ML17056B310: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 3: | Line 3: | ||
| issue date = 09/30/1989 | | issue date = 09/30/1989 | ||
| title = Revised Monthly Operating Rept for Sept 1989 for Nine Mile Point Nuclear Station Unit 1 | | title = Revised Monthly Operating Rept for Sept 1989 for Nine Mile Point Nuclear Station Unit 1 | ||
| author name = | | author name = Dahlberg K | ||
| author affiliation = NIAGARA MOHAWK POWER CORP. | | author affiliation = NIAGARA MOHAWK POWER CORP. | ||
| addressee name = | | addressee name = | ||
Revision as of 16:30, 19 June 2019
| ML17056B310 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/30/1989 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200122 | |
| Download: ML17056B310 (2) | |
Text
OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
(315)349-2443 1.Unit Name: Nine Mile Poiat Unit//'I 2.Reporting Period: 9/1/89 through 9/30/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reportiag Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Eaergy Geaerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anua 22 1 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each): 88.6,551.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 175,680.2 115,234.3 1,204.2 1+,117.2 20.4 188~473~132 0 62,473,070.0 60,524,382.0 63.8 63.8 56.5 55.5 22.4 26.Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRIClTY COMMERCIAL OPERATION'102200122'10207.
1 PDR ADOCK 05000220 R--PDR