of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation.

b ., ERMAL POWER shall not be increased above 90% or 0.9 X APL whichever is less) of RATED THERHAL POllER unless the indicated AFD is within the 5Ã target band and ACTION.2.a) 1), above 'has been satisfied.

c. THERMAL POWER shall not be increased above 50K of RATED THERMAL POWER unless the indicated AFD has not been outside of the

~ +5% target band for more than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> penalty deviation cumulative during the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d. During power reductions using control gods, the reporting require-ments of Specification 6.9.1.9 shall not apply provided the action items above are satisifed..

SURYEILLANCE RE UIREMENTS J

4.2.1.1 The indicated AXIAL FLUX DIFFERENCE shall be determined to be within its limits during POWER OPERATION above 15K of RATED THERMAL POWER by:

a.. Monitoring the indicated AFD for each OPERABLE excore .channel:

At least once per 7 days when the AFD Monitor Alarm is and 'PERABLE, 2., At least once per hour for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after restoring the AFD Monitor Alarm to OPERABLE status .

b. Monitoring and logging the indicated AXIAL FLUX DIFFERENCE for each OPERABLE excore channel at least once per hour for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 30 minutes thereafter,-

when the AXIAL FLUX DIFFERENCE Monitor Alarm is INOPERABLE.

The 1ogged values of the indicated AXIAL FLUX DIFFERENCE shall be. assumed to exist during the interval preceding each logging.

~ t

0. C.'. COOK UNIT 1 3/4 2-2

POWER DISTRIBUTION LI TS ACTION: (Continued) c) Surveillance testing of the APDMS may be performed pursuant to Specification 4.3.3.7.1 provided the indicated AFD is maintained within the limits of Figure 3.2-1. A total of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of operation may be accumulated with the AFD outside of the target band during this testing without penalty deviation.

b. THERMAL POWER shall not be increased above 814 of RATED THERMAL POWER unless the indicated AFD is within the +5% target band and ACTION 2.a) 1), above has been satisfied.

C. THERMAL POWER shall not be increased above 50% of RATED THERMAL POWER unless the indicated AFD has not been outside of the

+5% target band for more than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> penalty deviation cumulative during the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d. During power reductions using control, rods, the reporting require-ments of Specification 6.9.1.9 shall riot apply provided the action items above are satisifed.

SURVEILLANCE RE UIREMENTS 4.2.1.1 The indicated AXIAL FLUX DIFFERENCE shall be determined to be within its limits during POWER OPERATION above 15% of RATED THERMAL POWER by:

a. Monitoring the indi cated AFD for each OPERABLE excore channel:
l. At, least once per 7 days when the AFD Monitor Alarm is OPERABLE, and
2. At least once per hour for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after restoring the AFD Monitor Alarm to OPERABLE status .
b. Monitoring and logging the indicated AXIAL FLUX DIFFERENCE for each OPERABLE excore channel at least once per hour for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per 30 minutes thereafter, when the AXIAL FLUX DIFFERENCE Monitor Alarm is INOPERABLE.

The logged values of the indicated AXIAL FLUX DIFFERENCE shall be assumed to exist during the interval preceding each logging.

D. C. COOK UNIT 2 3/4 2-2

CHANGE NO.,-.

AEP:NRC:0372

REACTIVITY CONTROL SYSTEMS CHARGING PUMP - SHUTDOMN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3. 1.2.1 shall be OPERABLE and capable of being powered from an- OPERABLE emergency bus.

APPLICABILITY: MODES 5 and, 6.

ACTION:

With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive re~ctivity changes unti 1 one charging pump is restored to OPERABLE status.

SURVEILLANCE REQUIREMENTS 4.1.2.3 At least the above required charging pump shall be demonstrated OPERABLE by verifying, that on recirculation flow, the pump develops a discharge pressure of > 2390 psig when tested pursuant to Specification 4.0.5.

D. C. 'COOK - UNIT 2 3/4 1-11

~ ~ w s s ~ ~

/

CHANGE NO.....,

AEP:NRC:0372

CONTAIHMENT SYSTEMS CONTAIHMEHT AIR RECIRCULATION SYSTEMS LIMITIHG CONDITION FOR OPERATION 3.6.5.6 Two independent containment air recirculation systems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With one containment air recirculation system inoperable, restore the inoperable system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY wi.thin the next 6 hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REOUIREIMEHTS 4.6.5.6 Each containment air recirculation system shall be demonstrated OPERABLE at least once per 3 months on a STAGGERED TEST BASIS by:

a. Verifying that the return air fan starts on an auto-start signal after a 10 + 1 minute delay and operates "or at least 15 minutes,
b. Verifying that with the return air fan dampers closed, the fan

, motor current is 56 +10 amps when the fan speed is 880 + 20

'PH, C. Verifying that with the fan off, the return air fan damoer opens when a force. of < ll lbs is applied to the counter-weight, and Verifying that the motor operated valve in the suction line co the containment's lower compartment opens after a 10 + 1 minute delay.

0. C. COOK-UNIT 1 3/4 6-35

CONTAINMENT SYSTEMS CONTAINMENT AIR RECIRCULATION SYSTEMS LIMITING CONDITION FOR OPERATION 3.6.5.6 Two independent containment air recirculation systems shall be OP ERABLE.

APPLICABILITY: MODES 1, 2, 3 and 4.

'I ACTION:

With one containment air recirculation system in'operable,.restore. the inoperable system to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REOUIREMENTS 4.6.5.6 E'ach containment air recirculation system shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by:

Verifying that the return air fan starts on an auto-start signal after a 10 + 0/-1 minute delay and operates for at least 15 minutes.

b. Verifying that with the return air fan dampers closed, the fan motor current is 56 + 10 amps when the fan speed is 880 + 20 RPM.

Ci Verifying that with the fan off, the return air fan damper opens when a force of < ll lbs is applied to the counterweight.

d. Yerifyino that the motor operated valve in the, suction line to the containment's lower compartment opens after a 10 + 0/-1 minute delay.

. C. COOK'- UNIT 2 .,', .3/4 6 44 ~

Amendment Ho. 1

'C ~

CHANGE N0..7...

AEP:NRC:0372

~ ~

F

~ ~

REACTIVITY CONTROL SYSTEI~)S BORATED WATER SOURCES - SHUTOOWN LIHITING CONOITION FOR OPERATION 3.1.2.7. As a minimum, one of the following borated water sources shall

. be OPERABLE:,

a. A bor ic acid storage system and associated heat tracing with:
1. A minimum conta.ined volume of 835 gallons,

.Z. Between 20,000 and 22,500 ppm of boron, and

3. A'inimum solution temperature of 145'F.
b. The refueling water storage .tank with:
1. A minimum contained, volume of 9690 gallons,
2. ~

A minimum boron concentration of 1950 ppm, and

3. A.minimum solution temperature of 35'F.

C APPLICABILITY! NOOES 5 and 6.

ACTION: I With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until at least'ne borated water source is restored to OPERABLE status.

SURVEILLANCE RE UIREMENTS 4.1.2.7'he above required borated water source shall be demonstrated OPERABLE: .

a. At least once per 7 days by:
l. Verifying the boron concentration of the water,
2. Verifying the water level of the tank, and
3. Verifying the boric acid 'storage tank solution temperature when it is the source of borated water.
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature wh'en it is the sou'rce of borated water and the outside air temperature is < 35'F.

0.. C. COOK - UNIT 1 3/4 1-15

REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a. minimum, one of the following borated water sources shall be OPERABLE:

a. A boric acid storage system and associated heat tracing with:
l. A minimum contained borated water volume 835 gallons,
2. Between 20,000 and 22,500 ppm of boron, and
3. A minimum solution temperature of 145'F.
b. The refueling water storage tank with:
l. A minimum contained borated water volume of 9690 gallons,
2. A minimum boron concentration of'000 ppm, and
3. A minimum solution temperature of 35'F.

APPLICABILITY: MODES 5 and 6.

ACTION:

With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until at least one borated water source is restored to..OPERABLE status.

SURVEILLANCE RE UIREMEHTS 4.1.2.7 The above required borated water source shall be demonstrated OPERABLE:

a. At least once per 7 days by:
l. Verifying the boron'oncentration of the water,
2. Verifying the contained borated water volume, and
3. Verifying the boric acid storage tank solution temperature when it is the source of borated water.
b. At least once per 24 hours by verifying the RWST temperature when it is the source of borated water and the outside air temperature is < 35'F.

D. C. COOK - UNIT 2 3/4'>>15