MONTHYEARML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) IR 05000440/20220062023-03-0101 March 2023 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2022006) ML23026A2112023-01-26026 January 2023 Notification of Nrc Baseline Inspection and Request for Information Inspection Report 05000440/2023002 ML22336A1222022-12-0505 December 2022 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000440/2023010 IR 05000440/20220052022-08-26026 August 2022 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2022005) ML22234A1482022-08-22022 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines IR 05000440/20210062022-03-0202 March 2022 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2021006) ML21257A4602021-09-15015 September 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Perry Nuclear Power Plant IR 05000440/20210052021-09-0101 September 2021 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2021005) ML21168A0662021-06-17017 June 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000440/2021010 ML21099A0872021-04-0808 April 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000440/2021012 IR 05000440/20200062021-03-0404 March 2021 Annual Assessment Letter Perry Nuclear Power Plant (Report 05000440/2020006) ML21020A0392021-01-20020 January 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000440/2021010 ML21004A0922021-01-0404 January 2021 Notification of NRC Baseline Inspection and Request for Information, Inspection Report 05000440/2021001 ML20294A0462020-10-19019 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000440/20200052020-09-0101 September 2020 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2020005) IR 05000440/20190062020-03-0303 March 2020 Annual Assessment Letter Perry Nuclear Power Plant (Report 05000440/2019006) IR 05000440/20190052019-08-28028 August 2019 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2019005) ML19205A4252019-07-23023 July 2019 Ltr. 07/23/19 Perry Nuclear Power Plant, Unit 1 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000440/2019004 (DRS-L.Rodriguez) IR 05000440/20180062019-03-0404 March 2019 Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2018006) IR 05000440/20180052018-08-28028 August 2018 Updated Inspection Plan for Perry, Unit 1 (Report 05000440/2018005) IR 05000440/20170062018-03-0202 March 2018 Annual Assessment Letter for Perry Nuclear Power Plant; Report 05000440/2017006 ML18005A6092018-01-0505 January 2018 Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000440/20170072017-12-21021 December 2017 NRC Problem Identification and Resolution Inspection Report 05000440/2017007 IR 05000440/20170052017-08-28028 August 2017 Updated Inspection Plan for Perry Nuclear Plant, Unit 1 (Report 05000440/2017005) IR 05000440/20160062017-03-0101 March 2017 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2016006) IR 05000440/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2016005) ML16237A0812016-08-24024 August 2016 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000440/2016004 IR 05000440/20150062016-03-0202 March 2016 Annual Assessment Letter for Perry, Unit 1 (Inspection Report 05000440/2015006) ML16042A1672016-02-10010 February 2016 Ltr. 02/10/16 Perry Nuclear Power Plant - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection 05000440/2016007 (AAS) IR 05000440/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2015005) ML15204A8292015-07-23023 July 2015 IR 05000440/2015008, 09/21/15, Perry Nuclear Power Plant - Notification of NRC Triennial Fire Protection Baseline ML15062A6042015-03-0404 March 2015 Annual Assessment Letter for Perry Nuclear Power Plant (Report 050003440/2014001) ML14245A3172014-09-0202 September 2014 Mid-Cycle Assessment Letter for Perry Nuclear Power Plant IR 05000440/20130012014-03-0404 March 2014 Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2013001) ML13351A3232013-12-16016 December 2013 CDBI Request for Information ML13246A2372013-09-0303 September 2013 2013 Perry Nuclear Power Plant Mid-Cycle Letter Combined IR 05000440/20120012013-03-0404 March 2013 Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2012001) ML12248A3122012-09-0404 September 2012 Mid-Cycle Assessment Letter for Perry Nuclear Power Plant ML12166A1902012-06-11011 June 2012 Temporary Instruction 2515/177 Inspection Document Request IR 05000220/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000220/2011001 and 05000440/2011001) IR 05000440/20110072012-03-0505 March 2012 Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2011007) IR 05000440/20110062011-09-0101 September 2011 Inspection Plan 05000440-11-006, 9/1/2011 - 12/31/2012, for Perry Nuclear Power Plant ML1106203062011-03-0404 March 2011 EOC Annual Assessment Letter and Inspection/Activity Plan ML1024400842010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Perry Nuclear Power Plant ML1006102812010-03-0303 March 2010 EOC Assessment Letter, Inspection/Activity Plan ML0924404092009-09-0101 September 2009 Perry - Mid-Cycle Performance Review and Inspection Plan IR 05000440/20090012009-03-0404 March 2009 Annual Assessment Letter - Perry Nuclear Plant (050000440/2009001) 2024-01-03
[Table view] Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 September 3, 2013
Mr. Ernest Harkness Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A
-PY-A290 Perry, OH 44081
-0097
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR PERRY NUCLEAR POWER PLANT (REPORT 0500440/2013006
)
Dear Mr. H arkness:
On August 13, 2013, the U.S. Nuclear Regulatory Commission (NR C) completed its mid
-cycle performance review of the Perry Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 12 , through June 30, 20 13. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Perry during the most recent quarter, ending June 30, 2013, was within the Degraded Cornerstone Column (Column 3) of the NRC's Reactor Oversight Process (ROP) Action Matrix because of a low-to-moderate safety significance (i.e., White) held-open inspection finding and Notice of Violation (NOV), a Yellow Occupational Exposure Control Effectiveness PI, and a parallel White PI inspection finding, all of which affected the Occupational Radiation Safety Cornerstone.
Work management performance at Perry has remained steady over the assessment period with some challenges caused by human performance problems. During the refueling outage in March and April 2013, NRC inspectors identified human performance deficiencies, indicatin g that additional effort is needed to engrain expected behaviors when the organization is conducting infrequently performed tasks or schedule pressure exists. Of note were two valve mispositionings that resulted in NRC findings of very low safety significance (Green). The NRC also noted that your staff ma de a conservative decision to shut down the reactor when E. Harkness leakage increased in the drywell after the refueling outage was completed. Several unexpected maintenance issues and equipment repairs arose during th e shutdown and the performance of your staff in addressing those issues was considered good. On August 12, 2013, the NRC issued 95002 Supplemental Inspection Report and Assessment Follow-up Letter (ML13224A382) that closed the held
-open White inspection finding and NOV, and the parallel White PI inspection finding. Also, the Occupational Exposure Control Effectiveness PI returned from Yellow to Green in the second quarter of 2013. As a result, the NRC assessed the performance at Perry to be in the Licensee Response Column (Column 1) of the ROP Action Matrix as of August 12, 2013.
Our August 12, 2013 inspection report discusses that continued management attention and focus is needed to address lower level, less risk significant issues in the radiation protection area, radiological work coordination among all site departments, and continued emphasis that the issues in the radiation protection area are not restricted to the radiation protection department but apply to radiation workers in the other Perry departments. Included in these lower level issues that affect other departments are procedure use and adherence and procedure quality. In a letter dated January 17, 2013, a deviation from the R OP Action Matrix was approved by the Executive Director for Operations. Because of two White inspection findings in the occupational radiation safety area and one o r more Greater
-than-Green inspection findings in the security area, Perry met the criteria for a Repetitive Degraded Cornerstone (Column 4) of the Action Matrix. However, because the performance issues were well understood and appeared limited to occupational radiation safety, the NRC considered the regulatory actions specified for Column 3 were more appropriate tha n those for Column 4.
With satisfactory completion of the inspection procedure 95002 inspection, documented in the August 12, 2013 , inspection report, this deviation is no longer in effect.
Based on this assessment, we plan to conduct ROP baseline inspections at your facility.
However, the radiation protection baseline inspections will focus on those radiation protection issues identified above and the biennial Problem Identification and Resolution team inspection will review your corrective actions for your extent of cause evaluations completed in response to the White findings. The enclosed inspection plan lists the inspections scheduled through December 31, 20 1 4. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence.
E. Harkness In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 , with any questions you may have regarding this letter or the inspection plan.
Sincerely, /RA/
Cynthia D. Pederson Re gional Ad minist r a t o r Docket No. 50
-440 License No. NPF
-58 E nc losu r e: P e rr y N uc l ear P o w er Plant Inspe c t i on/A c t i v i t y Pl a n cc w/enc l: Di s tr i bu t i on v i a L i s t S e r vŽ E. Harkness In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Michael Kunowski, Branch 5 Chief, Division of Reactor Projects, at 630-829-9618 , with any questions you may have regarding this letter or the inspection plan.
Sincerely, /RA/
Cynthia D. Pederson Re gional Ad minist r a t o r Docket No. 50
-440 License No. NPF
-58 E nc losu r e: P e rr y N uc l ear P o w er Plant Inspe c t i on/A c t i v i t y Pl a n cc w/enc l: Di s tr i bu t i on v i a L i s t S e r vŽ DISTRIBUTION
- See next page DOCUMENT NAME: PERRY MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski:sb/rj KO'Brien CPederson DATE 08/29/13 08/29/13 08/29/13 OFFICIAL RECORD COPY
Letter to E. Harkness from C. Pederson dated September 3, 2013
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR PERRY NUCLEAR POWER PLANT (REPORT 0500440/2013006
) DISTRIBUTION
- Vivian Campbell RidsNrrPMPerry Resource RidsNrrDorlLpl3
-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
Page 1 of 2 08/26/2013 07:15:01 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site PerryInspection / Activity Plan 09/01/2013
-12/31/2014 BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION 2 1 IP A lert and Notification System Testing7111402 09/16/2013 09/20/2013 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 09/16/2013 09/20/2013 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 09/16/2013 09/20/2013 1 IP Performance Indicator Verification71151 09/16/2013 09/20/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Environmental Monitoring Program71124.07 09/23/2013 09/27/2013 BI PI&R-BIENNIAL PI&R INSPECTION 5 1 IP Problem Identification and Resolution71152B11/04/201311/22/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 2 1 IP Radiation Monitoring Instrumentation71124.05 10/28/201311/01/2013 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 10/28/201311/01/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/18/201311/22/2013 1 IP Occupational Dose Assessment71124.0411/18/201311/22/2013 1 IPReactor Coolant System Activity71151-BI0111/18/201311/22/2013 1 IPOccupational Exposure Control Effectiveness71151-OR0111/18/201311/22/2013 1 IPRETS/ODCM Radiological Effluent71151-PR0111/18/201311/22/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 01/13/2014 01/17/2014 1 IP Occupational Dose Assessment71124.04 01/13/2014 01/17/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/10/2014 02/14/2014 BI ENG-COMPONENT DESIGN BASIS INSPECTION 6 1 IP Component Design Bases Inspection7111121 03/03/2014 04/04/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiation Monitoring Instrumentation71124.05 05/05/2014 05/09/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Occupational ALARA Planning and Controls71124.02 06/16/2014 06/20/2014 1 IPReactor Coolant System Activity71151-BI01 06/16/2014 06/20/2014 1 IPOccupational Exposure Control Effectiveness71151-OR01 06/16/2014 06/20/2014 1 IPRETS/ODCM Radiological Effluent71151-PR01 06/16/2014 06/20/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/26/2013 07:15:01 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site PerryInspection / Activity Plan 09/01/2013
-12/31/2014 BI EPX-EP EXERCISE INSPECTION / PI VERIFICATION 2 1 IP Performance Indicator Verification71151 09/22/2014 09/26/2014 ISFSI-ISFSI OPERATION AT REACTOR SITE 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 10/01/2014 10/31/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/20/2014 10/24/2014 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 1 IP Licensed Operator Requalification Program7111111B 12/15/2014 12/19/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.