| {{#Wiki_filter:Document Control Desk Attachment 3 LR-N97109 LCR S95-19 SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 MODE APPLICABILITY OF THE POWER RANGE, NEUTRON FLUX REACTOR TRIP AND SURVEILLANCE REQUIREMENTS TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request: Technical Specification Table 3.3-1 Table 4.3-1 Page 3/4 3-2 3/4 3-11 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request: Technical Specification Table 3.3-1 Table 4.3-1 | | {{#Wiki_filter:Document Control Desk LR-N97109 Attachment 3 LCR S95-19 SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 MODE APPLICABILITY OF THE POWER RANGE, NEUTRON FLUX REACTOR TRIP AND SURVEILLANCE REQUIREMENTS TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request: |
| - | | Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request: |
| --*----. 9710270012 971021 ----------\ . PDR ADOCK 05000272 I P PD_ij Page 1 of 1 Page 3/4 3-2 3/4 3-11 | | Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 Page 1 of 1 |
| | ~--.-- - ---~-*- -- *---- |
| | . 9710270012 971021 -- --------\ |
| | . PDR ADOCK 05000272 I P PD_ij |
|
| |
|
| TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL WII CHECK CALIBRATION TEST REQUIRED 1. Manual Reactor Trip Switch N.A. N.A. R(9) l, 2, and | | TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL WII CHECK CALIBRATION TEST REQUIRED |
| * I -*' 2. Power Range, Neutron Flux s D'2' .;11 Q 1, 2) , and 0(6) 3. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Positive Rate 4. Power Range, Neutron Flux, N.A. R"' Q 1, 2 High Negative Rate 5. Intermediate Range, Neutron Flux s RŽ s/u<'' 1, 2 and | | : 1. Manual Reactor Trip Switch N.A. N.A. R(9) l, 2, and |
| * 6. Source Range, Neutron Flux sm RŽ 0 and S/u'-11 2, 3. 4, 5 and * ' 7. Overtemperature 4T s R Q 1, 2 8. Overpower 6T s R Q 1, 2 9. Pressurizer Preseure--Low s R Q l, 2 10. Pressurizer Preeeure--High s R 0 l, 2 -11. Pressurizer Nater Level--High s R Q 1, 2 12. Lose of Plow -Single Loop s R Q 1 SALBM -UNIT 1 3/4 3-11 Amendment No. 176 I tAIU&
| | * I s 1, 2) ~3 |
| BlaCIQB IRlf IHSIBUMIHIAtIOH en 1111 ... MINIMUM <: TOTAL NUMBER CHANNELS CHANNELS APPLICABLE c: [UNg'.IONAL UNII OF CHANNELS TO TBIP OPERABLE HODES ACTION :I .... .+ N 1. Manual Reactor Trip 2 1 2 1,2 and | | -*' |
| * 12 2. Power Range, Heutron Flux* 4 2 3 1,2 0-MC ' 2 3. Power Range, Neutron Flux 4 2 3 1,2 2 High Positive Rate 4. Power Range, Neutron Flux, 4 2 3 1,2 2 High Negative Rate 5. Intermediate Range, Neutron Flux 2 1 2 1,2 and | | : 2. Power Range, Neutron Flux D'2' , .;11 Q and 0(6) |
| * 3 6. Source Range, Neutron Flux A. Startup 2 1 2 2##, and | | : 3. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Positive Rate |
| * 4 w ....... B . Shutdown 2 0 1 3,4 and 5 5 .. w I N 1. Overtemperature AT 4 2 3 1,2 6 8. overpower AT 4 2 ,3 \ 1,2 6 9. Pressurizer Pressure-Low 4 2 3 1,2 6 10. Pressurizer Pressure--High 4 2 3 1,2 6 -..
| | : 4. Power Range, Neutron Flux, N.A. R"' Q 1, 2 High Negative Rate |
| ; TABLE 4.3-1 r: REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN.WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED 1. Manual Reactor Trip Switch N.A. N.A. R'"'' 1, 2, and * '*" 2. Power Range, Neutron Flux s om, .r11 Q 1, 2 a,,.._J.. | | : 5. Intermediate Range, Neutron Flux s R' s/u<'' 1, 2 and * |
| 3 } and Q''' 9, 3. Power Range, Neutron Flux, N.A. R''' Q 1, 2 High Positive Rate 4. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Negative Rate 5. Intermediate Range, Neutron Flux s Rcc.1 s;u<<*> 1, 2 and
| | : 6. Source Range, Neutron Flux sm R' 0 and S/u'- 11 2, 3. 4, 5 and * |
| * 6. Source Neutron Flux sm Rl6> Q and s/u<11 2, 3, 4, 5 and
| | : 7. Overtemperature 4T s R Q 1, |
| * 7. Overtemperature 6T s R Q 1, 2 8. Overpower 6T s R Q 1, 2 9. Pressurizer Pressure--Low s R Q 1, 2 10. Pressurizer Pressure--High s R Q 1, 2
| | '2 |
| * 11. Pressurizer Water Level--High s R Q 1, 2 12. Loss of Flow -Single Loop s R Q 1 SALEM -UNIT 2 3/4 3-11 Amendment No. 1 1 1/}}
| | : 8. Overpower 6T s R Q 1, 2 |
| | : 9. Pressurizer Preseure--Low s R Q l, 2 10. |
| | 11. |
| | 12. |
| | Pressurizer Preeeure--High Pressurizer Nater Level--High Lose of Plow - Single Loop s |
| | s s |
| | R R |
| | R 0 |
| | Q Q |
| | l, 1, |
| | 1 2 |
| | 2 |
| | - |
| | SALBM - UNIT 1 3/4 3-11 Amendment No. 176 I |
| | |
| | tAIU& ~:3-l BlaCIQB IRlf SX§I~H IHSIBUMIHIAtIOH |
| | ...~ |
| | en 1111 MINIMUM <: |
| | TOTAL NUMBER CHANNELS CHANNELS APPLICABLE c: [UNg'.IONAL UNII OF CHANNELS TO TBIP OPERABLE HODES ACTION |
| | .... |
| | :I |
| | .+ |
| | N 1. Manual Reactor Trip 2 1 2 1,2 and |
| | * 12 |
| | : 2. Power Range, Heutron Flux* 4 2 3 1,2 0-MC~t |
| | ' 2 |
| | : 3. Power Range, Neutron Flux 4 2 3 1,2 2 High Positive Rate |
| | : 4. Power Range, Neutron Flux, 4 2 3 1,2 2 High Negative Rate |
| | : 5. Intermediate Range, Neutron Flux 2 1 2 1,2 and |
| | * 3 |
| | : 6. Source Range, Neutron Flux |
| | .. |
| | w |
| | ....... |
| | w I |
| | A. |
| | B. |
| | Startup Shutdown 2 |
| | 2 1 |
| | 0 2 |
| | 1 2##, and |
| | * 3,4 and 5 4 |
| | 5 N |
| | : 1. Overtemperature AT 4 2 3 1,2 6 |
| | : 8. overpower AT 4 2 ,3 |
| | \ |
| | 1,2 6 |
| | : 9. Pressurizer Pressure-Low 4 2 3 1,2 6 |
| | : 10. Pressurizer Pressure--High 4 2 3 1,2 6 |
| | -.. |
| | |
| | ; |
| | TABLE 4.3-1 r: |
| | REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN.WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED |
| | : 1. Manual Reactor Trip Switch N.A. N.A. R'"'' 1, 2, and * |
| | : 2. Power Range, Neutron Flux s om, .r11 Q 2 a,,.._J.. 3 |
| | '*" |
| | 1, } |
| | and Q''' |
| | 9, |
| | : 3. Power Range, Neutron Flux, N.A. R''' Q 1, 2 High Positive Rate |
| | : 4. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Negative Rate |
| | : 5. Intermediate Range, Neutron Flux s Rcc.1 s;u<<*> 1, 2 and * |
| | : 6. Source Ran~e, Neutron Flux sm Rl6> Q and s/u< 11 2, 3, 4, 5 and * |
| | : 7. Overtemperature 6T s R Q 1, 2 |
| | : 8. Overpower 6T s R Q 1, 2 |
| | * |
| | : 9. Pressurizer Pressure--Low s R Q 1, 2 |
| | : 10. Pressurizer Pressure--High s R Q 1, 2 |
| | : 11. Pressurizer Water Level--High s R Q 1, 2 |
| | : 12. Loss of Flow - Single Loop s R Q 1 SALEM - UNIT 2 3/4 3-11 Amendment No. 111/}} |
Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed PositionML18102B632 |
Person / Time |
---|
Site: |
Salem |
---|
Issue date: |
10/21/1997 |
---|
From: |
Public Service Enterprise Group |
---|
To: |
|
---|
Shared Package |
---|
ML18102B631 |
List: |
---|
References |
---|
NUDOCS 9710270012 |
Download: ML18102B632 (5) |
|
Similar Documents at Salem |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
Document Control Desk LR-N97109 Attachment 3 LCR S95-19 SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 MODE APPLICABILITY OF THE POWER RANGE, NEUTRON FLUX REACTOR TRIP AND SURVEILLANCE REQUIREMENTS TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:
Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:
Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 Page 1 of 1
~--.-- - ---~-*- -- *----
. 9710270012 971021 -- --------\
. PDR ADOCK 05000272 I P PD_ij
TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL WII CHECK CALIBRATION TEST REQUIRED
- 1. Manual Reactor Trip Switch N.A. N.A. R(9) l, 2, and
-*'
- 2. Power Range, Neutron Flux D'2' , .;11 Q and 0(6)
- 3. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Positive Rate
- 4. Power Range, Neutron Flux, N.A. R"' Q 1, 2 High Negative Rate
- 5. Intermediate Range, Neutron Flux s R' s/u< 1, 2 and *
- 6. Source Range, Neutron Flux sm R' 0 and S/u'- 11 2, 3. 4, 5 and *
- 7. Overtemperature 4T s R Q 1,
'2
- 8. Overpower 6T s R Q 1, 2
- 9. Pressurizer Preseure--Low s R Q l, 2 10.
11.
12.
Pressurizer Preeeure--High Pressurizer Nater Level--High Lose of Plow - Single Loop s
s s
R R
R 0
Q Q
l, 1,
1 2
2
-
SALBM - UNIT 1 3/4 3-11 Amendment No. 176 I
tAIU& ~:3-l BlaCIQB IRlf SX§I~H IHSIBUMIHIAtIOH
...~
en 1111 MINIMUM <:
TOTAL NUMBER CHANNELS CHANNELS APPLICABLE c: [UNg'.IONAL UNII OF CHANNELS TO TBIP OPERABLE HODES ACTION
....
- I
.+
N 1. Manual Reactor Trip 2 1 2 1,2 and
- 2. Power Range, Heutron Flux* 4 2 3 1,2 0-MC~t
' 2
- 3. Power Range, Neutron Flux 4 2 3 1,2 2 High Positive Rate
- 4. Power Range, Neutron Flux, 4 2 3 1,2 2 High Negative Rate
- 5. Intermediate Range, Neutron Flux 2 1 2 1,2 and
- 6. Source Range, Neutron Flux
..
w
.......
w I
A.
B.
Startup Shutdown 2
2 1
0 2
1 2##, and
5 N
- 1. Overtemperature AT 4 2 3 1,2 6
- 8. overpower AT 4 2 ,3
\
1,2 6
- 9. Pressurizer Pressure-Low 4 2 3 1,2 6
- 10. Pressurizer Pressure--High 4 2 3 1,2 6
-..
TABLE 4.3-1 r:
REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN.WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED
- 1. Manual Reactor Trip Switch N.A. N.A. R'" 1, 2, and *
- 2. Power Range, Neutron Flux s om, .r11 Q 2 a,,.._J.. 3
'*"
1, }
and Q
9,
- 3. Power Range, Neutron Flux, N.A. R Q 1, 2 High Positive Rate
- 4. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Negative Rate
- 5. Intermediate Range, Neutron Flux s Rcc.1 s;u<<*> 1, 2 and *
- 6. Source Ran~e, Neutron Flux sm Rl6> Q and s/u< 11 2, 3, 4, 5 and *
- 7. Overtemperature 6T s R Q 1, 2
- 8. Overpower 6T s R Q 1, 2
- 9. Pressurizer Pressure--Low s R Q 1, 2
- 10. Pressurizer Pressure--High s R Q 1, 2
- 11. Pressurizer Water Level--High s R Q 1, 2
- 12. Loss of Flow - Single Loop s R Q 1 SALEM - UNIT 2 3/4 3-11 Amendment No. 111/