{{#Wiki_filter:}} | {{#Wiki_filter:August 31, 2007 Mr. Barry S. Allen Site Vice President | ||
FirstEnergy Nuclear Operating Company | |||
Perry Nuclear Power Plant | |||
P. O. Box 97, 10 Center Road, A-PY-290 | |||
Perry, OH 44081-0097 | |||
==SUBJECT:== | |||
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - | |||
PERRY NUCLEAR POWER PLANT, UNIT 1 | |||
==Dear Mr. Allen:== | |||
On August 14, 2007, the NRC staff completed its performance review of Perry for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The | |||
purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | |||
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will | |||
include the security cornerstone review and resultant inspection plan. | |||
On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that | |||
all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone | |||
column of the NRC's Action Matrix. Therefore, effective the second quarter 2007, the Perry | |||
plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the | |||
Regulatory Response column, based on the White Emergency AC Power System mitigating | |||
systems performance index from January 2007. | |||
Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs | |||
in a Strategic Performance Area," during the week of August 20 to assess the root cause | |||
analysis and implementation of corrective actions for the performance index. The results will be documented in a report within 30 days of the end of the supplemental inspection. | |||
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any | |||
scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. | |||
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection scheduled for April 2008. The | |||
inspections scheduled within the last nine months of the inspection plan are tentative and may | |||
be revised at the end-of-cycle review. | |||
B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC | |||
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise | |||
the inspection plan, we will contact you to discuss the change as soon as possible. Please | |||
contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this | |||
letter or the inspection plan. | |||
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58 | |||
==Enclosure:== | |||
Perry Inspection/Activity Plan DISTRIBUTION See next page B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC | |||
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise | |||
the inspection plan, we will contact you to discuss the change as soon as possible. Please | |||
contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this | |||
letter or the inspection plan. | |||
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58 | |||
==Enclosure:== | |||
Perry Inspection/Activity Plan DISTRIBUTION See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Perry\Perry MOC 2007 letter.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEGWright:dtpBBurgessAHsia for CPederson JCaldwellDATE08/21/0708/21/0708/28/0708/29/07 OFFICIAL RECORD COPY Letter to B. Allen from J. Caldwell dated August 31, 2007 | |||
==SUBJECT:== | |||
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - | |||
PERRY NUCLEAR POWER PLANT, UNIT 1cc w/encl:J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and | |||
Chief Operating Officer - FENOC | |||
D. Pace, Senior Vice President, Fleet Engineering - FENOC | |||
J. Rinckel, Vice President, Fleet Oversight - FENOC | |||
R. Anderson, Vice President, Nuclear Support - FENOC | |||
Director, Fleet Regulatory Affairs - FENOC | |||
Manager, Fleet Licensing - FENOC | |||
Manager, Site Regulatory Compliance - FENOC | |||
D. Jenkins, Attorney, FirstEnergy Corp. | |||
Public Utilities Commission of Ohio | |||
Ohio State Liaison Officer | |||
R. Owen, Ohio Department of Health | |||
President, Geauga County Board | |||
Director, Department of Emergency Services | |||
Geauga County Sheriff | |||
President, Ashtabula County Board of Commissioners | |||
Ashtabula County Sheriff | |||
Director, Ashtabula County Emergency | |||
Management Agency | |||
Mayor, Village of Genoa | |||
Genoa Village Administrator | |||
President, Lake County Board of Commissioners | |||
Lake County Sheriff | |||
Painesville City Manager | |||
Lake County Administrator | |||
Director, Lake County Emergency Management Agency | |||
President, Village of Fairport Harbor | |||
Mayor, City of Eastlake | |||
Mayor, City of Wickliffe | |||
President, Geneva City Council | |||
City Manager, Geneva | |||
Mayor, City of Kirtland | |||
Mayor, City of Mentor | |||
City Manager, Mentor | |||
Mayor, City of Mentor on the Lake | |||
Administrative Director | |||
Mayor, City of Willoughby Hills | |||
Mayor, City of Willoughby | |||
Mayor, City of Willowick | |||
Mayor, Village of Madison | |||
Village Administrator, Village of Madison | |||
Chairman, Board of Madison Township Trustees | |||
Mayor, Village of Kirtland Hills | |||
Mayor, Village of Geneva-on-the-Lake | |||
Mayor, Lakeline Village | |||
Mayor, Village of Timberlake | |||
Mayor, Village of Grand River | |||
INPO Letter to B. Allen from J. Caldwell dated August 31, 2007 | |||
==SUBJECT:== | |||
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - | |||
PERRY NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION | |||
: RAG1 TJW2 TEB RidsNrrDirslpab | |||
JLC1 MAS KGO RML2 SAM9 SRI Perry | |||
DRPIII DRSIII PLB1 TXN Perry Inspection / Activity Plan 09/01/2007 | |||
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/28/2007 Report 22 2 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP. | |||
Baseline Inspections 08/27/2007 09/14/2007 1 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/27/2007 09/14/2007 1 7111117B IP Permanent Plant Modifications 1 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections 10/16/2007 10/20/2007 1 7111402 IP A lert and Notification System Testing Baseline Inspections 10/16/2007 10/20/2007 1 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/16/2007 10/20/2007 1 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP03 IP A lert & Notification System 1 95003-INDEPENDENT CAP FOLLOW UP Supplemental Progra m 10/01/2007 11/30/2007 1 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 2 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1 7112102 IP A LARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/22/2007 10/26/2007 1 71151-PR01 IP RETS/ODCM Radiological Effluent 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/10/2007 12/14/2007 1 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 RPV HEAD-RPV HEAD DROP ANALYSIS INSPECTION Baseline Inspections 01/07/2008 02/15/2008 1 7111120 IP Refueling and Other Outage Activities 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 1 71151-PR01 IP RETS/ODCM Radiological Effluent 5 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/14/2008 05/16/2008 1 7111121 IP Component Design Bases Inspection 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/08/2008 09/12/2008 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/08/2008 09/12/2008 1 71151-OR01 IP Occupational Exposure Control Effectiveness 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 10/06/2008 10/10/2008 1 7111401 IP Exercise Evaluation Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Perry Inspection / Activity Plan 09/01/2007 | |||
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/28/2007 Report 22 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/13/2008 10/17/2008 1 7112102 IP A LARA Planning and Controls Baseline Inspections 10/13/2008 10/17/2008 1 71151-BI01 IP Reactor Coolant System Activity 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/17/2008 11/21/2008 1 7112202 IP Radioactive Material Processing and Transportation 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 12/01/2008 12/05/2008 1 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures.}} |
Revision as of 19:46, 10 November 2018
ML072430076 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 08/31/2007 |
From: | Caldwell J L Region 3 Administrator |
To: | Allen B S FirstEnergy Nuclear Operating Co |
References | |
Download: ML072430076 (7) | |
Text
August 31, 2007 Mr. Barry S. Allen Site Vice President
FirstEnergy Nuclear Operating Company
Perry Nuclear Power Plant
P. O. Box 97, 10 Center Road, A-PY-290
Perry, OH 44081-0097
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PERRY NUCLEAR POWER PLANT, UNIT 1
Dear Mr. Allen:
On August 14, 2007, the NRC staff completed its performance review of Perry for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The
purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will
include the security cornerstone review and resultant inspection plan.
On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that
all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone
column of the NRC's Action Matrix. Therefore, effective the second quarter 2007, the Perry
plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the
Regulatory Response column, based on the White Emergency AC Power System mitigating
systems performance index from January 2007.
Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs
in a Strategic Performance Area," during the week of August 20 to assess the root cause
analysis and implementation of corrective actions for the performance index. The results will be documented in a report within 30 days of the end of the supplemental inspection.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any
scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection scheduled for April 2008. The
inspections scheduled within the last nine months of the inspection plan are tentative and may
be revised at the end-of-cycle review.
B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise
the inspection plan, we will contact you to discuss the change as soon as possible. Please
contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this
letter or the inspection plan.
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58
Enclosure:
Perry Inspection/Activity Plan DISTRIBUTION See next page B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise
the inspection plan, we will contact you to discuss the change as soon as possible. Please
contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this
letter or the inspection plan.
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58
Enclosure:
Perry Inspection/Activity Plan DISTRIBUTION See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Perry\Perry MOC 2007 letter.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEGWright:dtpBBurgessAHsia for CPederson JCaldwellDATE08/21/0708/21/0708/28/0708/29/07 OFFICIAL RECORD COPY Letter to B. Allen from J. Caldwell dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PERRY NUCLEAR POWER PLANT, UNIT 1cc w/encl:J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and
Chief Operating Officer - FENOC
D. Pace, Senior Vice President, Fleet Engineering - FENOC
J. Rinckel, Vice President, Fleet Oversight - FENOC
R. Anderson, Vice President, Nuclear Support - FENOC
Director, Fleet Regulatory Affairs - FENOC
Manager, Fleet Licensing - FENOC
Manager, Site Regulatory Compliance - FENOC
D. Jenkins, Attorney, FirstEnergy Corp.
Public Utilities Commission of Ohio
Ohio State Liaison Officer
R. Owen, Ohio Department of Health
President, Geauga County Board
Director, Department of Emergency Services
Geauga County Sheriff
President, Ashtabula County Board of Commissioners
Ashtabula County Sheriff
Director, Ashtabula County Emergency
Management Agency
Mayor, Village of Genoa
Genoa Village Administrator
President, Lake County Board of Commissioners
Lake County Sheriff
Painesville City Manager
Lake County Administrator
Director, Lake County Emergency Management Agency
President, Village of Fairport Harbor
Mayor, City of Eastlake
Mayor, City of Wickliffe
President, Geneva City Council
City Manager, Geneva
Mayor, City of Kirtland
Mayor, City of Mentor
City Manager, Mentor
Mayor, City of Mentor on the Lake
Administrative Director
Mayor, City of Willoughby Hills
Mayor, City of Willoughby
Mayor, City of Willowick
Mayor, Village of Madison
Village Administrator, Village of Madison
Chairman, Board of Madison Township Trustees
Mayor, Village of Kirtland Hills
Mayor, Village of Geneva-on-the-Lake
Mayor, Lakeline Village
Mayor, Village of Timberlake
Mayor, Village of Grand River
INPO Letter to B. Allen from J. Caldwell dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PERRY NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION
- RAG1 TJW2 TEB RidsNrrDirslpab
JLC1 MAS KGO RML2 SAM9 SRI Perry
DRPIII DRSIII PLB1 TXN Perry Inspection / Activity Plan 09/01/2007
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/28/2007 Report 22 2 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections 08/27/2007 09/14/2007 1 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/27/2007 09/14/2007 1 7111117B IP Permanent Plant Modifications 1 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections 10/16/2007 10/20/2007 1 7111402 IP A lert and Notification System Testing Baseline Inspections 10/16/2007 10/20/2007 1 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/16/2007 10/20/2007 1 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP03 IP A lert & Notification System 1 95003-INDEPENDENT CAP FOLLOW UP Supplemental Progra m 10/01/2007 11/30/2007 1 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 2 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1 7112102 IP A LARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/22/2007 10/26/2007 1 71151-PR01 IP RETS/ODCM Radiological Effluent 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/10/2007 12/14/2007 1 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 RPV HEAD-RPV HEAD DROP ANALYSIS INSPECTION Baseline Inspections 01/07/2008 02/15/2008 1 7111120 IP Refueling and Other Outage Activities 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 1 71151-PR01 IP RETS/ODCM Radiological Effluent 5 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/14/2008 05/16/2008 1 7111121 IP Component Design Bases Inspection 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/08/2008 09/12/2008 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/08/2008 09/12/2008 1 71151-OR01 IP Occupational Exposure Control Effectiveness 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 10/06/2008 10/10/2008 1 7111401 IP Exercise Evaluation Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Perry Inspection / Activity Plan 09/01/2007
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/28/2007 Report 22 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/13/2008 10/17/2008 1 7112102 IP A LARA Planning and Controls Baseline Inspections 10/13/2008 10/17/2008 1 71151-BI01 IP Reactor Coolant System Activity 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/17/2008 11/21/2008 1 7112202 IP Radioactive Material Processing and Transportation 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 12/01/2008 12/05/2008 1 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.