ML18102B646: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Control Attachment 3 LR-N970603 LCR S97-14 SALEM GENERATING STATION UNIT NOS. 1 AND 2 CHANGE TO TECHNICAL SPECIFICATIONS HYDROGEN ANALYZER CALIBRATION FREQUENCY TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request: Technical Specification 4.6.4.1 3/4 6-18 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request: Technical Specification 4.6.4.1 --9711040231 971024 PDR ADOCK 05000272 p PDR 3/4 6-21 
{{#Wiki_filter:~Document  Control                                   LR-N970603 Attachment 3                                        LCR S97-14 SALEM GENERATING STATION UNIT NOS. 1 AND 2 CHANGE TO TECHNICAL SPECIFICATIONS HYDROGEN ANALYZER CALIBRATION FREQUENCY TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:
" . CONIAINMENI SYSTEMS 3/4.6.4 CQMBQSTIBLE CONTRQL .. HYDRQGEN ANALXZERS LIMITING CONDITION FOR OPERATION 3.6.4.l Two independent containment hydrogen analyzers shall be OPERABLE.
Technical Specification 4.6.4.1                                   3/4 6-18 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:
APPLICABILITY:
Technical Specification 4.6.4.1                                   3/4 6-21
MODES l. and 2 .* ACTION: With one hydrogen analyzer inoperable., restore the inoperable analyzer to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours. With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours. SURVEILLANCE REQUIREMENTS 4.6.4.l a. b. Each hydrogen analyzer be demonstrated OPERABLE by the performance of a CHANNEL CHECK at least once per 12 hours, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once performing a CHANNEL CALIBRATION using sample gises containing:
  - -
Two volume percent hydrogen (low span), balance Nitrogen, and Six volume percent hydrogen (high span), balance.Nitrogen.  
9711040231 971024 PDR ADOCK 05000272 p               PDR
'* SALEM -UNIT l 3/4 6-18 Amendment No. 153
 
'J * " .. CONTAINMBRT SYSTDJS 3/4.6.4 CODOSTIBLB GAS CONTROL HYDROGEN ANALY%ERS  
" .
* * , :. ' ... LIMITING CONDITION.FOR OPERATION 3.6.4.l Two independent containment hydroqen analyzers shall be OPERABLE.
CONIAINMENI SYSTEMS 3/4.6.4 CQMBQSTIBLE CONTRQL
AEPLICABILITX:
                        ..
tl:>DBS 1 and 2 . ACTION: With one hydrogen analyzer restore the inoperable analyzer to OPERABLE status within 30 days or be in at least Har STANDBY within the next 6 hours. With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours or be in at least Har STANDBY within the naxt 6 hours. SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen analyzer shall be demonstrated OPERABI.B by the performance of a CHANNEL CHECK at least once per 12 hours, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once performing a CHANNEL CALIBRATION using sample gas containing:
HYDRQGEN ANALXZERS LIMITING CONDITION FOR OPERATION 3.6.4.l   Two independent containment hydrogen analyzers shall be OPERABLE.
: a. Two volume percent hydrogen (low span), balance Nitrogen, and b. Six volume percent hydrogen thigh span), balance Nitrogen.  
APPLICABILITY: MODES l. and 2 .*
,. SALEM -UN\:1' 3/4 6-21 No. 134}}
ACTION:
With one hydrogen analyzer inoperable., restore the inoperable analyzer to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours.
With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours.
SURVEILLANCE REQUIREMENTS 4.6.4.l     Each hydrogen analyzer sh~:l be demonstrated OPERABLE by the performance of a CHANNEL CHECK at least once per 12 hours, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once pertRef~eling)by performing a CHANNEL CALIBRATION using sample gises containing:
: a. Two volume percent hydrogen (low span), balance Nitrogen, and
: b. Six volume percent hydrogen (high span), balance.Nitrogen.
                                                    '*
SALEM - UNIT l                       3/4 6-18               Amendment No. 153
 
'J " ..
CONTAINMBRT SYSTDJS
* 3/4.6.4 CODOSTIBLB GAS CONTROL HYDROGEN ANALY%ERS         , :. ~
                            *' * ...
LIMITING CONDITION.FOR OPERATION 3.6.4.l   Two independent containment hydroqen analyzers shall be OPERABLE.
AEPLICABILITX: tl:>DBS 1 and 2 .
ACTION:
With one hydrogen analyzer inope~able, restore the inoperable analyzer to OPERABLE status within 30 days or be in at least Har STANDBY within the next 6 hours.
With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours or be in at least Har STANDBY within the naxt 6 hours.
SURVEILLANCE REQUIREMENTS 4.6.4.1       Each hydrogen analyzer shall be demonstrated OPERABI.B by the performance of a CHANNEL CHECK at least once per 12 hours, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once pe~efueliii}>by performing a CHANNEL CALIBRATION using sample gas containing:
: a. Two volume percent hydrogen (low span), balance Nitrogen, and
: b. Six volume percent hydrogen thigh span), balance Nitrogen.
                                                        ,.
3/4 6-21             Amendmen~ No. 134 SALEM - UN\:1' ~}}

Revision as of 09:15, 21 October 2019

Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1
ML18102B646
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/24/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102B645 List:
References
NUDOCS 9711040231
Download: ML18102B646 (3)


Text

~Document Control LR-N970603 Attachment 3 LCR S97-14 SALEM GENERATING STATION UNIT NOS. 1 AND 2 CHANGE TO TECHNICAL SPECIFICATIONS HYDROGEN ANALYZER CALIBRATION FREQUENCY TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:

Technical Specification 4.6.4.1 3/4 6-18 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:

Technical Specification 4.6.4.1 3/4 6-21

- -

9711040231 971024 PDR ADOCK 05000272 p PDR

" .

CONIAINMENI SYSTEMS 3/4.6.4 CQMBQSTIBLE ~ CONTRQL

..

HYDRQGEN ANALXZERS LIMITING CONDITION FOR OPERATION 3.6.4.l Two independent containment hydrogen analyzers shall be OPERABLE.

APPLICABILITY: MODES l. and 2 .*

ACTION:

With one hydrogen analyzer inoperable., restore the inoperable analyzer to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4.l Each hydrogen analyzer sh~:l be demonstrated OPERABLE by the performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once pertRef~eling)by performing a CHANNEL CALIBRATION using sample gises containing:

a. Two volume percent hydrogen (low span), balance Nitrogen, and
b. Six volume percent hydrogen (high span), balance.Nitrogen.

'*

SALEM - UNIT l 3/4 6-18 Amendment No. 153

'J " ..

CONTAINMBRT SYSTDJS

  • 3/4.6.4 CODOSTIBLB GAS CONTROL HYDROGEN ANALY%ERS , :. ~
  • ' * ...

LIMITING CONDITION.FOR OPERATION 3.6.4.l Two independent containment hydroqen analyzers shall be OPERABLE.

AEPLICABILITX: tl:>DBS 1 and 2 .

ACTION:

With one hydrogen analyzer inope~able, restore the inoperable analyzer to OPERABLE status within 30 days or be in at least Har STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least Har STANDBY within the naxt 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen analyzer shall be demonstrated OPERABI.B by the performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once pe~efueliii}>by performing a CHANNEL CALIBRATION using sample gas containing:

a. Two volume percent hydrogen (low span), balance Nitrogen, and
b. Six volume percent hydrogen thigh span), balance Nitrogen.

,.

3/4 6-21 Amendmen~ No. 134 SALEM - UN\:1' ~