{{#Wiki_filter:PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued) | {{#Wiki_filter:PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued) | ||
: b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary is greater than psig. The provisions of Specification 4.0.4 are not applicableX A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ---- | : b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary is greater than psig. The provisions of Specification 4.0.4 are not applicableX A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ---- | ||
9409270338 940920 PDR ADDCK 05000272 P PDR SALEM -UNIT 1 , ' 3/4 7-6 Amendment No. 153 | 9409270338 940920 PDR ADDCK 05000272 P PDR SALEM -UNIT 1 , ' 3/4 7-6 Amendment No. 153 | ||
* INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig. | * INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig. | ||
* PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) | * PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) | ||
: b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow. | : b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow. | ||
that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J? | that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J? | ||
1 Y pressure is greater than ?S.9-psig. | 1 Y pressure is greater than ?S.9-psig. | ||
The provisions Specification | The provisions Specification | ||
: 4. O. 4 are not applicable)< | : 4. O. 4 are not applicable)< | ||
::I't-J s-t<. -r A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ,' SALEM -UNIT 2 3/4 7-6 Amendment No. 134 INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.}} | ::I't-J s-t<. -r A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ,' SALEM -UNIT 2 3/4 7-6 Amendment No. 134 INSERT A ... provided the surveillance is performed within 24 hours after secondary side pressure is greater than 680 psig.}} |
Revision as of 15:26, 25 April 2019
ML18101A238 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 09/20/1994 |
From: | Public Service Enterprise Group |
To: | |
Shared Package | |
ML18101A237 | List: |
References | |
NUDOCS 9409270338 | |
Download: ML18101A238 (4) | |
Text
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (continued)
- b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow. Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary is greater than psig. The provisions of Specification 4.0.4 are not applicableX A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ----
9409270338 940920 PDR ADDCK 05000272 P PDR SALEM -UNIT 1 , ' 3/4 7-6 Amendment No. 153
- INSERT A ... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.
- PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- b. At least once per 92 days on a STAGGERED TEST BASIS by: 1. 2. Verifying that each motor-driven pump develops a discharge pressure of greater than or equal to 1275 psig on recirculation flow.
that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1500 psig on recirculation flow when the secondary steam iJ'!J£3;J?
1 Y pressure is greater than ?S.9-psig.
The provisions Specification
- 4. O. 4 are not applicable)<
- I't-J s-t<. -r A c. At least once per 18 months during shutdown by: 1. Verifying that each automatic valve in the motor driven pump flow path actuates to its correct position on a pump discharge pressure test signal. 2. Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of each auxiliary feedwater actuation test signal. ,' SALEM -UNIT 2 3/4 7-6 Amendment No. 134 INSERT A ... provided the surveillance is performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after secondary side pressure is greater than 680 psig.