{{#Wiki_filter:Enclosure V.C. Summer Nuclear StationRadiation Safety Baseline Inspection Initial Information Request Inspection Report:
{{#Wiki_filter:ML18240A212 V.C. Summer Nuclear Station Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018004 During the weeks of October 22 - 26 and November 5 - 9, 2018, the NRC will perform a baseline Radiation Safety Inspection at Summer Nuclear Station (NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05, and Radiation Safety Sections of 71151).
201800 4 During the week s of October 22 - 26 and November 5 - 9, 201 8, the NRC will perform a baseline Radiation Safety Inspection at Summer Nuclear Station (NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05, and Radiation Safety Sections of 71151
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than October 5, 2018.
). Experience has shown that this inspection is resource
If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade Loo at 404-997-4727, or the Engineering Branch 3 Chief, Brian Bonser at 404-997-4653.
-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/
-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than October 5, 2018. If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade Loo at 404-997-4 727, or the Engineering Branch 3 Chief, Brian Bonser at 404
adams.html.
-997-4653. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
adams.html. PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
-0011, 3150-0014, 3150
Enclosure
-0044, and 3150
 
-0135. PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Occupational Radiation Safety Cornerstone Inspection Dates:               October 22 - 26 and November 5 - 9, 2018 Documents Due by:               October 5, 2018 Licensee:                       Summer Nuclear Station Docket Number:                   05000395 Inspection Procedures (IPs): 71124.01 - Radiological Hazard Assessment and Exposure Controls 71124.02 - Occupational ALARA Planning and Controls 71124.03 - In-Plant Airborne Radioactivity Control and Mitigation 71124.04 - Occupational Dose Assessment 71124.05 - Radiation Monitoring Instrumentation 71151 - Performance Indicator Verification Lead Inspector:                 Wade Loo Sr. Health Physicist US NRC Region II 404-997-4727 Wade.Loo@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
Enclosure Document Request List Occupational Radiation Safety Cornerstone Inspection Dates:
Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
October 22 - 26 and November 5  
Documentation for these inspection procedures, are requested from October 1, 2016, to present, unless otherwise specified. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.
- 9, 2018 Documents Due by:
Miscellaneous:
October 5, 2018 Licensee:   Summer Nuclear Station Docket Number
: 1.       List of primary site contact(s) for each inspection area including names and telephone numbers.
: 05000395 Inspection Procedures (IPs): 71124.01 - Radiological Hazard Assessment and Exposure Controls 71124.02 - Occupational ALARA Planning and Controls 71124.03 - In-Plant Airborne Radioactivity Control and Mitigation 71124.04 - Occupational Dose Assessment 71124.05 - Radiation Monitoring Instrumentation 7 1151 - Performance Indicator Verification Lead Inspector:
: 2.       List of radiation protection procedures, including title and number.
Wade Loo     Sr. Health Physicist US NRC Region II 404-997-4727     Wade.Loo@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
: 3.       Plant Management, Radiation Protection, and Chemistry organizational charts w/contact numbers. Outage schedule, including work activities to be conducted during the weeks of the inspection.
Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or "flash" drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
: 4.       Most recent DAW 10 CFR Part 61 analytical results.
Documentation for these inspection procedu res, are requested from October 1, 2016, to present, unless otherwise specified. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on
: 5.       Independent Spent Fuel Storage Installation (ISFSI) information to include surveys, exposure data, and as low as reasonably achievable (ALARA) planning and reviews Enclosure
-site review.
 
Miscellaneous
conducted for the last two moves, as well as last two routine surveys of the facility and Thermoluminescent Dosimeter (TLD) area monitoring results of the facility.
: 1. List of primary site contact(s) for each inspection area including names and telephone numbers. 2. List of radiation protection procedures, including title and number.
: 6. Corrective Action Program procedure(s).
: 3. Plant Management, Radiation Protection, and Chemistry organizational charts w/contact numbers. Outage schedule, including work activities to be conducted during the weeks of the inspection
: 7. Audits and self-assessments performed since May 1, 2017, that encompass the areas of (1) HP controls, (2) the ALARA program and implementation, (3) respiratory protection, (4) airborne radioactivity, monitoring and/or mitigation-engineering controls, (5) dose assessment, and (6) radiological monitoring instrumentation (portable, installed, and counting room instruments).
. 4. Most recent DAW 10 CFR Part 61 analytical results
71124.01 - Radiological Hazard Assessment and Exposure Controls:
. 5. Independent Spent Fuel Storage Installation (ISFSI) information to include surveys, exposure data, and as low as reasonably achievable (ALARA) planning and reviews Enclosure conducted for the last two moves, as well as last two routine surveys of the facility and Thermoluminescent Dosimeter (TLD) area monitoring results of the facility
: 1. List of active Radiation Work Permits (RWPs), including planned and contingency outage RWPs, with their administrative limits, electronic dosimeter dose rate limit, and dose limit.
. 6. Corrective Action Program procedure(s)
. 7. Audits and self
-assessments performed since May 1, 2017 , that encompass the areas of (1) HP controls, (2) the ALARA program and implementation, (3) respiratory protection, (4) airborne radioactivity, monitoring and/or mitigation
-engineering controls, (5) dose assessment, and (6) radiological monitoring instrumentation (portable, installed, and counting room instruments)
. 71124.01 - Radiological Hazard Assessment and Exposure Controls
: 1. List of active Radiation Work Permits (RWPs), including planned and contingency outage RWPs, with their administrative limits, electronic dosimeter dose rate limit, and dose limit.
: 2. Timeline of major outage activities (e.g., Gantt chart or similar list).
: 2. Timeline of major outage activities (e.g., Gantt chart or similar list).
: 3. Procedures related to health physics (HP) controls (e.g., Posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/locked high radiation area (LHRA)/very high radiation area (VHRA) control, key control, control of divers, special controls during fuel offload, hot spots).
: 3. Procedures related to health physics (HP) controls (e.g., Posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/locked high radiation area (LHRA)/very high radiation area (VHRA) control, key control, control of divers, special controls during fuel offload, hot spots).
: 4. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm followup).
: 4. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm followup).
: 5. List of National Source Tracking System (NSTS) sources, change-of-ownership and copies of transactions since May 1, 2017. 6. Documentation of annual NSTS sources inventory reconciliation for 2017. 7. Most recent survey of all LHRAs and VHRAs, as applicable.
: 5. List of National Source Tracking System (NSTS) sources, change-of-ownership and copies of transactions since May 1, 2017.
: 6. Documentation of annual NSTS sources inventory reconciliation for 2017.
: 7. Most recent survey of all LHRAs and VHRAs, as applicable.
: 8. Most recent radioactive materials (RAM) sealed source inventory record.
: 8. Most recent radioactive materials (RAM) sealed source inventory record.
: 9. List of all non
: 9. List of all non-fuel items stored in spent fuel pool (SFP).
-fuel items stored in spent fuel pool (SFP).
: 10. List of Corrective Action Program (CAP) documents related to HP controls where the cause was listed as human performance (e.g., radworker error, HP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems) issued since May 1, 2017.
1 0. List of Corrective Action Program (C AP) documents related to HP controls where the cause was listed as human performance (e.g., radworker error, HP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems) issued since May 1, 2017. [This should be a list of corrective action documents containing an Action Request (AR) or Condition Report (CR) number s and brief description, not full Nonconformance Reports (NCRs)
[This should be a list of corrective action documents containing an Action Request (AR) or Condition Report (CR) numbers and brief description, not full Nonconformance Reports (NCRs).]
.] 11 All self-assessments and audits covering HP controls since May 1, 201 7. 12. All CAP documents related to NSTS sources since May 1, 201 7. 71124.02 - ALARA Planning and Controls
11   All self-assessments and audits covering HP controls since May 1, 2017.
: 12. All CAP documents related to NSTS sources since May 1, 2017.
71124.02 - ALARA Planning and Controls
: 1. Site and corporate procedures associated with maintaining site dose ALARA, including those involving ALARA work activities. These procedures should include:
: 1. Site and corporate procedures associated with maintaining site dose ALARA, including those involving ALARA work activities. These procedures should include:
ALARA program implementation, including ALARA committee activities and ALARA planning, briefing, and reviews Radiation work permit preparation and worker compliance Processes used to estimate and track work activity specific exposures Making changes to dose estimates during task performance Work controls Engineering controls Exposure mitigation requirements
* ALARA program implementation, including ALARA committee activities and ALARA planning, briefing, and reviews
. 2. List of top five dose jobs for the upcoming refueling outage and ALARA planning packages (including dose estimates, work
* Radiation work permit preparation and worker compliance
-hour estimates, special HP controls, and dose
* Processes used to estimate and track work activity specific exposures
* Making changes to dose estimates during task performance
* Work controls
* Engineering controls
* Exposure mitigation requirements.
: 2. List of top five dose jobs for the upcoming refueling outage and ALARA planning packages (including dose estimates, work-hour estimates, special HP controls, and dose Enclosure


Enclosure reduction initiatives).
reduction initiatives).
: 3. Most recent annual ALARA report and most recent refueling outage report.
: 3. Most recent annual ALARA report and most recent refueling outage report.
: 4. Annual ALARA goals for 2017 and 2018, and the methodology utilized to make the projections.
: 4. Annual ALARA goals for 2017 and 2018, and the methodology utilized to make the projections.
: 5. ALARA Committee activity summaries (e.g. meeting minutes) discussing and approval of activities associated with the upcoming refueling outage.
: 5. ALARA Committee activity summaries (e.g. meeting minutes) discussing and approval of activities associated with the upcoming refueling outage.
: 6. Outline of the source term reduction strategy. Information should include:
: 6. Outline of the source term reduction strategy. Information should include:
Historic trends and current status of plant source term Factors that affect the source term Activities employed to reduce the source term Specific sources identified for reduction actions Source term reduction evaluation Results achieved since May 1, 2017
* Historic trends and current status of plant source term
. 7. List of C AP documents (e.g. NCRs, CRs, etc.)
* Factors that affect the source term
generated since May 1, 201 7, related to the ALARA program, including the following:
* Activities employed to reduce the source term
ALARA planning Post-job review identified problems Radiation worker practices Occurrences where the collective exposure was greater than intended dose determined to be ALARA for the individual work activities
* Specific sources identified for reduction actions
[This should be a list of corrective action documents containing an AR or CR numbers and brief description, not fu ll NCRs.] 8. Available for onsite review during the inspection:
* Source term reduction evaluation
ALARA planning packages for jobs to be performed during the outage Temporary shielding requests generated for the outage Completed ALARA packages (including post
* Results achieved since May 1, 2017.
-job reviews) for the five (5) work activities that were completed during the last outage that had the greatest collective dose, and/or presented significant radiological risk.
: 7. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, related to the ALARA program, including the following:
* ALARA planning
* Post-job review identified problems
* Radiation worker practices
* Occurrences where the collective exposure was greater than intended dose determined to be ALARA for the individual work activities
[This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]
: 8. Available for onsite review during the inspection:
* ALARA planning packages for jobs to be performed during the outage
* Temporary shielding requests generated for the outage
* Completed ALARA packages (including post-job reviews) for the five (5) work activities that were completed during the last outage that had the greatest collective dose, and/or presented significant radiological risk.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
: 1. Site and corporate procedures/manuals associated with airborne radiation monitoring instrumentation and respiratory protection. Procedures/manuals should include:
: 1. Site and corporate procedures/manuals associated with airborne radiation monitoring instrumentation and respiratory protection. Procedures/manuals should include:
Operation, calibration, and maintenance of air sampling instrumentation, including set-point determination (e.g., low
* Operation, calibration, and maintenance of air sampling instrumentation, including set-point determination (e.g., low-vols, high vols, goosenecks, AMS 4s, etc.)
-vols, high vols, goosenecks, AMS 4s, etc.)
* Actions to be taken when air sampling instrumentation is found to be significantly out of tolerance/calibration
Actions to be taken when air sampling instrumentation is found to be significantly out of tolerance/calibration Issuance and use of respiratory protective equipment (emphasis on SCBA and air
* Issuance and use of respiratory protective equipment (emphasis on SCBA and air-supplied equipment)
-supplied equipment)
* Total Effective Dose Equivalent-ALARA evaluation guidance
Total E ffective Dose Equivalent-ALARA evaluation guidance Training, including fit
* Training, including fit-testing, for use of SCBA and supplied-air systems
-testing, for use of SCBA and supplied
* SCBA maintenance activities, including vital components (i.e. regulators)
-air systems SCBA maintenance activities, including vital components (i.e. regulators) Determination/verification of Grade D air for SCBA
* Determination/verification of Grade D air for SCBA.
. 2. Two most recent HEPA filter DOP and charcoal test results for the Main Control Room ventilation system.
: 2. Two most recent HEPA filter DOP and charcoal test results for the Main Control Room ventilation system.
: 3. Records of certification of air quality for equipment used to provide breathing air for air
: 3. Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and SCBA bottles (air compressors and bottled breathing air) since May 1, 2017.
-supplied respirators and SCBA bottles (air compressors and bottled breathing air) since May 1, 201 7. 4. Documentation for last two surveillances performed on SCBA stored for emergency use.
: 4. Documentation for last two surveillances performed on SCBA stored for emergency use.
: 5. List of CAP documents (e.g. NCRs, CRs, etc.)
: 5. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017 involving Enclosure
generated since May 1, 2017 involving Enclosure radiation monitoring and protective equipment deficiencies, including the following:
 
Continuous air monitors Respiratory protection equipment and program implementation
radiation monitoring and protective equipment deficiencies, including the following:
[This should be a list of corrective action documents containing an AR or CR numbers and brief description, not fu ll NCRs.] 6. Available for onsite review by inspector during inspection
* Continuous air monitors
Inventory, inspection, and maintenance records for SCBA equipment Training records, including fit
* Respiratory protection equipment and program implementation
-testing, for SCBA
[This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]
-qualified individuals
: 6. Available for onsite review by inspector during inspection:
: i. List of all licensed operators qualified to use SCBA ii. List of all instrumentation and control personnel qualified to use SCBA iii. List of all HP personnel qualified to use SCBA Training records/certification for individuals qualified to perform maintenance on vital components (e.g. regulators) on SCBA.
* Inventory, inspection, and maintenance records for SCBA equipment
71124.04: Occupational Dose Assessment
* Training records, including fit-testing, for SCBA-qualified individuals
: 1. Site and corporate Procedures/Guidance Documents for external dose monitoring, i.e. dosimetry issuance and use. The documents should include:
: i. List of all licensed operators qualified to use SCBA ii. List of all instrumentation and control personnel qualified to use SCBA iii. List of all HP personnel qualified to use SCBA
Guidance for multi
* Training records/certification for individuals qualified to perform maintenance on vital components (e.g. regulators) on SCBA.
-badging; monitoring in steep/highly variable dose rate gradients Personnel contamination events; storage/care of personal dosimeters; use of electronic dosimeters including evaluation of any biases identified relative to TLD monitoring Internal dose assessment, i.e., both in vivo and in vitro bioassay and air sampling capabilities. The documents should include guidance for calibration/QC and use of whole body counter (WBC); release of contaminated individuals, use of passive monitoring as screening method for evaluations, and special in vitro sample collection and analysis, and actions for declared pregnant workers.
71124.04: Occupational Dose Assessment
: 1. Site and corporate Procedures/Guidance Documents for external dose monitoring, i.e.
dosimetry issuance and use. The documents should include:
* Guidance for multi-badging; monitoring in steep/highly variable dose rate gradients
* Personnel contamination events; storage/care of personal dosimeters; use of electronic dosimeters including evaluation of any biases identified relative to TLD monitoring
* Internal dose assessment, i.e., both in vivo and in vitro bioassay and air sampling capabilities. The documents should include guidance for calibration/QC and use of whole body counter (WBC); release of contaminated individuals, use of passive monitoring as screening method for evaluations, and special in vitro sample collection and analysis, and actions for declared pregnant workers.
: 2. NVLAP accreditation documentation for current dosimetry used by the site.
: 2. NVLAP accreditation documentation for current dosimetry used by the site.
: 3. List of all positive whole body count (WBC), in vitro, or air sampling analyses which resulted in an assigned CEDE equal to
: 3. List of all positive whole body count (WBC), in vitro, or air sampling analyses which resulted in an assigned CEDE equal to, or exceeding, 10 millirem since May 1, 2017.
, or exceeding
[Note: only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
, 10 millirem since May 1, 2017. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in
: 4. List of all personnel contamination events, dispersed contamination/discrete particles, identified since May 1, 2017. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
-depth review during the onsite inspection]
: 5. Copies of all audits, self-assessments, and/or reviews related to internal or external dosimetry issues generated since May 1, 2017. The documents provided should include any reviews/evaluations conducted of vendor facilities, e.g., corporate or outside vendor/
. 4. List of all personnel contamination events, dispersed contamination/discrete particles, identified since May 1, 2017. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in
or corporate calibration facilities.
-depth review during the onsite inspection
: 6. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, for internal or external dosimetry issues/events. [This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]
]. 5. Copies of all audits, self
71124.05 - Radiation Monitoring Instrumentation
-assessments, and/or reviews related to internal or external dosimetry issues generated since May 1, 2017. The documents provided should include any reviews/evaluations conducted of vendor facilities, e.g., corporate or outside vendor/ or corporate calibration facilities.
: 6. List of CAP documents (e.g. NCRs, CRs, etc.)
generated since May 1, 2017, for internal or external dosimetry issues/events.
[This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.] 71124.05 - Radiation Monitoring Instrumentation
: 1. Procedures/Guidance Documents for:
: 1. Procedures/Guidance Documents for:
use of portable instrument calibrators (e.g.
* use of portable instrument calibrators (e.g. Shepherd calibrator)
Shepherd calibrator) calibration and functional test/source checks of portable radiation detection instrumentation
* calibration and functional test/source checks of portable radiation detection instrumentation Enclosure
 
* calibration and functional tests of small article monitor (SAM), personnel contamination monitor (PCM), portal monitor (PM), whole body counting (WBC) equipment; and continuous air monitors (CAMs)
Enclosure  calibration and functional tests of small article monitor (SAM), personnel contamination monitor (PCM), portal monitor (PM), whole body counting (WBC) equipment; and continuous air monitors (CAMs) determination of set
* determination of set-points for Area Radiation Monitor (ARM), CAM, PCM, PM and SAM equipment
-points for Area Radiation Monitor (ARM), CAM, PCM, PM and SAM equipment collection and analysis of high
* collection and analysis of high-range, post- accident effluent samples
-range, post
* QA program for count room instruments (e.g. laboratory inter-comparison data).
- accident effluent samples QA program for count room instruments (e.g. laboratory inter
: 2. The last two calibration records for the following monitors:
-comparison data)
* RM-G6: Reactor Building Refueling Bridge Area Radiation Monitor
. 2. The last two calibration records for the following monitors:
* RM-G7: Reactor Building High Range Area Radiation Monitor
RM-G6: Reactor Building Refueling Bridge Area Radiation Monitor RM-G7: Reactor Building High Range Area Radiation Monitor RM-G10: Auxiliary Building Waste Gas Decay Tank Area Radiation Monitor RM-G12: Auxiliary Building Waste Holdup Tank Area Radiation Monitor RM-G18: Reactor Building High Range Area Radiation Monitor Documentation for the radioactive sources used to calibrate the instruments in item 2 above, including paperwork showing traceability to a National Institute of Standards
* RM-G10: Auxiliary Building Waste Gas Decay Tank Area Radiation Monitor
& Technology standard and/or traceability to the primary calibration, as applicable
* RM-G12: Auxiliary Building Waste Holdup Tank Area Radiation Monitor
. 3. The last two surveillances performed on the Post
* RM-G18: Reactor Building High Range Area Radiation Monitor
-accident Sampling System, as applicable if it is still required in the plant technical specifications
* Documentation for the radioactive sources used to calibrate the instruments in item 2 above, including paperwork showing traceability to a National Institute of Standards
. 4. The last two test record s of the instrument calibrator (Shepherd validation testing/dose rate curves).
          & Technology standard and/or traceability to the primary calibration, as applicable.
: 3. The last two surveillances performed on the Post-accident Sampling System, as applicable if it is still required in the plant technical specifications.
: 4. The last two test records of the instrument calibrator (Shepherd validation testing/dose rate curves).
: 5. The last two records of calibration for the whole body counter (WBC).
: 5. The last two records of calibration for the whole body counter (WBC).
: 6. List of the portable instruments currently in service and available for use.
: 6. List of the portable instruments currently in service and available for use. Several will be selected for on-site review of the calibration records.
Several will be selected for on
: 7. List of the following radiation monitors currently in service. Several will be selected for on-site review of the calibration records.
-site review of the calibration records
* Portal Monitors used in Dosimetry for Passive Monitoring
. 7. List of the following radiation monitors currently in service. Several will be selected for on-site review of the calibration records.
* SAMs at RCA exit point
Portal Monitors used in Dosimetry for Passive Monitoring SAMs at RCA exit point Whole Body Contamination Monitors at RCA exit point Portal Monitors at RCA exit point Countroom High
* Whole Body Contamination Monitors at RCA exit point
-purity Germanium and liquid scintillation systems
* Portal Monitors at RCA exit point
. 8. Documentation for the radioactive sources used to calibrate the monitors requested for item 8 above showing traceability to a national standard (NIST
* Countroom High-purity Germanium and liquid scintillation systems.
). 9. Chart or procedure listing any Emergency Action Level (EAL) value associated with installed or portable radiation monitoring instrument indication(s).
: 8. Documentation for the radioactive sources used to calibrate the monitors requested for item 8 above showing traceability to a national standard (NIST).
: 9. Chart or procedure listing any Emergency Action Level (EAL) value associated with installed or portable radiation monitoring instrument indication(s).
: 10. Latest system health report for the Radiation Monitoring system.
: 10. Latest system health report for the Radiation Monitoring system.
: 11. Copies of all audits, self
: 11. Copies of all audits, self-assessments, and/or reviews of area and personnel monitoring equipment and portable radiation survey instruments generated since May 1, 2017. The records should include any reviews conducted of vendor facilities, e.g., outside calibration laboratories, as applicable.
-assessments, and/or reviews of area and personnel monitoring equipment and portable radiation survey instruments generated since May 1, 2017. The records should include any reviews conducted of vendor facilities, e.g., outside calibration laboratories, as applicable.
: 12. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, related to portable instruments, area monitors, CAMs, WBCs, and count room instruments. [This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]
: 12. List of C AP documents (e.g. NCRs, CRs, etc.)
71151 - Performance Indicator (PI) Verification
generated since May 1, 2017, related to portable instruments, area monitors, CAMs, WBCs, and count room instruments. [This should be a list of corrective action documents containing an AR or CR number s and brief description, not full NCRs
.] 71151 - Performance Indicator (PI) Verification
: 1. Site procedures/manuals for gathering and reporting PI data.
: 1. Site procedures/manuals for gathering and reporting PI data.
: 2. Monthly/Quarterly PI reports since May 1, 2017, and copies of associated corrective action reports for any RETS/ODCM Radiological Effluent occurrences.
: 2. Monthly/Quarterly PI reports since May 1, 2017, and copies of associated corrective action reports for any RETS/ODCM Radiological Effluent occurrences.
: 3. End of calendar year (CY) 201 7 liquid and gaseous effluent release permits which Enclosure specify the monthly, quarterly, and annual curies released by isotope, and associated public dose assessments.
: 3. End of calendar year (CY) 2017 liquid and gaseous effluent release permits which Enclosure
 
specify the monthly, quarterly, and annual curies released by isotope, and associated public dose assessments.
: 4. List of all corrective action documents since May 1, 2017, using keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked door, etc.
: 4. List of all corrective action documents since May 1, 2017, using keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked door, etc.
: 5. List of all electronic dosimeter (ED) dose rate alarms and ED dose alarms since May 1, 201 7 which includes dose or dose rate alarm received, and the alarm setpoint(s)
: 5. List of all electronic dosimeter (ED) dose rate alarms and ED dose alarms since May 1, 2017 which includes dose or dose rate alarm received, and the alarm setpoint(s).
. 6. List of all C AP documents (e.g. NCRs, CRs, etc.) generated since May 1, 201 7, using keywords abnormal/ unmonitored effluent release, etc
: 6. List of all CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, using keywords abnormal/ unmonitored effluent release, etc. [This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]
. [This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs
Assistance Requested During Onsite Inspection
.] Assistance Requested During Onsite Inspection Identification of work activities available during the inspection for inspector observations, including notification of pre
* Identification of work activities available during the inspection for inspector observations, including notification of pre-job briefings, notification of diving activities, audio/visual surveillance for remote job coverage.
-job briefings, notification of diving activities, audio/visual surveillance for remote job coverage.
* HP assistance in plant walkdowns assessing access controls (e.g., verifying the posting and locking of entrances to HRAs and VHRAs, and SFP controls).
HP assistance in plant walkdowns assessing access controls (e.g., verifying the posting and locking of entrances to HRA s and VHRA s, and SFP controls). H P assistance in plant walkdowns/job coverage of ongoing activities to assess access controls. Discussions with appropriate individuals regarding access controls Assistance with observations of source checks and full calibrations for selected portable and fixed radiation monitoring equipment.
* HP assistance in plant walkdowns/job coverage of ongoing activities to assess access controls.
Assistance with observations of maintenance activities for selected SCBAs
* Discussions with appropriate individuals regarding access controls
. Assistance with observations of ALARA committee meetings scheduled during the inspection weeks
* Assistance with observations of source checks and full calibrations for selected portable and fixed radiation monitoring equipment.
. Inspector Contact Information
* Assistance with observations of maintenance activities for selected SCBAs.
: Mailing Address
* Assistance with observations of ALARA committee meetings scheduled during the inspection weeks.
: Wade Loo     U.S. Nuclear Regulatory Commission Sr. Health Physicist Region II US NRC Region II ATTN: Mr. Wade Loo 404-997-4727     245 Peachtree Center Ave., NE Wade.Loo@nrc.gov Suite 1200 Atlanta, GA 30303 1 Egelstad, Donna From: Loo, Wade Sent: Thursday, August 23, 2018 2:42 PM To: REESE, SUSAN B; STEWART, TRACEY
Inspector Contact Information:                 Mailing Address:
Wade Loo                                       U.S. Nuclear Regulatory Commission Sr. Health Physicist                           Region II US NRC Region II                               ATTN: Mr. Wade Loo 404-997-4727                                   245 Peachtree Center Ave., NE Wade.Loo@nrc.gov                               Suite 1200 Atlanta, GA 30303 Enclosure
 
Egelstad, Donna From:                             Loo, Wade Sent:                             Thursday, August 23, 2018 2:42 PM To:                               REESE, SUSAN B; STEWART, TRACEY


==Subject:==
==Subject:==
Initial Information Request for Upcoming NRC RP Inspection at V C Summer 2018 004 Attachments:
Initial Information Request for Upcoming NRC RP Inspection at V C Summer 2018 004 Attachments:                     Summer Information Request Email EB3 RP 2018 004.pdf Please find attached the Initial Information Request for the upcoming Radiation Safety Baseline Inspection scheduled for the weeks of October 22 - 26 and November 5 - 9, 2018. Any questions regarding this please let me know. Thanks.
Summer Information Reques t Email EB3 RP 2018 004.pdfPlease find attached the Initial Information Request for the upcoming Radiation Safety Baseline Inspection scheduled for the weeks of October 22 - 26 and November 5 - 9, 2018. Any questions regarding this please let me know. Thanks.  
Wade T. Loo Senior Health Physicist U. S. Nuclear Regulatory Commission Region II Engineering Branch 3 Division of Reactor Safety 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 (404) 997-4727 (404) 997-4907 (fax)
 
Wade.Loo@NRC.GOV 1}}
Wade T. Loo Senior Health Physicist  
 
U. S. Nuclear Regulatory Commission  
 
Region II Engineering Branch 3 Division of Reactor Safety  
 
245 Peachtree Center Avenue, NE  
 
Suite 1200  
 
Atlanta, GA 30303-1257 (404) 997-4727 (404) 997-4907 (fax)
Wade.Loo@NRC.GOV}}

Latest revision as of 15:52, 20 October 2019

VC Summer Emailed Information Request EB3 RP 2018004
ML18240A212
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/27/2018
From:
Division of Reactor Safety II
To:
References
Download: ML18240A212 (8)


Text

ML18240A212 V.C. Summer Nuclear Station Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018004 During the weeks of October 22 - 26 and November 5 - 9, 2018, the NRC will perform a baseline Radiation Safety Inspection at Summer Nuclear Station (NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05, and Radiation Safety Sections of 71151).

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than October 5, 2018.

If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade Loo at 404-997-4727, or the Engineering Branch 3 Chief, Brian Bonser at 404-997-4653.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/

adams.html.

PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Enclosure

Document Request List Occupational Radiation Safety Cornerstone Inspection Dates: October 22 - 26 and November 5 - 9, 2018 Documents Due by: October 5, 2018 Licensee: Summer Nuclear Station Docket Number: 05000395 Inspection Procedures (IPs): 71124.01 - Radiological Hazard Assessment and Exposure Controls 71124.02 - Occupational ALARA Planning and Controls 71124.03 - In-Plant Airborne Radioactivity Control and Mitigation 71124.04 - Occupational Dose Assessment 71124.05 - Radiation Monitoring Instrumentation 71151 - Performance Indicator Verification Lead Inspector: Wade Loo Sr. Health Physicist US NRC Region II 404-997-4727 Wade.Loo@nrc.gov Note: The current version of these documents is expected unless specified otherwise.

Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.

Documentation for these inspection procedures, are requested from October 1, 2016, to present, unless otherwise specified. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.

Miscellaneous:

1. List of primary site contact(s) for each inspection area including names and telephone numbers.
2. List of radiation protection procedures, including title and number.
3. Plant Management, Radiation Protection, and Chemistry organizational charts w/contact numbers. Outage schedule, including work activities to be conducted during the weeks of the inspection.
4. Most recent DAW 10 CFR Part 61 analytical results.
5. Independent Spent Fuel Storage Installation (ISFSI) information to include surveys, exposure data, and as low as reasonably achievable (ALARA) planning and reviews Enclosure

conducted for the last two moves, as well as last two routine surveys of the facility and Thermoluminescent Dosimeter (TLD) area monitoring results of the facility.

6. Corrective Action Program procedure(s).
7. Audits and self-assessments performed since May 1, 2017, that encompass the areas of (1) HP controls, (2) the ALARA program and implementation, (3) respiratory protection, (4) airborne radioactivity, monitoring and/or mitigation-engineering controls, (5) dose assessment, and (6) radiological monitoring instrumentation (portable, installed, and counting room instruments).

71124.01 - Radiological Hazard Assessment and Exposure Controls:

1. List of active Radiation Work Permits (RWPs), including planned and contingency outage RWPs, with their administrative limits, electronic dosimeter dose rate limit, and dose limit.
2. Timeline of major outage activities (e.g., Gantt chart or similar list).
3. Procedures related to health physics (HP) controls (e.g., Posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/locked high radiation area (LHRA)/very high radiation area (VHRA) control, key control, control of divers, special controls during fuel offload, hot spots).
4. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm followup).
5. List of National Source Tracking System (NSTS) sources, change-of-ownership and copies of transactions since May 1, 2017.
6. Documentation of annual NSTS sources inventory reconciliation for 2017.
7. Most recent survey of all LHRAs and VHRAs, as applicable.
8. Most recent radioactive materials (RAM) sealed source inventory record.
9. List of all non-fuel items stored in spent fuel pool (SFP).
10. List of Corrective Action Program (CAP) documents related to HP controls where the cause was listed as human performance (e.g., radworker error, HP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems) issued since May 1, 2017.

[This should be a list of corrective action documents containing an Action Request (AR) or Condition Report (CR) numbers and brief description, not full Nonconformance Reports (NCRs).]

11 All self-assessments and audits covering HP controls since May 1, 2017.

12. All CAP documents related to NSTS sources since May 1, 2017.

71124.02 - ALARA Planning and Controls

1. Site and corporate procedures associated with maintaining site dose ALARA, including those involving ALARA work activities. These procedures should include:
  • ALARA program implementation, including ALARA committee activities and ALARA planning, briefing, and reviews
  • Radiation work permit preparation and worker compliance
  • Processes used to estimate and track work activity specific exposures
  • Making changes to dose estimates during task performance
  • Work controls
  • Engineering controls
  • Exposure mitigation requirements.
2. List of top five dose jobs for the upcoming refueling outage and ALARA planning packages (including dose estimates, work-hour estimates, special HP controls, and dose Enclosure

reduction initiatives).

3. Most recent annual ALARA report and most recent refueling outage report.
4. Annual ALARA goals for 2017 and 2018, and the methodology utilized to make the projections.
5. ALARA Committee activity summaries (e.g. meeting minutes) discussing and approval of activities associated with the upcoming refueling outage.
6. Outline of the source term reduction strategy. Information should include:
  • Historic trends and current status of plant source term
  • Factors that affect the source term
  • Activities employed to reduce the source term
  • Specific sources identified for reduction actions
  • Source term reduction evaluation
  • Results achieved since May 1, 2017.
7. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, related to the ALARA program, including the following:
  • Post-job review identified problems
  • Radiation worker practices
  • Occurrences where the collective exposure was greater than intended dose determined to be ALARA for the individual work activities

[This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]

8. Available for onsite review during the inspection:
  • ALARA planning packages for jobs to be performed during the outage
  • Temporary shielding requests generated for the outage
  • Completed ALARA packages (including post-job reviews) for the five (5) work activities that were completed during the last outage that had the greatest collective dose, and/or presented significant radiological risk.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

1. Site and corporate procedures/manuals associated with airborne radiation monitoring instrumentation and respiratory protection. Procedures/manuals should include:
  • Operation, calibration, and maintenance of air sampling instrumentation, including set-point determination (e.g., low-vols, high vols, goosenecks, AMS 4s, etc.)
  • Actions to be taken when air sampling instrumentation is found to be significantly out of tolerance/calibration
  • Issuance and use of respiratory protective equipment (emphasis on SCBA and air-supplied equipment)
  • Total Effective Dose Equivalent-ALARA evaluation guidance
  • Training, including fit-testing, for use of SCBA and supplied-air systems
  • SCBA maintenance activities, including vital components (i.e. regulators)
  • Determination/verification of Grade D air for SCBA.
2. Two most recent HEPA filter DOP and charcoal test results for the Main Control Room ventilation system.
3. Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and SCBA bottles (air compressors and bottled breathing air) since May 1, 2017.
4. Documentation for last two surveillances performed on SCBA stored for emergency use.
5. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017 involving Enclosure

radiation monitoring and protective equipment deficiencies, including the following:

  • Continuous air monitors
  • Respiratory protection equipment and program implementation

[This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]

6. Available for onsite review by inspector during inspection:
  • Inventory, inspection, and maintenance records for SCBA equipment
  • Training records, including fit-testing, for SCBA-qualified individuals
i. List of all licensed operators qualified to use SCBA ii. List of all instrumentation and control personnel qualified to use SCBA iii. List of all HP personnel qualified to use SCBA
  • Training records/certification for individuals qualified to perform maintenance on vital components (e.g. regulators) on SCBA.

71124.04: Occupational Dose Assessment

1. Site and corporate Procedures/Guidance Documents for external dose monitoring, i.e.

dosimetry issuance and use. The documents should include:

  • Guidance for multi-badging; monitoring in steep/highly variable dose rate gradients
  • Personnel contamination events; storage/care of personal dosimeters; use of electronic dosimeters including evaluation of any biases identified relative to TLD monitoring
  • Internal dose assessment, i.e., both in vivo and in vitro bioassay and air sampling capabilities. The documents should include guidance for calibration/QC and use of whole body counter (WBC); release of contaminated individuals, use of passive monitoring as screening method for evaluations, and special in vitro sample collection and analysis, and actions for declared pregnant workers.
2. NVLAP accreditation documentation for current dosimetry used by the site.
3. List of all positive whole body count (WBC), in vitro, or air sampling analyses which resulted in an assigned CEDE equal to, or exceeding, 10 millirem since May 1, 2017.

[Note: only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].

4. List of all personnel contamination events, dispersed contamination/discrete particles, identified since May 1, 2017. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
5. Copies of all audits, self-assessments, and/or reviews related to internal or external dosimetry issues generated since May 1, 2017. The documents provided should include any reviews/evaluations conducted of vendor facilities, e.g., corporate or outside vendor/

or corporate calibration facilities.

6. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, for internal or external dosimetry issues/events. [This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]

71124.05 - Radiation Monitoring Instrumentation

1. Procedures/Guidance Documents for:
  • use of portable instrument calibrators (e.g. Shepherd calibrator)
  • calibration and functional test/source checks of portable radiation detection instrumentation Enclosure
  • calibration and functional tests of small article monitor (SAM), personnel contamination monitor (PCM), portal monitor (PM), whole body counting (WBC) equipment; and continuous air monitors (CAMs)
  • determination of set-points for Area Radiation Monitor (ARM), CAM, PCM, PM and SAM equipment
  • collection and analysis of high-range, post- accident effluent samples
  • QA program for count room instruments (e.g. laboratory inter-comparison data).
2. The last two calibration records for the following monitors:
  • RM-G6: Reactor Building Refueling Bridge Area Radiation Monitor
  • RM-G7: Reactor Building High Range Area Radiation Monitor
  • RM-G10: Auxiliary Building Waste Gas Decay Tank Area Radiation Monitor
  • RM-G12: Auxiliary Building Waste Holdup Tank Area Radiation Monitor
  • RM-G18: Reactor Building High Range Area Radiation Monitor
  • Documentation for the radioactive sources used to calibrate the instruments in item 2 above, including paperwork showing traceability to a National Institute of Standards

& Technology standard and/or traceability to the primary calibration, as applicable.

3. The last two surveillances performed on the Post-accident Sampling System, as applicable if it is still required in the plant technical specifications.
4. The last two test records of the instrument calibrator (Shepherd validation testing/dose rate curves).
5. The last two records of calibration for the whole body counter (WBC).
6. List of the portable instruments currently in service and available for use. Several will be selected for on-site review of the calibration records.
7. List of the following radiation monitors currently in service. Several will be selected for on-site review of the calibration records.
  • Whole Body Contamination Monitors at RCA exit point
  • Countroom High-purity Germanium and liquid scintillation systems.
8. Documentation for the radioactive sources used to calibrate the monitors requested for item 8 above showing traceability to a national standard (NIST).
9. Chart or procedure listing any Emergency Action Level (EAL) value associated with installed or portable radiation monitoring instrument indication(s).
10. Latest system health report for the Radiation Monitoring system.
11. Copies of all audits, self-assessments, and/or reviews of area and personnel monitoring equipment and portable radiation survey instruments generated since May 1, 2017. The records should include any reviews conducted of vendor facilities, e.g., outside calibration laboratories, as applicable.
12. List of CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, related to portable instruments, area monitors, CAMs, WBCs, and count room instruments. [This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]

71151 - Performance Indicator (PI) Verification

1. Site procedures/manuals for gathering and reporting PI data.
2. Monthly/Quarterly PI reports since May 1, 2017, and copies of associated corrective action reports for any RETS/ODCM Radiological Effluent occurrences.
3. End of calendar year (CY) 2017 liquid and gaseous effluent release permits which Enclosure

specify the monthly, quarterly, and annual curies released by isotope, and associated public dose assessments.

4. List of all corrective action documents since May 1, 2017, using keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked door, etc.
5. List of all electronic dosimeter (ED) dose rate alarms and ED dose alarms since May 1, 2017 which includes dose or dose rate alarm received, and the alarm setpoint(s).
6. List of all CAP documents (e.g. NCRs, CRs, etc.) generated since May 1, 2017, using keywords abnormal/ unmonitored effluent release, etc. [This should be a list of corrective action documents containing an AR or CR numbers and brief description, not full NCRs.]

Assistance Requested During Onsite Inspection

  • Identification of work activities available during the inspection for inspector observations, including notification of pre-job briefings, notification of diving activities, audio/visual surveillance for remote job coverage.
  • HP assistance in plant walkdowns assessing access controls (e.g., verifying the posting and locking of entrances to HRAs and VHRAs, and SFP controls).
  • HP assistance in plant walkdowns/job coverage of ongoing activities to assess access controls.
  • Discussions with appropriate individuals regarding access controls
  • Assistance with observations of source checks and full calibrations for selected portable and fixed radiation monitoring equipment.
  • Assistance with observations of maintenance activities for selected SCBAs.
  • Assistance with observations of ALARA committee meetings scheduled during the inspection weeks.

Inspector Contact Information: Mailing Address:

Wade Loo U.S. Nuclear Regulatory Commission Sr. Health Physicist Region II US NRC Region II ATTN: Mr. Wade Loo 404-997-4727 245 Peachtree Center Ave., NE Wade.Loo@nrc.gov Suite 1200 Atlanta, GA 30303 Enclosure

Egelstad, Donna From: Loo, Wade Sent: Thursday, August 23, 2018 2:42 PM To: REESE, SUSAN B; STEWART, TRACEY

Subject:

Initial Information Request for Upcoming NRC RP Inspection at V C Summer 2018 004 Attachments: Summer Information Request Email EB3 RP 2018 004.pdf Please find attached the Initial Information Request for the upcoming Radiation Safety Baseline Inspection scheduled for the weeks of October 22 - 26 and November 5 - 9, 2018. Any questions regarding this please let me know. Thanks.