ML060950290: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/22/2006
| issue date = 03/22/2006
| title = 2006/03/22-GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP)
| title = 2006/03/22-GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP)
| author name = Morgan M J
| author name = Morgan M
| author affiliation = NRC/NRR/ADRO/DLR/RLRC
| author affiliation = NRC/NRR/ADRO/DLR/RLRC
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000271
| docket = 05000271
| license number =  
| license number =  
| contact person = morgan M J NRR/NRC/DLR/RLRC, 415-2232
| contact person = morgan M NRR/NRC/DLR/RLRC, 415-2232
| case reference number = %dam200611, TAC MC9668
| case reference number = %dam200611, TAC MC9668
| package number = ML060950189
| package number = ML060950189

Revision as of 21:41, 13 July 2019

2006/03/22-GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP)
ML060950290
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/22/2006
From: Morgan M
NRC/NRR/ADRO/DLR/RLRC
To:
Office of Nuclear Reactor Regulation
morgan M NRR/NRC/DLR/RLRC, 415-2232
Shared Package
ML060950189 List: ... further results
References
%dam200611, TAC MC9668
Download: ML060950290 (6)


Text

XI.M5 BWR Feedwater Nozzle 1 AUDIT W ORKSHEET GALL R EPORT AMP PLANT: ______________________________

LRA AMP: __________________________

R EVIEWER: ______________________

GALL AMP: XI.M5, BWR Feedwater Nozzle DATE: __________________________

Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. This program includes (a) enhanced inservice inspection (ISI) in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Code,Section XI, Subsection IWB, Table IWB 2500-1 (2001 edition including the 2002 and 2003 Addenda) and the recommendation of General Electric (GE) NE-523-A71-0594, and Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: " B. (b) system modifications to mitigate cracking. The program specifies periodic ultrasonic inspection of critical regions of the boiling water reactor (BWR) feedwater nozzle. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 1. Scope of Program A. The program includes enhanced ISI to monitor the effects of cracking on the intended function of the component, and Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: " B. systems modifications to mitigate cracking. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M5 BWR Feedwater Nozzle 2 Program Element Auditable GALL Criteria Documentation of Audit Finding 2. Preventive Actions A. Mitigation occurs by systems modifications, such as removal of stainless steel cladding and installation of improved spargers. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: " B. Mitigation is also accomplished by changes to plant-operating procedures, such as improved feedwater control and rerouting of the reactor water cleanup system, to decrease the magnitude and frequency of temperature fluctuations. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 3. Parameters Monitored/ Inspected A. The aging management program (AMP) monitors the effects of cracking on the intended function of the component by detection and sizing of cracks by ISI in accordance with ASME Section XI, Subsection IWB and the recommendation of GE NE-523-A71-0594. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 4. Detection of Aging Effects A. The extent and schedule of the inspection prescribed by the program are designed to ensure that aging effects will be discovered and repaired before the loss of intended function of the component. Inspection can reveal cracking. GE NE-523-A71-0594 specifies ultrasonic testing (UT) of specific regions of the blend radius and bore. The UT examination techniques and personnel qualifications are in accordance with the guidelines of GE NE-523-A71-0594. Based on the inspection method and techniques and plant-specific fracture mechanics assessments, the inspection schedule is in accordance with Table 6-1 of GE NE-523-A71-0594. Leakage monitoring may be used to modify the inspection interval. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 5. Monitoring and Trending A. Inspections scheduled in accordance with GE NE-523-A71-0594 provide timely detection of cracks. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

XI.M5 BWR Feedwater Nozzle 3 Program Element Auditable GALL Criteria Documentation of Audit Finding Comment: 6. Acceptance Criteria A. Any cracking is evaluated in accordance with IWB-3100 by comparing inspection results with the acceptance standards of IWB-3400 and IWB-3500. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 7. Corrective Actions A. Repair is performed in conformance with IWB-4000 and replacement in accordance with IWB-7000. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 8.

Confirmation Process A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 9. Administrative Controls A. See Item 8, above. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment: 10. Operating Experience A. Cracking has occurred in several BWR plants (NUREG-0619, NRC Generic Letter 81-11). This AMP has been implemented for nearly 25 years and has been found to be effective in managing the effect of cracking on the intended function of feedwater nozzles. Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M5 BWR Feedwater Nozzle 4 EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -

ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -

DOCUMENT REVIEWED D URING A UDIT Document Number Identifier (number) Title Revision and/or Date 1. 2. 3. 4. -.