ML17056B314: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 3: Line 3:
| issue date = 05/31/1989
| issue date = 05/31/1989
| title = Revised Monthly Operating Rept for May 1989 for Nine Mile Point Nuclear Station Unit 1
| title = Revised Monthly Operating Rept for May 1989 for Nine Mile Point Nuclear Station Unit 1
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  

Revision as of 16:30, 19 June 2019

Revised Monthly Operating Rept for May 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B314
Person / Time
Site: Nine Mile Point 
Issue date: 05/31/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200129
Download: ML17056B314 (2)


Text

OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:

(315)349-2443 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: 5/1/89 through 5/31/89 3~Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Refuel outa e started on anunr 22 I 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each): 88.3,623.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 172,752.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62)473p070 0 60,524,382.0 64.9 64.9 57.4 56,5 20.8 26.Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved IN1TIAL CR1TICAL1TY INlTIAL ELECTRIC1TY COMMERCIAL OPERATION 9 1 02200 129'50QQ22Q p P10207 pDR" ADOCK PDR R 4 lg Py l