{{#Wiki_filter:PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)
{{#Wiki_filter:PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)
: b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary is greater than psig. The provisions of Specification 4.0.4 are not applicableX A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ----
: b. At least once per 92 days on a STAGGERED TEST BASIS by:
9409270338 940920 PDR ADDCK 05000272 P PDR SALEM -UNIT 1 , ' 3/4 7-6 Amendment No. 153
: 1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
* INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.
: 2. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary ste~Sl:lfl~l,*pressure is greater than     psig. The provisions of Specification 4.0.4 are not applicableX ;TNS6~~ A 1
* PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
: c. At least once per 18 months during shutdown by:
: b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J?
: 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.
1 Y pressure is greater than ?S.9-psig.
    ---- -----~------------"
The provisions Specification
9409270338 940920                         ,'
: 4. O. 4 are not applicable)<
PDR   ADDCK 05000272 P                 PDR SALEM - UNIT 1                       3/4 7-6                 Amendment No. 153
::I't-J s-t<. -r A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ,' SALEM -UNIT 2 3/4 7-6 Amendment No. 134 INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.}}
* INSERT A
... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.
 
PLANT SYSTEMS
* SURVEILLANCE REQUIREMENTS (Continued)
: b. At least once per 92 days on a STAGGERED TEST BASIS by:
: 1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
: 2. Verifyin~  that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J&#xa3;3;J? 1 Y pressure is greater than ?S.9-psig. The provisions           Specification
: 4. O. 4 are not applicable)< ::I't-J s- ~ t<. -r A
: c. At least once per 18 months during shutdown by:
: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
: 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.
                                                    ,'
SALEM - UNIT 2                         3/4 7-6                       Amendment No. 134
 
INSERT A
... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.}}

Revision as of 09:21, 21 October 2019

Proposed Tech Specs Re Auxiliary Feedwater Sys
ML18101A238
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/20/1994
From:
Public Service Enterprise Group
To:
Shared Package
ML18101A237 List:
References
NUDOCS 9409270338
Download: ML18101A238 (4)


Text

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)

b. At least once per 92 days on a STAGGERED TEST BASIS by:
1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary ste~Sl:lfl~l,*pressure is greater than psig. The provisions of Specification 4.0.4 are not applicableX ;TNS6~~ A 1
c. At least once per 18 months during shutdown by:
1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.

-----~------------"

9409270338 940920 ,'

PDR ADDCK 05000272 P PDR SALEM - UNIT 1 3/4 7-6 Amendment No. 153

  • INSERT A

... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.

PLANT SYSTEMS

  • SURVEILLANCE REQUIREMENTS (Continued)
b. At least once per 92 days on a STAGGERED TEST BASIS by:
1. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
2. Verifyin~ that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J? 1 Y pressure is greater than ?S.9-psig. The provisions Specification
4. O. 4 are not applicable)< ::I't-J s- ~ t<. -r A
c. At least once per 18 months during shutdown by:
1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal.
2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal.

,'

SALEM - UNIT 2 3/4 7-6 Amendment No. 134

INSERT A

... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.